CONTENTS - PROJECTS 4 ...............................
Woodford Road, London 2016 - 2017
6 ............................................ 8 .......................................
Forest Rise, Essex 2017 The Cottage, Essex 2015 -2016
12 ..........................................
High Road, Essex 2016 - 2017
13 ..........................................
Church Hill, Essex 2017
14 ............................. 16 .................
Redesdale House, Oxford 2014 - 2015
Antringham Gardens, Birmingham 2014 - 2015
17 ........................
Williamsburg Hotel, New York 2013
......................................................................................... ............................................................................................................... 18 ................. 20 .....................
Scrapman’s Enterprise, Barcelona 2012 - 2013 Stalemate Platform, Tottenham 2011 - 2012
22 ......................
Rental Property Abroad, Lagos 2011
23 .......................................... 24 .............................................
Mixed Media Art 2009 - 2010 Other Interests
WOODFORD ROAD WOODFORD - LONDON Summary: A complete refurbishment and two-storey rear extension to an original Art Deco style house situated in a conservation area. Keywords: #tree roots #modifications for wheelchair accessibility #pile & trench foundations #site visits #meeting schedules #communication with contractor #project management
Client: Domestic Budget: ÂŁ500,000 Current stage: 5 Involvement: Stages 2 - 5 Tasks: Project management and planning, site meetings, client meetings, technical drawings, schedules of information, problem solving, co-ordination of information between different consultants, health and safety, concept presentation, AutoCAD, freehand sketch, photoshop.
All images copyright Clear Architects Ltd.
Site visit photographs of the rear of the house following demolition of the single storey roof
PRACTICE: CLEAR ARCHITECTS
Artist’s Impression of Proposal
My hand sketch of concept, proposed landscaping and elevation treatment
290 61 Woodford Road Š Clear Architects ltd
290-PR-02A
FOREST RISE LOUGHTON - ESSEX
PRACTICE: CLEAR ARCHITECTS
Summary: A complete remodelling and single storey side extension to a Victorian era house, including a new-build annexe building and a subterranean indoor pavilion style swimming pool. Keywords: #concept & project brief development #large site #landscaping #multi-generational living #site visits #time management
Client: Domestic Budget: ÂŁ2.5m Current stage: 2 Involvement: Stages 2 Tasks: Liaising with the client, organising surveys, technical drawings, problem solving, coordination of information between different consultants, AutoCAD, freehand sketch, photoshop.
All images copyright Clear Architects Ltd.
Render of landscape concepts
Elevations 1:100
Internal Artist’s Impression NTS
Elevations 1:100
existing roof tiles to be removed/stored and reused in line with new roof structure new black timber dormer
existing roof tiles to be removed/stored and reused in line with new roof structure new black timber dormer
existing tiles to be retained
white polished concrete
existing tiles toslot be windows retained on vertical white concrete wall
timber detail continuing the white polished rhythm ofconcrete the slots windows
contemporary tile detail
Proposed West Elevation
Proposed North Elevation
con tile
Proposed West Elevation
new window/doors into family room
feature slot window to allow natural light to flood through to the central staircase and into the central living areas
Proposed South Elevation
feature slot window to allow natural light to flood through to the central staircase and into the central living areas
Proposed East Elevation
My sketch concept for the scheme - axis connects the home to other structures across Concept Presentation/313 Forest Rise 313-PR-01 the site
Proposed East Elevation
September 2017
© Clear Architects ltd
Concept Presentation/313 Forest Rise
Concept Presentation/313 Forest Rise © Clear Architects ltd
313-PR-01
© Clear Architects ltd
313-PR-01
THE COTTAGE ONGAR - ESSEX G Summary: A two-storey new build contemporary style home.
G.3 - dining
Underfloor Heating:
FCL +52.845
ALL TO ACHIEVE U-VALUE: 1.50 W/m²k
When specifying carpets ensure: - Underlay Tog to be 0.5 or Less - Carpet Tog to be 1.5 or less
G.6 utility / store room
DE-020 03
DE-010 01
DPC+50.350
GFL +50.200
Tasks: Project management and planning, site meetings, client meetings, technical drawings, schedules of information, problem solving, co-ordination of information between different consultants, health and safety, concept presentation, AutoCAD, G freehand sketch, photoshop, SIP sub-contractor.
