WOODFORD ROAD WOODFORD - LONDON
PRACTICE: CLEAR ARCHITECTS
Summary: A complete refurbishment and two-storey rear extension to an original Art Deco style house situated in a conservation area. Keywords: #tree roots #modifications for wheelchair accessibility #pile & trench foundations #site visits #meeting schedules #communication with contractor #project management
Client: Domestic Budget: ÂŁ500,000 Current stage: 5 Involvement: Stages 2 - 5 Tasks: Project management and planning, site meetings, client meetings, technical drawings, schedules of information, problem solving, co-ordination of information between different consultants, health and safety, concept presentation, AutoCAD, freehand sketch, photoshop.
All images copyright Clear Architects Ltd.
Site visit photograph of the rear of the house following demolition of the single storey roof
Site visit photograph of rear of the house following strip out works
Artist’s Impression of Proposal
Site visit photograph of entrance into home
290 61 Woodford Road Š Clear Architects ltd
Hand sketch of concept of front elevation/entrance using technical pen and colour markers
290-PR-02A
FOREST RISE LOUGHTON - ESSEX
PRACTICE: CLEAR ARCHITECTS
Summary: A complete remodelling and single storey side extension to a Victorian era house, including a new-build annexe building and a subterranean indoor pavilion style swimming pool. Keywords: #concept & project brief development #large site #landscaping #multi-generational living #site visits #time management
Client: Domestic Budget: ÂŁ2.5m Current stage: 2 Involvement: Stages 2 Tasks: Liaising with the client, organising surveys, technical drawings, problem solving, coordination of information between different consultants, AutoCAD, freehand sketch, photoshop.
All images copyright Clear Architects Ltd.
Render of landscape concepts
Elevations 1:100 Elevations 1:100
existing roof tiles to be removed/stored and reused in line with new roof structure new black timber dormer
existing roof tiles to be removed/stored and reused in line with new roof structure new black timber dormer
existing tiles to be retained
white polished concrete
existing tiles toslot be windows retained on vertical white concrete wall
timber detail continuing the white polished rhythm ofconcrete the slots windows
contemporary tile detail
Proposed West Elevation
Proposed North Elevation
con tile
Proposed West Elevation
new window/doors into family room
feature slot window to allow natural light to flood through to the central staircase and into the central living areas
Proposed South Elevation
feature slot window to allow natural light to flood through to the central staircase and into the central living areas
Proposed East Elevation
My sketch concept for the scheme - depicting the axis connecting the structures Concept Presentation/313 Forest Rise 313-PR-01 across the site
Proposed elevations
Proposed East Elevation
September 2017
Š Clear Architects ltd
Concept Presentation/313 Forest Rise
313-PR-01
Š Clear Architects ltd
Ground Floor Plan Scale 1:100 Ground Floor Plan N Scale 1:100 N
Precedents Precedents
vertical slot windows on the white concrete wall will create and alternative and dynamic vertical slotoutlook windows on the white concrete wall will create and alternative and dynamic outlook vertical slot window
vertical slot window
Double height with open riser staircase
Double height with open riser staircase
Floor to ceiling windows to frame the views Floor to ceiling windows to frame the views
steel frame windows creating visual link and to allow morning sunlight to flood the rearframe livingwindows areas creating steel visual link and to allow morning sunlight to flood the rear living areas
large kitchen island
large kitchen island
direct access to upper terrace and growing area for fresh fruit & vegetables
private entrance to study
direct access to upper terrace and growing area for fresh fruit & vegetables
private entrance to study
grand staircase refurbished
structural glazing alowwing visual connection of the wine cellar structural glazing alowwing secret door connection visual connection of lounge the between the formal wine cellarplan kitchen/ and open
dinning space secret door connection between the formal loungeare closed existing doorways and open plan expressed usingkitchen/ recessed dinning detailingspace
view
closed existing doorways are expressed using recessed angled stairs pointing detailing towards the childrens den, heading to the pavilion angled stairs pointing towards the childrens den, heading to the pavilion
view
*
view
view
feature slot window to allow grand staircase refurbished natural light to flood through to the central staircase and into the central living feature slotmore window to allow areas light to flood through natural to the central staircase and into the more central living areas double height fireplace creating a striking feature and continuity between the two floors double height fireplace creating a striking feature and continuity between the two floors
existing ground floor slab removed existing ground floor slab removed
Wall panelling hidden storage
Wall panelling hidden storage
Wine celar visually connected to the upper floor Wine celar visually connected to the upper floor
Photograph of main elevation of the house
Feature element to divide open plan kitchen/dinning area Feature element to divide open plan kitchen/dinning area
view view view
view
view view
view
view
Light Careful position of spaces to maximise natural light as much Light as possible to fill the internal living areas. Careful position of spaces to maximise natural light as much as possible to fill the internal living areas. Orientation & Axis Rear extension has been orientated along the axis that Orientation & Axis connects the home to the childrens den. Permanently Rear extension has been orientated along the axis that connecting the children with the family home. connects the home to the childrens den. Permanently connecting the children with the family home. Different Experiences A mix of dramatic architectural features have been introduced Different Experiences into the home to juxtapose & contrast the existing traditional A mix of dramatic architectural features have been introduced aesthetic of the home. into the home to juxtapose & contrast the existing traditional aesthetic of the home.
