I am the Principal Designer for this residential project, from Stage 0, including Stage 4 technical design. I have managed client expectations through necessary value engineering and worked closely with the contractor to ensure a high quality finish.
17 20
2870.12
21
- Fold House 21 18 17 6
450
23 42
315
24 22 25 19
46 32 33 34 39
40
I am delighted to have undertaken Stages 0-3 of Fold House, a Paragraph 79 (now 80) house in the greenbelt. The independent Design Review Panel, DesigNE, concluded their report: “the scheme, should it proceed, would be an exemplar to the northeast. Indeed, this project makes the case for Paragraph 79 exemptions.”
This drawing is copyright. It is sent to you in confidence and must not be reproduce parties without our prior permission. Do not scale from this drawing. This drawing is conjunction with all relevant consultants, specialist manufacturers drawings and sp discrepancies in dimensions or details on or between these drawings should be dra dimensions are in millimetres unless noted otherwise. Any surveyed information inc drawing cannot be guaranteed as accurate unless confirmed by fixed dimension. REV:
DESCRIPTION:
BY:
P01
PROPOSED ELEVATION
JA
P02
PROPOSED ELEVATION UPDATED
JA
P03
PROPOSED ELEVATION UPDATED
JA
P04
PROPOSED ELEVATION UPDATED
JA
P05
PROPOSED ELEVATION UPDATED
JA
P06
ALTERNATIVE ANCILLARY ROOF
JA
P07
OVERHANG ADDED
JA
P08
PROPSED ELEVATION UPDATED
JA
P09
DRP 2 UPADTE
JA
P10
DRP 2 UPADTE
JA
P11
LINEWEIGHT AMENDED
JA
LEVEL 01 114680 3000
LEVEL 00 111780 0
PURPOSE: FOR INFORMATION PROJECT:
Fold House
DESCRIPTION: WEST
ELEVATION INCLUDING ANCILLARY
R O O F S T R U C T U R E B EF OR E & A F T ER
C OU R T YA R D C ON T EM POR A RY A D D I T I ON B EF OR E & A F T ER
R O O F S T R U C T U R E B EF OR E & A F T ER
THE
COACH
C OU R T YA R D C ON T EM POR A RY A D D I T I ON B EF OR E & A F T ER 1
2
2200
2200
HOUSE
BEFORE & AFTER BEFORE & AFTER Living
Store/ Studio
Living
Ensuite Ensuite Ensuite
Utilities
Bedroom 2
Utilities
Bedroom 1
Kitchen
Kitchen
Lobby
Lobby
Bedroom 1
Bedroom 3 Lobby
Ensuite
Lobby
Bedroom 3 Ensuite Bedroom 2
Bedroom 1
3
Ensuite
Bedroom 1
3
Ensuite
Lobby
Store
2200
2200
UP Kitchen
Kitchen
Living
Living
Lobby
Lobby
Store
Store
Utilities
Utilities Kitchen
Kitchen
Toilet
4
Toilet
4
Utilities/ Store
2200
2200
Utilities Toilet
Toilet Store
Lift
UP
Lobby
Lobby Lobby
Lobby Living
Ensuite
Ensuite
Ensuite
Bedroom 2 Ensuite
Bedroom 2
Bedroom 1 Services
Living
Bedroom 1
1
2
2200
2200
Heritage / Residential - The Coach House This project brought a new lease of life to a neglected Grade II listed Coach House. I handled the complexities of taking this project on from another architecture firm, and completed Stages 2 and 3, working closely with the Local Authority to create a scheme that was viable for the client, whilst respecting the historic fabric of the building. Howarth Litchfield nominated this project for the Lord Mayor’s Design Award.
This drawing is copyright. It is sent to you in confidence and must not be reproduced or disclosed to third parties without our prior permission. Do not scale from this drawing. This drawing is to be read in conjunction with all relevant consultants, specialist manufacturers drawings and specifications. Any discrepancies in dimensions or details on or between these drawings should be drawn to our attention. All dimensions are in millimetres unless noted otherwise. Any surveyed information incorporated within this drawing cannot be guaranteed as accurate unless confirmed by fixed dimension. REV:
DESCRIPTION:
BY:
CHK:
DATE:
P01 P02 P03 P04
Elevations Vent strategy & mound update. Compound indicated Entrance update Planning Issue
JA srt srt srt
ST ARW ARW NT
2019/08/01 2020/02/12 2020/05/11 2020/12/14
Metal Panelling Louvres "Frameless" Glass Curtain Wall
Education / Leisure
Stone Retaining Walls
- Sports Pavilion
Balustrading on Stone Retaining Walls
Barnard Castle Private School appointed Howarth Litchfield to design a landmark sports pavilion to house a number of functions. Having completed the Stage 3 design and gained planning permission, I am expecting to embark on the Stage 4 design in the coming weeks.
