Title Picture Rendered 12" = 1'-0"
SYMBOL LEGEND
MATERIAL LEGEND WOOD, FINISHED
REVISION
2
1
WINDOW TYPE
101
ROOM NUMBER
CMU
BRICK
CONCRETE
PARTITION TYPE
2
WOOD, ROUGH
DOOR TYPE
U1
ABBREVIATIONS A/C AB ABV AC ACC ACFL ACPL ACT AD ADD ADJ ADJT A/E AFF AGG AL ALT ANC ANLD ANOD AP APPROX ARCH ASPH ASSEM ASTM ATS AUTO AVE
AIR CONDITIONING ANCHOR BOLT ABOVE ACOUSTICAL ACCESS ACCESS FLOOR ACOUSTICAL PLASTER ACOUSTIC CEILING TILE AREA DRAIN ADDENDUM ADJACENT ADJUSTABLE ARCHITECT/ENGINEER ABOVE FINISHED FLOOR AGGREGATE ALUMINUM ALTERNATE ANCHOR, ANCHORAGE ANNEALED ANODIZED ACCESS PANEL APPROXIMATE ARCHITECT (URAL) ASPHALT ASSEMBLY AMERICAN SOCIETY for TESTING MATERIALS ABOVE TOP OF SLAB AUTOMATIC AVENUE
BC BD BEL BET BIT,BITUM BKR BLDG BLK BLKG BM BOC BOT BPL BRG BRK BS BSMT BTU BUR BW
BRICK COURSE BOARD BELOW BETWEEN BITUMINOUS BACKER ROD BUILDING BLOCK BLOCKING BENCH MARK BOTTOM OF CURB BOTTOM BEARING PLATE BEARING BRICK BOTH SIDES BASEMENT BRITISH THERMAL UNIT BUILT-UP ROOFING BOTH WAYS
SHIM
1
BUILDING SECTION BATT INSULATION
A100
EARTH
1
WALL OR DETAIL SECTION
A100
RUBBLE STONE 1
ELEVATION
A100
BLUSTONE SLATE SOAP STONE FLAGGING
1
ENLARGED DETAIL
A100
PLAN OR SECTION
POROUS FILL (GRAVEL, STONE)
PLYWOOD
NORTH RIGID INSULATION
NEW (PROPOSED) ELEVATION
EXISTING ELEVATION
MARBLE, GRANITE
STEEL
1 2
4
GYPSUM WALLBOARD
INTERIOR ELEVATION MARK
3
CERAMIC OR QUARRY TILE
10
COLUMN LINE ALUMINUM
C CAB CB CEM CF CFLG CFM CG CH CI CIPC CIR CIRC CJT CL CLG CLL CLN CLR CMPL CMU CO COL COMB COMP CONC CONN CONST CONT CONTR COORD CORR CPR CPT CPTT CSK CS CSMT
CT CTR CUH CW CY
CERAMIC TILE COUNTER CABINET UNIT HEATER COLD WATER CUBIC YARD
D DA DEM DEP DH DIA DIAG DIFF DIM DR DN DTL DWG
DRAIN DOUBLE-ACTING DEMOLISH, DEMOLITION DEPRESSED DOUBLE HUNG DIAMETER DIAGONAL DIFFUSER DIMENSION DUPLEX RECEPTACLE DOWN DETAIL DRAWING
E EA EF EL ELAS ELEC ELEV EMER ENC EP EQ EQPT EST EWC EWEF EXIST EXH EXIST EXP EXP JT EXPN BLT EXT
EAST EACH EACH FACE ELEVATION ELASTOMERIC ELECTRIC (AL) ELEVATOR EMERGENCY ENCLOSE (URE) ELECTRICAL PANELBOARD EQUAL EQUIPMENT ESTIMATE ELECTRIC WATER COOLER EACH WAY EACH FACE EXISTING EXHAUST EXISTING EXPANSION, EXPOSED EXPANSION JOINT EXPANSION BOLT EXTERIOR