Ground floor plan Concept Presentation/313 Forest Rise Š Clear Architects ltd
Concept Presentation/313 Forest Rise Š Clear Architects ltd
313-PR-01 313-PR-01
September 2017 September 2017
Internal Artist’s Impression NTS
Tasks: Approached the Visualiser for a fee quotation for the production of an external and internal render/ cgi. Sent relevant information to provide context to the project including; topographical survey, CAD drawings, precedent images, hand sketches, design brief and expectations by email. Set deadlines with the visualiser who was based in South Africa and established means of communication. Provided clear comments on draft renders received to allow the visualiser to finalise the images. Communicated efficiently to confirm acceptance of finalised images and established timeframes (along with other projects) to allow all renders to be delivered on time. Key skills used:
Time management Communication and negotiation Freehand sketch and annotation Drafting and CAD
Internal render of the double height living space
Concept Presentation/313 Forest Rise
313-PR-01
September 2017
Š Clear Architects ltd
THE COTTAGE ONGAR - ESSEX G Summary: A two-storey new build contemporary style home.
2645
Current stage: 5 G.3 - dining
Underfloor Heating:
FCL +52.845
r
DE-020 02
Windows specification:ALL TO ACHIEVE U-VALUE: 1.50 W/m²k
When specifying carpets ensure: - Underlay Tog to be 0.5 or Less - Carpet Tog to be 1.5 or less
G.6 utility / store room
DE-020 03
DE-010 01
DPC+50.350
GFL +50.200
Tasks: Project management and planning, site meetings, client meetings, technical drawings, schedules of information, problem solving, co-ordination of information between different consultants, health and safety, concept presentation, AutoCAD, G freehand sketch, photoshop, SIP sub-contractor.
FFL +50.200 SSL +49.995
refer to 282-DE-011 for details
F.4 balcony
F.3 - master bedroom FFL +53.231
PC sum for secondary steel DE-011 02
G.2 living area DE-010 02
External Render wall Specification: - K-Rend Silicone TC 15 render system applied as per manufacturer's instructions - 12.5mm Knauf Aquapanel® Exterior cement board by - 25x38mm treated SW counter battens - SIPco Breather membrane - 175mm Structural Insulated wall Panel supplied and installed by SIPco - Vapour Control Layer; DuPont AirGuard Reflective - timber battens to create void for service runs, depth of void as per details 282-DE-030 & 282-DE-111 - 12.5mm plasterboard with skim finish
4
refer to 282-DE-30 & 282-DE-031 for wall details ALL EXTERNAL WALLS TO ACHIEVE U-VALUE: 0.18 W/m²k
5
6
7
FFL +50.200
External Timber Clad wall Specification: - pre-stained 50x50mm Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner fixed from the back , with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions - black painted 18mm WBP plywood as carrierboard - 25x38mm treated SW counter battens - SIPco breather membrane - Structural Insulated Panels supplied and installed by SIPco - Vapour Control Layer; DuPont ™ AirGuard® Reflective (taped and sealed) - timber battens to create void for service runs, depth of void as per details 282-DE-030 & 282-DE-031 - 12.5mm plasterboard with skim finish refer to 282-DE-030 & 282-DE-031 for wall details
All images copyright Clear Architects Ltd.
ALL EXTERNAL WALLS TO ACHIEVE U-VALUE: 0.18 W/m²k
Section
Structure:
:
ils is
F.2 master ensuite
FFL +53.231 refer to 282-DE-011 and SIPCO drawing no. H-04 for details
Involvement: Stages 2 - 4
L +50.200
F.6 - bedroom 3
255
385
DE-011 03
F.7 shower room
Balcony Specification:- Terrace finish TBC by client - Bauder adjustable pedestal supports - Waterproof single ply membrane EPDM or similar approved by client - 18mm WBP plywood structural deck - timber firrings to create1:40 fall - insulation applied between firrings to improve u-value - Vapour control layer; DuPont™ AirGuard® Reflective (taped and sealed) - Structural Insulated Panel supplied and installed by SIPco - 50x50mm timber counter ceiling battens - 12.5mm plasterboard with skim finish
3565
FCL +55.831
- 100mm Isover APR1200 acoustic insulation roll between joists - 50x38mm SW timber battens for fixing ceiling - 12.5mm plasterboard with skim finish
Budget: £450,000
ing area
- Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
2935 structural slab to underside of joist
2105
Client: Domestic
L +53.231
7
DE-111 01
3740 top of joist to underside of SIP roof
#managing expectations #co-ordinating consultant information #researching new materials refer to 282-DE -110 & 282-DE-111 for details DE-110 #production of tender drawings and 04 ALL TO ACHIEVE U-VALUE: 0.15 W/m²k documents #tenders and negotiations #SIPs First Floor specification:- 20mm zone allowed for carpet/tile/timber floor finish #site visits locations of finishes TBC by client - 8mm plywood layer (for carpet finishes or omitted for #communication with prospective tile and timber finishes) contractors - 18mm for Overlay™ by Polypipe underfloor heating system, see box notes for Tog specification. #managing timeframes and agreeing F.5 - dressing - 22mm Egger Protect decking installed by SIPco deadlines - 254mm open metal web joists
6
- Walls and floors containing enclosing the double height entrance foyer to have fire protection of a minimum of 30 minutes. Walls to be fire protected up to roof structure and fire stopped
385
Keywords:
5
2600 finish to finish
Roof Specification:- SSQ Spanish Slate roof tiles - 25x38mm treated SW battens - SIPco breather membrane - 25x38mm counter battens - Structural Insulated Panel (by SIPco) -Vapour Control Layer; DuPont™ AirGuard® Reflective (taped and sealed) - 47x100mm Timber ceiling battens to create ceiling service void - 12.5mm plasterboard with skim finish
2600
master ensuite
4
Fire Protection:
2645 finish to finish
DE-110 03
PRACTICE: CLEAR ARCHITECTS
Tiling: Electrics:
- Main contractor to include costs for fitting only: -
- Main contractor to include PC cost of £25,000 final design TBC following return of tender
10
Floor Finishes: - Refer to drawing 282-ID-001 for all floor finishes - Main contractor to ensure the appropriate substrate is included in costs
- Main contractor to install square aluminium RWPs
- Main contractor to allow for 3no. mains wired smoke detectors/alarms and 1no. mains wired heat detector to BS5839-6 type LD3 specification according to Flatt Consulting specification - refer to GA plan for positions of smoke and heat detectors in protected stairwell, landing, kitchen & utility room.
