Beech House
James Neal ADC 273
A106 1
32' - 9" 12' - 3 23/32"
2
UP
2 A110 14 14R R@ 0'--777/16" @0' 7/16"
3 5
3' - 0 1/16"
10' - 0"
5 5
5
5
5
1 2
5
5
5
5
Powder room 5
5
5
9' - 9"
3
4' - 2"
3' - 0"
2
3
3
11 2
2
5
Living Room
1
14' - 5"
13' - 2"
2
3
A107
1 9
Kitchen
10' - 5"
A107
4
3' - 0"
1 9' - 9"
1 2
No.
Dinning Room 2
Description
Date
4
2
4 10
10
1
9' - 7"
4
9' - 7"
20' - 6" 1 4
18' - 1"
4
4 2 9' - 9 23/32"
15' - 1"
2 A106
James Neal First Floor 1/4" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A104 1/4" = 1'-0"
Scale
8/14/2014 8:29:51 PM
1
Beech House First Floor Plan
A106 1
32' - 9"
2
4' - 1"
4' - 1"
15' - 1" 4' - 1" 9
DN
2
2
7 2
3 A110
2
2
2 5
5
6
6 5 5
7
5
8 5
7
5
5
5
2' - 6 1/16" 10
Master Bed
9
5
1 6
6
Bedroom 2
6
5
9 5
5
5
7 5
Bathroom 1
5
0' - 2 19/32" 2' - 9 1/2"
A107
5
3' - 1"
9
2
2
5
5
5 4
7
5 5
5
8
3' - 0 5/32"
9
5
3' - 0 1/16"
22' - 1"
5 2
1
5
5
22' - 1"
8
18' - 4"
3' - 0 1/16"
Bedroom 1
2
Master Bath 6
5 1
1
8
5
No.
Description
Date
8
2
2
2
24' - 7"
4
4 2 14' - 3"
15' - 1" 2 A106
James Neal Beech House Second Floor Plan
Second Floor 1/4" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A105 1/4" = 1'-0"
Scale
Energy Usage in 90 Degree Orientation Water Usage and Costs
Annual Electric Use
Annual Fuel Use
Total: 77,007 Gal / yr $430 / yr Indoor: 66,108 Gal / yr $402 / yr Outdoor: 10,899 Gal / yr $28 / yr 3
Net Utility: 77,007 Gal / yr $430 / yr
Second View West and South 6
Second Floor North And East
Annual Energy Energy, Carbon and Cost Summary Annual Energy Cost - $8,744 Lifecycle Cost - $119,100 Annual CO2 - Emissions Electric - 0.8 tons
Energy Use Intensity (EUI) - 235 kBtu / ft² / year Electric - 20,082 kWh Fuel - 5,658 Therms Annual Peak Demand - 4.8 kW
No.
Description
Date
No.
2
First Floor View West and South 5
Description
Date
First Floor North And East
Lifecycle Energy Electric - 602,457 kW Fuel - 169,755 Therms
James Neal
James Neal
Beech House Energy Usage 90 Degree Oreintation
Beech House Parametric Model
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A115 Scale
Project number
Project Number Issue Date Author Checker
Date
8/14/2014 8:31:02 PM
Large SUV Equivalent - 3.1 SUVs / Year
Drawn by Checked by
1
Basement View West and South 4
A113
Basement North And East Scale
8/14/2014 9:03:09 PM
Onsite Fuel - 32.8 tons
8/14/2014 8:30:28 PM
1