LinkedIn: https://www.linkedin.com/in/ jana-pretorius-864653106/
SOUTH AFRICA, 7441
Portfolio: https://issuu.com/janaprets
CONTACT
ONLINE
JANA PRETORIUS
LOCATION
LANDSCAPE ARCHITECTURE PORTFOLIO
PORTFOLIO.
AUGUST 2021
E: JANAPRETS@GMAIL.COM C: (+27) 082 8945 422
INDEX.
02 CONCEPTUAL THINKING,
NOVEMBER 2021
01 CV & PROJECT EXPERIENCE ,
03 MAPPING & DIAGRAMS, 04 GRAPHIC REPRESENTATION, 05 PLANS, 06 SECTIONS, 07 DETAILS. 08 SCHEDULES, 09 3D MODEL VIEWS,
3
10 MORE ABOUT ME ...
LANDSCAPE ARCHITECTURE PORTFOLIO
JANA PRETORIUS
082 894 5422 < JANAPRETS@GMAIL.COM <
LANDSCAPE ARCHITECT SACLAP (461)
Hello, I’m a Candidate Landscape Architect. I received my BSc in Landscape Architecture at The University of Pretoria in 2015. I furthered my studies at the University of Cape Town, where I completed my Masters in Landscape Architecture (MLA) in 2019. I have 3+ years working experience in the Landscape profession. I am always looking to gain more experience and to further my knowledge, skills and relationships in the Landscape Industry of South Africa. I am passionate about the industry, because I know what a vital part space-making is to a rapid urbanizing country. My passion lies in graphic representation, but I know I still have a lot to learn in this criteria. I am also actively seeking to advance my BIM skills to ensure I grow with the industry. My ideal working environment will be one where I work with a team that can support me to evolve my skills in a variety of fields. I am very passionate about Architecture and the impact it has on our everyday lives- our surrounds have to make it possible for us to live a happy, healthy, meaningful and productive life.
>>
PERSONAL PROFILE
Hello I’m Jana, I am a Graduate Landscape Architect. I received my BSc in Landscape Architecture at The University of Pretoria in 2015. I furthered my studies at the University of Cape Town, where I completed my Masters in Landscape Architecture at the end of 2019. Currently I am working at SSH where I practice as a Graduate Landscape Architect. I have 2 - 3 years working experience in the Landscape profession. I am currently looking to gain some more experience and to further my knowledge, skills and relationships in the Landscape Industry in South Africa. I am passionate about the industry, because I know what a vital part space-making is to a rapid urbanizing country.
> 2015
EDUCATION UNIVERSITY OF PRETORIA 2013 - 2015
BSc in Landscape Architecture BSc(LARCH)
2017
Thank you for showing your interest, I hope you enjoy this compilation of my work. Thank you.
NOVEMBER 2021
CAPE TOWN <
UNIVERSITY OF CAPE TOWN
AutoCAD REVIT Photoshop Illustrator Indesign
2017 - 2019
Sketchup
Masters in Landscape Architecture
ArcGIS
MLA
2019
4
Rhino Lumion
GRADUATED >
>
SKILLS
>
EXPERIENCE
LANGUAGE SKILLS
English
2016
Golf Data
Afrikaans
FEB 2016 - DEC 2016 ( 1 year) Assisted co-workers in projects (render, BOQ, planting plans, technical plans, site visits, design).
2017
CONTOURS DESIGN STUDIO
SACLAP | Candidate Landscape Architect (461) Lumion Essential Training Certificate - 2021
FEB 2017 - NOV 2017 (10 months)
Revit 2019: Essential Training for Architecture (Metric) - 2020
>
PERSONAL SKILLS & INTERESTS
FREELANCE DESIGNER Cape Town Garden designs and planting schemes, Furniture design and manufacturing (indoor and outdoor), branding design, illustration commisions.
2020
CERTIFICATES & REGISTRATION
Junior Landscape Designer - Cape Town
Assisted Co-workers in projects (render, BOQ, Planting plans, details, sections, detail plans, 3ds, design assistance). Run of Projects under supervision (from conceptual stage to implementation).
2020
>
LANDSCAPE ARCHITECT SSH - Cape Town SEP 2020 - CURRENT Leading and assisting in Landscape Architecture Consulting, under supervisions from our Lead and Senior Landscape Architects. Our team provides concept design, schematic design, detail design, and tender packages.
Illustration
Painting
Woodworking
Graphic Design
Photography
LANDSCAPE ARCHITECTURE PORTFOLIO
01 CV .
Candidate Landscape Architect - Johannesburg
2016
GOLF DATA
Steyn City , Johannesburg
Responsibilities included: 2018
- Resedential design; - Golf Course design & drafting, - Site analysis & surveys, - Estate maintanance & Landscaping, - Planting design, and - Cost Estimates
CONTOURS LANDSCAPES Muizenberg, Cape Town
Role: Landscape Designer (Feb 2018 - Dec 2018) Responsibilities included:
- Resedential design; - 3D Modeling, - Detailing & Site sections, - Sourcing materials & plants, - Planting design, - Design implimentation packs to installation team,
- Site supervision, and - Cost Estimates
Cape Town
Role: Landscape Architect (Sep 2020 - Current) Working within a Multidisciplinary environment as part of a Landscape design team, undertaking and completing defined tasks with limited guidance and supervision of a Senior Landscape Architect.
Responsibilities included:
- Concept design Packages
- Schematic Design Packages
- Mood Boards - Hand & Digital Sketches - InDesign client presentations - Revit Modeling - Autocad Drawings - Site Sections - Report - InDesign client presentations - Revit Modeling - Autocad Drawings - Master Plan - Site Sections - General Arrangement Plans - Report - Typical details
- Revit Schedules
- Detail Design Packages
- InDesign client presentations - Revit Modeling - Model Coordination - Autocad Drawings - Master Plan - Site Sections - Schedules - Typical & Bespoke Details - Grading plans - Hard & Soft GA Plans - Report
- Tender Packages - All drawings included in Detail pack - List of potential landscape contract tors - Final Landscape Specifications
5
Projects & Tasks responsibilities: - Manazil, Saudi (11 Multi-use Sites): A Landscape Architectural projects with focus on creating a comfortable and enjoyable environment for workers and staff that will be living in these ‘villages’. The DNA is created with a minamimalist approach to ensure the landscape will be low maintanance and flexable in terms of spacial opperations. - Revit modeling, - Populating the innitial concept de sign on to multiple sites.
2019
FREELANCE DESIGNER City of Cape Town
- Capital Waterfront, Baghrain:
Role: Freelancer (Dec 2019 - Aug 2020)
The Capital Waterfront project proposes to revitalise and develop a strip of coastal land in the city of Manama, Bahrain for the ministry works, municipalities and Urban planning.
Design Portfolio:
- Custon Furniture design, - Landscape Design - Planting Design, - Branding, and - Illustrations.
- Design, - Planting design, - Modeling, - Detailing - Sections, - Schedules (hard, soft, furniture and equipment), - General Arrangement Tagging, - Importing and creating families from sketchup files.
LANDSCAPE ARCHITECTURE PORTFOLIO
01 PROJECTS .
Projects: - House Pieters (Paarl), Landscape Design, Planting design, Detailing, site visits, BOQ - House Robbertze (Paarl), Landscape design, planting design, BOQ, client liaison, occasional site supervision, and final client handover. - House Biggs (Higgovale CT), Site survey (spot heights), big scale water feature detailing, drafting. - House Pillay (Constantia, CT), Design, planting design, site visits, presentations, drafting, BOQ - Groote Schuur Hospital - Creche (CT), Design proposal. - House Mc Connell (Newlands, CT) Landscape Design, 3D modeling, drafting, site visits.
SSH Design
NOVEMBER 2021
Role: Junior Landscape Architect (Feb 2016 - Dec 2016)
2020 2021
- Multi-purpose smart school (BID):
This project I ran with from the start, currently we are busy with the Detail design.
This project has been approached as a conceptual exploration of opportunities in a school that will host children spanning from kindergarden to secondary school.
The project is situated in Yiti, Oman - where they are proposing to develop a Sustainable City with Multi-use programmes and development. In this project we are creating a 4 star hotel that slots into the Master plan of the Sustainable City.
NOVEMBER 2021
- Hotel Indigo, Oman (project lead):
The building footprint fills the entire site up to the property lines, this challanged the landscape team to create playful courtyarsd throghout the building. General Notes:
300
25
25mm X 114mm TREATED TIMBER BEAMS
1. Do not scale from this drawing. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order or manufacture of materials or production of site drawings.
25
5mm CONCRETE GREY PERSPEX SHEET BACKING 8mm THREADED ROD
- Concept design, - Model views (Revit), - Client Presentation - Report, - Master Plan.
Key Plan:
5mm CONCRETE GREY PERSPEX SHEET BACKING
850
900
1200
1250
850
3mm STEEL SHEET, WITH LASER CUT LTTERS
T
610
PART A
PART B
PART C
HOTEL
CONFERENCE
OFFICES
3 BASEMENTS L00 to L20 ROOF
TRUE NORTH
810
100
25mm X 114mm TREATED TIMBER BEAMS
3 BASEMENTS L00 to L02 ROOF
3 BASEMENTS L00 to L24 ROOF
100
SPACER
THREADED ROD WELDED TO STEEL SHEET
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
GROUND LEVEL
50
50
GROUND LEVEL
A
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS.
C
B
25mm X 114mm TREATED TIMBER BEAMS
4 .5 84 6
8mm THREADED ROD
5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE
28
LED STRIP (40 watts)
25
114
STEEL TUBE SPACER
350
ROD WELDED TO STEEL SHEET
LED STRIPS (30 watts)
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE
CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS 8mm THREADED ROD, BOLTED TO STEEL SUPPORT 25mm x 50mm x 3mm STEEL POST
410
400
25mm x 50mm x 3mm STEEL POST
20
513 520
STEEL SUPPORTS
STEEL SUPPORTS BASE PLATE
BASE PLATE
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200
200
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
1
SIGNAGE TYPE 1
200mm CONCRETE FOUNDATION INFILL
100
100
200mm CONCRETE FOUNDATION INFILL
100mm CONCRTE BLINDING
SIGNAGE - TYPE 1 - FRONT VIEW
2
SIGNAGE - TYPE 1 - SIDE SECTION
3
1 : 10
100mm CONCRTE BLINDING
SIGNAGE - TYPE 1 - TOP SECTION
4
1 : 10
25mm X 114mm TREATED TIMBER BEAMS
1 : 10
25
25
5mm CONCRETE GREY PERSPEX SHEET BACKING
8mm THREADED ROD
3mm STEEL SHEET, WRAPPED AROUND POSTS AND REPEATED ON BOTH SIDES, WITH LASER CUT LETTERS
850
900
1200
3mm STEEL SHEET, WITH LASER CUT LTTERS
1250
850
900
1150
5mm CONCRETE GREY PERSPEX SHEET BACKING
- King Salman Park Competition, Saudi:
25mm X 114mm TREATED TIMBER BEAMS
STEEL TUBE SPACER ROD WELDED TO STEEL SHEET
810
LED STRIP (40 watts) 8mm THREADED ROD, BOLTED TO STEEL SUPPORT
610
GROUND LEVEL
50
50
GROUND LEVEL
SPACERS THREADED ROD WELDED TO STEEL SHEET
25
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS. 25mm X 114mm TREATED TIMBER BEAMS 8mm THREADED ROD
28
5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE LED STRIPS (30 watts)
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
51
STEEL SUPPORTS BASE PLATE
BASE PLATE
200
216
350 STEEL SUPPORTS
114
25mm x 50mm x 3mm STEEL POST
400
410
25mm x 50mm x 3mm STEEL POST
200mm CONCRETE FOUNDATION INFILL
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS
200mm CONCRETE FOUNDATION INFILL
100
100
100mm CONCRTE BLINDING
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
100mm CONCRTE BLINDING
520 20
5
SIGNAGE TYPE 2
SIGNAGE - TYPE 2 - FRONT VIEW
6
SIGNAGE - TYPE 2 - SIDE SECTION
7
1 : 10
8
1 : 10
513
SIGNAGE - TYPE 2 - TOP SECTION 1 : 10
300
Creating a Grand Mosque that sits inside a Arabic garden. The whole project is connected by a pedestrian network and is also a part of a creater approach to green the City of Riyad. - Plant Selection - Landscape materials, - Landscape Consulting.
900
1150
3mm STEEL SHEET, WITH LASER CUT LETTERS
300
- Concept design, - Schemat Design, - Detail Design, - Project Coordination (landscape), - Client Presentation - Reports, - Master Plan, - General Arrangement Plans, - Schedules, - Details, - Sections, - Soft Landscape Plans & plant selec tion, - Grading & Drainage.
- Kigali International Financial & Business Square:
General Notes:
3mm STEEL SHEET, WITH LASER CUT LTTERS
350
100
100
I assisted in Detail design Packages, where we were tasked with producing details for all the typical and bespoke elements in the design.
300
250
250
25
LED STRIP (40 watts)
5mm CONCRETE GREY PERSPEX SHEET BACKING
25
5mm CONCRETE GREY PERSPEX SHEET BACKING
1150
8mm THREADED ROD
750
750
Key Plan:
Consultants: 5mm CONCRETE GREY PERSPEX SHEET BACKING
T
2050
8mm THREADED ROD
3mm STEEL SHEET, WITH LASER CUT LTTERS
1585
25
ROD WELDED TO STEEL SHEET
100
610
PART A
PART B
PART C
HOTEL
CONFERENCE
OFFICES
3 BASEMENTS L00 to L20 ROOF
TRUE NORTH
810
850
1250
5mm CONCRETE GREY PERSPEX SHEET BACKING
900
850
1150
900
3mm STEEL SHEET, WITH LASER CUT LETTERS
1200
2050
2100
21/10/15 Date
ISSUED FOR DETAIL DESIGN
3 BASEMENTS L00 to L02 ROOF
3 BASEMENTS L00 to L24 ROOF
100
25mm X 114mm TREATED TIMBER BEAMS
Client: SPACER THREADED ROD WELDED TO STEEL SHEET
25mm X 114mm TREATED TIMBER BEAMS
25
ROD WELDED TO STEEL SHEET
LED STRIP (40 watts)
400
205
50
SPACER
216
350
25mm x 50mm x 3mm STEEL POST
8mm THREADED ROD
400
400
410
400
25mm x 50mm x 3mm STEEL POST
25mm x 50mm x 3mm STEEL POST
5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE
SIGNAGE TYPE 1
SIGNAGE - TYPE 3 - FRONT VIEW
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
11
Designed by:
N.S.
Checked by: Project Title:
P.V.E.
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
513 520
HARD LANDSCAPE DETAILS HARDSCAPE - SHEET 09
200mm CONCRETE FOUNDATION INFILL
SIGNAGE - TYPE 3 - SIDE SECTION
100mm CONCRTE BLINDING
SIGNAGE - TYPE 3 - TOP SECTION
12
1 : 10
1 : 10
Scale:
1 : 10
Sheet Size:
Revision:
A0
00
Sheet Number:
19228-LSC-DD-DWG-50-009-0
SIGNAGE - TYPE 1 - SIDE SECTION
3
1 : 10
20
KIGALI INTERNATIONAL FINANCIAL & BUSINESS SQUARE
100mm CONCRTE BLINDING
SIGNAGE - TYPE 1 - FRONT VIEW
2
N.S.
Drawing Title:
200mm CONCRETE FOUNDATION INFILL
100mm CONCRTE BLINDING
1 : 10
4
1 : 10
SIGNAGE - TYPE 1 - TOP SECTION 1 : 10
300
- Concept design, - Coordinating, - Concept Report, - Masterplan, - General Arrangement Plan, - Sections, - Details, - Schedules.
200mm CONCRETE FOUNDATION INFILL
STEEL SUPPORTS BASE PLATE
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
Drawn by:
LANDSCAPE ARCHITECTURE PORTFOLIO
1
10
100
200
SIGNAGE TYPE 3
100
100
25mm X 114mm TREATED TIMBER BEAMS
25
25
5mm CONCRETE GREY PERSPEX SHEET BACKING
8mm THREADED ROD
3mm STEEL SHEET, WRAPPED AROUND POSTS AND REPEATED ON BOTH SIDES, WITH LASER CUT LETTERS
850
900
1200
3mm STEEL SHEET, WITH LASER CUT LTTERS
1250
850
1150
5mm CONCRETE GREY PERSPEX SHEET BACKING
900
9
100mm CONCRTE BLINDING
CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS 8mm THREADED ROD, BOLTED TO STEEL SUPPORT
200
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200mm CONCRETE FOUNDATION INFILL
STEEL SUPPORTS BASE PLATE
100
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200
200
- City Centre Re-Development, Bahrain Mall:
BASE PLATE
CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS
LANDSCAPE ARCHITECTURE
LED STRIPS (30 watts)
STEEL SUPPORTS
BASE PLATE
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE
Discipline:
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS.
25mm x 50mm x 3mm STEEL POST
4 .5 84 6
8mm THREADED ROD
LED STRIPS (30 watts)
GROUND LEVEL
THREADED ROD WELDED TO STEEL SHEET
GROUND LEVEL
50
50
50
GROUND LEVEL
C
5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE
28
231
GROUND LEVEL
B
25mm X 114mm TREATED TIMBER BEAMS
Lead Consultant:
114
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
A
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS.
STEEL TUBE SPACER
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
350
761
25mm X 114mm TREATED TIMBER BEAMS
STEEL SUPPORTS
25mm X 114mm TREATED TIMBER BEAMS
STEEL TUBE SPACER ROD WELDED TO STEEL SHEET
- Zuneirah Sikka:
810
LED STRIP (40 watts) 8mm THREADED ROD, BOLTED TO STEEL SUPPORT
610
GROUND LEVEL
50
GROUND LEVEL
50
I was part of a design team where we introduced a thoroughfare inbetween fillas leading on to the beach. I was tasked to Produce the Schematic design package for submission;
SPACERS THREADED ROD WELDED TO STEEL SHEET
25
25mm x 50mm x 3mm STEEL POST
400
410
25mm x 50mm x 3mm STEEL POST
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS.
51
114
LED STRIPS (30 watts)
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200
200
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
8mm THREADED ROD 5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE
28
STEEL SUPPORTS BASE PLATE
BASE PLATE
200mm CONCRETE FOUNDATION INFILL
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS
200mm CONCRETE FOUNDATION INFILL
100
100
216
350
25mm X 114mm TREATED TIMBER BEAMS
STEEL SUPPORTS
100mm CONCRTE BLINDING
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
100mm CONCRTE BLINDING
520 20
SIGNAGE - TYPE 2 - FRONT VIEW
6
SIGNAGE - TYPE 2 - SIDE SECTION
7
1 : 10
8
513
SIGNAGE - TYPE 2 - TOP SECTION 1 : 10
300
1 : 10
3mm STEEL SHEET, WITH LASER CUT LTTERS
100
5mm CONCRETE GREY PERSPEX SHEET BACKING
1150
100
350
250
250
25
LED STRIP (40 watts)
750
750
00 PACKAGE 3.4 - 100% DD SUBMISSION Rev Description Stage: 3mm STEEL SHEET, WITH LASER CUT LTTERS
2050
8mm THREADED ROD
21/10/15 Date
ISSUED FOR DETAIL DESIGN Consultants:
3mm STEEL SHEET, WRAPPED AROUND POSTS, WITH LASER CUT LETTERS
2050
5
SIGNAGE TYPE 2
2100
- Concept design, - Schematic Design, - Concept/schematic Report, - Masterplan, - General Arrangement Plan, - Planting Plan, - Sections, - Details, - Schedules.