Staircase:
- Main contractor to include PC sum of £20,000 for the main staircase - 15 risers and treads - min going 220mm - max rise 220mm max pitch not to exceed 42°
Windows & Front Door: - Outside of contract until supplier has been chosen by client and architect - Main contractor to allow costs for 3 x Velux windows
-
- Tiles supplied by client
Internal doors: - Main contractor to supply and all internal doors:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
Moisture Resistant Board:
- Main contractor to include costs for Mechanical ventilation to WC, bathrooms, Kitchen & Utility
Dropped Ceilings:
- Load bearing and non-load bearing Timber stud walls to be supplied and installed by SIPco
First floor: hatched area shows extent of dropped ceiling
F.3 master
- Main contractor to include costs for ventilation as shown on Flatt Consulting drawings 2543-E-204 & 205 2543-M-103 & 104
bedroom
RWP 02
1W.03
F.4 balcony
RWP 03
1W.02
ALL DIMENSIONS TO STRUCTURAL
1W.01 RWP 01
GW.10
opaque
F.2 master ensuite
up
GW.01
SVP 02
12 1
void
2
3
4
5
6
7
8
9
foyer
10
11
SVP 03
EX
13 RWP 04
14 15
F.1 landing
1D.02 FD 30S
1D.01
F.5 dressing
SD 1D.03
1D.05 FD 30S
rooflight above
FD 30S
F.8
- Background ventilation to all habitable rooms: trickle vents to windows by specialist design TBC by client
- Fire protected stairwell to achieve min 30mins protection
- SIP walls to be supplied and installed by SIPco
required to wet area's
Ventilation:
Key :
- Refer to GA's for extents of moisture resistant boarding
bedroom 2
1D.04 FD 30S
rooflight
F.6 bedroom 3
F.7
1W.07
shower room
above
rooflight above
EX
RWP & guttering:
Smoke detectors:
Total floor tiles 146m ². (Includes;- Internal floor tiles @ 90m² in all wet areas, entrance, open plan living area and utility). External floor tiles @ 56m² in front entrance, rear patio area and upper terrace). Total wall tiles 28.9m². (Includes full height in all showers, full height walls as indicated on floor plans).
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
SVP 05 SVP 04
1W.06
RWP 06
1W.05
1W.04
RWP 05 RWP 07
OPENINGS UNLESS OTHERWISE STATED
DuPont Airguard Reflective vapour control layer taped and sealed SIP roof panel by SIPCO 25mm x 38mm timber counter battens SIPco breather membrane
100x47mm ceiling joists
25mm x 38mm timber counter battens aluminium powder coated parapet in distance
SSQ spanish slate roof tile
SSQ Spanish Slate roof tiles
SSQ spanish slate roof tile
slate ridge tile
eaves carrier tilting fillet
25mm x 38mm counter timber battens
timber packer
SIPco breather membrane
line of parapet in the distance
Glidevale FV100 ventilator
eaves carrier 12.5mm plasterboard with skim finish
EDPM lapped into gutter
25mm x 38mm timber battens
DuPont Airguard Reflective vapour control layer taped and sealed
SW tilting fillet
ceiling services void max 150mm to be reduced where possible following confirmation of chosen light fittings from client
Lead to form gutter
timber firring to create fall min. 1:40 to Rainwater outlets in the foreground and background
EPDM lapped over gutter
timber packer
lead to form gutter
Glidevale FV100 ventilator
timber firings to create fall min 1:40
SIPco breather membrane
18mm WBP plywood layer EPDM waterproof membrane
air
Structural Insulated Panel supplied and installed by SIPco
th
pa
air
pa
th
timber packer/fillet to form fall aluminium powder coated parapet with drip
copper flashing formed from cladding
air path
100
timber packer/fillet to create fall insect mesh
air path 40mm min
insect mesh
Detail 03: Ridge Detail 40mm min
air path
MASTER DRESSING
structural insulated roof panel by SIPCO air path 3-ply timber by SIPCO FCL +55.876
EXTERNAL
FCL +55.876
MASTER ENSUITE
MASTER ENSUITE FCL +55.665
MASTER DRESSING
Detail 02: Valley Gutter
W5
air path
W9 Detail 04: Parapet
Detail 01: Copper Parapet
Fixing of Secondary Timber:
Roof details
Service Voids: Note: Insect Mesh - Insect mesh to be installed at eaves around perimeter of building
- Minimum 50mm services void provided to all external and internal walls unless otherwise stated / shown - See plan for details of increased service void zones required - First floor ceilings to have a dropped ceiling to create a minimum of 50mm services void unless otherwise shown on 282-DE-110
Notes 1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported
Air Permeability:
Air test: Note: U-Values
5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part
Walls - 0.18 W/m²k Roof - 0.15 W/m²k Rooflights - 1.30 W/m²k Ground Floor - 0.15 W/m²k Windows - 1.5 W/m²k Doors - 1.6 W/m²k Minimum U-Values to be achieved by elements as per SAP assessment by Flatt Consulting tel: 01883 331630
