Fall 2018 - Microschool

Page 1

DOWNTOWN PASADENA STEM ACADEMY GRADES SERVED: 6-8

Nested away just feet from the Pasadena City Hall along the famously known Big Bang Theory Way, is a proposed middle school specializing in STEM, gearing towards serving students in grades 6 through 8. The project is built on a narrowing site that is wedged between two existing commercial buildings and an apartment complex on the other side leaving two alleys on both east and west sides of the building. The project responds to the narrowing site through organization of a grid laid over the site allowing for the extracting of geometries. To maximize efficiency of the building’s footprint, the idea for this project was to layout the most important space throughout the site from the larger end to the narrower end. This process allowed for quality spaces that served as smaller collaborative spaces situated along circulation pathways. These labs and collaborative spaces are lifted above to the second floor which are accessed along Big Bang Theory Way through the feature stair starting at the ground floor. The building is primarily enclosed with triple pane low emissivity glazing that is cladded with a perforated metal system, designed to maximize natural light into the more prominent spaces on the interior. At the highest level, is an extensive green roof serving as an outdoor science garden and recreation area. Adjacent this area is the grand feature of the building which is the great room, left with no metal cladding and only by the glazing system, allows for a pure glass box intended for multi-purpose use, entertainment, or demonstration.

HOLLY ST.

PROGRAM: STEM (SCIENCE TECHNOLOGY, MATH, & SCIENCE)

800 sf 400 sf 200 sf

TOTAL: 14,600 sf

RY WA Y

Mechanical Room Electrical Room Data/Telephone

HEO

1200 sf 1200 sf 1200 sf 1200 sf

MECHANICAL:

GT

sf sf sf sf sf sf 400 sf

600 sf

UNION ST.

ARROYO PARKWAY

Science Lab Media Lab Inventor Lab MPR Lab/Kinesthetics Lab

200 200 120 400 400 120

Storage

BAN

LABS:

SERVICE/LOADING:

400 sf 100 sf

BIG

Principal Admissions Secretary Meeting Room Faculty Restrooms Storage Faculty Lab

Male/Female Janitorial Room

LEGGE ALLEY

ADMINISTRATIVE:

1,000 sf 3,000 sf 900 sf

RAYMOND AVE.

Lobby/Reception/ Gallery Great Room Pull Out Collab Spaces

RESTROOMS:



MAIN:


CONCEPT & PROCESS

STRUCTURAL ELEMENTS & CONSTRUCTION

CIRCULATION GRID

CUT

LIFT

PROGRAM

NORTH ELEVATION 1/16" = 1'-0"

SOUTH ELEVATION 1/16" = 1'-0"

HORIZONTAL CIRCULATION

CONCRETE FOUNDATION WALLS

GLASS MULLION SYSTEM

VERTICAL CIRCULATION

CONCRETE SLABS & FLOORS

EXTENSIVE GREEN ROOF

STEEL FRAME CONSTRUCTION

WALLS & PARTITIONS

TRIPLE PANE LOW-E GLASS ENCLOSURE

PERFORATED METAL PANEL SYSTEM

WEST ELEVATION 1/16" = 1'-0"

EAST ELEVATION 1/16" = 1'-0"


3

3

3

3

LOADING/STORAGE

PRINCIPAL

FACULTY STORAGE

OPEN TO BELOW KINESTHETICS LAB GREAT ROOM

SECRETARY

FACULTY ROOM MAIN ENTRY/SOCIAL SPACE

1

1

VESTIBULE

COLLAB SPACE #2

1

1

ST UD EN T

MTG. ROOM

DR OP -O F

1

1

F

COLLAB SPACE #1

1

1

(F)/RESTOOM

SCIENCE LAB ROOFTOP SCIENCE GARDEN & RECREATION SPACE

GALLERY

(F)/RESTOOM

(M)/RESTOOM JANITORIAL

COLLAB SPACE #3 (M)/RESTOOM

2

2

2

2

2 ADMIN.

2

MEDIA LAB

2

2

RECEPTION

COLLAB SPACE #4

UP

UP

BIG

BAN

G TH

LEGGE ALLEY

EOR YW AY

LOBBY

COLLAB SPACE # 5

DATA/ TELEPHONE

3

3

3

COLLAB SPACE # 6

3

MECHANICAL

INVENTOR LAB

INVENTOR LAB

SECTION 01 1/16" = 1'-0"

LEVEL 02 1/16" = 1'-0"

LEVEL 01 1/16" = 1'-0"

PARKING/MEP 1/16" = 1'-0"

SECTION 02 1/16" = 1'-0"

SECTION 03 1/16" = 1'-0"

LEVEL 03 1/16" = 1'-0"



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.