Grass Mounds Recycling & compressor compound
NORTH ELEVATION - PROPOSED 1 : 100
Metal Panelling Louvres "Frameless" Glass Curtain Wall Glass Curtain Wall, Main Entrance Balustrading on Stone Retaining Walls Stone Retaining Walls Grass Mounds
Site DS1 2,800m2
Site DS2 12,000m2
Refurbished Retail 1
Site DS3
- Refurbished Units
- Development Sites PROJECT: PROJECT:
BILLINGHAM TOWN CENTRE BILLINGHAM TOWN CENTRE - OPTION 1
DESCRIPTION: PROPOSED MASTERPLAN DESCRIPTION: PHASING PLAN - OPTION 1 DRAWN CHECKED DRAWN BY: BY: CHECKED BY: BY: SCALE:SCALE:
Liddon House, Belmont Business Park, DH1 1TW. T:Durham (0191) 384 9470 E: hlp@hlpuk.com 16-25 Bastwick Street, London, EC1V 3PS T:(0207) 2518905 E: hlp@hlpuk.com © Copyright and all intellectual property remain vested in Howarth Litchfield Partnership Limited
Liddon House, Belmont Business Park, DH1 1TW. T:Durham (0191) 384 9470 E: hlp@hlpuk.com 16-25 Bastwick Street, London, EC1V 3PS T:(0207) 2518905 E: hlp@hlpuk.com © Copyright and all intellectual property remain vested in Howarth Litchfield Partnership Limited
JA AW
AW JA
NTS NTS
SHEET SIZE: DATE: SHEET SIZE:
A1
A3
DATE:
10/09/2021 10/09/2021
VOLUME PRO. PRO. NO. NO. ORIG ORIG VOLUME LEVEL LEVEL TYPE TYPE ROLE ROLE NUMBERNUMBER STATUS STATUS REV
21006 HL HL02 21006
02 XX
XX DR DR A
A0002 0007S3
S3P04
REV
P03
Masterplanning
This drawing i parties withou conjunction w discrepancies dimensions ar drawing canno
- Billingham Town Centre I have worked with Stockton Town Council on a number of projects. Adjacent is one of the options considered for Billingham Town Centre. I not only designed the proposed modernisation of the town centre, but also planned the logistics of closing and relocating individual retail units.
REV:
DE
P01 P02
Fir Ba
I’ve also created masterplans for Wellington Shopping Centre, Thornaby Park, Norton town centre and Yarm town centre.
PURPOSE:
PROJECT: This drawing is copyright. It is sent to you in confidence and must not be reproduced or d parties without our prior permission. Do not scale from this drawing. This drawing is to be conjunction with all relevant consultants, specialist manufacturers drawings and specifica discrepancies in dimensions or details on or between these drawings should be drawn to DESCRIPTION dimensions are in millimetres unless noted otherwise. Any surveyed information incorpor drawing cannot be guaranteed as accurate unless confirmed by fixed dimension.
REV: P01
Heritage
DESCRIPTION: First Issue
BY:DRAWN BY: CH
JA
JA PRO. NO: N
20092
- St. Peter’s Church, Bywell St. Peter’s Church is a stunning Grade I listed building in the greenbelt. Situated in the Tyne Valley, it is nationally significant due to its Saxon and Norman features.
Liddon House, 16-25 Bastwic www.howarthl
C Copyright
I worked closely with my Interior Design colleagues, creating a subtle, contemporary intervention to facilitate much needed modern amenities for the congregation.
PURPOSE:
Tonn
4 3
Health
2 1
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020
Total CO2 Produced Commuting Other Driving Public Transport Flights Office
Lockdown 1
Lockdown 2
9 8
Tonnes of CO2
7
Staff WC and shower
DESCRIPTION
BY
CHKD
P01
Initial Issue
EB
MS
5
2 1
DATE 25/02/2022
This drawing is copyright. It is sent to you in confidence and must not be reproduced or disclosed to third parties without our prior permission. Do not scale from this drawing. This drawing is to be read in conjunction with all relevant consultants, specialist manufacturers drawings and specifications. Any discrepancies in dimensions or details on or between these drawings should be drawn to our attention. All dimensions are in millimeters unless noted otherwise. Any surveyed information incorporated within this drawing cannot be guaranteed as accurate unless confirmed by fixed dimension. REV
DESCRIPTION
BY
CHKD
P01
Initial Issue
EB
MS
DATE 25/02/2022
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020
Acc. W.C 3.8 m²
Utility Store
Shelf above Desk
Bin
Printer on Desk
Clinical Waste 1.0 m²
Trolley
Virtual Consult 14.0 m²
Consulting 1 14.0 m²
Consulting 8 14.0 m²
Height & Weight
Admin 17.0 m² Records
Weight & Height
Bin
Consulting 7 14.0 m²
Bin
Printer on Desk
Shelf above Desk
Trolley
Kitchen 4.0 m²
PM Office 6.0 m²
GF Circulation 1.0 m²
Reception 11.0 m²
Weight & Height
Printer on Desk
Shelf above Desk Printer on Desk
Store / Records 5.0 m²
Records
Height & Weight
W.C 2.0 m²
Consulting 9
Shelf above Desk