- Main contractor to include cost to provide an air test on completion of the build. - The building must achieve an air tightness of 4.0 m3/h/m2@50Pa
- all plasterboard junctions including those with wall penetrations to be sealed with mastic to ensure maximum air permeability
Fire Protection: - The walls to the central stairwell to align throughout and extend up to the roof structure and fire stopped - Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
Skirting
Moisture Resistant Board:
- First floor to be fire protected as shown on 282-GA-101 to ensure continuous fire break between the protected lobby and habitable room
- Main contractor to include costs for square edged skirting throughout
Date
- Refer to GA's for extents of moisture resistant boarding required to wet areas
No
Revision
-
building regulations submission 25/11/16
Drawn By
TJ
JM
A
issued for tender
06/01/17
TJ
JM
Checked By
- All fixing methods and proposals of secondary timber to contractor's proposals and to be verified by structural engineer
Structure:
Roof ventilation:
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
- Ventilation is required to SIP roof and wall panels. Main contractor to ensure fitting of breather membrane is draped and is well taped and sealed. A separate continuous and effectively sealed vapour control layer on the warm side of the insulation to be included and also to be taped and sealed. All to comply with BS 5250: 2011.
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
Project
Title
The Cottage Toot Hill Road Ongar CM5 9LJ
Roof Details 1
Client
Drawing Status
Drawn By
Key : - Elements to be supplied and installed by SIPco indicated in blue
11
clear.
RW.01
Velux rooflights
FCL +55.831
aluminium powder coated capping to parapet wall
RW.03 RW.02
FCL +55.831
RWP 06
1W.06
1W.05
SSQ Spanish slate roof tiles as per specification below
1W.04
RWP 05
1W.02
horizontal timber cladding as per specification below
RWP 04
1W.01
1W.03 RWP 01
RWP 02
Alumasc hopper head - exact spec. to be confirmed by client K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030 FFL +53.231
FFL +53.231
toughened glass balustrade within concealed channel RWP 03
GFL +52.845 GW.08
DPC +50.350
GE.01
high level external grilles for passive vents GW.07
GE.02
GW.06
GW.04
GW.03
GW.02
GFL +52.845
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions
GW.05
external hot and cold water supply for external mixer tap
Internal Ground Floor Level GFL+50.200
DPC+50.350
Internal Ground Floor Level
external grille for downdraught extractor in kitchen island ducted through external wall
GFL+50.200
Ground Floor Level new external door allow PC sum of £300 for supply
GFL +50.000
Elevation B - North-East Elevation
GFL +50.000
Aurubis Nordic Brown Oxidised Copper cladding
Ground Floor Level
Elevation A - South-West Elevation
Aurubis Nordic Brown Oxidised Copper cladding aluminium powder coated capping to parapet and gable ends
aluminium powder coated capping to parapet and gable ends EQ
K-Rend Silicone TC 15 system applied to gable ends as per the manufacturer's instructions refer to 282-DE-110 & 282-DE-110 for details
EQ
SSQ Spanish slate roof tiles as per specification below
1W.07
black painted WBP carrier board behind timber EQ
RWP 06
1W.02
EQ
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions, see drawings 282-DE-030, 282-DE-031, 282-DE-110 & 282-DE-111 for details
EQ
EQ
Alumasc hopper head exact spec. to be confirmed by client
RWP 01
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030
Hormann garage door - allow PC sum of £5,000 EQ
full height glazed entrance by others - glazing outside of contract
GE.01
GW.04
ACO slot drain to drain entrance with level threshold entrance
View 1 - North-West Perspective
copper cladding 50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions to underside of soffit SSQ Spanish slate roof tiles
Aurubis Nordic Brown Oxidised Copper cladding
aluminium powder coated capping to parapet
timber fence and door in same stained finish as timber cladding on main house
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030
Elevation C - North-West Elevation
EQ
EQ
GE.03
GW.09
GW.01
concrete kerb to flower bed
main contractor to allow PC sum of £5,000 for Hormann garage door, design and spec. TBC by client
distinct wide aluminium powder coated capping to parapet at gable ends
EQ
parapet wall to conceal 'hidden gutter'
EQ
toughened glass balustrade within concealed channel
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030 Aurubis Nordic Brown Oxidised Copper cladding
Lighting: - Main contractor to allow for lighting according to Flatt Consulting drawings and specifications.