6
STEEL TUBE SPACER
25mm X 114mm TREATED TIMBER BEAMS
01 PROJECTS .
00 PACKAGE 3.4 - 100% DD SUBMISSION Rev Description Stage:
3mm STEEL SHEET, WITH LASER CUT LTTERS
3mm STEEL SHEET, WRAPPED AROUND POSTS, WITH LASER CUT LETTERS
I also lead the design of the signage that will be placed accross the site, as well as doing the details for the individual elements. - Details, - Signage design, - Signage detailing.
I was tasked to lead the landscape part of the project. The mall was being upgraded and the main entrance was to be redesigned.
1. Do not scale from this drawing. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order or manufacture of materials or production of site drawings.
25
25mm X 114mm TREATED TIMBER BEAMS
7
MIXED MEDIA EXPLORATIONS .
02 CONCEPTUAL THINKING .
Multimedia collages, consisting of hand drawn sketches, tracing paper scans, photos, maps, image montage; highlighting studies and analysis information.
CONCEPTUAL SITE ANALYSIS
CONCEPTUAL SITE MONTAGE
03 MAPPING & DIAGRAMS .
CBD of Cape Town, ZA mapping and analytical studies for my thesis project.
HISTORIC
VIEW LINES
SOCIO-ECONOMIC
FOCUS AREA
8 CITY SCALE STUDY
SITE NARRATIVE
BREAKING DOWN THE SCALE - SECTIONS
UNPACKING THE CONCEPTUAL TYPOLOGIES
25 250 100 750
3D REPRESENTATION .
100
9
9
SIGNAGE TYPE 3 1
SIGNAGE TYPE 1
10
SIGNAGE CONCEPT OPTIONS .
04 GRAPHIC REPRESENTATION .
200
400
50
761
25
2050
2100
Our landscape team has been actively involved in all phases of the project. Currently I am assisting in site wayfinding and signage design. This will slot in seamlessly with the design intent and conceptual approach.
SIGNAGE - TYPE 1 : 10
INTERIOR ELEVATIONS - LOUNGE .
10
INTERIOR ELEVATIONS - TOILETS .
04 GRAPHIC REPRESENTATION .
INTERIOR ELEVATIONS - LOBBY .
Interior design elevation renders done for a redevelopment and refurbishment for the Mall of Bahrain.
SECTION & ELEVATION - ROAD .
11
ROAD AND PEDESTRIAN INTERFACE
SECTION ELEVATION - ROAD .
04 GRAPHIC REPRESENTATION .
Road sections to explain the pedestrian & car interface.
Graphic representations of my thesis project. A design in the CBD of the City of Cape Town.
MASTERPLAN REPRESENTATION
04 GRAPHIC REPRESENTATION .
SPACIAL REPRESENTATION OF DESIGN
12
CONCEPTUAL SITE SECTIONS
4* Hotel Masterplan on left and Urban waterfront park on the right.
VIEW POINT
KIOSK
G WIN V IE C K E D
RU BOU LAND S I F REE
RY NDA
LE CYC G& NNIN
CK T RA TR CEN
N AR LAW
T
IC PICN
LAW
N
L A ZA AL P ADMIN & SECURIT Y BUILDIN G
R WATE E 2 R U T A FE
D NDE MOU WN LA G WIN VIE CK DE
ME N EVET
CL IM W BI AL NG L
ER STON
EA
SE & REFU OM R LV O
VIEWING AREA
TM EN
TU S TA
ON E
RE
VE
T
ST
TOP POOL
K
ST
OUTDOOR SPA FACILITIES
ON
ER
POOL
EV
ET
ME
NT
KIOSK
ALK RDW BOA
ING VIEW K DE C
BOARDWALK
PEDESTRIAN ARRIVAL
&C
RAC K
L A WN
PLANTED BERMS
LAW
N AR
KIOS
N IL TO
DROP
EAT R
E
E REFUS Y/EXIT ENTR AREA G IN PARK ING BAYS) K R A P 7 (35
-OFF
K
S ET
EXIT
T
TRUE NORTH
EA
M
MARINA BEACH
AREA
E TS TOIL
JUICE BAR CANOPY
FUTURE BRIDGE CONNECTION
PEDESTRIAN BRIDGE LINK & CHANGING
CENTRAL GARDEN
FUTURE NEIGHBOURHOOD CAFE SPILLOUT SPACE PEDESTRIAN
Notes:
BRIDGE
21/06/24 Date
LH App
ICE SERV ING D BUIL
P.v.E Chk
STON
ISSUED FOR TENDER
G WIN VIE CK DE
Client:
RUN ND BOU AND F ISL REE
ARY
SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
D NDE MOU WN LA
Consultants:
WA L
K
ST
GREEN WALL BALLROOM SPILLOUT
ER
EV
ET
ME
ING VIEW K DE C
NT
TERRACED PLANTING Discipline:
LANDSCAPE ARCHITECTURE Drawn by: EA N AR Designed by:LAW Checked by: Project Title:
R DOO O UT M GY
C YC
LE T
RAC K
L A WN
AREA
TOIL
CASCADING PLANTS PEDESTRIAN BRIDGE LINK & CHANGING
PLANTED BERM
1
LANDSCAPE MASTERPLAN 1 : 300
LAW
KIOS
N
J.P. J.P. P.v.E.
E TS
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
Drawing Title:
GENERAL DRAWINGS LANDSCAPE MASTERPLAN FUTURE PEDESTRIAN BRIDGE
Scale:
1 : 300
Sheet Size: Revision:
A1
Sheet Number:
20078-LSC-TD-DWG-HTL-00-005
00
LIS
IC PICN
CK T RA CEN
E NT
T RA L
LAW
SE RP O S TI-PU T M UL T CO UR R SPO
N
TOILETS
A PLAZ ADMIN & SECURI TY BUILDIN G
R WATE E 2 R FEATU
EA
GUARD HOUSE OUT DOO GYM R
SE & REFU OM LV RO
R WATE 1 URE FEAT
DROP-
-OFF DROP
K
S ET
SUBSTATION
N
IT AMPH
'S DREN CHIL ROUND G PLAY
MAJ
REFUSE
RU NNIN G&
ARRIVAL EXPERIENCE
R BOA
TU E
K
LK DW A IL TO
PLANTING
PLANTED BERM
KIOS
Sub-Consultants: ON
ING VIEW K DE C
PLANTED BERM
LAW
T TM EN AR D
ON E
RE
VE
S TA
ST
BO
CL E & CY
VETM
EXIT
E HEATR REFUSE Y/EXIT ENTR AREA NG PARKI NG BAYS) RKI (357 PA
OFF
ENTRY/EXIT
-O DROP
VIEWING AREA
GREEN WALL
SERVICE YARD
WATER FEATURE
N AR LAW
G WIN VIE CK DE
TIMBER SEAT
STAIR ACCESS
NING
E RE
CL IM W BI AL NG L
00 TENDER DESIGN Rev Description Stage:
GREEN ROOF
E
MECCA
PLANTED BERMS
TERRACED LANDSCAPE
ITH AMPH
-O F F
Key Plan:
R DOO O UT Y M G
YC L ET
LAW
MASTERPLAN .
13
K
HY
POOL DECKING
RU NNI NG
D R OP
'S DREN CHIL ROUND G Y PLA
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. Contractor must report any discrepancies prior to execution REF3.USof Eany works. SUBHY 4. All dimensions must be verified on site prior to order of STATION manufacture of materials or production of site drawings.
ING VIEW K E D C
N
LIS MAJ
General Notes:
BOTTOM POOL
05 PLAN .
KIOS
E
MASTERPLAN .
WA L
VIEW POINT
AR D
LAW
T
EN REVETM
BO
R WATE 1 URE FEAT
STONE
LAWN TERRACE
EXIT
FF
612
213
TERRACED PLANTER
213 626
PLANTING
608 623
626
TERRACED PLANTER
PLANTER
213
204 213
203
626
402
626
612
205
607 608 PLANTER
203
CANOPY SUPPORTS
624
627
213 213
624 624
205 205
624 624
212 212
213 213
15
TIMBER SEAT
213
3%
PLANTING TOW: 8.40
HP
1%
TOW: 8.05
210
FPL: 8.05
BALLROOM
204
DROP OFF
404
FPL: 8.05
FFL: 6.85
203
208
202
O SL
FGL: 8.30
BALLROOM SPILL-OUT
207
TOW: 8.40
PLANTING
FPL: 8.05
SLOPE
1% SL OP E
PE O
PLANTED TERRACES
SLO
3% PE
FPL: 7.33
PE 2%
SLO
PLANTED TERRACES
PE 2%
FPL: 7.326
SLO
213
E
FGL: 9.20
PE SLO
SLOPE
OP
3%
FPL: 5.55
201 202
DN
203 UP
204
FGL: 7.85
205
FFL: 6.10
SL
FPL: 8.30
205
UP
TOW: 7.95 PLANTING
3% SLO PE
TOW: 9.30
FSL: 7.03
Key Value
PLANTING
626LP
FPL: 7.33
FGL: 7.80
FGL: 8.06
2%
3%
E OP 3%
SLOPE
SL
FPL: 7.33
FPL: 8.08
HP
Keynote...
TOW: 7.95
UP
FPL: 9.65
213
DRAIN OUT OF SITE
206
3% 3% SLO PE
BERMED PLANTING
FGL: 8.065
SLOP
221 402 FGL: 7.308
FGL: 7.306
FSL: 7.318
FSL: 7.27
5.86°
FPL: 8.063
FPL: 7.306
SL
FPL: 8.08
FPL: 8.068
O
PE
605 607 608
PE
TOW: 8.07 FSL: 7.28
OP SL
2%
FSL: 7.28
616
FGL: 7.97
FGL: 7.306
617 618 619
E
FGL: 7.60
620 3% 3%
FGL: FGL:8.06 8.06
223
TOW: TOW:8.564 8.564
FPL: FPL:8.05 8.05
FPL: FPL:8.062 8.062
SSLL OOPP EE
33%%
M
EE OPP LO SSL
FPL: FPL:8.05 8.05
FPL: FPL:8.05 8.05
SSLL OOP PEE
TOW: TOW:8.559 8.559
SLOPE SLOPE
FPL: FPL:8.063 8.063
3% 3% SLO S LOP PE E
FPL: FPL:8.07 8.07
GRADING AND DRAINAGE PLAN - LEVEL 00 - PART A
SLOPE
TOW: 8.07
SL OP E
FPL: 8.08 FPL: 8.07
SL
3%
1.5% SLO PE
PE
T-OE
LP
3%
PE
E 670,184.237 m N 2,604,593.872 m
E 670,170.480 m N 2,604,586.233 m
E 670,151.947 m N 2,604,597.288 T-OE m
E 670,150.842 m N 2,604,594.913 m PLANTER
00
220
E 670,163.137 m
BERMED T-OE PLANTING
ISSUED FOR TENDER
E 670,155.177 m N 2,604,573.154 m
221
E 670,138.392 m N 2,604,580.681 m
LANDSCAPE ARCHITECTURE SUSTAINABLE DEVELOPMENT J.P. COMPANY SAOC
J.P. P.v.E.
500
221
50
E 670,162.072 m 220 N 2,604,570.224 m
E 670,158.471 m N 2,604,571.367 m
E 670,161.405 m N 2,604,569.983 m
E 670,160.071 m N 2,604,573.404 m
E 670,161.685 m N 2,604,573.887 m
BERMED PLANTING
E 670,196.613 m N 2,604,556.353 m
3500
220
P-PD P-PD
SETTING OUT PLAN - LEVEL 00 - PART B
219 219
T-HT T-HT
T-OE T-OE
T-OE
E 670,215.827 m N 2,604,546.155 m
SEATING E 670,215.267 m N 2,604,544.950 m
T-HT T-HT
T-CC
T-OE T-OE
T-OE T-OE
T-PD
T-PD
T-CC T-CC
222 222
T-HT T-HT
223 223
T-HT T-HT P-PD P-PD
TIMBER WALL SEAT TIMBER WALL SEAT
T-OE T-OE
PLANTER PLANTER
1
T-PD T-PD
VEGETABLE BOXES
T-CC
JUICE BAR
T-OE T-OE 224 224
221 221
219
223 223
Scale:
T-FA T-FA T-CL T-CL
VEGETABLE VEGETABLE BOXES BOXES
T-OE T-OE T-OE T-OE
224 224
221 221
T-OE T-OE
T-BS T-BS
P-PD
T-FA
NEIGHBOURHOOD CAFE
P-RR
T-BS
00
Keynote Text Surface - Decking Surface - Mix 1 Surface - Mix 2 Surface - Mix 3 Surface - Mix 4 Surface - Mix 5 Surface - Mix 6 Surface - Herb Mix Surface - Vegetable Surface - Lawn Furniture Freestanding Planter Type 4
Drawn by: Designed by: Checked by: Project Title:
J.P. J.P. P.v.E.
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI Drawing Title:
SOFT LANDSCAPE PLAN LEVEL 00 - PART A Scale:
1 : 200
Sheet Size: Revision:
A1
00
Key Plan:
T-OE
219
A1
General Notes: Sheet Number: 1. Do not scale from this drawings. 20078-LSC-TD-DWG-HTL-53-L00-A 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
T-BS LOBBY SPILL OUT SEATING CLUSTERS
TRUE NORTH
201 218 219 220 221 222 223 224 225 227 612
T-OE
T-OE
T
Keynote... Key Value
P-PD P-PD
T-OE
Sheet Size: Revision:
1 : 200 Sheet Number: Discipline:
20078-LSC-TD-DWG-HTL-45-L00-B LANDSCAPE ARCHITECTURE
T-OE T-OE
225 225
CAFE CAFEOUT SPILL SPILL OUT
T-FA
OUT PLAN LEVEL 00 - PART B
T-BS T-BS
T-FA T-FA
T-FA
Sub-Consultants: SETTING
219 219
VEGETABLE VEGETABLE BOXES BOXES
1 : 200
Drawing Title:
P-PD P-PD
T-BS T-BS
224 224
T-OE T-OE
T-BS
T-BS T-BS
T-OE T-OE
J.P. P.v.E.
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
T-OE
P-RR P-RR
T-BS T-BS
T-BS T-BS SOFT LANDSCAPE PLAN - LEVEL 00 - PART A
FPL: 8.49
M
T-HT T-HT
T-OE T-OE
225 225
Drawn by: INVESTMENT Designed by: Checked by: Project Title: Consultants:
T-OE PLANTER
T-PD T-PD
FIREPIT FIREPIT
T-BS
P.v.E Chk
LANDSCAPE ARCHITECTURE SUSTAINABLE DEVELOPMENT J.P. COMPANY SAOC
220
T-BS
PLANTING
221 221 T-HT T-HT
LH App
ISSUED FOR TENDER
T-HT
225
221 221
T-OE T-OE
21/06/24 Date
Discipline:
T-HT
PLANTED BERMS
T-CC
T-CL T-CL
00
SIGNAGE
P-PD P-PD
221 221
00 TENDER DESIGN Rev Description Stage:
221
JUICE BAR TERRACE
220 220
Sheet Size: Revision:
E 670,213.812 m N 2,604,551.667 m
E 670,211.667 m N 2,604,546.623 m
T-PD
T-CC
222 222
T-HT T-HT
T-HT T-HT
GRADING AND DRAINAGE PLAN LEVEL 00 - PART A
General Notes: Sheet Number: 1. Do not scale from this drawings. 20078-LSC-TD-DWG-HTL-44-L00-A 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
PLANTER
E 670,219.761 m N 2,604,552.225 m
Sub-Consultants:
T-PD
E 670,211.496 m N 2,604,551.856 m
221
T-CC
T-OE
PLANTED PLANTED BERMS BERMS
T-OE T-OE T-HT T-HT
Consultants:
T-HT
T-CC
P.v.E Chk
E 670,229.079 m N 2,604,552.105 m
218
222
LH App
Client:
OUTDOOR SHOWER
223
1 : 200
E 670,215.997 m N 2,604,553.974 m
E 670,212.131 m N 2,604,552.284 m
E 670,189.059 m N 2,604,557.847 m
PLANTER PLANTER
J.P. J.P. P.v.E.