FFL +50.200 SSL +49.995
FFL +53.231
PC sum for secondary steel DE-011 02
G.2 living area DE-010 02
External Render wall Specification: - K-Rend Silicone TC 15 render system applied as per manufacturer's instructions - 12.5mm Knauf Aquapanel® Exterior cement board by - 25x38mm treated SW counter battens - SIPco Breather membrane - 175mm Structural Insulated wall Panel supplied and installed by SIPco - Vapour Control Layer; DuPont AirGuard Reflective - timber battens to create void for service runs, depth of void as per details 282-DE-030 & 282-DE-111 - 12.5mm plasterboard with skim finish
4
refer to 282-DE-30 & 282-DE-031 for wall details ALL EXTERNAL WALLS TO ACHIEVE U-VALUE: 0.18 W/m²k
5
6
7
FFL +50.200
External Timber Clad wall Specification: - pre-stained 50x50mm Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner fixed from the back , with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions - black painted 18mm WBP plywood as carrierboard - 25x38mm treated SW counter battens - SIPco breather membrane - Structural Insulated Panels supplied and installed by SIPco - Vapour Control Layer; DuPont ™ AirGuard® Reflective (taped and sealed) - timber battens to create void for service runs, depth of void as per details 282-DE-030 & 282-DE-031 - 12.5mm plasterboard with skim finish refer to 282-DE-030 & 282-DE-031 for wall details
All images copyright Clear Architects Ltd.
ALL EXTERNAL WALLS TO ACHIEVE U-VALUE: 0.18 W/m²k
Structure:
:
ils is
DE-020 02
Windows specification:-
refer to 282-DE-011 for details
F.4 balcony
F.3 - master bedroom
FFL +53.231 refer to 282-DE-011 and SIPCO drawing no. H-04 for details
Involvement: Stages 2 - 4
L +50.200
F.2 master ensuite
255
2645
Current stage: 5
F.6 - bedroom 3
2935 structural slab to underside of joist
385
DE-011 03
F.7 shower room
Balcony Specification:- Terrace finish TBC by client - Bauder adjustable pedestal supports - Waterproof single ply membrane EPDM or similar approved by client - 18mm WBP plywood structural deck - timber firrings to create1:40 fall - insulation applied between firrings to improve u-value - Vapour control layer; DuPont™ AirGuard® Reflective (taped and sealed) - Structural Insulated Panel supplied and installed by SIPco - 50x50mm timber counter ceiling battens - 12.5mm plasterboard with skim finish
3565
FCL +55.831
- 100mm Isover APR1200 acoustic insulation roll between joists - 50x38mm SW timber battens for fixing ceiling - 12.5mm plasterboard with skim finish
Budget: £450,000
ing area
- Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
385
Client: Domestic
L +53.231
7
DE-111 01
3740 top of joist to underside of SIP roof
#managing expectations #co-ordinating consultant information #researching new materials refer to 282-DE -110 & 282-DE-111 for details DE-110 #production of tender drawings and 04 ALL TO ACHIEVE U-VALUE: 0.15 W/m²k documents #tenders and negotiations #SIPs First Floor specification:- 20mm zone allowed for carpet/tile/timber floor finish #site visits locations of finishes TBC by client - 8mm plywood layer (for carpet finishes or omitted for #communication with prospective tile and timber finishes) contractors - 18mm for Overlay™ by Polypipe underfloor heating system, see box notes for Tog specification. #managing timeframes and agreeing F.5 - dressing - 22mm Egger Protect decking installed by SIPco deadlines - 254mm open metal web joists
6
- Walls and floors containing enclosing the double height entrance foyer to have fire protection of a minimum of 30 minutes. Walls to be fire protected up to roof structure and fire stopped
2645 finish to finish
Keywords:
5
2600 finish to finish
Roof Specification:- SSQ Spanish Slate roof tiles - 25x38mm treated SW battens - SIPco breather membrane - 25x38mm counter battens - Structural Insulated Panel (by SIPco) -Vapour Control Layer; DuPont™ AirGuard® Reflective (taped and sealed) - 47x100mm Timber ceiling battens to create ceiling service void - 12.5mm plasterboard with skim finish
2105
master ensuite
4
Fire Protection:
2600
DE-110 03
PRACTICE: CLEAR ARCHITECTS
Tiling: Electrics:
- Main contractor to include costs for fitting only: -
- Main contractor to include PC cost of £25,000 final design TBC following return of tender
r
Floor Finishes: - Refer to drawing 282-ID-001 for all floor finishes - Main contractor to ensure the appropriate substrate is included in costs
- Main contractor to install square aluminium RWPs
- Main contractor to allow for 3no. mains wired smoke detectors/alarms and 1no. mains wired heat detector to BS5839-6 type LD3 specification according to Flatt Consulting specification - refer to GA plan for positions of smoke and heat detectors in protected stairwell, landing, kitchen & utility room.