corner to corner sliding door supported by secondary steel work provided as required - manufacturer TBC by architect - outside of contract vertical timber as per drawings 282-DE-030, 282-DE-031, 282-DE-110 & 282-DE-111
External Wall Finishes:
Landscaping
Slate Roof:
Rooflights:
- Main contractor to include costs to level site at the front of the property (76m2) with hardcore and sand blinding ready to receive final finish TBC by client. - Main contractor to include cost for 46m² of patio at the rear of the property. - Prepare triangular flower beds 01 and 02 an enclosed concrete kerbs as shown. - Prepare ground ready to receive concrete tile finish at the rear by the bin store (152m²)
- SSQ Spanish Slate Roof Tile or similiar approved - see
- Main contractor to include costs for 3no. Velux roof lights
tiled rear terrace with level threshold from living
site under terrace to be leveled as specified - see "Landscaping" box note
View 2 - North-East Perspective
Proposed Elevations Notes
12
View
Key plan N
1
Elevation B
View
5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part without written consent
RWP 02
Elevation C
1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported to the Architect prior to commencement of any work 4. All work and materials to be in accordance with current statutory legislation, relevant codes of practice and British Standards
2
finishes and specifications Please see the key below for the extents of the different wall finishes, where no finish is shown finish is render. Refer to drawings 282-DE-030 & 282-DE-031 for wall details.
Structure:
- K-Rend Silicone TC 15 system - see 282-DE-030 & 282-DE-031 for details, colour TBC by architect
Garage door:
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
RWP & guttering: -
Main contractor to install square aluminum rain water rain pipes (colour TBC by architect). - Main contractor to be aware that roof gutters at high levels are concealed (refer to roof details for clarification).
- Bennetts Timber - 50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions - see 282-DE-030 & 282-DE-031 for details
- Main contractor to include PC costs for insulated Hormann garage door - £5,000
No
Revision
-
building regulations submission 25/11/16
TJ
JM
A
issued for tender
Date
TJ
JM
06/01/17
Drawn By
Checked By
Windows & Front Door:
Electrics:
- Outside of contract until supplier has been chosen by
- Main contractor to allow for standard LED light fittings - - Refer to Flatt Consulting's drawings for layout
client and architect - Main contractor to allow costs for 3 x Velux windows only for windows.
Project
Title
The Cottage Toot Hill Road Ongar CM5 9LJ
Proposed Elevations
RWP 04
SVP 03
RW.01
RW.02
RW.03
Client
Drawing Status
Private Client
Tender
TJ Checked By
Elevation A
Scale
Sheet
Date
Drawing No.
Rev
1:50
A1
Nov-16
282-GA-200
A
drainage. Tel:02085440033 - main contractor to price for all drainage/below ground and surface drainage
- Main contractor to include costs for lead valley gutters and all lead flashings
Drawn By
JM RWP 08
- Refer to Elliott Wood's drawings for all underground
Leadwork:
SVP 05
RWP 07
Below Ground Drainage:
- Aurubis - Nordic Brown Oxidised Copper - metal cladding - see 282-DE-030 & 282-DE-031 for details
RWP 06
RWP 05
- Refer to drawing 256-DE-030 & 282-DE-031 for all
Copper Cladding:
RWP 01
SVP 02
Wall Types: wall types and specifications
Timber Cladding:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
- Refer to drawing 282-DE-030 & 282-DE-031 for all wall concrete kerb to be formed for flower beds
282-DE-110 & 282-DE-111 for details
Render Finish:
clear. The Studio 38 Church Hill Loughton Essex, IG10 1LA
Tel +44 (0)208 502 5585 www.clear.gb.com
© Clear Architects Ltd
sealant at perimeter
5 7(55$&( 9,(: (55$&( 9,(:
door sill
20mm floor finish TBC by client
floor tile TBC by client Bauder adjustable pedestal terrace supports
8mm plywood layer
EPDM waterproof membrane tucked under door sill
Overlay™ underfloor heating system by Polypipe
timber firrings to create min. 1:60 fall
22mm Egger Protect decking supplied and installed by SIPco
18mm WBP plywood structural deck
steel beam supplied and installed by SIPco with open metal web joists spanning in-between
insulation applied locally to improve u-value
MASTER BEDROOM
BALCONY
FCL +53.231
FCL +53.231
SIPco breather membrane
FCL +52.845
structural insulation roof panel supplied and installed by SIPco insulation applied under steel beam to minimise cold bridging
12.5mm plasterboard with skim finish 50x50mm timber ceiling battens, with insulation locally around beams to prevent cold bridging
LIVING ROOM
DuPont Airguard Reflective vapour control layer, taped and sealed
100mm batt insulation
Detail 1 - First floor Master Bedroom to Balcony threshold detail
Detail 2
Detail 1 - Bedroom to balcony floor threshold detail DRESSING ROOM 20mm floor finish TBC by client
8mm plywood layer Overlay underfloor heating system by Polypipe 22mm Egger Protect decking supplied and installed by SIPco
sealant at perimeter
FCL +53.231
toughened laminated glass
door sill
20mm floor finish TBC by client
balustrade channel with top covers and aluminium side covers
floor tile TBC by client
aluminium powder coated capping with drip Bauder adjustable pedestal terrace supports
8mm plywood layer
timber firrings to create min. 1:60 fall
22mm Egger Protect decking supplied and installed by SIPco
18mm WBP Plywood
W5
EPDM waterproof membrane tucked under door sill
Overlay™ underfloor heating system by Polypipe
150x47mm timber battens
18mm WBP plywood structural deck
steel beam supplied and installed by SIPco with open metal web joists spanning in-between
K-Rend Silicone TC 15 system applied as per manufacturer's instructions
insulation applied locally to improve u-value
MASTER BEDROOM
EXTERNAL
BALCONY
BALCONY
FCL +53.231
EPDM waterproof membrane lapped into hidden gutter