E 670,203.273 m N 2,604,554.387 m POOL SLOT DRAIN
21/06/24 Date
E 670,222.418 m N 2,604,553.196 m
T-OE
221
E 670,210.098 mT-CC N 2,604,556.716 m
BEACH
SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
DN
T-CC
M MECCA MARINA
Notes:
E 670,223.079 m N 2,604,554.619 m
E223 670,207.656 m N 2,604,558.485 m
T
TRUE NORTH
ISSUED FOR TENDER
E 670,219.473 m N 2,604,556.522 m
T-PD
PLANTING
T-PD
BEACH
Client:
E 670,225.067 m
E 670,218.038 m N 2,604,556.960 m
MARINA
00 TENDER DESIGN Rev Description Stage:
E 670,236.439 m N 2,604,557.190 m
SIGNAGE
T-OE T-OE
1
E 670,196.686 m N 2,604,558.474 m
E 670,189.224 m N 2,604,562.793 m
P-RR
T-BS
ARRANGEMENT PLAN LEVEL 00 - PART B
Sheet Number: Discipline:
E 670,183.785 m
SIGNAGE
223
E 670,243.110 m N 2,604,557.677 m 40
E 670,242.175 m N 2,604,557.190 m
E 670,232.179 m N 2,604,558.776 m
E 670,226.931 m N 2,604,561.215 m
T-CC
T-OE
E 670,191.051 m N 2,604,564.501 m
223
Drawing Title:
E 670,206.502 m N 2,604,562.204 m
P-PD
220
Sub-Consultants: GENERAL
11
E 670,233.885 m N 2,604,561.102 m
221
E 670,209.870 m N 2,604,560.639 m
P-PD
E 670,160.971 m N 2,604,574.035 m
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
E 670,230.538 m N 2,604,560.973 m
221N 2,604,561.004 m 222
N 2,604,568.611 MAIN POOL m
TOWEL DROP
E 670,237.337 m N 2,604,559.527 m
E 670,225.040 m N 2,604,562.630 m
220
P-PD
E 670,164.630 m PLANTER N 2,604,569.238 m
0
E 670,226.593 m N 2,604,562.806 m
222
E 670,185.610 m N 2,604,570.319 m
E 670,182.563 m N 2,604,569.543 m
E 670,167.844 m N 2,604,576.358 m P-PD
E 670,162.758 m N 2,604,571.702 m E 670,164.710 m N 2,604,570.855 m
E 670,158.397 m N 2,604,572.228 m
222
E 670,183.614 m N 2,604,571.811 m E 670,179.167 m N 2,604,573.870 m
E 670,162.732 m N 2,604,572.173 m
E 670,163.092 m N 2,604,574.250 m
223
223
PLANTED TERRACES
E 670,238.544 m N 2,604,559.723 m
E 670,231.402 m N 2,604,560.851 m
E 670,181.659 m N 2,604,577.508 m
N 2,604,576.178 m
50 0
Discipline:
E 670,165.408 m N 2,604,578.121 m
E 670,233.418 m N 2,604,561.166 m TERRACED PLANTER
PLANTING
223E 670,167.044 m
E 670,162.516 m N 2,604,575.775 m
P.v.E Chk
E 670,196.054 m N 2,604,579.679 m
PLANTING
E 670,168.790 m N 2,604,578.675 m
E 670,164.335 m N 2,604,578.335 m
E 670,155.515 m N 2,604,582.041 m
E 670,157.533 m N 2,604,580.582 m
221
2000
BALLROOM SPILL-OUT
PRE-FUNCTION
E 670,192.810 m N 2,604,580.453 m
E 670,169.949 m N 2,604,581.781 m
E 670,247.492 m N 2,604,563.952 m
1000
E 670,244.979 m N 2,604,565.724 m
E 670,198.808 m N 2,604,585.933 m
E 670,194.896 m N 2,604,582.276 m
E 670,185.861 m N 2,604,581.818 m
4000
E 670,167.229 221 m N 2,604,582.466 m
STORE N 2,604,582.007 m E 670,165.404 m N 2,604,580.716 m
E 670,187.862 m N 2,604,582.580 m
E 670,169.630 m N 2,604,583.833 m
E 670,164.495 m 222
N 2,604,584.929 m
222
WATER FEATURE
E 670,192.463 m N 2,604,582.857 m
E 670,171.069 m N 2,604,584.718 m
E 670,168.360 m N 2,604,585.459 m
E 670,148.814 m N 2,604,589.209 m
T-OE
E 670,185.121 m N 2,604,583.704 m P-RR
E 670,171.223 m E 670,175.746 m N 2,604,585.160 m N 2,604,583.899 m
E 670,166.750 m N 2,604,587.000 m
T-OE
E 670,158.073 m N 2,604,584.431 m POOL
T-OE
E 670,189.743 m N 2,604,588.845 m
E 670,178.880 m N 2,604,589.304 m
E 670,170.903 m N 2,604,586.037 m
BERMED PLANTING T-OE
E 670,151.371 m N 2,604,591.599 m 65
P-PD
E 670,201.598 m N 2,604,583.926 m
M MECCA
Notes:
E 670,247.784 m N 2,604,565.618 m
E 670,245.236 m N 2,604,566.797 m
E 670,202.865 m N 2,604,584.007 m
E 670,192.139 m N 2,604,590.731 m
T
TRUE NORTH
Key Plan:
E 670,246.908 m N 2,604,568.870 m
1700
E 670,244.307 m N 2,604,569.351 m
80 0
750
E 670,189.334 m N 2,604,589.511 m
E 670,179.231 m N 2,604,589.489 m
BALLROOM
E 670,204.833 m N 2,604,585.847 m
1000
E 670,189.155 m N 2,604,591.912 m
E 670,179.140 m N 2,604,590.537 m
E223 670,155.138 m N 2,604,604.154 m
612
E 670,133.404 m N 2,604,593.662 m
A1
201N 2,604,595.856 m
N 2,604,590.946 m
E 670,147.668 m N 2,604,596.388 m
00
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
E 670,247.199 m N 2,604,570.535 m
E 670,244.498 m N 2,604,570.857 m 1660
E 670,189.490 m PLANTER N 2,604,592.822 m
E 670,183.197 m
DROP OFF
T-OE
Drawn by: Designed by: Checked by: Project Title:
E 670,192.147 m N 2,604,592.035 m
E 670,178.958 m P-RR
E 670,148.773 m N 2,604,598.764 m
T-OE
Key Plan: FPL: 8.067
SL O
PE O S L 3%
FPL: 8.08
O
FPL: 8.08
E SL
FPL: 8.062
FPL: 8.056
OP
E 670,174.473 m N 2,604,605.189 m
E 670,156.590 m N 2,604,604.185 TOWEL DROP m
P.v.E Chk
A1
General Notes:
E 670,239.705 m N 2,604,574.327 m E 670,238.580 m N 2,604,574.333 m
E 670,204.881 m N 2,604,587.261 m
P-RR
Client:
1 : 200
FPL: 7.62
E 670,164.690 m N 2,604,606.209 m
Sub-Consultants:
Scale:
FGL: 7.95
1 : 200
E 670,162.215 m N 2,604,607.112 m
220
TOP POOL
OUTDOOR SPA FACILITIES
T-OE
Drawing Title: 3% 3%
FPL: FPL:8.08 8.08
3% 3%
E 670,163.833 m E 670,173.391 m N 2,604,606.785 m N 2,604,605.973 m
E 670,151.964 m N 2,604,605.629 m
BEACH
E 670,244.864 m E 670,245.072 m N 2,604,580.934 m N 2,604,580.707 m
PLANTING
E 670,194.803 m N 2,604,593.900 m E 670,162.445 m N 2,604,607.430 m
E 670,155.261 m N 2,604,605.607 m
E 670,152.864 m N 2,604,607.567 m
MARINA
E 670,254.271 m N 2,604,580.662 m
E 670,196.571 m N 2,604,595.141 m GREEN WALL
5
E 670,153.452 m SIGNAGE N 2,604,607.644 m
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
SLOPE SLOPE
TERRACED PLANTER
T-OE
MECCA
00
NEIGHBOURHOOD CAFE
ROOF ACCESS STAIRS
E 670,160.838 m N 2,604,611.807 m
TRUE NORTH
A1
E 670,206.791 m N 2,604,615.948 m E 670,203.766 m N 2,604,618.326 m
Sheet Size: Revision:
1 : 200
General Notes: Sheet Number: 1. Do not scale from this drawings. 20078-LSC-TD-DWG-HTL-45-L00-A 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
E 670,251.396 m EN670,251.396 mm 2,604,597.245 N 2,604,597.245 m E 670,249.983 m N 2,604,597.292 m
LOBY
T-OE E 670,151.107 m
T-OE
Sheet Size: Revision:
Scale: E 670,248.930 m EN670,248.930 mm 2,604,598.418 N 2,604,598.418 m
E 670,245.020 m N 2,604,579.300 m
Consultants:
1 : 200
2526
2526
E 670,157.853 m N 2,604,619.976 m
218
Notes:
SLOPE SLOPE
FPL: FPL:7.92 7.92
221
12 41
SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
Scale:
SETTING OUT PLAN LEVEL 00 - PART A
E 670,255.505 m EN670,255.505 mm 2,604,601.085 N 2,604,601.085 m
E 670,255.225 m N 2,604,581.396 m
N 2,604,620.407 m
222
T
Drawn by: INVESTMENT Designed by: Checked by: Project Title: Consultants:
3000
3000
Key Plan:
T-OE T-OE
LH App
PLANTER PLANTER
PLANTER
BEACH
21/06/24 Date
Drawing Title: 50 0
50 0
CAFE CAFEOUT SPILL SPILL OUT
J.P. J.P. P.v.E.
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
E 670,253.782 m N 2,604,585.224 m
MARINA
00 TENDER DESIGN Rev Description Stage:
E 670,251.024 m EN670,251.024 mm 2,604,606.840 N 2,604,606.840 m
E 670,255.648 m EN670,255.648 mm 2,604,605.325 N 2,604,605.325 m
T-OE
20078-LSC-TD-DWG-HTL-10-L00-B LANDSCAPE ARCHITECTURE
FPL: FPL:8.55 8.55 FGL: FGL:7.97 7.97
TOW: TOW:8.07 8.07
FPL: FPL:7.47 7.47
626
FPL: FPL:8.055 8.055
3% 3% SLO S LO P PE E
FGL FGL7.60 7.60
3% 3%
FSL: FSL:7.32 7.32
1
624 TOW: TOW:9.05 9.05
PE SLOPE SLO 3% 3%
66.9.9 55°°
SLOPE SLOPE
SLOPE SLOPE
622
FGL: FGL:8.066 8.066
FPL: FPL:8.08 8.08
621
FGL: FGL:8.95 8.95
FPL: FPL:8.07 8.07
FGL: FGL:7.18 7.18
SLO SLOPE PE FPL: FPL:8.08 8.08
5.78°
FGL: FGL:7.80 7.80
FGL: FGL:7.18 7.18
TOW: TOW:7.90 7.90
E PE OP SLLO S % 33%
1 : 200
FPL: FPL:7.32 7.32
PE SLOPE SLO
PEE OP LO SSL
FGL: FGL:7.80 7.80
GENERAL ARRANGEMENT PLAN - LEVEL 00 - PART B
614 615
FGL: 7.276
SLOPE
O
FGL: 7.19
E
SL
FGL: 3.80
SLOP
TOW: 7.60
1%
1
404 604
FPL: 8.06
FPL: 7.29
SLOPE
1%
SLOPE
213
E
BERMED PLANTING
OP E
FPL: 7.90
212
PLANTING
Surface - Decking Surface - Pre Cast Concrete Type1 Surface -Precast Concrete Type 2 Surface - Precast Concrete Type 3 Surface - In Situ Exposed Aggregate Concrete Surface - In Situ Concrete (Smooth) Surface - Sohar Marble Surface - Pebbles Surface - Porcelain Tile - Mark Gypsum Surface - Concrete Tile Surface - Natural Stone Cladding Surface - Mix 4 Structure - Insitu Concrete Wall With Coping- Type 2 (300mm wide) Structure - Pool Wall Furniture - Bicycle Rack - Steel Furniture - Fire Pit Furniture - Table Furniture - Wooven Side Table Furniture - Timber Seating Furniture - Valet Stand Furniture - ID Couch Outdoor Furniture - ID Chair Outdoor Furniture - ID Pouf Furniture - ID Side Table Furniture - Small ID Pot Furniture - Medium ID Pot Furniture - Large ID Pot Furniture - Standard Handrail Furniture Ballustrade
E 670,241.850 m EN670,241.850 mm 2,604,616.195 N 2,604,616.195 m
E 670,263.315 m EN670,263.315 mm 2,604,605.736 N 2,604,605.736 m
E 670,252.401 m EN670,252.401 mm 2,604,608.801 N 2,604,608.801 m
GRASS TERRACE
500
E SLOP 3%
FPL: 7.322 SIGNAGE
PLANTING
SIGNAGE FSL: 7.31
207 208 210
FGL: 8.95 FPL: 8.08
3%
E
E
FPL: 7.33
FPL: 7.33
FPL: 8.06
FPL: 7.33 SL OP E
3%
SLOPE
213
OP
OP SL
TOW: 7.90
FPL: 3.90
3%
SL
BERMED PLANTING DOWN PIPE
FPL: 7.33
3%
FPL: 7.32
SL
FPL: 8.044
SLOP
E
TOW: 9.05
Keynote Text
E 670,251.557 m EN670,251.557 mm 2,604,608.604 N 2,604,608.604 m
E 670,238.776 m EN670,238.776 mm 2,604,619.484 N 2,604,619.484 m
T-OE
ISSUED FOR TENDER
TOW: 7.136 FGL: 7.85
205
TOW: 9.60
E 670,155.948 m N 2,604,630.822 m
LANDSCAPE ARCHITECTURE Drawn by: Designed by: Checked by: Project Title:
PLANTER PLANTER
227
E 670,151.613 m N 2,604,632.837 m
MECCA
LH App
Discipline: E 670,265.666 m EN670,265.666 mm 2,604,610.082 N 2,604,610.082 m
11 00
PE
FPL: 7.33 ARRIVAL SIGNAGE
FPL: 8.05
FPL: 8.25 SL OP E 3%
220
E 670,257.889 m EN670,257.889 mm 2,604,618.400 N 2,604,618.400 m
E 670,206.164 m N 2,604,617.775 m
E 670,200.374 m N 2,604,619.320 m E 670,202.232 m N 2,604,616.892 m
Client:
SLOPE
SLOPE
FPL: 8.70
FFL: 9.50
E 670,198.003 m N 2,604,624.494 m
T
21/06/24 Date
E 670,199.543 m N 2,604,622.846 m E 670,199.946 m N 2,604,621.874 m
00 10 00
10
E 670,211.041 m N 2,604,618.796 m E 670,210.073 m N 2,604,619.281 m
00
E 670,157.267 m N 2,604,633.661 m
M
2500
2000
FPL: 7.33 FPL: 8.08
FPL: 8.08
PLANTING
TOW: 6.35
O SL
UP FPL:9.60 FPL: 9.150
FGL: 6.25 PLANTING
22
E 670,196.480 m N 2,604,623.043 m
TRUE NORTH
00 TENDER DESIGN Rev Description Stage:
DEOP-OFF SIGNAGE
402 BERMED PLANTING
E 670,197.616 m N 2,604,626.923 m
E 670,167.462 m N 2,604,640.650 m
E 670,206.996 m EN670,206.996 mm 2,604,623.615 N 2,604,623.615 m2500
Sub-Consultants:
VEGETABLE VEGETABLE BOXES BOXES
E 670,261.085 m EN670,261.085 mm 2,604,622.294 N 2,604,622.294 m
1000 1000
E 670,243.022 m EN670,243.022 mm 2,604,620.640 N 2,604,620.640 m E 670,243.326 m EN670,243.326 mm 2,604,616.781 N 2,604,616.781 m
E 670,212.642 m EN670,212.642 mm 2,604,621.181 N 2,604,621.181 m E 670,211.673 m EN670,211.673 mm 2,604,621.701 N 2,604,621.701 m
1500
FPL: 9.20
SL
PE
FPL: 8.05
TOW: 10.00
PRE-FUNCTION
TIMBER WALL SEAT TIMBER WALL SEAT
PLANTER PLANTER
E 670,212.527 m EN670,212.527 mm 2,604,625.856 N 2,604,625.856 m E 670,212.484 m EN670,212.484 mm 2,604,627.092 N 2,604,627.092 m
E 670,249.300 m EN670,249.300 mm 2,604,623.922 N 2,604,623.922 m
E 670,254.676 m EN670,254.676 mm 2,604,623.866 N 2,604,623.866 m E 670,258.241 m EN670,258.241 mm 2,604,621.286 N 2,604,621.286 m E 670,257.663 m EN670,257.663 mm 2,604,619.372 N 2,604,619.372 m
10 00
WATER FEATURE
FFL: 9.34
FIREPIT FIREPIT
1 : 200
E 670,152.805 m N 2,604,635.404 m
Notes:
00
E 670,195.740 m N 2,604,627.754 m
SETTING OUT PLAN - LEVEL 00 - PART A
Key Plan:
615
FGL: 7.95
00
1575
69 6
69 6
E 670,252.522 m N 2,604,627.062 m
E 670,247.709 m EN670,247.709 mm 2,604,623.151 N 2,604,623.151 m
E 670,241.880 m EN670,241.880 mm 2,604,621.365 N 2,604,621.365 m E 670,239.053 m EN670,239.053 mm 2,604,620.312 N 2,604,620.312 m
E 670,261.954 m N 2,604,623.201 m
1575
750
SLOPE
PLANTING
22 22
445 445
84
84
800
213 FPL:9.10
JACOB STEEL GREEN WALL
MODULAR GREEN WALL
TOW: 6.80
OP E
TOW: 9.60 TOW: 9.10
1
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
PLANTING
10 00 10 00
E 670,199.346 m EN670,199.346 mm 2,604,631.357 N 2,604,631.357 m
General Notes:
FPL: 8.045
SLOPE 3%
05 PLAN .
ROOF ACCESS STAIRS
FSL: 8.20
FPL:9.18
00
E 670,218.525 m EN670,218.525 mm 2,604,626.503 N 2,604,626.503 m
E 670,210.585 m EN670,210.585 mm 2,604,629.392 N 2,604,629.392 m
E 670,204.015 m EN670,204.015 mm 2,604,632.081 N 2,604,632.081 m
Key Plan:
PE
SL
E 670,204.930 m EN670,204.930 mm 2,604,632.743 N 2,604,632.743 m
E 670,225.897 m EN670,225.897 mm 2,604,627.873 N 2,604,627.873 m
E 670,259.048 m EN670,259.048 mm 2,604,621.985 N 2,604,621.985 m
700
620
E 670,206.587 m EN670,206.587 mm 2,604,630.998 N 2,604,630.998 m
10 10
E 670,232.856 m EN670,232.856 mm 2,604,626.311 N 2,604,626.311 m E 670,230.860 m EN670,230.860 mm 2,604,625.542 N 2,604,625.542 m E 670,229.115 m EN670,229.115 mm 2,604,624.870 N 2,604,624.870 m E 670,234.388 m EN670,234.388 mm 2,604,621.419 N 2,604,621.419 m
E 670,255.430 m N 2,604,624.515 m
E 670,247.667 m N 2,604,630.973 m
E 670,242.504 m E 670,249.124 m mm EN670,242.504 m m EN670,249.124 2,604,627.120 2,604,630.870 N 2,604,630.870 m N 2,604,627.120 m E 670,248.315 m EN670,248.315 mm 2,604,624.833 N 2,604,624.833 m E 670,239.779 m E 670,247.459 m EN670,239.779 mm 2,604,628.978 EN670,247.459 mm 2,604,623.724 N 2,604,628.978 m N 2,604,623.724 m
11 2 11 5 25 11 2 11 5 25 11 2 11 5 25 11 2 11 5 25
E 670,271.732 m N 2,604,623.133 m
E 670,265.893 m N 2,604,625.517 m
JUICE BAR 1278
E 670,244.741 m N 2,604,631.171 m
Consultants:
PLANTING
E 670,262.838 m N 2,604,629.243 m
50 0 50 0
O
A1
E 670,216.874 m EN670,216.874 mm 2,604,627.539 N 2,604,627.539 m
75 0
E 670,263.547 m N 2,604,630.059 m
1000
E 670,256.192 m N 2,604,629.642 m
15001500
212
FPL: 8.05
SL
Sheet Size: Revision:
1 : 200
207
202
E 670,207.794 m EN670,207.794 m m PLANTED 2,604,640.097 N 2,604,640.097 m PLANTED BERMS BERMS
4000
E 670,229.857 m EN670,229.857 mm 2,604,629.978 N 2,604,629.978 m
E 670,227.597 m EN670,227.597 mm 2,604,631.878 N 2,604,631.878 m
E 670,223.625 m EN670,223.625 mm 2,604,631.771 N 2,604,631.771 m E 670,222.680 m EN670,222.680 mm 2,604,631.573 N 2,604,631.573 m
E 670,204.271 m EN670,204.271 mm 2,604,624.240 N 2,604,624.240 m
General Notes: Sheet Number: 1. Do not scale from this drawings. 20078-LSC-TD-DWG-HTL-10-L00-A 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
FGL: 9.00
FSL: 8.35
E 670,228.266 m EN670,228.266 mm 2,604,631.250 N 2,604,631.250 m
E 670,223.499 m EN670,223.499 mm 2,604,628.423 N 2,604,628.423 m
E 670,161.755 m N 2,604,643.316 m
E 670,239.443 m N 2,604,633.429 m E 670,238.161 m EN670,238.161 mm 2,604,633.177 N 2,604,633.177 m
P.v.E Chk
SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
E 670,264.689 m N 2,604,630.392 m
1286
E 670,259.998 m N 2,604,633.201 m
LH App
ISSUED FOR TENDER
00
E 670,248.043 m N 2,604,633.758 m
E 670,246.604 m N 2,604,632.747 m
E 670,222.140 m N 2,604,642.631 m
PLANTER PLANTER
E 670,205.944 m EN670,205.944 mm 2,604,644.315 N 2,604,644.315 m
E 670,204.638 m EN670,204.638 mm 2,604,641.074 N 2,604,641.074 m
Scale:
LOBY
E 670,221.400 m N 2,604,645.543 m E 670,213.264 m EN670,213.264 mm 2,604,647.231 N 2,604,647.231 m
4000
10 00
21/06/24 Date
Client:
E 670,263.431 m N 2,604,633.240 m E 670,265.737 m N 2,604,631.550 m
15
E 670,248.965 m N 2,604,632.234 m
E 670,269.424 m N 2,604,632.402 m
E 670,265.037 m N 2,604,637.504 m
E 670,263.210 m N 2,604,634.270 m
E 670,253.024 m N 2,604,637.065 m
00 TENDER DESIGN Rev Description Stage:
E 670,264.096 m N 2,604,641.273 m
E 670,253.998 m E 670,259.845 m N 2,604,637.139 m N 2,604,633.893 m
E 670,239.350 m N 2,604,634.488 m
PLANTED BERMS
E 670,267.125 m N 2,604,640.868 m 00
45 61
E 670,244.550 m N 2,604,633.311 m
E 670,241.917 m N 2,604,637.529 m
E 670,230.949 m N 2,604,645.160 m
FFL 3.900 m
E 670,258.618 m N 2,604,641.398 m
E 670,248.247 m N 2,604,637.480 m
E 670,244.232 m N 2,604,636.869 m
E 670,233.695 m N 2,604,644.629 m
E 670,225.232 m N 2,604,644.733 m
PLANTER
BEACH
E 670,266.866 m N 2,604,641.698 m
E 670,262.613 m N 2,604,642.907 m 10
E 670,256.009 m N 2,604,639.747 m
E 670,238.591 m N 2,604,641.833 m
M MECCA MARINA
Notes:
E 670,285.370 m N 2,604,639.289 m
PLANTER
E 670,257.745 m N 2,604,642.790 m
E 670,246.465 m N 2,604,641.634 m
E 670,237.518 m N 2,604,644.570 m
T
TRUE NORTH
E 670,274.253 m N 2,604,642.791 m
E 670,264.063 m N 2,604,644.697 m
E 670,261.346 m N 2,604,643.086 m
E 670,255.120 m N 2,604,644.806 m
E 670,244.177 m N 2,604,639.877 m
E 670,224.154 m N 2,604,647.452 m
E 670,219.048 m N 2,604,648.743 m
E 670,250.785 m N 2,604,649.965 m E 670,254.544 m N 2,604,646.168 m
E 670,241.222 m N 2,604,650.134 m
E 670,235.408 m N 2,604,645.685 m
E 670,229.889 m N 2,604,646.641 m
E 670,218.299 m N 2,604,649.581 m
E 670,208.632 m N 2,604,654.778 m
E 670,208.443 m EN670,208.443 mm 2,604,646.734 N 2,604,646.734 m
GENERAL ARRANGEMENT PLAN LEVEL 00 - PART A
VEGETABLE VEGETABLE BOX BOX
616
TOW: 9.10
E 670,231.787 m N 2,604,647.233 m
E 670,217.248 m N 2,604,654.840 m
E 670,215.337 m N 2,604,652.990 m
Drawing Title:
614 614
617
FGL: 8.30
E 670,217.258 m N 2,604,655.268 m
E 670,209.399 m N 2,604,654.315 m
E 670,249.912 m N 2,604,650.899 m
E 670,238.694 m N 2,604,650.714 m
E 670,230.461 m N 2,604,654.029 m E 670,218.360 m N 2,604,655.917 m
1500
E 670,205.257 m N 2,604,658.777 m
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
626 626 213 213
605
LOBBY SPILL OUT SEATING CLUSTERS
203
E 670,173.310 m N 2,604,679.521 m
E 670,252.081 m N 2,604,649.817 m
E 670,246.354 m N 2,604,652.111 m
E 670,263.461 m N 2,604,650.573 m
E 670,261.088 m N 2,604,644.874 m
31003100
BALLUSTRADE BALLUSTRADE
201 201
NEIGHBOURHOOD CAFE
E 670,218.413 m E 670,227.932 m N 2,604,658.019 m N 2,604,654.610 m
E 670,217.186 m N 2,604,659.332 m
J.P. J.P. P.v.E.
E 670,260.452 m N 2,604,650.287 m
E 670,222.284 m N 2,604,660.651 m
2200
402
E 670,185.205 m N 2,604,681.916 m
PLANTER PLANTER
PLANTER
E 670,235.007 m N 2,604,654.655 m
E 670,233.177 m N 2,604,655.075 m
20
E 670,216.745 m N 2,604,662.093 m
22002200
604 604
617
14
23
E 670,216.473 m N 2,604,662.219 m
E 670,210.967 m N 2,604,659.803 m
Drawn by: Designed by: Checked by: Project Title:
621 621
618
E 670,210.206 m N 2,604,671.224 m
E 670,204.041 m N 2,604,658.348 m
E 670,247.215 m E 670,236.861 m N 2,604,655.861 m N 2,604,664.031 m
E 670,258.807 m N 2,604,651.444 m
2320
E 670,221.875 m N 2,604,663.213 m
E 670,183.575 m N 2,604,682.674 m
P.v.E Chk
E 670,271.103 m E 670,273.828 m N 2,604,647.979 m N 2,604,646.117 m E 670,275.419 m N 2,604,645.300 m
E 670,261.464 m N 2,604,652.131 m
300300
614 614
212
LH App
E 670,265.415 m N 2,604,651.841 m
E 670,240.084 m N 2,604,663.489 m
MAIN POOL
LANDSCAPE ARCHITECTURE
SIGNAGE SIGNAGE BICYCLE BICYCLE PARKING PARKING
213 213
CAFE CAFE SPILL OUT SPILL OUT
212
E 670,209.082 m N 2,604,671.748 m E 670,182.758 m N 2,604,683.053 m
Discipline:
622 622
201 201
1 : 200
21/06/24 Date
E 670,210.575 m N 2,604,670.215 m
200200
201 201
GENERAL ARRANGEMENT PLAN - LEVEL 00 - PART A
E 670,235.398 m N 2,604,664.547 m
E 670,211.491 m N 2,604,674.515 m
E 670,176.213 m N 2,604,685.765 m
E 670,260.286 m N 2,604,655.880 m E 670,249.131 m N 2,604,658.707 m
E 670,238.063 m N 2,604,664.201 m
80
E 670,233.132 m N 2,604,666.971 m
E 670,210.568 m N 2,604,674.944 m
E 670,176.611 m N 2,604,685.910 m
5035 5035
614 614
203 203
VEGETABLE VEGETABLE BOX BOX
E 670,225.267 m N 2,604,670.510 m
00
16
E 670,232.789 m N 2,604,668.718 m
25002500
1
E 670,189.013 m N 2,604,683.741 m
22
Sub-Consultants:
TIMBER TIMBER WALL SEAT WALL SEAT
TIMBER TIMBER WALL SEAT WALL SEAT
221 221
605 605
E 670,185.365 m N 2,604,688.663 m
E 670,233.737 m N 2,604,671.200 m
16 80
E 670,212.675 m N 2,604,674.777 m
POOL STORE
E 670,237.268 m N 2,604,671.397 m
0 0 270270
PLANTER PLANTER
213 213
E 670,187.358 m N 2,604,686.548 m
E 670,224.971 m N 2,604,672.366 m
20 00
4000
204 204
608 608
206 206
619 619
E 670,192.886 m N 2,604,684.246 m
E 670,214.323 m N 2,604,678.324 m
TERRACED PLANTER
10 00
E 670,233.265 m N 2,604,673.612 m
E 670,213.911 m N 2,604,679.453 m
E 670,204.732 m N 2,604,685.601 m
E 670,202.513 m N 2,604,684.970 m
E 670,203.065 m N 2,604,658.803 m
PLANTER PLANTER
207 207 616 616
E 670,212.882 m N 2,604,679.925 m
E 670,209.567 m N 2,604,649.522 m
203 203
FIREPIT FIREPIT
E 670,182.922 m N 2,604,691.246 m
213 213
212 212
PLANTED PLANTED BERMS BERMS
TIMBER TIMBER WALL SEAT WALL SEAT
E 670,194.193 m N 2,604,687.060 m
E 670,188.480 m N 2,604,688.961 m
E 670,237.453 m N 2,604,673.280 m
E 670,231.959 m N 2,604,679.177 m
E 670,217.929 m N 2,604,675.494 m
PLANTING
607 607
207 207
E 670,190.077 m N 2,604,692.397 m
00
E 670,242.471 m N 2,604,668.880 m
E 670,237.091 m N 2,604,672.502 m E 670,205.576 m N 2,604,685.279 m
E 670,193.283 m N 2,604,688.034 m
00
E 670,239.242 m N 2,604,669.724 m E 670,241.206 m N 2,604,669.485 m
E 670,213.181 m N 2,604,684.977 m
JUICE BAR
SIGNAGE SIGNAGE
212 212
20
20
408 VEGETABLE BOX
PLANTER PLANTER
E 670,186.491 m N 2,604,691.087 m
E 670,193.570 m N 2,604,689.725 m
Consultants:
PLANTED BERMS
PLANTER PLANTER
20
E 670,182.561 m N 2,604,693.461 m
23
E 670,207.062 m N 2,604,685.633 m
E 670,237.101 m N 2,604,675.489 m
1325
205
606
JUICE BAR TERRACE
201
PLANTER
206
29 2000 3800 00
E 670,184.933 m N 2,604,692.755 m
PLANTER
00
E 670,230.933 m N 2,604,679.635 m
2200
SIGNAGE
213
E 670,207.301 m E 670,199.440 m N 2,604,691.703 m N 2,604,686.609 m E 670,197.920 m N 2,604,689.852 m
SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
212
SIGNAGE
624
202
E 670,191.299 m N 2,604,695.726 m
E 670,184.580 m N 2,604,694.962 m
23
E 670,213.211 m N 2,604,688.477 m E 670,212.775 m N 2,604,687.547 m
1676
E 670,201.221 m N 2,604,693.114 m
40
SIGNAGE
E 670,200.582 m N 2,604,693.191 m
2320
609
E 670,222.693 m N 2,604,684.454 m
E 670,199.424 m N 2,604,692.434 m
E 670,193.363 m N 2,604,693.081 m
E 670,232.512 m N 2,604,679.292 m E 670,234.132 m N 2,604,678.664 m
PLANTER
E 670,196.692 m N 2,604,693.041 m
Client:
601
213
E 670,212.915 m N 2,604,690.332 m
E 670,198.355 m N 2,604,695.410 m
E 670,195.803 m N 2,604,695.835 m
E 670,231.080 m N 2,604,682.280 m
1680
201
608
E 670,193.297 m N 2,604,695.775 m
E 670,187.642 m N 2,604,693.563 m
ISSUED FOR TENDER
623
OUTDOOR SPA FACILITIES
E 670,186.845 m N 2,604,702.703 m
1200
Key Plan:
E 670,225.312 m N 2,604,691.489 m
TOP POOL
E 670,200.043 m N 2,604,699.028 m
2300
E 670,197.598 m N 2,604,699.697 m
E 670,202.452 m N 2,604,701.526 m
2320
SIGNAGE
PLANTER
E 670,186.732 m N 2,604,704.595 m
BEACH
00 TENDER DESIGN Rev Description Stage:
402
402
213
202
BICYCLE PARKING
606
POOL SLOT DRAIN
213
203
E 670,188.860 m N 2,604,704.197 m
20
2348
211 626
625
PLANTER
MARINA
E 670,197.486 m N 2,604,701.591 m
20 00
23
22 00
205
E 670,193.159 m N 2,604,707.951 m
E 670,185.912 m N 2,604,705.922 m
MECCA
E 670,199.945 m N 2,604,700.427 m
58
601
210
MAIN POOL
M
E 670,192.067 m N 2,604,708.326 m
24
608 207
E 670,187.174 m N 2,604,708.637 m
E 670,230.669 m N 2,604,684.603 m
E 670,202.043 m N 2,604,704.089 m
2320
230
E 670,218.437 m N 2,604,696.725 m
E 670,196.763 m N 2,604,705.543 m
T
TRUE NORTH
Notes:
213
1820
E 670,203.645 m N 2,604,707.536 m
E 670,193.948 m N 2,604,707.320 m
1680
402
E 670,194.397 m N 2,604,709.348 m
1100
203
2361
E 670,188.436 m N 2,604,711.352 m
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
TERRACED PLANTER
2000
206 PLANTING
PLANTING
E 670,189.345 m N 2,604,713.306 m
E 670,204.564 m N 2,604,708.436 m
E 670,199.248 m N 2,604,710.889 m
E 670,192.524 m N 2,604,712.359 m
1467
213
230
610
210
203
OUTDOOR SPA FACILITIES
E 670,192.527 m N 2,604,714.222 m
General Notes: E 670,214.646 m N 2,604,702.591 m
3500
613
GRASS TERRACE
50
TOP POOL
201
201
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
E 670,210.954 m N 2,604,708.966 m
E 670,208.033 m N 2,604,709.936 m E 670,200.029 m N 2,604,711.640 m
42
213
E 670,193.672 m N 2,604,716.685 m
1800
SIGNAGE
E 670,198.006 m N 2,604,714.858 m
General Notes:
Key Plan:
601
E 670,212.601 m N 2,604,710.371 m
E 670,191.835 m N 2,604,719.376 m
12
608
E 670,212.441 m N 2,604,712.657 m PLANTER
42
GRASS TERRACES
613 614 616 619 621 622 623 624 625 626 627
SETTING OUT - PLAN .
610
E 670,208.800 m N 2,604,715.325 m E 670,194.453 m N 2,604,717.437 m
25 00
601
PLANTER
E 670,207.028 m N 2,604,718.635 m
PLANTING - PLAN .
213
E 670,205.300 m N 2,604,722.302 m
0
408 601 604 605 606 607 608 609
GRASS TERRACE
GRADING & DRAINAGE - PLAN .
4* Hotel Plans, submitted for tender design.
E 670,206.226 m N 2,604,725.427 m
E 670,204.612 m N 2,604,724.724 m
100 0100
212 213 221 230 402
00
211
200020
207 210
2200
206
700
Surface - Precast Concrete Type 3 Surface - In Situ - Exposed Aggregate Concrete Surface - In Situ Concrete (Smooth) Surface - Sohar Marble Surface - Porcelain Tile - Mark Gypsum Surface - Porcelain Tile- Pool Coping - Bianco Surface - Concrete Tile Surface - Natural Stone Cladding Surface - Mix 4 Surface - Porcelain Tile - Bianco Structure - Insitu Concrete Wall With Coping- Type 2 (300mm wide) Structure - Canopy Furniture - Single Lounger Furniture - Bicycle Rack - Steel Furniture - Fire Pit Furniture - Chair Furniture - Table Furniture - Wooven Side Table Furniture - Freestanding Planter Type 1 Furniture - Freestanding Planter Type 2 Furniture - Freestanding Planter Type 4 Furniture - Spa Bed Furniture - Timber Seating Furniture - ID Couch Outdoor Furniture - ID Side Table Furniture - Medium ID Pot Furniture - Large ID Pot Furniture - Towel Drop Furniture - Standard Handrail Furniture - Wall Mounted Handrail Furniture - Ballustrade Furniture - Outdoor Shower
205
GENERAL ARANGEMENT - PLAN .
204
220
T
TRUE NORTH M
ﻣﻼﺣﻅﺎﺕ ﻋﺎﻣﺔ
General Notes: 1. Do not scale from this drawing.
ﺍﻟﻣﺧﻁﻁ ﻟﻳﺱ ﻟﻠﻘﻳﺎﺱ 2. This drawing must be read in conjunction with all other relevant drawings. ﻳﺗﻡ ﻗﺭﺍءﺓ ﺍﻟﻣﺧﻁﻁ ﻣﻊ ﺍﻟﻣﺧﻁﻁﺎﺕ ﺍﻻﺧﺭﻯ ﺫﺍﺕ ﺍﻟﻌﻼﻗﺔ 3. Contractor must report any discrepancies prior to execution of any works. ﻋﻠﻰ ﺍﻟﻣﻘﺎﻭﻝ ﺍﻟﺗﺑﻠﻳﻎ ﻋﻥ ﺃﻱ ﻓﺭﻭﻗﺎﺕ ﻗﺑﻝ ﺍﻟﺗﻧﻔﻳﺫ 4. All dimensions must be verified on site prior to order or manufacture of materials or production of site drawings. ﺍﻟﺗﺄﻛﺩ ﻣﻥ ﺍﻟﻘﻳﺎﺳﺎﺕ ﻣﻭﻗﻌﻳﺎ ﻗﺑﻝ ﺗﻭﺭﻳﺩ ﺃﻭ ﺗﺻﻧﻳﻊ ﺍﻟﻣﻭﺍﺩ ﻭﻗﺑﻝ ﻋﻣﻝ ﻣﺧﻁﻁﺎﺕ ﺍﻟﺗﻧﻔﻳﺫ ﻣﻥ ﻗﺑﻝ ﺍﻟﻣﻘﺎﻭﻝ
Key Plan:
ﻣﻼﺣﻅﺎﺕ ﻋﺎﻣﺔ
General Notes: 1. Do not scale from this drawing.