F FA FAS FAWP FB FBD FD FDN FE COURSE FEC CABINET FF CATCH BASIN, CORNER BEAD FGL CEMENT FH CUBIC FOOT (FEET) FHC COUNTERFLASHING FHS CUBIC FEET PER MINUTE FIN CORNER GUARD FIXT CEILING HEIGHT FJT CAST IRON FL CAST IN PLACE CONCRETE FLG CIRCLE FLUR CIRCUMFERENCE FLX CONTROL JOINT FNR CENTER LINE FOC CEILING FOF CONTRACT LIMIT LINE FOM CLEAN FOS CLEAR (ANCE) FP CEMENT PLASTER (PORTLAND) FPL CONCRETE MASONRY UNIT FPM CLEANOUT FR COLUMN FRC COMBINATION FRCB COMPRESS (ED,ION,IBLE) CONCRETE FRT CONNECTION FSP CONSTRUCTION FSR CONTINUOUS or CONTINUE FT CONTRACT (OR) FTG COORDINATE FTR CORRIDOR FUR COPPER FUT CARPET CARPET TILE GA COUNTER SINK(SUNK) GB CAST STONE GC CASEMENT
FAHRENHEIT FIRE ALARM FASTEN (ER) FLUID APPLIED WATERPROOFING FACE BRICK FIBERBOARD FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISHED FLOOR FIBERGLASS FIRE HYDRANT FIRE HOSE CABINET FIRE HOSE STATION FINISH (ED) FIXTURE FLUSH JOINT FLOOR (ING) FLASHING FLUORESCENT FLEXIBLE FEMININE NAPKIN RECEPTACLE FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FIREPROOF FLOOR PLATE FEET PER MINUTE FRAME (D) (ING) FIRE-RESISTANT COATING FIBER REINFORCED CEMENTITIOUS BOARD FIRE-RETARDANT FIRE STAND PIPELINE FLEXIBLE SHEET ROOFING FOOT, FEET FOOTING FINNED TUBE RADIATION FURRED (ING) FUTURE GAGE, GAUGE GRAB BAR GENERAL CONTRACT (OR)
GD GKT GL GLB GLCOM GLF GLV GRL GRN GSS GST GT GWB
GRADE, GRADING GASKET (ED) GLASS, GLAZING GLASS BLOCK GLAZING COMPOUND GLASS FIBER GALVANIZED GRILLE GRANITE GALVANIZED STEEL SHEET GLAZED STRUCTURAL TILE GROUT GYPSUM WALL BOARD
HARDN HB HBD HC HD HDW HJT HM HOR HP HR HT HTG HVAC HW HWD
HARDENED HOSE BIBB HARDBOARD HOLLOW CORE HEAVY DUTY HARDWARE HEAD JOINT HOLLOW METAL HORIZONTAL HIGH POINT HOUR HEIGHT HEATING HEATING/VENTILATING/ AIR CONDITIONING HOT WATER, HEADWALL HARDWOOD
ID INCL INSUL INT INV IPS
INSIDE DIAMETER INCLUDE (D) (ING) INSULATE (D) (ION) INTERIOR INVERT IRON PIPE SIZE
J JB JF JT
JOIST JUNCTION BOX JOINT FILLER JOINT
K KD KIT KV KVA KW
KIPS (1000 LBS) KNOCK-DOWN KITCHEN KILOVOLT KILOVOLT-AMPERE KILOWATT
L LAB LAV LBL LH LL LMS LOC LP LSW LT LTL LVR LWC
LENGTH LABORATORY LAVATORY LABEL LEFT HAND LIVE LOAD LIMESTONE LOCATION LIGHTPROOF, LOW POINT LIGHT SWITCH LIGHT LINTEL LOUVER LIGHTWEIGHT CONCRETE
M MAR MAS MAX MB MBR MDL MECH MED MEMB MFD MFR MH MIN MIR MISC MLDG MO MRD MT MTFR MTL MTL ST MULL
METER (S) MARBLE MASONRY MAXIMUM MACHINE BOLT MEMBER MODULAR MECHANIC (AL) MEDIUM MEMBRANE METAL FLOOR DECK MANUFACTURE (R) MANHOLE MINIMUM MIRROR MISCELLANEOUS MOLDING, MOULDING MASONRY OPENING METAL ROOF DECK MOUNT (ED) (ING) METAL FURRING METAL METAL STUD MULLION
LOCATION MAP N NAT NIC N0,# NOM NRC NTS
NORTH NATURAL NOT IN CONTRACT NUMBER NOMINAL NOISE REDUCTION COEFFICIENT NOT TO SCALE
OA OC OD OFF OH OPNG OPP
OVERALL ON CENTER (S) OUTSIDE DIAMETER OFFICE OVERHEAD OPENING OPPOSITE