steel beam with open metal web joists spanning FCL +53.231 in-between supplied and installed by SIPco
FCL +53.231
timber packing
FCL +52.845
along length of balustrade main contractor to provide steel beam TBC by structural engingeer
main contractor to supply 100mm batt insulation between floor joists 50x50mm timber ceiling counter battens, with insulation locally around beams to prevent cold bridging 12.5mm plasterboard with skim finish
timber firrings to create min. 1:60 fall
UTILITY
DuPont Airguard Reflective vapour control layer, taped and sealed
Detail 3 - Typical First Floor to External SIP wall detail
SIPco breather membrane steel beam supplied and installed by SIPco batt insulation applied locally to prevent cold bridging around steel beam timber battens 12.5mm Knauf Aquapanel Exterior cement board render stop bead affixed to battens, to create gap for ventilation
SIPco breather membrane
FCL +52.845
structural insulation roof panel supplied and installed by SIPco insulation applied under steel beam to minimise cold bridging
12.5mm plasterboard with skim finish 50x50mm timber ceiling battens, with insulation locally around beams to prevent cold bridging
LIVING ROOM
DuPont Airguard Reflective vapour control layer, taped and sealed
100mm batt insulation
Detail 1 - First floor Master Bedroom to Balcony threshold detail
External perspective of the home at concept level - depicting materials, fenestration and orientation
Notes 1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported to the Architect prior to commencement of any work 4. All work and materials to be in accordance with current statutory legislation, relevant codes of practice and British Standards
5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part without written consent
No
FCL +52.845
-
Date
Revisioninsect mesh
Drawn
building regulations submission 25/11/16
K-Rend Silicone TC 15 system applied as per manufacturer's instructions
A
sealant
issued for tender
sliding door - exact detail TBC on confirmation of window/door system
LIVING ROOM
06/01/17
TJ TJ
EXTERNAL
Detail 2 - First floor Balcony floor parapet detail
Detail 2 - Balcony floor balustrade and parapet detail
DRESSING ROOM
20mm floor finish TBC by client
8mm plywood layer Overlay underfloor heating system by Polypipe 22mm Egger Protect decking supplied and installed by SIPco
FCL +53.231
Roof ventilation: - Ventilation is required to SIP roof and wall panels. Main contractor to ensure fitting of breather membrane is draped and is well taped and sealed. A separate continuous and effectively sealed vapour control layer on the warm side of the insulation to be included and also to be taped and sealed. All to comply with BS 5250: 2011.
W5
Wall Types: - Refer to drawing 282-DE-030 & 282-DE-031 for all wall types and specifications
Air Permeability: - all plasterboard junctions including those with wall penetrations to be sealed with mastic to ensure maximum air permeability
Fire Protection: EXTERNAL steel beam with open metal web joists spanning in-between supplied and installed by SIPco main contractor to supply 100mm batt insulation between floor joists 50x50mm timber ceiling counter battens, with insulation locally around beams to prevent cold bridging 12.5mm plasterboard with skim finish
FCL +52.845
- The walls to the central stairwell to align throughout and extend up to the roof structure and fire stopped - Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
Note: Insect Mesh
Wind
- Insect mesh to be installed at eaves around perimeter of building and locally where external finish has been penetrated to create ventilation paths
- Refer to dr
13
Structure:
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
Moisture Resistant Board:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
- Refer to GA's for extents of moisture resistant boarding required to wet areas
- First floor to be fire protected as shown on 282-GA-101 to ensure continuous fire break between the protected lobby and habitable room
Air test: Note: U-Values
- Main contractor to include cost to provide an air test on completion of the build. - The building must achieve an air tightness of
window deta - Refer to dra floor door a
Unde
- Ground F screed. - First Floo Overlay by - Refer to F - 4 x towel - Heat Pum PUHZ-HW Flatt Consu
When spec
Underlay T
Carpet Tog
HIGH ROAD CHIGWELL - ESSEX
PRACTICE: CLEAR ARCHITECTS
Summary: Two new-build apartment buildings. Client: Developer Current stage: 4/5 Involvement: Stages 3 - 5 Tasks: Project management and planning, planning application submission and monitoring, planning strategy and discharging planning conditions and phasing, chairing design team meetings, meeting agendas and minutes, coordination of information between different consultants, site meetings, client meetings, technical drawings, schedules of information, problem solving, concept presentation, AutoCAD, photoshop.
All images copyright Clear Architects Ltd.
Render of main entrance of the front apartment building
14
PRACTICE: CLEAR ARCHITECTS
LOUGHTON - ESSEX
CHURCH HILL
Summary: New-build apartment building on a steep site. Client: Developer Current stage: 2 Involvement: Stages 2 Tasks: Concept presentation, client liaising, AutoCAD, photoshop.
All images copyright Clear Architects Ltd.
Aerial perspective
Front perspective
15
4 REDESDALE OXFORD
PRACTICE: KHOURY ARCHITECTS
Summary: A new build home in Oxfordshire which utilises large amounts of glazing to make the most of the surrounding scenic views. Additional features include FDQWLOHYHUHG EDOFRQLHV DQG Ă RRU WR ceiling glazing. Client: Private Budget: ÂŁ1,000,000 Current design stage: 5 Involvement: Stages 2-5 Tasks: Rendering, local planning authority and building control applications, co-ordination of information between external consultants, photoshopping, technical drawings for planning and construction purposes, technical details using CAD and BIM software and schedules of information.