Staircase:
- Main contractor to include PC sum of £20,000 for the main staircase - 15 risers and treads - min going 220mm - max rise 220mm max pitch not to exceed 42°
Windows & Front Door: - Outside of contract until supplier has been chosen by client and architect - Main contractor to allow costs for 3 x Velux windows
-
- Tiles supplied by client
Internal doors: - Main contractor to supply and all internal doors:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
Moisture Resistant Board:
- Main contractor to include costs for Mechanical ventilation to WC, bathrooms, Kitchen & Utility
Dropped Ceilings:
- Load bearing and non-load bearing Timber stud walls to be supplied and installed by SIPco
First floor: hatched area shows extent of dropped ceiling
F.3 master
- Main contractor to include costs for ventilation as shown on Flatt Consulting drawings 2543-E-204 & 205 2543-M-103 & 104
bedroom
RWP 02
1W.03
F.4 balcony
RWP 03
1W.02
ALL DIMENSIONS TO STRUCTURAL
1W.01 RWP 01
GW.10
opaque
F.2 master ensuite
up
GW.01
SVP 02
12 1
void
2
3
4
5
6
7
8
9
foyer
10
11
SVP 03
EX
13 RWP 04
14 15
F.1 landing
1D.02 FD 30S
1D.01
F.5 dressing
SD 1D.03
1D.05 FD 30S
rooflight above
FD 30S
F.8
- Background ventilation to all habitable rooms: trickle vents to windows by specialist design TBC by client
- Fire protected stairwell to achieve min 30mins protection
- SIP walls to be supplied and installed by SIPco
required to wet area's
Ventilation:
Key :
- Refer to GA's for extents of moisture resistant boarding
bedroom 2
1D.04 FD 30S
rooflight
F.6 bedroom 3
F.7
1W.07
shower room
above
rooflight above
EX
RWP & guttering:
Smoke detectors:
Total floor tiles 146m ². (Includes;- Internal floor tiles @ 90m² in all wet areas, entrance, open plan living area and utility). External floor tiles @ 56m² in front entrance, rear patio area and upper terrace). Total wall tiles 28.9m². (Includes full height in all showers, full height walls as indicated on floor plans).
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
SVP 05 SVP 04
1W.06
RWP 06
1W.05
1W.04
RWP 05 RWP 07
OPENINGS UNLESS OTHERWISE STATED
DuPont Airguard Reflective vapour control layer taped and sealed SIP roof panel by SIPCO 25mm x 38mm timber counter battens SIPco breather membrane
100x47mm ceiling joists
25mm x 38mm timber counter battens aluminium powder coated parapet in distance
SSQ spanish slate roof tile
SSQ Spanish Slate roof tiles
SSQ spanish slate roof tile
slate ridge tile
eaves carrier tilting fillet
25mm x 38mm counter timber battens
timber packer
SIPco breather membrane
line of parapet in the distance
Glidevale FV100 ventilator
eaves carrier 12.5mm plasterboard with skim finish
EDPM lapped into gutter
25mm x 38mm timber battens
DuPont Airguard Reflective vapour control layer taped and sealed
SW tilting fillet
ceiling services void max 150mm to be reduced where possible following confirmation of chosen light fittings from client
Lead to form gutter
timber firring to create fall min. 1:40 to Rainwater outlets in the foreground and background
EPDM lapped over gutter
timber packer
lead to form gutter
Glidevale FV100 ventilator
timber firings to create fall min 1:40
SIPco breather membrane
18mm WBP plywood layer EPDM waterproof membrane
air
Structural Insulated Panel supplied and installed by SIPco
th
pa
air
pa
th
timber packer/fillet to form fall aluminium powder coated parapet with drip
copper flashing formed from cladding
air path
100
timber packer/fillet to create fall insect mesh
air path 40mm min
insect mesh
Detail 03: Ridge Detail 40mm min
air path
MASTER DRESSING
structural insulated roof panel by SIPCO air path 3-ply timber by SIPCO FCL +55.876
EXTERNAL
FCL +55.876
MASTER ENSUITE
MASTER ENSUITE FCL +55.665
MASTER DRESSING
Detail 02: Valley Gutter
W5
air path
W9 Detail 04: Parapet
Detail 01: Copper Parapet
Fixing of Secondary Timber: Air Permeability:
Air test: Note: U-Values Service Voids: Note: Insect Mesh - Insect mesh to be installed at eaves around perimeter of building
- Minimum 50mm services void provided to all external and internal walls unless otherwise stated / shown - See plan for details of increased service void zones required - First floor ceilings to have a dropped ceiling to create a minimum of 50mm services void unless otherwise shown on 282-DE-110
Notes 1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported
Walls - 0.18 W/m²k Roof - 0.15 W/m²k Rooflights - 1.30 W/m²k Ground Floor - 0.15 W/m²k Windows - 1.5 W/m²k Doors - 1.6 W/m²k Minimum U-Values to be achieved by elements as per SAP assessment by Flatt Consulting tel: 01883 331630
- Main contractor to include cost to provide an air test on completion of the build. - The building must achieve an air tightness of 4.0 m3/h/m2@50Pa