ﺍﻟﻣﺧﻁﻁ ﻟﻳﺱ ﻟﻠﻘﻳﺎﺱ 2. This drawing must be read in conjunction with all other relevant drawings. ﻳﺗﻡ ﻗﺭﺍءﺓ ﺍﻟﻣﺧﻁﻁ ﻣﻊ ﺍﻟﻣﺧﻁﻁﺎﺕ ﺍﻻﺧﺭﻯ ﺫﺍﺕ ﺍﻟﻌﻼﻗﺔ 3. Contractor must report any discrepancies prior to execution of any works. ﻋﻠﻰ ﺍﻟﻣﻘﺎﻭﻝ ﺍﻟﺗﺑﻠﻳﻎ ﻋﻥ ﺃﻱ ﻓﺭﻭﻗﺎﺕ ﻗﺑﻝ ﺍﻟﺗﻧﻔﻳﺫ 4. All dimensions must be verified on site prior to order or manufacture of materials or production of site drawings. ﺍﻟﺗﺄﻛﺩ ﻣﻥ ﺍﻟﻘﻳﺎﺳﺎﺕ ﻣﻭﻗﻌﻳﺎ ﻗﺑﻝ ﺗﻭﺭﻳﺩ ﺃﻭ ﺗﺻﻧﻳﻊ ﺍﻟﻣﻭﺍﺩ ﻭﻗﺑﻝ ﻋﻣﻝ ﻣﺧﻁﻁﺎﺕ ﺍﻟﺗﻧﻔﻳﺫ ﻣﻥ ﻗﺑﻝ ﺍﻟﻣﻘﺎﻭﻝ
-1 -2 -3
-4
Key Plan: N 2,901,758.377 m E 456,884.688 m
T
LEGEND
204
Code
804
217
419
EPDM RUNNING & ASPHALT CYCLING TRACK
204
EB
E Y LIN DA R OU N
PLANTER
203 204
624
206
CENTRAL PLAZA
625
207
203
208 209 210 212 214
403 804
628 629
217
605 608 210
217
215 217 218
627
MOUNDED LAWN
401
403
502
419
BOARDWALK
PLANTER
621
217
217
217
217
605
WHEEL
202
N 2,901,665.872 m E 456,753.779 m
N 2,901,664.975 m E 456,741.673 m
VEHICULAR PARKING
N 2,901,659.616 m E 456,752.128 m
PLANTER
5000
N 2,901,656.953 m E 456,749.939 m
PA CESS
N 2,901,649.819 m E 456,737.042 m
Stage:
AC LCHAIR WHEE
207
N 2,901,652.237 m E 456,832.272 m N 2,901,651.635 m E 456,831.898 m
N 2,901,651.282 m E 456,829.472 m
R01 100% DD RE-SUBMISSION R00 100% DD SUBMISSION Rev Description
PA CESS
21-10-03 21-07-06 Date
Drawn by:
A.H.
Checked by:
P.v.E.
Authorised by:
K.H.
Client:
N 2,901,645.002 m E 456,802.585 m N 2,901,644.813 m E 456,801.729 m
Consultants:
N 2,901,633.569 m E 456,783.053 m
3000
N 2,901,629.250 m E 456,774.775 m
N 2,901,626.267 m E 456,771.596 m
ﻣﻼﺣﻅﺎﺕ ﻋﺎﻣﺔ
General Notes:
TE CESS GA
1. DoTitle: not scale from this drawing. Project
www.sshic.com
N 2,901,628.687 m E 456,783.897 m
Sheet Number Key Plan:
19037-LSC-DD-42-MSP-00-107
Discipline:
LANDSCAPE ARCHITECTURE
N 2,901,629.062 m E 456,779.930 m
AR AC VEHICUL
ﺍﻟﻣﺧﻁﻁ ﻟﻳﺱ ﻟﻠﻘﻳﺎﺱ- 1 2. This drawing must be read in conjunction CAPITAL WATERFRONT with all other relevant drawings. ﻳﺗﻡ ﻗﺭﺍءﺓ ﺍﻟﻣﺧﻁﻁ ﻣﻊ ﺍﻟﻣﺧﻁﻁﺎﺕ ﺍﻻﺧﺭﻯ ﺫﺍﺕ ﺍﻟﻌﻼﻗﺔ- 2 DEVELOPMENT 3. Contractor must report any discrepancies prior Drawing Title: of any works. to execution ﻓﺭﻭﻗﺎﺕ ﻗﺑﻝ ﺍﻟﺗﻧﻔﻳﺫ ﻋﻥ ﺃﻱ ﻋﻠﻰ ﺍﻟﻣﻘﺎﻭﻝ ﺍﻟﺗﺑﻠﻳﻎ 3 HARD LANDSCAPE PLAN - SHEET 08 -OF All dimensions must be verified on site prior to 094. order or manufacture of materials or production Scale:of site drawings. Rev. ﺍﻟﺗﺄﻛﺩ ﻣﻥ ﺍﻟﻘﻳﺎﺳﺎﺕ ﻣﻭﻗﻌﻳﺎ ﻗﺑﻝ ﺗﻭﺭﻳﺩ ﺃﻭ ﺗﺻﻧﻳﻊ ﺍﻟﻣﻭﺍﺩ- 4 1 : 200 @A0 ﻭﻗﺑﻝ ﻋﻣﻝ ﻣﺧﻁﻁﺎﺕ ﺍﻟﺗﻧﻔﻳﺫ ﻣﻥ ﻗﺑﻝ ﺍﻟﻣﻘﺎﻭﻝ R03
LINE
N 2,901,626.955 m E 456,783.452 m
TE CESS GA
A.H.
Checked by:
P.v.E.
Authorised by:
K.H.
ﻣﻼﺣﻅﺎﺕ ﻋﺎﻣﺔ
1. DoTitle: not scale from this drawing. Project
ﺍﻟﻣﺧﻁﻁ ﻟﻳﺱ ﻟﻠﻘﻳﺎﺱ- 1 2. This drawing must be read in conjunction CAPITAL WATERFRONT with all other relevant drawings. ﻳﺗﻡ ﻗﺭﺍءﺓ ﺍﻟﻣﺧﻁﻁ ﻣﻊ ﺍﻟﻣﺧﻁﻁﺎﺕ ﺍﻻﺧﺭﻯ ﺫﺍﺕ ﺍﻟﻌﻼﻗﺔ- 2 DEVELOPMENT 3. Contractor must report any discrepancies prior Drawing Title: of any works. to execution ﻋﻠﻰ ﺍﻟﻣﻘﺎﻭﻝ ﺍﻟﺗﺑﻠﻳﻎ ﻋﻥ ﺃﻱ ﻓﺭﻭﻗﺎﺕ ﻗﺑﻝ ﺍﻟﺗﻧﻔﻳﺫ- 3 SETTING OUTmust PLAN - SHEET 4. All dimensions be verified on site 08 priorOF to 09 order or manufacture of materials or production Scale:of site drawings. Rev. ﺍﻟﺗﺄﻛﺩ ﻣﻥ ﺍﻟﻘﻳﺎﺳﺎﺕ ﻣﻭﻗﻌﻳﺎ ﻗﺑﻝ ﺗﻭﺭﻳﺩ ﺃﻭ ﺗﺻﻧﻳﻊ ﺍﻟﻣﻭﺍﺩ- 4 1 : 200 @A0 ﻭﻗﺑﻝ ﻋﻣﻝ ﻣﺧﻁﻁﺎﺕ ﺍﻟﺗﻧﻔﻳﺫ ﻣﻥ ﻗﺑﻝ ﺍﻟﻣﻘﺎﻭﻝ R01
N 2,901,624.658 m E 456,772.685 m
UNDARY SITE BO
Drawn by:
General Notes:
LINE
Sheet Number Key Plan:
19037-LSC-DD-45-MSP-00-157
T
TRUE NORTH
FPL: 3.290
FPL: 2.850
P OOL
HY
HY
FPL: 2.700 HP
STONE REVETMENT
TOW 3.300 m
E
RESTAURANT DECK
FPL: 3.290
FPL: 2.650
FPL: 2.850
OPE
FPL: 2.675
FPL: 2.700
SL
SL
F & B UNIT OPE
FPL: 2.650
PLANTER
HP
CENTRAL PLAZA
BOARDWALK
SLOPE
E FPL: 2.550
SLOPE
OPE
SL
OP
E
E SLOP
SL
OP
FPL: 2.500 FPL: 2.500
SLOPE
WL: 2.500 FPL: 2.500 FPL: 2.475
FPL 3.300 m O SL
SL
PE
OPE
TOW: 2.950
SLO
PE
FPL: 2.650
WATER FEATURE 2
SLOPE
SLOPE
SLOPE
LAWN MOUND
E
FPL: 3.290
FPL: 2.700
SLOPE
FPL: 2.650 LAWN MOUND HP FSL: 4.000
FPL: 2.850
FPL: 2.550 SL
SLOP
E
FPL: 2.700
TOW 3.300 m
FPL: 2.450
E SLOP
SLOPE
SLOPE
FPL: 2.700 FPL: 2.600
FPL: 2.700
FPL: 2.450
SLOPE
PLANTER
FPL: 3.290
FPL: 2.500
SLOPE
SL
O
PE
E SLOP
SLOPE
SLOPE
FPL: 2.650
LAWN
SLOPE
HP
FPL: 2.850
FPL: 2.850
FPL: 2.450 FPL: 2.475
FPL: 2.750
SLOPE
RESTAURANT DECK
OP
FPL: 2.850
FPL: 2.575
SL
EPDM RUNNING & ASPHALT CYCLING TRACK
TOW 3.300 m
FPL: 2.850
OPE
OPE
SL
OPE
SLOPE
SL
SL
TOW: 3.050 FSL: 2.700
O SL
HP
PE
FPL: 2.625
SLO
FPL: 2.800
FPL: 2.610
PE
FPL: 2.800
HP
FPL: 2.450
FPL: 2.400 HP
TOW: 3.225
FPL: 2.625
TOW: 3.225 FSL: 3.000
SLOPE
FPL: 2.625
FPL: 2.700
SLOPE
FPL: 2.850
PE
FPL: 2.600 FPL: 2.700
FPL: 2.600
PE
E SLOP
SLO
PE
LP
FPL: 2.600
SLOPE
SLOPE
PUMP ROOM
E
PLANTER
PE
FPL: 2.675 FPL: 2.400
LP
PE SL O
FPL: 2.350
REFUSE ROOM
FPL: 2.625
SLO
SL
TOW: 3.125
FPL: 2.600
FPL: 2.350
LAWN
OP E
T-BV
FSL: 3.000
L-PV LAWN 153 m²
SLOPE
SL O
SLOPE
PLANTED BERM HP FSL: 3.500
SLOPE
PE
TOW: 3.125
DROP-OFF
R03 R02 R01 R00 Rev
100% DD RE-SUBMISSION 100% DD SUBMISSION 100% DD SUBMISSION 50% DD SUBMISSION Description
21-10-03 21-07-06 21-02-21 21-02-07 Date
K.H K.H K.H K.H. App
SLOPE
LCHA WHEE
T-FA
T-HT
T-CES
GC-CA 32 m²
OG-PR 52 m²
T-FA
SLOPE
GC-CM 53 m²
S-BS 108 m² OG-PR 98 m²
S-TC 75 m² SU-AV 51 m²
FGL: 2.650
AR AC VEHICUL
TE CESS GA
S-HR 106 m²
Drawn by:
A.H.
Checked by:
P.v.E.
Authorised by:
K.H.
CAPITAL WATERFRONT
SS PA
RKING
BAYS
S-NO 14 m²
GC-CM 15 m² S-DV 15 m²
DROP-OFF
S-DV 15 m²
GC-CM 47 m² S-NO 15 m² S-TC 14 m²
ACCESS LCHAIR WHEE ING BAYS PARK
S-TC 14 m²
R03 R02 R01 R00 Rev
100% DD RE-SUBMISSION 100% DD SUBMISSION 100% DD SUBMISSION 50% DD SUBMISSION Description
Stage:
ISSUED FOR DETAIL DESIGN Client:
GC-CM 19 m²
S-TC 15 m²
OG-PS 162 m²
Consultants:
S-NO 14 m²
www.sshic.com
S-NO 14 m² S-DV 15 m² S-TC 14 m²
AR AC VEHICUL
TE CESS GA
21-10-03 21-07-06 21-02-21 21-02-07 Date
S-DV 14 m²
Discipline:
Project Title:
ACCE CHAIR
S-LF 14 m²
S-TC 97 m²
S-TC 15 m²
LANDSCAPE ARCHITECTURE
FGL: 2.825
WHEEL
OG-PR 95 m²
OG-PR 61 m²
FGL: 2.825
S-DV 126 m²
OG-PS 153 m²
S-DV 78 m²
www.sshic.com
FGL: 2.700
S-DV 166 m²
VEHICULAR PARKING
OG-PS 142 m²
OG-PS 54 m²
T-FA
DROP-OFF S-NO 69 m²
S-BG 205 m² S-BS 108 m²
GC-CA 25 m²
P-PD
GC-CM 39 m²
GC-CA 44 m²
PLANTER MOUND
T-HT
SU-AV 68 m²
T-HT
REFUSE ROOM
S-BG 34 m²
201 379 m²
P-PD
T-HT
T-HT
P-PD
T-HT T-CES
Client:
Consultants:
PLANTER MOUNDS
T-HT
P-PD
T-BV
T-CES
ISSUED FOR DETAIL DESIGN G BAYS
T-CES T-CES
T-HT
T-CES
P-PD
P.v.E P.v.E P.v.E. P.v.E. Chk
Stage:
RKIN SS PA IR ACCE
P-PD
PLANTER MOUNDS
T-HT
T-CES
T-HT PLANTER MOUND
T-CES
P-PD P-PD
FPL: 2.130
P-PD
T-BV T-CES
FPL: 2.300 FPL: 2.675
T-CES
T-HT
T-CES
P-PD
HP
FPL: 2.675
T-FA
T-CES
P-PD
P-PD
P-PD
P-PD
T-FA
T-FA
L-PV 109 m²
AMPHITHEATRE
P-PD
T-BV
PLANTER
PLANTED BERM HP FSL: 3.500
WATER FEATURE 1
P-PD
L-PV LAWN 252 m²
PLANTER MOUNDS
SLOPE
FPL: 2.700
LP
T-FA
P-WR T-FA
CHILDREN PLAY AREA
SLOPE
PE
HP
OG-PS 114 m²
T-FA
T-FA
T-BV
OG-PS 4 m²
GC-M1 3 m²
SLOPE
FPL: 2.650
GC-M1 43 m²
T-BV
VEHICULAR PARKING
SLO
TOW: 3.125
SLOPE
P-WR
T-FA
SLOPE
SLOPE
FPL: 2.850
HP
S-NO 41 m²
P-PD
GC-AV 36 m²
PLANTER
FPL 2.430 m
PLANTED BERM HP FSL: 3.500
T-CES
P-WR
T-BV
S-DV 126 m²
L-PV 235 m²
T-FA
FPL: 2.700
FPL: 2.850
PE SLO
GC-AH 26 m²
P-PD
E
AMPHITHEATRE
S-TC 126 m²
T-PO
P-PD
FPL: 2.130
WATER FEATURE 2
PLANTER
P-PD
BOARDWALK
FPL: 2.450 FPL: 2.450
T-CES
T-BV PLANTER
LP
SL
SLOPE
CHILDREN PLAY AREA
P-PD T-CES
T-CES
P-WR
VIEWING DECK
STONE REVETMENT
T-PO
P-WR L-PV 914 m²
P-PD
HP
OP
FPL: 2.700
T-CES
T-PO
FSL: 3.000 LP
T-CES
T-CES
DROP-OFF
TOW: 3.050
P-PD
BOARDWALK
GC-AV 36 m²
PLANTED BERM HP HP FSL: 4.000
PE SLO
SLOP
FPL: 2.550
PLANTER
PE SLO
FPL: 2.850
TOW: 3.050
CENTRAL PLAZA
T-CES
E Y LIN DAR OU N
L-PV 893 m²
PLANTER WATER FEATURE 1
FPL: 2.600 FPL: 2.550
E
EB
T-CES
MOUNDED LAWN
FPL: 2.300
FPL: 2.575 FPL: 2.550
SLOP
TOW 3.300 m
SIT
SU-AV 3 m²
P-PD
EPDM RUNNING & ASPHALT CYCLING TRACK
PLANTER
PLANTED BERM HP FSL: 3.500
S-LF 12 m² GC-AV 7 m²
P-PD PLANTER
FPL: 2.700
NOTE: For all Planting Information, please refer to Sheet: 19037-LSC-PD-DWG-XXX-00-006-R00/ LANDSCAPE LEGENDS, & Sheet: 19037-LSCPD-DWG-XXX-00-006-R00/ SOFT LANDSCAPE SCHEDULE.
SU-AV 7 m²
FPL: 2.350
FPL: 2.625
WL: 2.800
FPL: 2.600
FPL: 2.575
SLOPE
TOW: 3.050
FPL: 2.600
BOARDWALK
GC-M1 18 m²
SLOPE
SLO
FPL: 2.575 FPL: 2.650
PLANTER
LP
FPL: 2.700
VIEWING DECK
SLOPE
PE
FPL: 2.600
FPL: 2.850
HY
HY
STONE REVETMENT
SLOPE
O SL
TOW 3.300 m
SLO
CENTRAL PLAZA
MECCA
P OOL
FPL: 2.825
SLOP E
PLANTER
FPL: 2.650
M
MECCA
TOW 3.300 m
T
TRUE NORTH
M
FPL: 2.650
P.v.E P.v.E Chk
ISSUED FOR DETAIL DESIGN
BAYS RKING
N 2,901,628.028 m E 456,775.038 m
GRADING & DRAINAGE - PLAN .