PAR PBD PCC PCF PCP PED PER PRKG PL PLAM PLAS PLF PLYWD PNL PNT PRF PSF PSI PTD PTH PTN PVC PVMT PVT
PARALLEL PARTICLE BOARD PRECAST CONCRETE POUNDS PER CUBIC FOOT PRECAST CONCRETE PLANK PEDESTAL PERIMETER PARKING PLATE PLASTIC LAMINATE PLASTER POUNDS PER LINEAL FOOT PLYWOOD PANEL PAINT (ED) IN FIELD PREFORMED POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAPER TOWEL DISPENSER PAPER TOWEL HOLDER PARTITION POLY VINYL CHLORIDE PAVEMENT PAVER TILE
QT
QUARRY TILE
"R" R RAD RB RBT RC RCB RCP RD REC RECP REF REG REINF REM REQD RES REV RFG RFL RGD RH RLG RM RO RTN RWC R/W
THERMAL RESISTANCE RADIUS, RISER RADIATOR RUBBER BASE-STRAIGHT RABBET, REBATE REINFORCED CONCRETE RUBBER COVE BASE REINFORCED CONCRETE PIPE ROOF DRAIN RECESSED RECEPTACLE REFERENCE REGISTER REINFORCE (D) (ING) REMOVED REQUIRED RESILIENT REVISION (S), REVISED ROOFING REFLECT (ED) (IVE) RIGID RIGHT HAND RAILING ROOM ROUGH OPENING RETURN RAIN WATER CONDUCTOR RIGHT OF WAY
S SC SCHED SCRN SD SECT SF SFGL SHT SHTHG SIM SKYLT SLR SLV SM SNT SP
SOUTH SOILD CORE SCHEDULE SCREEN STORM DRAIN SECTION SQUARE FOOT (FEET) SAFETY GLASS SHEET SHEATHING SIMILAR SKYLIGHT SEALER SLEEVE SHEET METAL SEALANT SOUND PROOF
SPEC SQ SST STD STL STR SURF SUSP SYM SYN SYS
SPECIFICATION SQUARE STAINLESS STEEL STANDARD STEEL STRUCTURAL SURFACE SUSPENDED SYMMETRY (ICAL) SYNTHETIC SYSTEM
T TAP T&B TB TC TCS
TREAD TAPERED TOP AND BOTTOM TEST BORING TERRA COTTA TERNE COATED STAINLESS STEEL TDC TRAFFIC DECK COATING TEL TELEPHONE TEMP TEMPORARY, TEMPERED T&G TONGUE AND GROOVE THK THICK (NESS) THRESH THRESHOLD THRU THROUGH TOP OF TO TOC TOP OF CONCRETE, CURB TOES TOP OF EXISTING SLAB TOF TOP OF FOOTING TOL TOLERANCE TOP TOP OF PLANK TOR TOP OF ROOFING TOS TOP OF STEEL/ TOP OF SLAB TOW TOP OF WALL TPH TOILET PAPER HOLDER TTD TOILET TISSUE DISPENSER TYP TYPICAL UC UNEX UNF UON
UNDERCUT UNEXCAVATED UNFINISHED UNLESS OTHERWISE NOTED
VAC VAR VB
VACUUM VARNISH VAPOR BARRIER, VINYL BASE-STRAIGHT VINYL COATED VINYL COVE BASE VINYL COMPOSITION TILE VERTICAL VESTIBULE VERTICAL GRAIN VERIFY IN FIELD VINYL V-JOINT (ED) VENEER VAPOR RETARDER VERMICULITE VINYL TILE VINYL WALL FABRIC
VC VCB VCT VERT VEST VG VIF VIN VJT VNR VR VRM VT VWF W W/ WB WC WD WGL WH WIN WM W/O WP WPT WR
WEST WITH WOOD BASE WATER CLOSET WOOD WIRED GLASS WALL HUNG WINDOW (S) WIRE MESH WITHOUT WATERPROOF (ING), WEATHERPROOF WORKING POINT WATER REPELLANT
W/R WSCT WST WWF
WATER RESISTANT WAINSCOTT WEATHERSTRIPPING WELDED WIRE FABRIC
XTR
EXISTING TO REMAIN
No.