Site photograph
16
Site photograph
66
2 / P03-303
C
D
D1
E
E1
F
G
3°
111.450 L4 Roof Level 110.995 L4 Roof Band Base
110.161 L1 Bedroom Roof 109.675 L1 Bedroom Roof Band Base 108.990 L3 Mezzanine FFL 108.515 L3 Mezzanine Band Base
107.230 L1 Bedroom FFL 106.855 L1 Bedroom Band Base
106.055 105.830 L0 Ground Floor FFL L0 Ground Floor Band Base
2 / P03-303 104.128 L-3 Basement below Master bed
9800
350
6345
375
3355
6130
South 1 : 50
Early Revit BIM model usedRevit for co-ordination stage Co-ordinated through
17
10 ANTRINGHAM GARDENS
- EDGBASTON - BIRMINGHAM
PRACTICE: KHOURY ARCHITECTS
Summary: A complete refurbishment and two-storey rear extension to a 1960s era detached house situated in the Calthorpe Estate in Edgbaston, Birmingham. Striking glass roof lights, a front porch extension and external Garden redesign. Client: Private Budget: ÂŁ300,000 Current design stage: 5 Involvement: Stages 2-5 Tasks: Client meetings, rendering, local planning authority and building control applications, co-ordination of information between external consultants, photoshopping, technical drawings for planning and construction purposes, technical details using CAD and BIM software and schedules of information.
Site photograph of the front of the house during construction
Photograph of the front of the house during construction
18
11 339
A-A
B-B
C-C
P02-01
P02-02
P02-02
Left: Technical drawings produced for the project tender package, Revit.
25mm Perimeter insulation 70
153
116
20mm Zone for Floor Finishes
P03-02 339
65mm Floor Screed with underfloor heating
6135
50mm Celotex FR5000 Rigid Insulation to achieve a u-value of 0.25W/m2.K
339
S
3839
339
Bottom left: On-Site picture of the rear of the house, Revit.
SG03
15 P05-15
SG02
SG04
DPM
1166
260
945
Separating membrane 500gauge
21 P05-21
Wood burner 1920
1920
339
339
RWP
To match existing level
SG01
Kitchen & Dining
339
3839
0
DG15
CVO Fire River Fireplace
4400
4065
1945
1854
860
64
P02-03
1970
D-D
5240
5500
20
3226
7000
998
41 m²
Lounge 17 m²
950
28 P05-28
150
1030
1123
3235
488
DG14
16 P05-16
2522
435 RWP SVP
2035
2035 418
DG11
890
DG04
RWP
5 Hall
1129
1832
1124
WG10
2044
910
19 m² 200.2 SF
1880
-
846
846
2 m²
DG06
1800
1418
34 P05-34
2771
1018
P02-03
12 m²
WG11 1 P06-11
83
1050
1150 2176
585
WC
3318
E-E
Reading Room
340
1900
2871
DG02
9 m²
IC
VOID
493
1942
1142
Utility
DG12
800
846
E
3318
SVP
922
P03-01 -
1010
100
29 P05-29
418
Bookshelf RWP
698
1827
51
235
600
WG06
348
Music Room
140 343 134
11 m²
802
4367
DG01 860 18
968
3365
894
Guest Room
274
846
18 m²
WG09
DG05
19 P05-19
Ensuite
1761
3 m²
1 P06-13
750
1881
944
Cupboard
RWP
585
WG08
MH
DG09
RWP SVP
IC
665
17 P05-17
Entrance Hall 5 m²
922
2475
724
100
Boilers
Cupboard
DG13
2025
562
846
DG10 746
885
WG07
Beam and Block floor to specialist details
DG07
1810
Garage
1003 2813
25 m²
30 P05-30
DG08
IC N
MH
P03-02
19
16 16 THEWILLIAMSBURG WILLIAMSBURGHOTEL HOTEL THE
YORK, NEWNEW YORK, USA USA
Summary:A A£30m £30mnew newbuild build Summary: commercial, hotel project located commercial, hotel project located in the of New York, in the citycity of New York, US. US. Client: Wythe Hotel group. Client: TheThe Wythe Hotel group. Client: Developer Client: Developer Budget: £30m Budget: £30m Tasks: CAD drawings; plans Tasks: CAD drawings; plans andand elevations, photoshopping elevations, photoshopping visulations presentations. visulations for for presentations. Right: Exterior render of the ground Right: Exterior render of the ground ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH Avenue in Brooklyn, New York. Avenue in Brooklyn, New York.
*All renders produced byvisual the visual *All renders produced by the teamteam at at
Site photograph of the front of the house during construction
20
PRACTICE: MICHAELIS BOYD PRACTICE: MICHAELIS BOYD
18
CLANDESTINE BAR ELEVATION A
1
1/2" = 1'-0"
4
CLANDESTINE BAR ELEVATION C 1/2" = 1'-0"
Internal Elevations of the “Clandestine Bar” space, Vectorworks
Internal Elevations of the “Clandestine Bar” space, Vectorworks
21
20 THE SCRAPMAN’S ENTERPRISE : RECLAMATION OF CULTURE, POWER AND PROFITABLE GOODS The scrapman’s enterprise is a project located in the neglected neighbourhood of El-Raval, Barcelona, and follows the livelihood and passions of the scrapman and his apprentices. The proposed scheme contains: a series of workshop spaces, recycling spaces, living accommodation, meeting spaces, retail spaces and a secret underground workshop. An on-site furnace provides not only the ‘equipment’ to smelt collected scrap metal but also allows waste heat to be recycled for localised hot water heating within the building. Using scrap materials, scrapmen create dynamic architecture and art to revitalise neglected zones within their neighbourhood. Bespoke art pieces are also created within the building to depict historic stories unique to the neighbourhood and city. In this way the scrapmen are able to ‘tell the stories’ of the neglected people of El-Raval.