LANDSCAPE ARCHITECTURE
STONE REVETMENT
K.H K.H App
Stage:
3000
Discipline:
AR AC VEHICUL
N 2,901,630.284 m E 456,779.667 m
N 2,901,630.916 m E 456,770.618 m
www.sshic.com 217
SLOP
05 PLAN .
VEHICULAR PARKING
N 2,901,633.952 m E 456,782.458 m N 2,901,631.554 m E 456,771.221 m
207
UNDARY SITE BO
N 2,901,674.139 m E 456,923.909 m
E 456,923.009 m
N 2,901,633.847 m E 456,781.970 m
Consultants:
207
BAYS RKINN G 2,901,673.911 m
N 2,901,645.196 m E 456,801.148 m
217
15
SS PA
N 2,901,657.010 m E 456,830.950 m
N 2,901,654.022 m E 456,825.778 m
N 2,901,649.077 m E 456,804.749 m
217
207
ACCE CHAIR
N 2,901,668.778 m E 456,880.272 m
N 2,901,660.588 m E 456,833.229 m
N 2,901,657.692 m E 456,819.933 m
DROP-OFF
PLANTER MOUND
Client:
BAYS RKING
PLANTER MOUNDS
REFUSE ROOM
N 2,901,659.548 m E 456,819.874 m
N 2,901,653.764 m E 456,803.898 m
N 2,901,650.072 m E 456,800.272 m
ISSUED FOR DETAIL DESIGN AC LCHAIR WHEE
WHEEL
N 2,901,665.708 m E 456,832.749 m
N 2,901,655.041 m E 456,808.169 m N 2,901,654.408 m E 456,765.786 m
N 2,901,653.647 m E 456,761.469 m
P.v.E P.v.E P.v.E. P.v.E. Chk
N 2,901,674.806 m E 456,848.554 m
N 2,901,663.811 m E 456,824.641 m
00
K.H K.H K.H K.H. App
N 2,901,672.649 m E 456,833.363 m
AMPHITHEATRE
200 0
N 2,901,658.825 m N 2,901,656.832 m E 456,818.141 m E 456,809.301 m
50
206
21-10-03 21-07-06 21-02-21 21-02-07 Date
N 2,901,657.690 m E 456,807.719 m
N 2,901,678.269 m E 456,925.956 m
N 2,901,674.273 m E 456,922.401 m
N 2,901,662.445 m E 456,822.382 m
5000
4850
R03 100% DD RE-SUBMISSION R02 100% DD SUBMISSION R01 100% DD SUBMISSION R00 50% DD SUBMISSION Rev Description
207
217
218
00
PLANTER MOUNDS
N 2,901,676.738 m E 456,834.901 m
N 2,901,671.866 m E 456,881.100 m
N 2,901,664.404 m E 456,817.513 m
N 2,901,663.164 m E 456,817.161 m N 2,901,660.814 m E 456,817.827 m
PLANTER MOUND
LAWN
N 2,901,656.779 m E 456,738.439 m
215
35
N 2,901,686.499 m E 456,938.369 m N 2,901,683.263 m E 456,925.526 m N 2,901,678.877 m E 456,921.236 m
N 2,901,676.173 m E 456,842.907 m
N 2,901,663.317 m E 456,825.606 m
N 2,901,664.868 m E 456,805.007 m
N 2,901,683.885 m E 456,927.993 m
N 2,901,684.972 m E 456,926.174 m
N 2,901,681.923 m E 456,839.045 m
N 2,901,664.867 m E 456,832.227 m
N 2,901,670.840 m E 456,823.543 m
N 2,901,669.631 m E 456,819.519 m
N 2,901,660.868 m E 456,808.333 m
N 2,901,660.341 m E 456,753.951 m
N 2,901,656.191 m E 456,746.854 m
202
DROP-OFF
N 2,901,665.371 m E 456,792.285 m
N 2,901,664.168 m E 456,779.220 m
217
PLANTER MOUND
N 2,901,665.695 m E 456,784.071 m
N 2,901,665.131 m E 456,780.969 m
N 2,901,671.020 m E 456,802.298 m
N 2,901,665.266 m E 456,752.020 m
00
604
607
N 2,901,671.222 m E 456,797.357 m
N 2,901,670.504 m E 456,790.279 m
N 2,901,663.367 m E 456,808.941 m 40
N 2,901,661.948 m E 456,739.198 m
REFUSE ROOM
217
CHILDREN PLAY AREA
215
PLANTER MOUND
LAWN
N 2,901,672.743 m E 456,810.641 m N 2,901,671.580 m E 456,818.684 m
N 2,901,671.897 m E 456,803.514 m
217 N 2,901,670.631 m E 456,730.852 m
N 2,901,672.380 m E 456,821.011 m
4277
402
605
BAYS
217
201
PLANTER
BOARDWALK
N 2,901,674.303 m E 456,806.877 m
7128
PLANTER MOUNDS
N 2,901,682.347 m E 456,862.216 m
N 2,901,680.641 m E 456,834.390 m 1500
N 2,901,674.810 m E 456,821.984 m
N 2,901,673.039 m E 456,801.990 m
N 2,901,676.236 m E 456,786.566 m
N 2,901,676.102 m E 456,783.595 m
WATER FEATURE 1
N 2,901,675.375 m E 456,824.279 m
N 2,901,676.395 m E 456,807.215 m
N 2,901,687.586 m E 456,936.550 m N 2,901,689.822 m E 456,893.372 m
N 2,901,687.478 m E 456,860.786 m N 2,901,682.808 m E 456,837.421 m
N 2,901,682.859 m E 456,834.679 m
N 2,901,692.701 m E 456,929.832 m
N 2,901,691.610 m E 456,928.015 m
PLANTING - PLAN .
217
RKING
207
PLANTER MOUNDS
634 401
SS PA
217
CHILDREN PLAY AREA
210
ACCE CHAIR
N 2,901,679.831 m E 456,823.832 m
N 2,901,678.693 m E 456,808.878 m
N 2,901,678.019 m E 456,808.892 m
LAWN
N 2,901,689.901 m E 456,865.713 m
N 2,901,688.753 m E 456,864.438 m
N 2,901,689.180 m E 456,833.087 m
1460
217 201
N 2,901,677.946 m E 456,788.319 m
20 00
0
633
635
217
206
PLANTER
N 2,901,677.696 m E 456,748.750 m
N 2,901,691.327 m E 456,890.764 m N 2,901,689.986 m E 456,898.637 m
N 2,901,680.893 m E 456,832.406 m
N 2,901,680.797 m E 456,808.621 m
1000
637
204
606
636
N 2,901,689.674 m E 456,825.044 m
N 2,901,703.004 m E 456,939.421 m
N 2,901,699.105 m E 456,931.429 m
N 2,901,698.014 m E 456,929.612 m
N 2,901,693.748 m E 456,886.571 m
N 2,901,693.783 m E 456,882.933 m
N 2,901,689.001 m E 456,838.452 m
N 2,901,690.380 m E 456,832.076 m
N 2,901,682.972 m E 456,828.567 m
N 2,901,700.734 m E 456,930.036 m
N 2,901,701.684 m E 456,888.895 m
PLANTER
N 2,901,693.101 m E 456,830.453 m
N 2,901,689.814 m E 456,822.770 m
N 2,901,685.232 m E 456,802.964 m
N 2,901,678.217 m E 456,781.068 m
N 2,901,680.336 m E 456,755.237 m
DROP-OFF
204
N 2,901,690.045 m E 456,819.008 m
N 2,901,683.128 m E 456,803.221 m
N 2,901,678.984 m E 456,775.901 m
N 2,901,703.441 m E 456,939.121 m 532 2
PLANTER
N 2,901,694.802 m E 456,839.190 m
1000
N 2,901,691.624 m E 456,831.241 m
N 2,901,708.317 m E 456,934.608 m
N 2,901,705.863 m E 456,938.684 m
N 2,901,705.695 m E 456,928.724 m
N 2,901,702.836 m E 456,892.537 m
N 2,901,695.926 m E 456,838.259 m
3200
N 2,901,695.379 m E 456,825.736 m N 2,901,690.441 m E 456,823.760 m
N 2,901,691.155 m E 456,818.076 m
N 2,901,690.544 m E 456,810.887 m
N 2,901,688.657 m E 456,798.581 m
N 2,901,688.401 m E 456,796.477 m N 2,901,687.028 m E 456,790.085 m
N 2,901,685.724 m E 456,768.168 m
N 2,901,679.578 m E 456,753.385 m
N 2,901,674.356 m E 456,740.389 m
AMPHITHEATRE 632
N 2,901,689.973 m E 456,778.062 m
N 2,901,682.245 m E 456,759.861 m
N 2,901,691.240 m E 456,799.564 m
N 2,901,691.385 m E 456,792.248 m
N 2,901,689.184 m E 456,776.224 m
STONE REVETMENT
605
PLANTER MOUNDS
605
BOARDWALK
N 2,901,693.432 m E 456,786.118 m
N 2,901,689.084 m E 456,764.588 m
204
WATER FEATURE 1
LAWN
N 2,901,689.196 m E 456,795.068 m
N 2,901,696.405 m E 456,830.465 m
N 2,901,696.475 m E 456,830.332 m
1000
PLANTER
N 2,901,691.432 m E 456,811.868 m
PLANTER
N 2,901,707.883 m E 456,932.997 m
N 2,901,705.704 m E 456,910.553 m
N 2,901,701.044 m E 456,915.290 m N 2,901,702.475 m E 456,879.677 m
2250
PLANTER
209 804
N 2,901,692.191 m E 456,791.210 m
N 2,901,691.181 m E 456,769.564 m
N 2,901,696.749 m E 456,824.869 m
N 2,901,697.067 m E 456,819.695 m
N 2,901,696.180 m E 456,818.640 m
N 2,901,694.398 m E 456,788.367 m
N 2,901,687.426 m E 456,765.287 m
LAWN
N 2,901,698.320 m E 456,831.002 m
N 2,901,697.124 m E 456,812.507 m N 2,901,699.198 m E 456,799.069 m
WATER FEATURE 2
N 2,901,714.529 m E 456,925.467 m
N 2,901,707.335 m E 456,917.100 m
N 2,901,702.204 m E 456,832.851 m
N 2,901,697.388 m E 456,784.213 m
1500
N 2,901,712.636 m E 456,913.897 m N 2,901,710.881 m E 456,902.120 m
N 2,901,703.557 m E 456,833.495 m
N 2,901,705.283 m E 456,812.453 m
N 2,901,701.268 m E 456,803.620 m
N 2,901,697.971 m E 456,789.846 m
604
203
605
N 2,901,699.623 m E 456,789.129 m
N 2,901,718.927 m N 2,901,717.627 m E 456,936.937 m E 456,937.708 m
1000
N 2,901,715.716 m E 456,918.944 m
N 2,901,713.882 m E 456,916.596 m
N 2,901,708.612 m E 456,885.447 m
PLANTER
VIEWING DECK
PLANTER MOUNDS
217
202
N 2,901,704.685 m E 456,763.285 m
N 2,901,720.157 m E 456,930.133 m
N 2,901,716.869 m E 456,925.581 m
N 2,901,710.704 m E 456,900.821 m N 2,901,713.105 m E 456,847.105 m
N 2,901,711.053 m E 456,842.417 m
N 2,901,708.001 m E 456,835.820 m
N 2,901,732.886 m E 456,940.086 m
N 2,901,717.309 m E 456,917.929 m
N 2,901,712.236 m E 456,837.837 m N 2,901,711.628 m E 456,826.260 m
50
CENTRAL PLAZA
N 2,901,719.428 m E 456,918.001 m
N 2,901,721.189 m E 456,913.923 m
N 2,901,716.924 m E 456,856.985 m
BOARDWALK
5000
804
N 2,901,723.666 m E 456,911.557 m N 2,901,722.794 m E 456,912.750 m
N 2,901,713.860 m E 456,838.610 m
11
N 2,901,732.222 m E 456,935.923 m
N 2,901,722.853 m E 456,916.058 m
N 2,901,719.877 m E 456,864.735 m
N 2,901,713.724 m E 456,830.799 m
N 2,901,736.748 m E 456,935.369 m
650
N 2,901,731.849 m E 456,937.018 m
ROLLING LAWN
N 2,901,719.410 m E 456,843.291 m
N 2,901,735.162 m E 456,933.965 m
N 2,901,733.092 m E 456,918.879 m
5000
204
805
203
608 403
608
N 2,901,718.286 m E 456,840.717 m
N 2,901,733.684 m E 456,917.104 m
N 2,901,724.910 m E 456,912.860 m
N 2,901,721.488 m E 456,848.544 m
N 2,901,717.351 m E 456,787.370 m
N 2,901,736.471 m E 456,923.529 m
N 2,901,729.309 m E 456,906.607 m
N 2,901,728.961 m E 456,889.515 m
N 2,901,722.209 m E 456,850.409 m
N 2,901,707.355 m E 456,817.004 m
N 2,901,733.219 m N 2,901,731.428 m E 456,902.224 m E 456,906.658 m
N 2,901,727.403 m E 456,864.054 m
500 0
PLANTER
E Y LIN DAR OU N
EPDM RUNNING & ASPHALT CYCLING TRACK
N 2,901,729.737 m E 456,870.419 m
N 2,901,724.224 m E 456,855.641 m
N 2,901,736.036 m E 456,934.106 m
1050
N 2,901,731.596 m E 456,897.311 m
3000
201
402
PLANTER
217
EB
1000
217
203
605 402
SIT
1000
419
208
STONE REVETMENT
805
804
N 2,901,735.623 m E 456,899.928 m
N 2,901,735.161 m E 456,885.219 m N 2,901,732.832 m E 456,878.869 m
00 10
PLANTER
419
624 625 627 628 629 632 633 634 635 636 637 804 805
201
N 2,901,735.846 m E 456,887.087 m
N 2,901,730.973 m E 456,860.714 m
PLANTER
9000
602
419 204
450
PLANTER
N 2,901,736.423 m E 456,916.259 m
5000
LAWN
204 804
401 621
VIEWING DECK
602 604 605 606 607 608 621
805
402
N 2,901,732.833 m E 456,865.784 m
N 2,901,736.620 m E 456,934.857 m
N 2,901,738.063 m E 456,923.654 m 650
N 2,901,729.283 m E 456,861.333 m
N 2,901,738.598 m E 456,923.119 m
N 2,901,738.882 m E 456,921.962 m N 2,901,737.233 m E 456,916.681 m
N 2,901,736.596 m E 456,899.204 m
100 0
450 502
217
N 2,901,745.027 m E 456,915.300 m
N 2,901,742.704 m E 456,907.860 m
6500
402
WATER FEATURE 2
804 621
N 2,901,739.066 m E 456,896.640 m
N 2,901,738.358 m E 456,894.521 m
650
624 805 203
BOARDWALK
N 2,901,738.388 m E 456,886.171 m N 2,901,738.237 m E 456,880.527 m
Surface - Pedestrian Paving - Type 1 600x300x80mm (S) Surface - Pedestrian Paving - Type 2 600x300x80mm (B) Surface - Pedestrian Paving - Type 3 280x162x80mm (R) Surface - Pedestrian Paving Type 4 - Tactile 400x400x65mm (S) Surface - Vehicular Paving - Type 1 225x112.5x100mm (LG) Surface - Vehicular Paving - Type 2 225x112.5x100mm (DG) Surface - Running track Surface - Rubber Matting - to specialist's spec. Surface - Sports Surface - Asphalt with resin type 1 Surface - Sports Surface - Asphalt with resin type 2 Surface - Boardwalk - 3000x 300x150mm precast concrete with timber pattern finish (LB) Surface - Asphalt - to infra engineer's spec. Kerb - Flush Kerb - 600x200x300mm (LG) Kerb - Raised Kerb - 600x200x350mm with 15mm chamfered edge (LG) Structure - Insitu Concrete Wall - Type 1 (500mm wide) Structure - Insitu Concrete Wall - Type 2 (700mm wide) Structure - Stone cladded Insitu Concrete Wall - Type 3 (400mm wide) Structure - Insitu Concrete Wall - Type 3 (200mm wide) Structure - Timber & Steel Handrail Surface - Porcelain Tile - Clay 375mm x 375mm x 9mm Furniture - Bench - concrete & timber Furniture - Removable Bollard Furniture - Litter Bin - concrete Furniture - Bicycle Rack - steel Furniture - Drinking Fountain - concrete Furniture - Tree Grill- concrete Furniture - Escofet Box Planter200 - 2000 x 500 x 450 mm Furniture - Solar Bench Connect Furniture - Solar Bench Furniture - Water Misters - type 1 (1m) Furniture - Water Misters - type 2 (1.5m) Furniture - Water Misters - type 3 (2m) Furniture - Spinner Type 1 Furniture - Spinner Type 2 Furniture - Climber Screen Furniture - Freestanding Cycler Furniture - Oodle Swing Furniture - Sensory Play Lighting - Light Post Type 3 (5000mm) Lighting - Light Post Type 4 (8000mm)
202
419
SIT
201
PLANTER
804
Item
N 2,901,740.095 m E 456,885.597 m
VIEWING DECK
950
419
450
605
1150
621
N 2,901,750.406 m E 456,932.479 m
1150
212
BOARDWALK
HY
N 2,901,752.740 m E 456,939.929 m
STONE REVETMENT N 2,901,746.890 m E 456,860.030 m
4300
804
401
VIEWING DECK
217
201
217
621
2000
208
403
HY
1500
HY
STONE REVETMENT
-4
MECCA
P OOL
0
HY
100
P OOL
-3
M
MECCA
401
-2
TRUE NORTH
M
621
-1
T
TRUE NORTH
214
SETTING OUT - PLAN .
GENERAL ARANGEMENT - PLAN .
Waterfront Urban Park, submitted for detail design.
S-NO 15 m² GC-WT 7 m² GC-GR
Discipline:
LANDSCAPE ARCHITECTURE
Drawn by:
A.H.
Checked by:
P.v.E.
Authorised by:
K.H.
Project Title:
CAPITAL WATERFRONT
K.H K.H K.H K.H. App
P.v.E P.v.E P.v.E. P.v.E. Chk
A
4* Hotel long sections, submitted for tender design.
TERRACED EDGE
STAIRS TO ADJACENT PARK
BOTTOM POOL
SECTION A-A 1 : 150
PLANTED BERMS
CENTRAL GARDEN
LOBBY NEIGHBOURHOOD CAFE
DINNING TERRACE
LANDSCAPE TEERACES
FIREPIT
213
A
201 211
601
210 212
06 SECTIONS .
207
B
SECTION A-A
201
605
212
203 212
FLOATING TIMBER SEAT
FIREPIT
215
206
207
213201
207
402
SECTION B-B 1 : 150
1 : 150
BOTTOM POOL
STAIRS TO ADJACENT PARK DINNING TERRACE
NEIGHBOURHOOD CAFE
TERRACED EDGE
16
207
201213
201 211
BOTTOM POOL
LANDSCAPE TEERACES
601 212
TOP POOL
PLANTED BERMS PLANTED BERMS
WALKWAY TO STAIRD LEADING TO PARK BELOW
CENTRAL GARDEN
LOBBY
FIREPIT
FLOATING TIMBER SEAT
FIREPIT
206
213201 210 212 402
207
201
401
201 213
205
212
B
401
201 213
205
201
605
212
203
608
213
210
215
207
213
211
503
213
SECTION B-B 1 : 150
A PLANTED BERMS
SECTION A-A BOTTOM POOL
TOP POOL
1 : 150
WALKWAY TO STAIRD LEADING TO PARK BELOW
NEIGHBOURHOOD CAFE
C
DINNING TERRACE
SECTION C-C LANDSCAPE TEERACES
1 : 150
FLOATING TIMBER SEAT
207
212
201
206
212 608
213
210
B
OUTDOOR SPA FACILITY
FIREPIT
213201 213
211
207
402
612
403 201
503
227
213
SECTION B-B 1 : 150 BOTTOM POOL
TOP POOL OUTDOOR SPA FACILITY
601
227
GYM CANOPY
TOILETS
RUNNING & CYCLING TRACK
TOILETS
RUNNING & CYCLING TRACK
805
PARKING
GYM CANOPY 805
403
SITE BOUNDARY
630 207
PARKING
217
215
217
206
604 605
605
217 401
805 207
217
215
217
206
604 605
SITE BOUNDARYSITE BOUNDARY
PARKING
GYM CANOPY 201
602
401
TOILETS 204
STEP
402
PLANTING
402
PLANTING
402
401 RUNNING & CYCLING TRACK
403
630
605
217 401
602
201
401
204
402
SITE BOUNDARY
SITE BOUNDARYSITE BOUNDARY
Waterfront Urban Park site sections, submitted for detail design.