Fire Protection: - The walls to the central stairwell to align throughout and extend up to the roof structure and fire stopped - Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
Skirting
Moisture Resistant Board:
- First floor to be fire protected as shown on 282-GA-101 to ensure continuous fire break between the protected lobby and habitable room
- Main contractor to include costs for square edged skirting throughout
No 5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part
- all plasterboard junctions including those with wall penetrations to be sealed with mastic to ensure maximum air permeability
Revision
Date
- Refer to GA's for extents of moisture resistant boarding required to wet areas
Drawn By
Checked By
-
building regulations submission 25/11/16
TJ
JM
A
issued for tender
06/01/17
TJ
JM
- All fixing methods and proposals of secondary timber to contractor's proposals and to be verified by structural engineer
Structure:
Roof ventilation:
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
- Ventilation is required to SIP roof and wall panels. Main contractor to ensure fitting of breather membrane is draped and is well taped and sealed. A separate continuous and effectively sealed vapour control layer on the warm side of the insulation to be included and also to be taped and sealed. All to comply with BS 5250: 2011.
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
Project
Title
The Cottage Toot Hill Road Ongar CM5 9LJ
Roof Details 1
Client
Drawing Status
Drawn By
Key : - Elements to be supplied and installed by SIPco indicated in blue
clear.
10 RW.01
Velux rooflights
FCL +55.831
aluminium powder coated capping to parapet wall
RW.03 RW.02
FCL +55.831
RWP 06
1W.06
1W.05
SSQ Spanish slate roof tiles as per specification below
1W.04
RWP 05
1W.02
horizontal timber cladding as per specification below
RWP 04
1W.01
1W.03 RWP 01
RWP 02
Alumasc hopper head - exact spec. to be confirmed by client K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030 FFL +53.231
FFL +53.231
toughened glass balustrade within concealed channel RWP 03
GFL +52.845 GW.08
DPC +50.350
GE.01
high level external grilles for passive vents GW.07
GE.02
GW.06
GW.04
GW.03
GW.02
GFL +52.845
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions
GW.05
external hot and cold water supply for external mixer tap
Internal Ground Floor Level GFL+50.200
DPC+50.350
Internal Ground Floor Level
external grille for downdraught extractor in kitchen island ducted through external wall
GFL+50.200
Ground Floor Level new external door allow PC sum of £300 for supply
GFL +50.000
Elevation B - North-East Elevation
GFL +50.000
Aurubis Nordic Brown Oxidised Copper cladding
Ground Floor Level
Elevation A - South-West Elevation
Aurubis Nordic Brown Oxidised Copper cladding aluminium powder coated capping to parapet and gable ends
aluminium powder coated capping to parapet and gable ends EQ
K-Rend Silicone TC 15 system applied to gable ends as per the manufacturer's instructions refer to 282-DE-110 & 282-DE-110 for details
EQ
SSQ Spanish slate roof tiles as per specification below
1W.07
black painted WBP carrier board behind timber EQ
RWP 06
1W.02
EQ
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions, see drawings 282-DE-030, 282-DE-031, 282-DE-110 & 282-DE-111 for details
EQ
EQ
Alumasc hopper head exact spec. to be confirmed by client
RWP 01
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030
Hormann garage door - allow PC sum of £5,000 EQ
full height glazed entrance by others - glazing outside of contract
GE.01
GW.04
ACO slot drain to drain entrance with level threshold entrance
View 1 - North-West Perspective
copper cladding 50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions
50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions to underside of soffit SSQ Spanish slate roof tiles
Aurubis Nordic Brown Oxidised Copper cladding
aluminium powder coated capping to parapet
timber fence and door in same stained finish as timber cladding on main house
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030
Elevation C - North-West Elevation
EQ
EQ
GE.03
GW.09
GW.01
concrete kerb to flower bed
main contractor to allow PC sum of £5,000 for Hormann garage door, design and spec. TBC by client
distinct wide aluminium powder coated capping to parapet at gable ends
EQ
parapet wall to conceal 'hidden gutter'
EQ
toughened glass balustrade within concealed channel
K-Rend Silicone TC 15 system applied as per manufacturer's instructions, further details on 282-DE-030 Aurubis Nordic Brown Oxidised Copper cladding
Lighting: - Main contractor to allow for lighting according to Flatt Consulting drawings and specifications.