Site photograph of the front of the house during construction
22
TUTOR: MATT LUCAS ASSOCIATED ARCHITECTS
21
SketchUp, Kerkythea and Photoshop
23
22 22
Second Floor Plan: Vectorworks & Photoshop Second Floor Plan: Vectorworks & Photoshop
24
Exterior Perspectives, dramatic elevations and 3D aerial view Exterior Perspectives, dramatic of exterior and roof 3D form:aerial SketchUp, elevations view Kerkythea andform: Photoshop. of exterior roof SketchUp, Kerkythea and Photoshop.
23 23
Vectorworks, SketchUp & Photoshop Vectorworks, SketchUp & Photoshop
25
24 24 THE THE TOTTENHAM TOTTENHAM STALEMATE STALEMATE PLATFORM PLATFORM M.Arch M.Arch
TUTOR: PETER MORRIS & DOMINIC MCKENZIE PETER MORRIS ARCHITECTS & DOMINIC ARCHITECTS TUTOR: PETER MORRIS MCKENZIE & DOMINIC MCKENZIE PETER MORRIS ARCHITECTS & DOMINIC MCKENZIE ARCHITECTS
In August 2011 a riot errupted on the In August a riot errupted on the streets of 2011 Tottenham and lead to streets of Tottenham lead to widescale destructionand throughout widescale the UK. Thedestruction Tottenham throughout Stalemate the UK. The Tottenham Stalemate 3ODWIRUP LV D FHQWUH IRU FRQÁLFW 3ODWIRUP FHQWUH ofIRU resolution LV for D members theFRQÁLFW public resolution for members the public and the police in an ofattempt to and thereoccurences police in anofattempt prevent the riots. to prevent reoccurences of the riots. The scheme is situated in the centre The the scheme is situated in the centre of existing Tottenham police of the The existing Tottenham station. proposed design police utilises station. The shaped proposed design utilises hexagonal ETFE panels on hexagonal ETFE panels on the facadeshaped to create a friendly the facadefacade to create friendly interactive and toaincrease interactive facade and to increase the transparency throughout the the transparency throughout the building. building. Local artists and community groups Local artists to and community groups are invited produce art which is are invitedinternally to produce which is featured andartexternally featured internally andgood externally as a celebration of the things as a celebrationInofaddition the goodtothings in Tottenham. this, in InFRQWDLQV additionDQ toRSHQ this, WKH Tottenham. JURXQG ÁRRU WKH JURXQG ÁRRU FRQWDLQV DQ of RSHQ auditorium where members the auditorium where members of can the public and the police task force public and the police taskissues force that can debate openly about debate openly issues that matter to them.about This encourages matter to of them. This and encourages the sharing opinions reduces the sharingbetween of opinions animosity theand tworeduces groups, animosity betweenthe theprevious two groups, thus transforming riot thus transforming the of previous riot start point into a place enjoyable start point into a place of enjoyable communal interaction. communal interaction.
Exterior perspective from street view: Exterior perspective from street view: ' 6NHWFK8S PRGHO UHQGHUHG ZLWK .HUN\WKHD DQG ÀQLVKHG RQ 3KRWRVKRS ' 6NHWFK8S PRGHO UHQGHUHG ZLWK .HUN\WKHD DQG ÀQLVKHG RQ 3KRWRVKRS
26
25 25
SketchUp, Vectorworks & Photoshop SketchUp, Vectorworks & Photoshop
27
26
28
Ground floor plan
Scale Plan A scale plan with coordinates and colour codes for different zones
27
Left: Diagram of arrangement of structural components; columns and beams. Vectorworks & Photoshop Above Right: Section Perspective Using SketchUp & Photoshop
29
30 RENTAL PROPERTY ABROAD The Bodurin Project is a residential project located in the city of Lagos, Nigeria. It was initiated by Mr & Mrs Bodurin in Jan 2011. The main goals were to maximise the rental potential of a single building on the 810sqm plot of land available and to provide a permanent holiday home for their family of four and accompanying guests. The brief also required that there ZRXOG EH VXIÀFLHQW VSDFH IRU SDUNLQJ cars in the front of the house and also that the family annex would have it’s own separate access to the rest of the building. In addition to this, a small communal garden was added to the rear of the KRXVH DQG VRPH VKDGHG ÀUVW ÁRRU balconies to create a few attractive external viewpoints where residents can relax outdoors. With Lagos being a very densely packed city these spaces add a touch of ‘grass and sky’ to the surroundings which is always appreciated by residents.
On this page: 3D section perspective, SketchUp, Kerkythea & Photoshop. Ground floor plan
Floor plans and 3D internal perspectives : SketchUp, Photoshop & Kerkythea
30
32 MIXED MEDIA DRAWINGS
31
33
32
BLOGGING & SOCIAL MEDIA
OTHER INTERESTS
Screenshot of my architecture blog - 168,101 views
Screenshot of my Facebook page to accompany my false nail designs
33
OTHER INTERESTS PORTFOLIO WEBSITE & ONLINE STORES
Screenshot of my portfolio website
Screenshot of my online store
34