401
STEP
403
630 207 A-A A SECTION scale1 : 150
217
215
217
206
604 605
605
217 401
602
201
401
204
402
402
PLANTING
401
STEP
A-A A SECTION scale1 : 150
REVETMENT
RUNNING & CYCLING TRACK
REVETMENT
RUNNING & CYCLING TRACK
A-A A SECTION scale1 : 150
ADMIN BUILDING
804
630
REVETMENT
629
17
ADMIN BUILDING 622
RUNNING & CYCLING TRACK
629
208
621
217 201 217 212
204
203
214
208
217 201 217 212 804
630
629
217
202
401
204
203
PLANTED MOUND
PARKING
PLANTED MOUND
PARKING
625 PLANTING
202 622
805
403
PARKING
805
805
804
403 214 630
217
202
401
805
217
202
218
207
217
215
217
207
217
202
218
207
217
215
217
207
217
202
218
207
217
215
217
207
625 PLANTING
202
621
622
403 214
208
217 201 217 212
204
203
217
202
401
625 PLANTING
202
B-B B SECTION scale1 : 150
PARKING
PLANTED MOUND
LAWN
RUNNING & CYCLING TRACK
DECK
PARKING
PARKING
PLANTED MOUND
LAWN
RUNNING & CYCLING TRACK
DECK
SITE BOUNDARYSITE BOUNDARY
PARKING
B-B B SECTION scale1 : 150 3 Metre
201 218
217
PARKING 218
217 215
217
217
207
LAWN
210
3 Metre
201 217 208 208 1 Metre
3 Metre
RUNNING & CYCLING TRACK
402
218
3 Metre
804 219
PLANTED MOUND 201
207
402
218
PARKING
1 Metre
210
201 217 208 208
215 3 Metre
218
217
217 215
C-C C SECTION scale1 : 150
207
218
214
214
402
1 Metre
601
214
601
214
210
450
214
3 Metre
804 219
450
DECK
804 219
201
601
201 217 208 208
214
450
SITE BOUNDARY
SITE BOUNDARYSITE BOUNDARY
B-B B SECTION scale1 : 150
SITE BOUNDARY
06 SECTIONS .
621
805
ADMIN BUILDING
805
PLANTED MOUND
80 50
8mm THREADED ROD
5mm CONCRETE GREY PERSPEX SHEET BACKING
ROD WELDED TO STEEL SHEET
ROD WELDED TO STEEL SHEET
305
STEEL TUBE SPACER
MECCA
Discipline:
50
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
200mm CONCRETE FOUNDATION INFILL
200mm CONCRETE FOUNDATION INFILL
400 200 100
VARIES
303 317
308 405
PUMP ROOM PLANTER WALL BELOW SEATING DETAIL
416
VARIES
301
- ON SLAB
LEVEL TRANSITION - BENCH TO PLANTER 4 1 : 10 TANK 1.6x1.6x2.5M-DP BALANCING
FEATURE 1 - SECTION 1 3 WATER scale 1 : 20
3
VARIES
LEVEL TRANSITION - DOUUBLE PLANTER WALL_EXPANSION JOINT 1 : 10 FLOW, CHLORINE MEASUREMENT
4
212 213 221 301 302 303 305 306 308 310 311 314 315 316 317 405 406 407
308
350
216
200
903 20 0
200 Keynote Text
Surface - Concrete Tile 315 - Natural Stone Cladding Surface Surface - Mix 4 Sub-surface - Compaction - to engineer's spec. 308 Sub-surface - Mulch Sub-surface Sand Blinding 405 Sub-surface - Screed to fall Sub-surface - Geotextile Membrane - to engineer's spec. Sub-surface - Drainage Mat Sub-surface - Planting Medium Sub-surface - Earth Sub-surface - Mortar Bed Sub-surface - Waterproofing - to specialist's spec. Sub-surface - Protection Board Sub-surface - Lightweight Fill Structure - Structural Slab to Engineers Specification Structure - Structural Wall to Engineers Specification Structure - Structural Footing to Engineers Specification
INSITU CAST CONCRETE STEPPING STONE 'PEBBLE' FINISH: SMOOTH
1
J.P. J.P. P.v.E.
- Concrete Footing to 4-STARStructure HOTEL & LUXURY SERVICED Engineers Specification APARTMENTS, THE SUSTAINABLE CITY 418 Structure -Conrete Slab to Engineers Specification YITI 416
501
Drawing Title:
502
Surface 1200 mm Surface 375mm x
- Porcelain Tile - Tobacco x1200mm x 20mm - Porcelain Tile - Clay 375mm x SETTING 9mm OUT
OF BESPOKE CIRCULATION FEATURES HARD LANDSCAPE DETAILS SHEET 04
ZERO DEPTH RAISED WATERFEATURE - ON GRADE
LEVEL TRANSITION - BENCH TO PLANTER
Keynote Text
Designed by: 301 Sub-surface - Compaction - to Checked by: engineer's spec. Project Title: 316 Sub-surface - Screed to fall
Keynote Legend 317 Key Value
1485
Keynote Legend LANDSCAPE ARCHITECTURE
Key Value Drawn by:
303
VARIES
315
BOTTOM POOL
Discipline:
ADJACENT SURFACE
308
FINISH: TEXTURED COLOUR: CLAY WITH MATCHING GROUT SIZE: 1200x1200x20mm WITH 3mm FLUSH GROUTING
100
5
316
4 175
200
213
535
WATER FEATURE PORCELAIN TILE
450
450
ADJACENT SURFACE
LIGHTING FIXTURE
310
3 152
200
3x 300x500x300mm WATER DIFFUSION BASINS FROM PUMP ROOM WITH 2x WATER SUPPLY PIPES FOR DIFFUSION
EXPANSION JOINT
35mm⌀X4.5mm MULTIGROOVE TACTILE WARNING STUD WITH 15mm LUG. FIXED INTO TILE WITH ADHESIVE STUDS @ 85mm C/C
1130
200
316
300
200
400
213
Sub-Consultants:
CHEMICALLY ANCHORED GALVANISED STEEL BENCH SUPPORT STRUCTURE
WATER CASCADE FROM TOP POOL TO BOTTOM POOL
HY
HY
200
TIMBER FACE BOARD
STRUCTURAL SLAB
418
MECCA
2333
P OOL
50 x 50 mm TIMBER SLATS
LIGHTING FIXTURE
BOTTOM POOL WALL BENEATH SLAB
0 20
200
213
305
EXPANSION JOINT BENEATH SLAB
M
100
0 30
CONNECTION POINT TO SANITORY
3112
2719
315
CHEMICALLY ANCHORED GALVANISED NETWORK STEEL BENCH SUPPORT STRUCTURE
TRUE NORTH
2370
Consultants:
302
308
7
0 15
660
WATER DIFFUSER SUPPLY POINT
1 : 10
SIGNAGE - TYPE 3 - SIGNAGE TOP SECTION - TYPE 3 - TOP 12 1 : 10
12
0 40
10
316
20078-LSC-TD-DWG-
144 6
SIGNAGE - TYPE 3 - FRONT VIEW
RAISED WALKWAY SLAB TILED TO MATCH POOL FINISH
317
501
Sheet Number:
40
315
1.6m HIGH WATER SPRAYER
502
20078-LSC-TD-DWG1 : 10
1 : 10 DEVELOPMENT SUSTAINABLE 150 INVESTMENT COMPANYT SAOC 1161
316
0.6m HIGH WATER SPRAYER
310
350
100
100mm CONCRTE BLINDING
SIGNAGE - TYPE 3 - SIGNAGE SIDE SECTION - TYPE 3 - SIDE SECTION Key Plan: 11 1 : 10 11 1 : 10
WATER DIFFUSER SUCTION POINT
5
310
200mm CONCRETE FOUNDATION to execution of any INFILL works. 100mm CONCRTE BLINDING ﺍﻟﺗﺑﻠﻳﻎ ﻋﻥ ﺃﻱ ﻓﺭﻭﻗﺎﺕ ﻗﺑﻝ ﺍﻟﺗﻧﻔﻳﺫ ﻋﻠﻰ ﺍﻟﻣﻘﺎﻭﻝ- 3 Stage: 2316 TOP POOL 4. --All dimensions must10be verified on site prior to 0 ISSUED FOR TENDER orderBLINDING or manufacture of materials or production 100mm CONCRTE of site drawings. Client: 264 2 ﺍﻟﺗﺄﻛﺩ ﻣﻥ- 4 ﺍﻟﻘﻳﺎﺳﺎﺕ ﻣﻭﻗﻌﻳﺎ ﻗﺑﻝ ﺗﻭﺭﻳﺩ ﺃﻭ ﺗﺻﻧﻳﻊ ﺍﻟﻣﻭﺍﺩ ﺍﻟﺗﻧﻔﻳﺫ ﻣﻥ ﻗﺑﻝ ﺍﻟﻣﻘﺎﻭﻝ19ﻭﻗﺑﻝ ﻋﻣﻝ ﻣﺧﻁﻁﺎﺕ 8
SIGNAGE DETAILS & 3D REPRESENTATION
50 x 50 mm TIMBER SLATS
WATER OUTLET TO SANITARY WATER NETWORK. C/W SHUT OFF VALVE FOR MANUAL EMPTYING OF THE WATER FEATURE BASIN.
200
200 100
100mm CONCRTE BLINDING
SIGNAGE TYPE 3
TIMBER FACE BOARD
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
0 20
9
213
302
200mm CONCRETE FOUNDATION INFILL
SIGNAGE - TYPE 3 - SIGNAGE FRONT VIEW - TYPE 3 - FRONT VIEW WATER FEATURE DRAIN 10 LINE1 : 10(WFDL) 10 1 : 10
302
1 : 10
STEEL SUPPORTS BASE PLATE
HARD LANDSC SHEE
633
WATER FEATURE SUCTION LINE (WFSL)
MIN 600mm PLANTING MEDIUM
100mm CONCRTE BLINDING
25mm x 50mm x 3mm STEEL POST
213
5 YI 4-STAR HOTEL & L APARTMENTS, THE YI HARD LANDSC SHEE
0
BASE PLATE
1 : 10
662
STEEL SUPPORTS
BASE PLATE
PLANTER (ON GRADE) Keynote Legend
202 Surface - Pre Cast Concrete Type1 205 203 Surface -Precast Concrete205 Type 2 Key Value Keynote Text 204 Surface - Precast Concrete Type 3 SPACER SPACER Drawing Title: 212 Surface - Concrete Tile 201 Surface - Decking THREADED ROD WELDED TO STEEL SHEET THREADED ROD WELDED TO STEEL SHEET GROUND LEVEL 301 Sub-surface - Compaction - to engineer's spec. 202 Surface - Pre Cast Concrete Type1 Notes: 25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING 25mm X 50mm X 3mm ALUMINIUM SUPPORT 303 Sub-surface Sand Blinding 25mm POST ELECTRICAL CONNECTIONS FOR LED STRIPS. ELECTRICAL CONNECTIONS FOR LED STRI 203 x 50mm x 3mm STEEL Surface -Precast Concrete Type 2 EXPANSION JOINT BENEATH 305 Sub-surface - Screed to fall COMPOSITE DECK 204 Surface - Precast Concrete Type 3 25mm X 114mm TREATED TIMBER BEAMS 25mm X 114mm TREATED TIMBER BEAMS Drawing Title: 306 Sub-surface - Geotextile Membrane - to engineer's spec. 212 Surface - Concrete Tile 8mm THREADED ROD 8mm THREADED ROD 308 Sub-surface Drainage Mat 25mm x 50mm x 3mm STEEL POST 301 Sub-surface - Compaction - to engineer's spec. 311 Sub-surface - Earth 5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE 5MM CONCRETE GREY PERSPEX SHEET, C 303 Sub-surface - Sand Blinding 314 Sub-surface - Mortar Bed LED STRIPS (30 watts) LED STRIPS (30 watts) 305 Sub-surface - Screed to fall 315 General Sub-surface - Waterproofing - to specialist's spec. ﻣﻼﺣﻅﺎﺕ Notes: EXPANSION JOINT STEEL SUPPORTS Scale: 306 Sub-surface - Geotextile Membrane - ﻋﺎﻣﺔ to engineer's spec. 3mm POWDERCOATED STEEL SHEET, CUT TO SIZE 3mm POWDERCOATED STEEL SHEET, CUT 317 Sub-surface - Lightweight Fill 308 PLATE Sub-surface - Drainage Mat STEEL SUPPORTS BASE 1. Do not scale from this drawing.Slab to Engineers Specification 405 Structure - Structural CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS CONCRETE FOOTING TO SPECIALIST SPE BASE PLATE 311 Sub-surface - Earth ﺍﻟﻣﺧﻁﻁ ﻟﻳﺱ ﻟﻠﻘﻳﺎﺱ- 1 8mm THREADED ROD, BOLTED TO STEEL SUPPORT 8mm THREADED ROD, BOLTED TO STEEL S 314 Sub-surface - Mortar Bed Sheet Number: 2. This drawing must be read in conjunction 1732 BOLT CAST INTO BLINDING AND CONCRETE 315 CAST INTO BLINDING Sub-surface - Waterproofing - to specialist's spec. BOLT AND CONCRETE Scale: with all other relevant drawings. FOOTING, TO SPECIALIST SPECIFICATION 317 Sub-surface - Lightweight Fill ﻳﺗﻡ ﻗﺭﺍءﺓ ﺍﻟﻣﺧﻁﻁ- 2 FOOTING, TO SPECIALIST SPECIFICATION ﺍﻟﻌﻼﻗﺔ ﺍﻻﺧﺭﻯ ﺫﺍﺕ ﺍﻟﻣﺧﻁﻁﺎﺕ ﻣﻊ 00 TENDER DESIGN 21/06/24 LH P.v.E 10 0 00 200mm CONCRETE FOUNDATION INFILL405 Structure Structural Slab to Engineers Specification 2 3. Contractor must report any discrepancies prior 1711 Rev Description Date App Chk
400
STEEL SUPPORTS
Keynote Text
- ON- Decking GRADE GROUND LEVELWALLSurface 201 LEVELPLANTER TRANSITION - RAISED 231
2
GROUND LEVEL
50
50 400
400
100
1 : 10
Keynote Legend 400
221
SURFACE - SECTION -TIMBER DECK
WATER FEATURE RETURN LINE (WFRL)
SIGNAGE TYPE 3 SIGNAGE TYPE 3 9 9
25mm x 50mm x 3mm STEEL POST
Drawn by: Discipline: Designed by: A by: 301 CheckedLANDSCAPE Project Title: Drawn by: Designed by: 4-STAR HOTEL & L Checked by: 400 APARTMENTS, THE 231 Project Title:
200
WATER FEATURE KEY
1 : 10
100
200
5a
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
LANDSCAPE A
407
200
1 : 10
25mm x 50mm x 3mm STEEL POST
200
400
5a
305
SURFACE - SECTION -TIMBER405DECK
Sub-Consultants: 406
BEACH
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
Sub-Consultants:
311
MARINA
25mm X 114mm TREATED TIMBER BEAMS
1 : 10
315 405
301
M
STEEL TUBE SPACER
25mm X 114mm TREATED TIMBER BEAMS
SUSTAINABLE C
MIN 600mm PLANTING MEDIUM
1585
25mm X 114mm TREATED TIMBER BEAMS
5mm CONCRETE GREY PERSPEX SHEET BACKING
ISSUED FO SUSTAINABLE INVESTMENT C
308 Consultants:
Key Plan:
VARIES
GROUND LEVEL
Client:
315
216
761 761
50
50
EXPANSION JOINT
SURFACE - SECTION - PRE-CAST CONCRETE PAVER TYPE 3
FINISH: TEXTURED COLOUR: TABACCO WITH MATCHING GROUT SIZE: 1200x1200x20mm WITH 3mm FLUSH GROUTING
308 305
28
311
TRUE NORTH
317 8mm THREADED ROD
1 : 10
114 51
316
T
LEVEL TRANSITION - RAISED PLANTER (ON SLAB)
1
317 315
1 : 10
5
513
00 TENDER DESIGN 314 Rev Description Stage: 213 00 TENDER ISSUED DESIGN 315 Rev Description Client: Stage:
314
BESPOKE - ESCAPE - SMALL FIRE PIT
520
315
20
Consultants: INVESTMENT
Key Value
306 308
405 SURFACE DETAIL - ON SLAB SURFACE - SECTION - PRE-CAST CONCRETE PAVER TYPE 3
WATER FEATURE PORCELAIN TILE
25mm X 114mm TREATED TIMBER BEAMS
8m
ADJACENT SURFACE
3mm STEEL SHEET, WITH LASER CUT LTTERS
317
GROUND LEVEL
216
28
51
350
114
350
80 50
100
1150
305
CO
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
405
CONCRETE SLAB
305
WITH FLOAT VALVE & POTABLE WATER CONNECTION WITH BACKFLOW PREVENTION
216
400 200
2050
250 2100 750
1585
25
25
100 761
1 : 10
315 405
0.6 HIGH WATER SPRAYER SPECIALIST'S SPECIFICATIONS AND DETAIL
315
3m
CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS
3mm STEEL SHEET, WRAPPED AROUND POSTS, WITH LASER CUT LETTERS
200
07 DETAILS .
201
25mm X 114mm TREATED TIMBER BEAMS
2
303 308
18
1.8m HIGH WATER SPRAYER TO SPECIALIST'S SPECIFICATIONS AND DETAIL
308
LE
3mm302 POWDERCOATED STEEL SHEET, CUT TO SIZE
310
EXPASION JOINT
308
LEVEL TRANSITION - RAISED PLANTER (ON GRADE) 306
308 305
4a
314
LED STRIPS (30 watts)
301 303
General Notes:
315
5M
SIGNAGE - TYPE 2 - SIGNAGE TOP SECTION - TYPE 2 - TOP FO 8 1 : 10 1 : 10 303
8
405
CONCRETE SLAB
317 315
4a
200
8m
Notes:
5MM CONCRETE GREY PERSPEX SHEET, CUT TO SIZE
311 301
317
316
25
8mm THREADED ROD
3mm STEEL SHEET, WITH LASER CUT LTTERS
3mm STEEL SHEET, WITH LASER CUT LTTERS
3mm STEEL SHEET, WRAPPED AROUND POSTS, WITH LASER CUT LETTERS
201
100
80
303 204
LEVEL TRANSITION - RAISED PLANTER (ON SLAB) 317 1 : 10
00
25 EL
25mm X 114mm TREATED TIMBER BEAMS
Notes:
513
306
80
1
301
5
ADJACENT SURFACE
407
204
VARIES
405
Revision:
A0 315
19228-LSC-DD-DWG-50-009-0
405 120
Sheet Size:
2050
1 : 10
200
LED STRIP (40 watts)
3mm STEEL SHEET, WITH LASER CUT LTTERS
406
306
120
314 213
25
20mmØ GAS PIPE. TO BE INSTALLED BY SPECIALIST.