corner to corner sliding door supported by secondary steel work provided as required - manufacturer TBC by architect - outside of contract vertical timber as per drawings 282-DE-030, 282-DE-031, 282-DE-110 & 282-DE-111
External Wall Finishes:
Landscaping
Slate Roof:
Rooflights:
- Main contractor to include costs to level site at the front of the property (76m2) with hardcore and sand blinding ready to receive final finish TBC by client. - Main contractor to include cost for 46m² of patio at the rear of the property. - Prepare triangular flower beds 01 and 02 an enclosed concrete kerbs as shown. - Prepare ground ready to receive concrete tile finish at the rear by the bin store (152m²)
- SSQ Spanish Slate Roof Tile or similiar approved - see
- Main contractor to include costs for 3no. Velux roof lights
tiled rear terrace with level threshold from living
site under terrace to be leveled as specified - see "Landscaping" box note
View 2 - North-East Perspective
Proposed Elevations Notes
View
Key plan N
1
Elevation B
View
5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part without written consent
RWP 02
Elevation C
1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported to the Architect prior to commencement of any work 4. All work and materials to be in accordance with current statutory legislation, relevant codes of practice and British Standards
2
finishes and specifications Please see the key below for the extents of the different wall finishes, where no finish is shown finish is render. Refer to drawings 282-DE-030 & 282-DE-031 for wall details.
Structure:
- K-Rend Silicone TC 15 system - see 282-DE-030 & 282-DE-031 for details, colour TBC by architect
Garage door:
- Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
RWP & guttering: -
Main contractor to install square aluminum rain water rain pipes (colour TBC by architect). - Main contractor to be aware that roof gutters at high levels are concealed (refer to roof details for clarification).
- Bennetts Timber - 50x50mm vertical Thermowood D Pine section PEFC machined to 45x45mm fin planed all round with 3mm radius to each corner, with Teknos mahogany stain and pre-stain base coat system applied as per manufacturer's instructions - see 282-DE-030 & 282-DE-031 for details
- Main contractor to include PC costs for insulated Hormann garage door - £5,000
No
Revision
-
building regulations submission 25/11/16
TJ
JM
A
issued for tender
Date
TJ
JM
06/01/17
Drawn By
Checked By
Windows & Front Door:
Electrics:
- Outside of contract until supplier has been chosen by
- Main contractor to allow for standard LED light fittings - - Refer to Flatt Consulting's drawings for layout
client and architect - Main contractor to allow costs for 3 x Velux windows only for windows.
Project
Title
The Cottage Toot Hill Road Ongar CM5 9LJ
Proposed Elevations
RWP 04
SVP 03
RW.01
RW.02
RW.03
Client
Drawing Status
Private Client
Tender
TJ Checked By
Elevation A
Scale
Sheet
Date
Drawing No.