Description
Date
Beech House 204 Toronto Ontario Canada 34454 DRAWING LIST
James Neal Beech House Title Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A101 Scale
12" = 1'-0"
8/14/2014 8:34:33 PM
1
A106 1
A107
2 1
2
A107
No.
Description
Date
A106
James Neal
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
1
Site 1" = 10'-0"
A102 Scale
1" = 10'-0"
8/14/2014 8:34:34 PM
Beech House Site
A106 1
32' - 7"
4' - 1"
9
9
5
1 A110
9
5 5 UP 5
2
A107
24' - 3"
5
5
9 1
A107
Basement
9
31' - 0"
10
No.
Description
Date
9
10' - 10"
20' - 5"
9
9
13' - 1"
Basement 1/4" = 1'-0"
James Neal Beech House Basement Floor Plan Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A103 Scale
1/4" = 1'-0"
8/14/2014 8:34:34 PM
1
A106 1
32' - 9" 12' - 3 23/32"
2
5
2 A110
5 UP
14 14RR@ @0'0'--777/16" 7/16"
5
5 5
3 5
3' - 0 1/16"
10' - 0"
5
1 2
5 5
5 5
Powder room 5
5
3
3
9' - 9"
3
4' - 2"
3' - 0"
2
11 2
2
5
Living Room
1
13' - 2"
14' - 5"
2
3
A107
1 9
Kitchen
4
9' - 9"
3' - 0"
1 1 2
Dinning Room 2
10' - 5"
A107
No.
Description
Date
4
2
4 10
10
1
9' - 7"
4
9' - 7"
20' - 6" 1 4
18' - 1"
4
4 2 9' - 9 23/32"
15' - 1"
2 A106
James Neal First Floor 1/4" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A104 Scale
1/4" = 1'-0"
8/14/2014 8:34:34 PM
1
Beech House First Floor Plan
A106 1
32' - 9"
2
9
DN
2
4' - 1"
4' - 1"
15' - 1" 4' - 1"
2
7 2
3 A110
2
2
2 5
5
6
6 5 5
7
5
8 5
7
5
5
5
2' - 6 1/16" 10
5
Master Bed
9
5
1 6
6
Bedroom 2
5
9 5
5 5
5
Bathroom 1
5 0' - 2 19/32" 2' - 9 1/2"
A107
5
3' - 1"
7
2
2
5 6
9
5
5 4
7
5 5
5
8
3' - 0 5/32"
9
5
3' - 0 1/16"
22' - 1"
5 2
1
5
22' - 1"
8
18' - 4"
3' - 0 1/16"
Bedroom 1
2
Master Bath 6
5 1
1
8
5
No.
Description
Date
8
2
2
2
24' - 7"
4
4 2 14' - 3"
15' - 1" 2 A106
James Neal Beech House Second Floor Plan
Second Floor 1/4" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A105 Scale
1/4" = 1'-0"
8/14/2014 8:34:35 PM
1
4' - 0" Rubber Roofing Membrane
1' - 1"
1" Metal Frame
Roof 20' - 0"
10' - 0"
Smooth Concrete Wall Surface
Second Floor 10' - 0"
10' - 0"
Exterior Aluminium Siding
First Floor 0' - 0"
1
North 1/4" = 1'-0"
4' - 0"
No.