Trolley
Records
Printer on Desk
Waiting 6.0 m²
Shelf above Desk
Consulting 10 14.0 m²
Waiting 1.0 m²
Server 2.0 m²
APPROVAL South Lambeth Road Practice
PURPOSE:
Weight & Height
PURPOSE: PROJECT:
Weight & Height
Weight & Height
Trolley
Stair
Trolley
Trolley Trolley
Bin
Bin
Printer on Desk
DRAWN BY:
SCALE:
SHEET SIZE:
EB
1:100
PRO. NO:
ORIG: VOLUME: LEVEL: TYPE:
19141 HL ZZ
A3
Printer on Desk
ROLE: NUMBER:
00 SK A
Consulting 2 16.0 m²
Consulting 12
Consulting 11
DESCRIPTION: Shelf above Desk
Entrance 4.0 m²
14.0 m² Proposed Ground Floor Plan
Shelf above Desk
DESCRIPTION:
Shelf above Desk
Consulting 6 14.0 m²
Shelf above Desk
Shelf above Desk
Services
Printer on Desk
APPROVAL South Lambeth Road Practice
Trolley
Trolley
Consulting 5 14.0 m²
PROJECT:
Weight & Height
Waiting 6.6 m²
Waiting 1.0 m²
Bin
Weight & Height
Waiting 6 m²
Waiting 1.0 m²
DATE:
Printer on Desk
Printer on Desk
25022022
SUITABILITY: REV:
0035 S2
P01
Liddon House, Belmont Business Park, Durham. DH1 1TW. Tele: (0191) 3849470 E: hlp@hlpuk.com www.howarthlitchfield.com
Bin
Bin
DRAWN BY:
Proposed First Floor Plan SCALE:
SHEET SIZE:
EB
1:100
PRO. NO:
ORIG: VOLUME: LEVEL: TYPE:
19141 HL ZZ
- Carbon footprint Further to co-authoring Howarth Litchfield’s Sustainability Strategy, I comprehensively calculate the firm’s carbon footprint as well as proposing implementable strategies to get towards being carbon neutral. - Rehabilitation from Technological Addiction
14.0 m² Waiting 1.0 m²
Buggy Park 3.0 m²
Adjacent are the plans and principal elevation for South Lambeth Road Surgery. I completed the complex extension/ reconfiguration to increase the clinical capacity, notably agreeing party wall awards with neighbours adjacent, and above the practice.
Thesis Project
Total CO2 Produced Commuting Other Driving Public Transport Flights Office
Bin
Meeting Room 16.0 m²
I have worked on many GP Surgeries and Health Centres, including a number of Feasibility Studies for South East London Clinical Commissioning Group. I undertook Stages 3-6 for the modernisation of Dysart Medical Centre.
Sustainability
4 3
This drawing is copyright. It is sent to you in confidence and must not be reproduced or disclosed to third parties without our prior permission. Do not scale from this drawing. This drawing is to be read in conjunction with all relevant consultants, specialist manufacturers drawings and specifications. Any discrepancies in dimensions or details on or between these drawings should be drawn to our attention. All dimensions are in millimeters unless noted otherwise. Any surveyed information incorporated within this drawing cannot be guaranteed as accurate unless confirmed by fixed dimension. REV
6
- South Lambeth Road Practice
A3
ROLE: NUMBER:
01 SK A
DATE:
25022022
SUITABILITY: REV:
0036 S2
P01
Liddon House, Belmont Business Park, Durham. DH1 1TW. Tele: (0191) 3849470 E: hlp@hlpuk.com www.howarthlitchfield.com
This project is a rehabilitation centre for people addicted to augmented reality. It exists within a near future where technological advancements have allowed people to live within individualised versions of reality. This is brought about by the transhuman implementation of augmented reality to a quality so high, many people are unaware of what is real and what is augmented. My project is to facilitate one’s reconnection with the nature of reality.
Published Work - Essay and Research An essay of mine is published in ‘Concrete Utopias, An Education of Desire’ by A. Butt. This work was based on my Part II Studies and focused on the concept of preservation in relation to architecture. With a team I studied Gagliato, a marginalised town in southern Italy. Architectural interventions which I suggested are in the process of being implemented by local residents and businesses. My research forms Chapter 2 of ‘Enabling the City: Interdisciplinary and Transdisciplinary Encounters in Research and Practice’ by J. Fokdal.
Library & Bowling Alley - Kunming, China My undergraduate project allowed me to refine my model making skills, pictured adjacent.
Research Facility - Undertaken at FaulknerBrowns Architects I designed the planned expansion for a research facility. We took the project through the RIBA Stages 1-3. Final render pictured adjacent.
Portfolio James Anderson Architect
Contact Phone
07972722856
1993andersonjames @gmail.com
Links LinkedIn linkedin.com/in/ james-anderson-449806ba Portfolio
issuu.com/ jamesanderson28