Rev
1:50
A1
Nov-16
282-GA-200
A
drainage. Tel:02085440033 - main contractor to price for all drainage/below ground and surface drainage
- Main contractor to include costs for lead valley gutters and all lead flashings
Drawn By
JM RWP 08
- Refer to Elliott Wood's drawings for all underground
Leadwork:
SVP 05
RWP 07
Below Ground Drainage:
- Aurubis - Nordic Brown Oxidised Copper - metal cladding - see 282-DE-030 & 282-DE-031 for details
RWP 06
RWP 05
- Refer to drawing 256-DE-030 & 282-DE-031 for all
Copper Cladding:
RWP 01
SVP 02
Wall Types: wall types and specifications
Timber Cladding:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
- Refer to drawing 282-DE-030 & 282-DE-031 for all wall concrete kerb to be formed for flower beds
282-DE-110 & 282-DE-111 for details
Render Finish:
clear. The Studio 38 Church Hill Loughton Essex, IG10 1LA
Tel +44 (0)208 502 5585 www.clear.gb.com
© Clear Architects Ltd
11 sealant at perimeter
5 7(55$&( 9,(: (55$&( 9,(:
door sill
20mm floor finish TBC by client
floor tile TBC by client Bauder adjustable pedestal terrace supports
8mm plywood layer
EPDM waterproof membrane tucked under door sill
Overlay™ underfloor heating system by Polypipe
timber firrings to create min. 1:60 fall
22mm Egger Protect decking supplied and installed by SIPco
18mm WBP plywood structural deck
steel beam supplied and installed by SIPco with open metal web joists spanning in-between
insulation applied locally to improve u-value
MASTER BEDROOM
BALCONY
FCL +53.231
FCL +53.231
SIPco breather membrane
FCL +52.845
structural insulation roof panel supplied and installed by SIPco insulation applied under steel beam to minimise cold bridging
12.5mm plasterboard with skim finish 50x50mm timber ceiling battens, with insulation locally around beams to prevent cold bridging
LIVING ROOM
DuPont Airguard Reflective vapour control layer, taped and sealed
100mm batt insulation
Detail 1 - First floor Master Bedroom to Balcony threshold detail
Detail
Detail 1 - Bedroom to balcony floor threshold detail DRESSING ROOM 20mm floor finish TBC by client
8mm plywood layer Overlay underfloor heating system by Polypipe 22mm Egger Protect decking supplied and installed by SIPco
sealant at perimeter
FCL +53.231
toughened laminated glass
door sill
20mm floor finish TBC by client
balustrade channel with top covers and aluminium side covers
floor tile TBC by client
aluminium powder coated capping with drip Bauder adjustable pedestal terrace supports
8mm plywood layer
timber firrings to create min. 1:60 fall
22mm Egger Protect decking supplied and installed by SIPco
18mm WBP Plywood
W5
EPDM waterproof membrane tucked under door sill
Overlay™ underfloor heating system by Polypipe
150x47mm timber battens
18mm WBP plywood structural deck
steel beam supplied and installed by SIPco with open metal web joists spanning in-between
K-Rend Silicone TC 15 system applied as per manufacturer's instructions
insulation applied locally to improve u-value
MASTER BEDROOM
EXTERNAL
BALCONY
BALCONY
FCL +53.231
EPDM waterproof membrane lapped into hidden gutter
steel beam with open metal web joists spanning FCL +53.231 in-between supplied and installed by SIPco
FCL +53.231
timber packing
FCL +52.845
along length of balustrade main contractor to provide steel beam TBC by structural engingeer
main contractor to supply 100mm batt insulation between floor joists 50x50mm timber ceiling counter battens, with insulation locally around beams to prevent cold bridging 12.5mm plasterboard with skim finish
timber firrings to create min. 1:60 fall
UTILITY
DuPont Airguard Reflective vapour control layer, taped and sealed
Detail 3 - Typical First Floor to External SIP wall detail
SIPco breather membrane steel beam supplied and installed by SIPco batt insulation applied locally to prevent cold bridging around steel beam timber battens 12.5mm Knauf Aquapanel Exterior cement board render stop bead affixed to battens, to create gap for ventilation
SIPco breather membrane
FCL +52.845
structural insulation roof panel supplied and installed by SIPco insulation applied under steel beam to minimise cold bridging
12.5mm plasterboard with skim finish 50x50mm timber ceiling battens, with insulation locally around beams to prevent cold bridging
LIVING ROOM
DuPont Airguard Reflective vapour control layer, taped and sealed
100mm batt insulation
Detail 1 - First floor Master Bedroom to Balcony threshold detail
External perspective of the home at concept level - depicting materials, fenestration and orientation
Notes 1. Do not scale this drawing 2. Drawing used for the status indicated only 3. All dimensions and setting out shall be checked and confirmed and any discrepancies to be reported to the Architect prior to commencement of any work 4. All work and materials to be in accordance with current statutory legislation, relevant codes of practice and British Standards
5. Drawing to be read in accordance with relevant consultants and sub-contractors drawings and specifications 6. This drawing is the property of Clear Architects Ltd and is not to be used in whole or in part without written consent
No
FCL +52.845
-
Revision insect mesh
Date
building regulations submission 25/11/16
K-Rend Silicone TC 15 system applied as per manufacturer's instructions
A
sealant
issued for tender
sliding door - exact detail TBC on confirmation of window/door system
LIVING ROOM
06/01/17
Dra
T
T
EXTERNAL
Detail 2 - First floor Balcony floor parapet detail
Detail 2 - Balcony floor balustrade and parapet detail
DRESSING ROOM
20mm floor finish TBC by client
8mm plywood layer Overlay underfloor heating system by Polypipe 22mm Egger Protect decking supplied and installed by SIPco
FCL +53.231
Roof ventilation: - Ventilation is required to SIP roof and wall panels. Main contractor to ensure fitting of breather membrane is draped and is well taped and sealed. A separate continuous and effectively sealed vapour control layer on the warm side of the insulation to be included and also to be taped and sealed. All to comply with BS 5250: 2011.