Description
Date
3' - 0"
3' - 0"
10' - 0"
Roof 20' - 0"
Smooth Concrete Wall Surface
18' - 1"
Second Floor 10' - 0" Cherry Wood Exterior Side Panel 9' - 11 23/32"
6' - 0 1/2" Curtain window 3" thick Glass 2' - 0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
2
South 1/4" = 1'-0"
A106 Scale
1/4" = 1'-0"
8/14/2014 8:34:36 PM
0' - 10"
James Neal Beech House North and South Elevation
First Floor 0' - 0"
8' - 4"
18' - 4" 3" Thivk Window Curtain Wall
Roof 20' - 0"
6' - 8 9/16"
1' - 8 1/4" 1' - 0 3/4"
2' - 7"
6' - 0"
2' - 8 3/4"
2' - 2 1/16"
21' - 1"
10' - 0"
5' - 0"
Cherry Wood Paneling
Second Floor 10' - 0" 3' - 0"
2' - 8 1/4" Smooth Concrete Wall Surface
8' - 3"
6' - 2"
Glass Door with Metal Frame
Cherry Wood Exterior Panel Siding
2' - 7"
Exterior Alumuin Panel Siding
First Floor 0' - 0"
1
East 1/4" = 1'-0"
18' - 7 27/32"
3" Window Curtain Wall Sliding Panel
9' - 1 27/32"
No.
9' - 0"
Description
Date
Roof 20' - 0"
Second Floor 10' - 0"
21' - 1"
2' - 1 3/4"
8' - 1"
Cherry Wood Paneling
3' - 0"
10' - 2"
3' - 0"
6' - 7"
3" Window Curtain Wall Sliding Panel
James Neal
First Floor 0' - 0"
Beech House East and West Elevations Project Number Issue Date Author Checker
Project number Date
2
West 1/4" = 1'-0"
Drawn by Checked by
A107 Scale
1/4" = 1'-0"
8/14/2014 8:34:36 PM
0' - 0" 3' - 3"
6' - 11"
8' - 3"
Glass Door with Metal Frame
Roof 20' - 0"
Second Floor 10' - 0"
First Floor 0' - 0" Gutter -3' - 0"
Basement -10' - 0" Foundation -11' - 0"
1
Section 2 1/4" = 1'-0"
Roof 20' - 0" No.
Description
Date
Second Floor 10' - 0"
First Floor 0' - 0" Gutter -3' - 0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
2
Section 4 1/4" = 1'-0"
A108 Scale
1/4" = 1'-0"
8/14/2014 8:34:38 PM
Basement -10' - 0" Foundation -11' - 0"
James Neal Beech House North and South Sections
Roof 20' - 0"
Second Floor 10' - 0"
First Floor 0' - 0" Gutter -3' - 0"
Basement -10' - 0" Foundation -11' - 0"
Section 1 1/4" = 1'-0"
Roof 20' - 0"
No.
Description
Date
Second Floor 10' - 0"
First Floor 0' - 0"
James Neal
Basement -10' - 0" Foundation -11' - 0"
Beech House East and West Sections Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
2
Section 3 1/4" = 1'-0"
A109 Scale
1/4" = 1'-0"
8/14/2014 8:34:39 PM
1
Roof 20' - 0"
UP
1
Callout of Basement 1/2" = 1'-0"
Second Floor 10' - 0"
UP
No.
First Floor 0' - 0"
2
Description
Date
Callout of First Floor 1/2" = 1'-0"
DN
James Neal
4
Stair Parametric View
5
Section 6 1/2" = 1'-0"
3
Callout of Second Floor 1/2" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A110 Scale
1/2" = 1'-0"
8/14/2014 8:34:41 PM
Beech House Stairs
Basement -10' - 0"
Rubber Roofing Membrane
Gspyum board wall
Concrete Smooth
2 x 4 Wood Joints Insulation
2 x 2 Wood Beam 4 x 6 Wood Beam
Roof 20' - 0" 2
Callout of Section 1 1" = 1'-0"
Second Floor 10' - 0"
4 x 6 Wood Frame Concrete Tile Flooring Concrete Smooth Surface Gysptum Board Wall 2 x 8 Wood Floor Joints Insulation
First Floor 0' - 0" Gutter -3' - 0" Gysptum Board Wall
No.
