Precedent Study - The New Crematorium, The Woodland Cemetery Precedent Focus - Crematorium/Use of Red Brick Exterior and Concrete Interior Architect - Johan Celsing Arkitektkontor Location - Stockholm, Sweden Year - 2013
Perforations
Desaturated Red Brick
Exposed white concrete has been used for the structure of the building. The aim has been to achieve the robust as well as to give a sense of clemency in the interiors.
Brick has been chosen for façades and roof to bring the small scale to the surfaces as well as for how it relates to the trunks of the surrounding pines.
1. Public Entry 2. Waiting Hall 3. Reception 4. Ceremony Room 5. Furnace Hall 6. Control Room 7. Cold Store 1 8. Cold Store 2 9. Coolers, Accumulators 10. Air Intake 11. Garage 12. Covered Car Entrance 13. Hall for Receiving Coffins 14. Urns 15. Atrium 16. Changing Room 17. Staff Room 18. Manager Office Aerial Perspective
Interior Perspective
Perspective
Ground Floor Plan
52