3mm STEEL SHEET, WRAPPED AROUND POSTS, WITH LASER CUT LETTERS
5
TH
25mm X 50mm X 3mm ALUMINIUM SUPPORTS, CONCEILING ELECTRICAL CONNECTIONS FOR LED STRIPS.
520 20
GAS-OPERATED BRONZE COPPER FIRE PIT
THREADED ROD WELDED TO STEEL SHEET
213
200
302
1 : 10
2050
2100
305
5
2050
1 : 10
400
5mm CONCRETE GREY PERSPEX SHEET BACKING
SURFACE - PLAN - TIMBER DECK
750
SURFACE - PLAN - PRE-CAST CONCRETE PAVER TYPE 3
4
1 : 10
5100mm CONCRTE BLINDING5 200
Sheet Number:
750
308
P.V.E.
Scale:
1 : 10
5mm CONCRETE GREY PERSPEX SHEET BACKING
500 5mm CONCRETE GREY PERSPEX SHEET BACKING
750
5
317
Checked by: Project Title:
750
300
308
SIGNAGE - TYPE 3 - TOP SECTION
2050
SURFACE DETAIL PLAN
1 : 10
N.S.
HARD LANDSCAPE DETAILS LED STRIP (40 watts) HARDSCAPE - SHEET 09
311 DECK SURFACE - PLAN - TIMBER
2100
4
Designed by:
CONCRETE PLINTH
EXPASION JOINT
301 314 SURFACE - PLAN - PRE-CAST CONCRETE PAVER TYPE 3
N.S.
250
216
350
ADJACENT SURFACE
200mm CONCRETE FOUNDATION INFILL
Drawn by:
315
12
200mm CONCRETE FOUNDATION INFILL
310
100
1 : 10
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
100mm CONCRTE BLINDING LANDSCAPE ARCHITECTURE 1000
350
11
SIGNAGE 315 - TYPE 3 - SIDE SECTION
250
AGE - TYPE 3 - FRONT VIEW
314
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
Drawing Title:
ADJACENT SURFACE
25
316
MATERIAL: PRECAST CONCRETE 200mm CONCRETE FOUNDATION INFILL COLOUR: GREY FINISH: SHOT-BLASTED FINISH SIZE: 280x162x80 100mm CONCRTE BLINDING PAVER UNIT: 204 PATTERN: IRREGULAR JOINT: BUTT JOINT MATERIAL: PRECAST CONCRETE COLOUR: GREY FINISH: SHOT-BLASTED FINISH SIZE: 280x162x80 PATTERN: IRREGULAR JOINT: BUTT JOINT
100
100mm CONCRTE BLINDING
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
STEEL SUPPORTS BASE PLATE
SIGNAGE - TYPE 2 INTERNATIONAL - SIGNAGE SIDE SECTION - TYPE 2 - SIDE SECTION KIGALI 7 & BUSINESS 1 : 10 1 : 10 FINANCIAL SQUARE212
7
CONCRETE FOOTING TO SPECIALIST SPECIFICATIONS
250
100
50-101
Discipline:
SIGNAGE - TYPE 2 - SIGNAGE FRONT VIEW - TYPE 2 - FRONT VIEW 316 6 1 : 10 1 : 10
6
100
315
MATERIAL: COMPOSITE DECKING COLOUR: TEAK 200mm CONCRETE FOUNDATION INFILL THREADED ROD WELDED TO STEEL SHEET FINISH: SEALED SIZE: 150x1800x20mm 25mm X 50mm XPAVER 3mm ALUMINIUM SUPPORTS, CONCEILING UNIT: 201 100mm CONCRTE BLINDING ELECTRICAL CONNECTIONS FOR LED STRIPS. PATTERN: VERTICAL COMPOSITE DECKING 25mm X 114mmMATERIAL: TREATED TIMBER BEAMS COLOUR: TEAK 8mm THREADED ROD FINISH: SEALED 5MM CONCRETESIZE: GREY 150x1800x20mm PERSPEX SHEET, CUT TO SIZE PATTERN: VERTICAL LED STRIPS (30 watts) SPACER
3mm POWDERCOATED STEEL SHEET, CUT TO SIZE
300
200
PAVER UNIT: 204
315
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
MIN 600mm PLANTING MEDIUM
STEEL SUPPORTS BASE PLATE
213
100mm CONCRTE BLINDING
25
400
213
50-101
3a
100
100
50
GROUND LEVEL
302
BASE PLATE
STEEL SUPPORTS BASE PLATE
25
PAVER UNIT: 201
100 100
200
200
314
25mm x 50mm x 3mm STEEL POST
STEEL SUPPORTS
315
25
25mm x 50mm x 3mm STEEL POST
1 : 10Lead Consultant:
350
231
205 BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
3a
25mm x 50mm x 3mm STEEL POST
250
213
SURFACE - SECTION - PRE-CAST CONCRETE PAVER TYPE 2 (ON SLAB)
200
50-101
200mm CONCRETE FOUNDATION INFILL
SIGNAGE TYPE 2 SIGNAGE TYPE 2 53a 5
200mm CONCRETE FOUNDATION INFILL
500
BASE PLATE
25mm x 50mm x 3mm STEEL POST
BOLT CAST INTO BLINDING AND CONCRETE FOOTING, TO SPECIALIST SPECIFICATION
5a
400
310
BASE PLATE
1 : 10
25mm x 50mm x 3mm STEEL POST
100
8mm THREADED ROD, BOLTED TO STEEL SUPPORT
STEEL SUPPORTS
GROUND LEVEL
STEEL SUPPORTS
410
2a
25mm x 50mm x 3mm STEEL POST
25
302 SURFACE - SECTION - PRE-CAST CONCRETE PAVER TYPE 1
410
1a 1 : 10 Hard landscape details, submitted at various stages of design packages.
MIN 600mm PLANTING MEDIUM
761
SURFACE - SECTION - CONCRETE TILE EDGE
1150
1 : 10
25mm X 114mm TREATED TIMBER BEAMS
PLAN - POOL PEBBLE CASCADE Scale: Sheet Size: Revision: 1 : 50
1 : 10
3
A1
00
LEVEL TRANSITION - DOUUBLE PLANTER WALL_EXPA
Sheet Number:
20078-LSC-TD-DWG-HTL-50-104
Hard & soft landscape details, submitted at various stages of design packages. Keynote Legend 800
Key Value
Keynote Legend
Keynote Text
800
Key Value
207 208 302 305 308 310 317 406
Keynote Text
207 208 302 305 308 310 317 406
PLANTING
Surface - Sohar Marble Surface - Pebbles Sub-surface - Mulch Sub-surface - Screed to fall Sub-surface - Drainage Mat Sub-surface - Planting Medium Sub-surface - Lightweight Fill Structure - Structural Wall to Engineers Specification
PALM TREE
750
450
450
PLANTING
Surface - Sohar Marble Surface - Pebbles Sub-surface - Mulch Sub-surface - Screed to fall Sub-surface - Drainage Mat Sub-surface - Planting Medium Sub-surface - Lightweight Fill Structure - Structural Wall to Engineers Specification
750
150
RAISED PLANTER
RUBBER STRAP TREE TIE WITH TENSIONERS TO SPECIFICATION
PALM TREE
350
500
350
150
208
M
SHRUB AND GROUND COVER PLANTING
T
SHRUB AND GROUND COVER PLANTING MECCA
TRUE NORTH
SHALLOW ROOTED GROUND COVER
M
302
70
FLUSH INGROUND WATER JET
MARINA
GRAVEL EDGE
MECCA
DEPTH 2000mm
75
DEPTH 2000mm
2000
375
VARIES
Notes:
300
405
1 : 50
1
2223
ROOF - EDGE DETAIL
00 DESIGN 1 : TENDER 20 Rev Description Stage:
302 SUSTAINABLE DEVELOPMENT INVESTMENT COMPANY SAOC
150
310 MIN 600 VARIES
Sub-Consultants:
WIRE MESH
207
WATER FEATURE SECTION 317
151
300
208
308 305 406
305
308
Drawn by: Designed by: Checked by: Project Title:
Scale:
J.P. J.P. P.v.E.
4-STAR HOTEL & LUXURY SERVICED APARTMENTS, THE SUSTAINABLE CITY YITI
GEOTEXTILE LAYER WRAPPED As indicated UP AND FOLDED UNDER Sheet Number: MULCH LAYER
1 : 20
MIN 300
2
WATER FEATURE DETAIL SECTION
308 315
Scale:
As indicated
Sheet Size: Revision:
A1
Sheet Number:
20078-LSC-TD-DWG-HTL-51-002
00
306 220
405
216
405
308
310WATERPROOFING MEMBRANE
Sheet Size: Revision:
A1
00
5
315
SHEET GREEN02ROOF / PLANTING ON SLAB DETAIL
310
305
20078-LSC-TD-DWG-HTL-51-002
305
302
310
APARTMENTS, THE SUSTAINABLE CITY YITI
LAWN PLANTING
LAWN TERRACE - DETAIL 1 : 10
MIX ZEOPLANT WITH SWEET SOIL AND FILL AROUND THE ROOTS OF THE PLANTS SIMILARLY TO THE APPLICATION FOR TREES. FOR PLANTING BEST JUST MIX ZEOPLANT AT 3 – 4 kg/ m2 IN THE SWEET SOIL AT A DEPTH OF 150 – 300mm
GEOTEXTILE LAYER WRAPPED UP
315
405
405 405
4
ROOF - TRANSITION - PLANTING TO UPSTAND PLANTER WA 1 : 10
GREEN ROOF STEPPED WALL DETAIL
300mm DEPTH PLANTING MEDIUM FOR LAWN PLANTING
310
305 308
305
IRRIGATION LAYOUT TO PH. ENG. SPECIFICATION AND DETAIL
SOFT LANDSCAPE DETAIL - TYPICAL PLANTING LANDSCAPE STRUCTURES 3 1 : 20 ROOF - TRANSITION - PLANTING TO GRAVEL 1 : 10
J.P. J.P. P.v.E.
317
Discipline: 1 : 20
1 : 20LAWN TERRACE
216
LANDSCAPE ARCHITECTURE
Drawing Title:
SOFT LANDSCA
220
LANDSCAPE STRUCTURES SOFT LANDSCAPE DETAIL - TYPICAL PLANTING SHEET 02
Drawing Title:
3
300
Discipline:
305 310
LANDSCAPE ARCHITECTURE 405
300
1 : 20
3
2
375
FLUSH INGROUND WATER JET
300
300 300
300
STEEL BRACKET
2
MIN 600
150
WIRE MESH
DRAINAGE CHANNEL TO OUTLET
308
375
406
1 : 10
TREES. FOR PLANTING 4-STAR BEST JUST HOTEL MIX ZEOPLANT AT 3 – 4 kg/ SERVICED & LUXURY m2 IN THE SWEET SOIL AT A DEPTH OF 150 – 300mm 315
INSULATION TO ARCHITECTURE SPECIFICATION
VARIES
750
305
ROOF - SURFACE- ROOF BUILD UP
207
Drawn by: 317 Designed by: GEOTEXTILE LAYER WRAPPED by: AND FILL AROUND THE WITH Checked SWEET SOIL UPMIX AND ZEOPLANT FOLDED UNDER Project Title: MULCH LAYER ROOTS OF 208THE PLANTS SIMILARLY TO THE APPLICATION FOR
306
300
151
2
Sub-Consultants:
308 302
150 151
310
DETAIL - TYPIC
1 : 20
DETAIL - TYPICAL TREE - SECTION 59a PLANTING scale 1 : 20
Consultants:
317
300
300
300 300
DRAINAGE CHANNEL TO OUTLET
308
302
FLUSH INGROUND WATER JET
216
CONCRETE STRUCTURE
2
MIX ZEOPLANT WITH SWEET SOIL AND FILL AROUND THE ROOTS OF THE PLANTS SIMILARLY TO THE APPLICATION FOR TREES. FOR PLANTING BEST JUST MIX ZEOPLANT AT 3 – 4 kg/ m2 IN THE SWEET SOIL AT A DEPTH OF 150 – 300mm
WIRE MESH
STEEL BRACKET
75
317
P.v.E Chk
75
1 : 20
151
302 310
150
LH App
302
Consultants: 2223
21/06/24 Date
TREE PLANTING DETAIL - ON GRADE SOFT LANDSCAPE
750
208
SUSTAINABLE DEVELOPMENT305
Client:
WIRE MESH
WATER FEATURE SECTION
315405
ISSUED FOR TENDER
150
750
STEEL ANGLE
Chk
308
SOFT LANDSCAPE DETAIL - TYPICAL PALM ON SLAB
150
1 : 10
1
CONCRETE STRUCTURE
ISSUED FOR TENDER
310
305 317 P.v.E
300
1
317
305
LH App
INVESTMENT PALM PLANTING DETAILON - ONSLAB SLABCOMPANY SAOC SOFT LANDSCAPE DETAIL - TYPICAL PALM
DETAIL - TYPICAL PALM - SECTION 58a PLANTING scale 1 : 20
310
315
21/06/24 Date
Client:
WATER FEATURE PLAN
208
00 TENDER DESIGN Rev Description Stage:
310
306 GEOTEXTILE LAYER WRAPPED UP AND FOLDED UNDER 308 MULCH LAYER
317
VARIES
2000
07 DETAILS .
GEOTEXTILE LAYER WRAPPED UP AND FOLDED UNDER MULCH LAYER
m 00 m
Notes:
2000
1500
WATER FEATURE DETAIL PLAN
STEEL ANGLE
ROOT-BALL UNTIL ROOT-BALL IS FULLY COVERED. FILL THE UPPER PIT WITH NORMAL 302 SOIL. SWEET
302
6 MIN
ARCHITECTURAL WALL SWEEP ROOF EDGE
SHALLOW ROOTED GROUND COVER
m 00 m
ARCHITECTURAL FACADE STONE CLADDING
308 305
1
MIX ZEOPLANT WITH SWEET SOIL TAKEN OUT OF THE TREE PIT AT RATIO 3-4% BY VOLUME. MIX ZEOPLANT WITH SWEET SOIL TAKEN OUT FILL THE MIX BACK TO THE PIT AT 150 – 30 mm OF THE TREE PIT AT RATIO 3-4% BY VOLUME. LAYER; THEN PLACE THE ROOTBALL ON THIS MIX BACK TO THE PIT AT 150 – 30 mm LAYER AND FILL THE FILL REST THE OF THE ZEOPLANT-SWEET SOIL MIX, AROUND LAYER; THENTHE PLACE THE ROOTBALL ON THIS ROOT-BALL UNTIL ROOT-BALL IS FULLY LAYER AND FILL THE REST OF THE COVERED. FILL THE UPPER PIT WITH NORMAL ZEOPLANT-SWEET SOIL MIX, AROUND THE SWEET SOIL.
UPSTAND WALL
308
204
FOR PALM PLANTED ON SLAB
WATER PROOFING MEMBRANE
BEACH
BEACH
6 MIN
m 00 m
310
302
306
19 -
MARINA 216
310
SLOT DRAIN TO OUTLET
---
6 MIN
m 00 m
204
1500
---
207
6 MIN
SLOT DRAIN TO OUTLET
207
302
302
MIN 2000mm DEPTHMIN PLANTING MEDIUM 2000mm DEPTH PLANTING MEDIUM FOR PALM PLANTED ON SLAB
701
VARIES
0 100
Key Plan:
DEPTH 1500mm
IRRIGATION T LAYOUT AROUND TREE ROOTBALL TO PH. ENG. SPECIFICATION AND
TRUE IRRIGATION LAYOUT AROUND TREE DETAIL NORTH AND ROOTBALL TO PH. ENG. SPECIFICATION DETAIL
375
400
FLUSH INGROUND WATER JET
Key Plan:
300
0 100
WATER
VARIES
400
1. Do not scale from this drawings. 2. This drawing must be read in conjunction with all other relevant drawings. 3. Contractor must report any discrepancies prior to execution of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
DEPTH 1500mm
General Notes:
WATER
75
1. Do not scale from this drawings. 2. This drawing must be read in conjunction 40mm DIAMETERwith TREEall TIEother STAKES INSERTED250mm relevant drawings. DEEPER THAN THE TREE'S ROOTBALL FOR 3. Contractor must report any SUFFICIENT discrepancies prior to execution SUPPORT of any works. 4. All dimensions must be verified on site prior to order of manufacture of materials or production of site drawings.
MIN 250mm
ARCHITECTURAL ELEMENT
40mm DIAMETER TREE TIE STAKES INSERTED250mm DEEPER THAN THE TREE'S ROOTBALL FOR SUFFICIENT SUPPORT
General Notes:
1000
ARCHITECTURAL ELEMENT
750
TREE TIES TO BE LOCATED AT 1/3'S OF CLEAR TRUNK HEIGHT
0 40
50
RUBBER STRAP TREE TIE WITH TENSIONERS TO SPECIFICATION
208
70
50
150
1800
500
300
150
5
LAWN TERRACE 1 : 10
4* Hotel model views
09 3D MODEL VIEWS .
VIEW FROM HOTEL LOBBY, LOOKING OUT ON POOL AND MARINA
HOTEL POOL WITH LOUNGERS FACING THE MARINA VIEW
20
ENTRANCE EXIT FROM PROMINADE TO HOTEL GUESTS
VIEW FROM BRIDGE CONNECTER VIEWING THE EXTERIOR JUICE BAR
NOVEMBER 2021
Waterfront Urabsn Park model views
MEANDERING WALKWAY, WITH SEATING WALL ON EITHER SIDE
MULTI-PURPOSE SPORTS COURTS
LANDSCAPE ARCHITECTURE PORTFOLIO
09 3D MODEL VIEWS .
21
MAIN ENTRANCE OF PARK @ DROP OFF PLAZA
PROMINADE RUNNING & CYCLING TRACK
MOUILLE POINT, CAPE TOWN, ZA
NOVEMBER 2021
MOUILLE POINT, CAPE TOWN, ZA
THE COMPANY GARDEN, CAPE TOWN, ZA
22
MILNERTON, CAPE TOWN, ZA
HEERENGRACHT ST, CAPE TOWN, ZA
DE KELDERS, ZA
HEERENGRACHT ST, CAPE TOWN, ZA FILM PHOTOGRAPHY
ILLUSTRATIONS
LANDSCAPE ARCHITECTURE PORTFOLIO
10 MORE ABOUT ME .
MERRIMAN SQUARE, CAPE TOWN, ZA