4
Description
Date
Callout of Section 5 1 1/2" = 1'-0"
Basement -10' - 0" Foundation -11' - 0"
Gspyum Wall Board
Concrete Cinder Block
Carpet Flooring
Section 5 1/4" = 1'-0"
Insulation
James Neal Beech House Elevation Detail
2 x 8 Wood Floor Joints Foundation
3
Callout of Section 2 3/4" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A111 Scale
As indicated
8/14/2014 8:34:42 PM
1
2
Perspective View 1 Rendered 12" = 1'-0"
1
Interior Shot_Rendered 12" = 1'-0"
No.
Description
Date
James Neal
Perspective View 2 Rendered 12" = 1'-0"
4
Perpsective View 3 Rendered 12" = 1'-0"
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A112 Scale
12" = 1'-0"
8/14/2014 8:34:43 PM
3
Beech House Perpsective View
3
Second View West and South
6
Second Floor North And East
No.
2
First Floor View West and South
5
Description
Date
First Floor North And East
James Neal
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
1
Basement View West and South
4
A113
Basement North And East Scale
8/14/2014 8:34:45 PM
Beech House Parametric Model
Energy Usage In 45 Degree Orientation
Water Usage and Costs Total: 77,007 Gal / yr $430 / yr
Annual Fuel Use
Annual Electric Use
Indoor: 66,108 Gal / yr $402 / yr Outdoor: 10,899 Gal / yr $28 / yr Net Utility: 77,007 Gal / yr $430 / yr
Annual Energy
Annual Energy Cost - $8,744
Annual CO2 - Emissions
Energy Use Intensity (EUI) - 235 kBtu / ft² / year Electric - 20,082 kWh Fuel - 5,658 Therms Annual Peak Demand - 4.8 kW
Electric - 0.8 tons
Lifecycle Energy
Onsite Fuel - 32.8 tons
Electric - 602,457 kW Fuel - 169,755 Therms
Lifecycle Cost - $119,100
No.
Description
Large SUV Equivalent - 3.1 SUVs / Year
Date
James Neal Beech House Energy Usage 45 Degree Orientation Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A114 Scale
8/14/2014 8:34:45 PM
Energy, Carbon and Cost Summary
Energy Usage in 90 Degree Orientation
Water Usage and Costs
Annual Electric Use
Annual Fuel Use
Total: 77,007 Gal / yr $430 / yr Indoor: 66,108 Gal / yr $402 / yr Outdoor: 10,899 Gal / yr $28 / yr Net Utility: 77,007 Gal / yr $430 / yr
Annual Energy Energy, Carbon and Cost Summary Annual Energy Cost - $8,744 Lifecycle Cost - $119,100 Annual CO2 - Emissions Electric - 0.8 tons
Energy Use Intensity (EUI) - 235 kBtu / ft² / year Electric - 20,082 kWh Fuel - 5,658 Therms Annual Peak Demand - 4.8 kW
No.
Description
Date
Lifecycle Energy Electric - 602,457 kW Fuel - 169,755 Therms
Onsite Fuel - 32.8 tons James Neal
Large SUV Equivalent - 3.1 SUVs / Year
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A115 Scale
8/14/2014 8:34:45 PM
Beech House Energy Usage 90 Degree Oreintation
Carbon Footprint
Natural Ventilation Potential Total Hours Mechanical Cooling Required: 2,714
Base Run Carbon Neutral Potential Help Annual CO2 Emissions tons Base Run Base Run 33.7 Onsite Renewable Potential -5.0 Natural Ventilation Potential -0.6 Onsite Biofuel Use -32.8 Net CO2 Emissions -4.8 Net Large SUV Equivalent: -0.4 SUVs / Year Assumptions Information
Hours Possible Natural Ventilation Hours: 1,052 Hours Possible Annual Electric Energy Savings: 1,546 kWh Possible Annual Electric Cost Savings: $144 Net Hours Mechanical Cooling Required: 1,662 Hours
Electric Power Plant Sources in Your Region Fossil 11 % Nuclear 53 % Hydroelectric 36 % Renewable 1 % Other 0 % Assumptions Information
No.