W5
Wall Types: - Refer to drawing 282-DE-030 & 282-DE-031 for all wall types and specifications
Air Permeability: - all plasterboard junctions including those with wall penetrations to be sealed with mastic to ensure maximum air permeability
Fire Protection: EXTERNAL steel beam with open metal web joists spanning in-between supplied and installed by SIPco main contractor to supply 100mm batt insulation between floor joists 50x50mm timber ceiling counter battens, with insulation locally around beams to prevent cold bridging 12.5mm plasterboard with skim finish
FCL +52.845
- The walls to the central stairwell to align throughout and extend up to the roof structure and fire stopped - Fire protection required to all structural elements including steel frames that are designed to offer structural stability excluding roofing elements
Note: Insect Mesh
Wind
- Insect mesh to be installed at eaves around perimeter of building and locally where external finish has been penetrated to create ventilation paths
- Refer to dr
Structure: - Refer to Elliottwood's drawings for all substructure proposals, details and calculations. Tel:02085440033
Moisture Resistant Board:
- Refer to SIPCO drawings for all superstructure proposals, details and calculations. Tel:0844 335 3997
- Refer to GA's for extents of moisture resistant boarding required to wet areas
- First floor to be fire protected as shown on 282-GA-101 to ensure continuous fire break between the protected lobby and habitable room
Air test: Note: U-Values
- Main contractor to include cost to provide an air test on completion of the build. - The building must achieve an air tightness of
window deta - Refer to dra floor door a
Unde
- Ground F screed. - First Floo Overlay by - Refer to F - 4 x towel - Heat Pum PUHZ-HW Flatt Consu
When spec
Underlay T
Carpet Tog
12 HIGH ROAD CHIGWELL - ESSEX
PRACTICE: CLEAR ARCHITECTS
Summary: Two new-build apartment buildings. Client: Developer Current stage: 4/5 Involvement: Stages 3 - 5 Tasks: Project management and planning, planning application submission and monitoring, planning strategy and discharging planning conditions and phasing, chairing design team meetings, meeting agendas and minutes, coordination of information between different consultants, site meetings, client meetings, technical drawings, schedules of information, problem solving, concept presentation, AutoCAD, photoshop.
All images copyright Clear Architects Ltd.
Render of main entrance of the front apartment building
13 PRACTICE: CLEAR ARCHITECTS
LOUGHTON - ESSEX
CHURCH HILL
Summary: New-build apartment building on a steep site. Client: Developer Current stage: 2 Involvement: Stages 2 Tasks: Concept presentation, client liaising, AutoCAD, photoshop.
All images copyright Clear Architects Ltd.
4 14 REDESDALE OXFORD
PRACTICE: KHOURY ARCHITECTS
Summary: A new build home in Oxfordshire which utilises large amounts of glazing to make the most of the surrounding scenic views. Additional features include FDQWLOHYHUHG EDOFRQLHV DQG Ă RRU WR ceiling glazing. Client: Private Budget: ÂŁ1,000,000 Current design stage: 5 Involvement: Stages 2-5 Tasks: Rendering, local planning authority and building control applications, co-ordination of information between external consultants, photoshopping, technical drawings for planning and construction purposes, technical details using CAD and BIM software and schedules of information.
Site photograph
66
15 2 / P03-303
C
D
D1
E
E1
F
P03-302
G
C 3°
B-B
C-C
P02-202
P02-202
N
D
E
F
E1
111.450 L4 Roof Level
9800
110.995
Continued on Sheet no.
6695
+107.60
L4 Roof Band Base
375
3355
6130
DT 45 P04-482
1 / P01-105
110.161
*
L1 Bedroom Roof RWP
109.675
6
RWP
L1 Bedroom Roof Band Base
DT 7 P04-??