Description
Date
Photovoltaic Potential Annual Energy Savings: 6,847 kWh Total Installed Panel Cost: $54,232 Nominal Rated Power: 7 kW Total
James Neal
Payback Period: 50 years @ $0.09 / kWh
Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A116 Scale
8/14/2014 8:34:45 PM
Beech House Energy Notes
Panel Area: 528 ft² Maximum
97.00
Count 1
97.00
1
97.00
1
100.00
1
100.00
1
100.00
1
100.00
1
100.00
1
50.00
1
97.00
1
Cost 120.00 100.00 200.00 120.00 100.00 200.00 90.00 90.00 90.00 90.00 170.00 90.00 90.00 70.00 70.00 70.00 70.00 170.00 170.00 200.00 89.00 200.00 87.00 180.00 180.00 180.00
Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h Single-Flus h
Count 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Family
Family Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed
Finish Glass
Door Schedule Frame Material Metal
Wall Schedule Height
8' - 0"
Width 3' - 0"
Thickness 0' - 3"
Level
8' - 0"
3' - 0"
0' - 3"
First Floor
Glass
8' - 0"
3' - 0"
0' - 3"
First Floor Second Floor Second Floor Second Floor Second Floor Second Floor Second Floor Second Floor
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
White Paint Hardwood
7' - 0"
2' - 6"
0' - 3"
White Paint Hardwood
8' - 0"
3' - 0"
0' - 3"
Window Schedule Height Width 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 4' - 0" 3' - 0" 3' - 0" 1' - 4" 1' - 4" 1' - 4" 1' - 4" 4' - 0" 4' - 0" 6' - 0" 3' - 0" 6' - 0" 4' - 0" 6' - 4" 6' - 4" 7' - 0"
1' - 4" 2' - 0" 3' - 0" 1' - 4" 2' - 0" 3' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 3' - 0" 4' - 0" 4' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 4' - 0" 3' - 0" 2' - 0" 3' - 0" 3' - 0" 3' - 0"
Level
Second Floor Second Floor Second Floor Second Floor Second Floor Second Floor Basement Basement Basement Basement First Floor Second Floor Second Floor Second Floor Second Floor First Floor First Floor Second Floor Second Floor First Floor Second Floor Second Floor First Floor First Floor First Floor First Floor
Assembly Description
Width
Family
Structural Material
First Floor
White Paint Hardwood Metal
Type Mark
1 2 3 4 5 6 7 8 9 10
Curtain Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls Exterior Walls
0' - 9" 0' - 8" 0' - 8" 0' - 6" 0' - 4" 0' - 8" 0' - 4" 0' - 8" 0' - 6"
Curtain Wall Basic Wall Basic Wall Basic Wall Basic Wall Basic Wall Basic Wall Basic Wall Basic Wall Basic Wall
Concrete, Cast-in-Place gray Default Mass Exterior Wall Oak Flooring Gypsum Wall Board Oak Flooring Gypsum Wall Board Gypsum Wall Board Concrete Masonry Units Stainless Steel
Model G-90 M-70 D-90 G-90 M-70 D-90 F-555 F-555 F-555 F-555 CX-457 VG1-89 VG1-89 11XC-450 11XC-450 11XC-450 11XC-450 CX-457 CX-457 D-90 ZSD-1123 D-90 JK-9066 PHB-658 PHB-658 ZSD-1123
No.
Description
Date
James Neal Beech House Window Doors and Wall Schedule Project Number Issue Date Author Checker
Project number Date Drawn by Checked by
A117 Scale
8/14/2014 8:34:45 PM
Cost