108.990 L3 Mezzanine FFL
108.515 L3 Mezzanine Band Base
SVP
Planting +107.60
107.230 G-G
DT 61 P04-484
L1 Bedroom FFL
*
DT 38 P04-479
106.855
P02-204
L1 Bedroom Band Base DT 60 A P04-468
DT 2
7660
106.055 105.830 L0 Ground Floor FFL L0 Ground Floor Band Base
P04-485
DT 4
DT 41
P04-471
P04-485
SVP
954
2 / P03-303
104.128
*
+ 107.830
L-3 Basement below Master bed DT 6 B P04-485
DT 60 P04-469
F-F
1
DT 42 P04-485
E-E P02-203
+105.30
DT 46 P04-483
P02-203
350
6345
375
+107.830
5
3355
+107.830
6130
DT 56 P04-484
DT 12 P04-471
Planting +107.60
P02-204
DT -57 P04-484 ---
DW
A-A
S
S
DT ??
UP
P04-4??
1714
RWP
1101
SVP
BU
WC
DT 6 G P04-4?? DT 6 C P04-4??
226
R008
P02-201
* DT 64 P04-4??
FZ
FG
DT 47 P04-483 DT 65 P04-467
DT 58 P04-469
*
RWP
4
1180
DN
+107.830
520
H-H
107.230
DT 6 A P04-486 DT -59 P04-4?? ---
1180
Co-ordinated through Revit
UP
UP
+107.230
660
2990
1 : 50
*
RWP
South
+105.84
UP
DT 4 P04-471 9800
2 m²
SVP
1300
HO
EX
P02-201
WF
5675
D-D
+ 106.055
+107.230
DT 6 F
DT 50 P04-469
P04-4??
+106.055 +106.055
RWP
RWP RWP
DT 49
+105.50 P04-483 DT 51 P04-468
RWP
700
2
DT 12 P04-471
DT 6 P04-471
DT 53 P04-468
RWP
+105.20
DT 8 P04-471
RWP
1
DT 30 P04-468
DT 53 P04-468
+106.65 Terrace +106.055
326
UP
Top: Early Revit BIM model used for co-ordination stage. Right: Early Revit BIM floor plan.
9800
C
Continued on Sheet no.
F-F P02-203
350
D
6345
D1
S P03-302
1 / P01-105
Proposed Ground Floor Plan 1 : 50
375
B-B
C-C
P02-202
P02-202
E
3355
E1
6130
F
E-E P02-203
1010 16
AM GARDENS ANTRINGHAM GARDENS ANTRINGHAM GARDENS
- EDGBASTON - BIRMINGHAM - EDGBASTON - BIRMINGHAM
te refurbishment Summary: A complete refurbishment Summary: A complete refurbishment extension and to atwo-storey rear extension to a to a and two-storey rear extension d house situated 1960s era detached house situated 1960s era detached house situated te in Edgbaston, in the Calthorpe Estate inEstate Edgbaston, in the Calthorpe in Edgbaston, Birmingham. Birmingham.
PRACTICE: KHOURY ARCHITECTS
PRACTICE: KHOURY ARCHITECTS PRACTICE: KHOURY ARCHITECTS
339
A-A
B-B
C-C
P02-01
P02-02
P02-02
Le pr pa
25mm Perimeter insulation 70
153
116
20mm Zone for Floor Finishes
P03-02 339
65mm Floor Screed with underfloor heating
6135
339
S
3839
SG02
Bo rea
SG04
DPM
945
1166
260
hts, a front porch Striking Striking glass roof lights, front porch glass roofalights, a front porch rnal Garden extension re- extension and external GardenGarden reand external redesign.design.
339
SG03
15 P05-15
50mm Celotex FR5000 Rigid Insulation to achieve a u-value of 0.25W/m2.K
Separating membrane 500gauge
21 P05-21
Wood burner 1920
1920
339
339
RWP
To match existing level
SG01
Kitchen & Dining
3839
0
DG15
3226
7000
CVO Fire River Fireplace
4065
860
1945
1854
4400
5240
64
P02-03
1970
20
D-D
Client: Private Client: Private
339
998
41 m²
5500
- EDGBASTON - BIRMINGHAM
Lounge 17 m²
950
488
28 P05-28
1123
150
DG14
16 P05-16
2522
435 RWP SVP
DG11
1 P06-11
DG06
2035
418
2 m²
890
DG04
RWP
5 Hall
1129
1832
1124
WG10
2044
910
19 m² 200.2 SF
34 P05-34
-
846
846
WC 1800
1418
1880
2771
E-E
12 m²
WG11
3318
P02-03
Reading Room
83
1050
1150 2176
585
VOID
2035
1942 1900
2871
1010
1142
DG02
9 m²
846
Utility
DG12
IC
WG07 Music Room
348
140 343 134
11 m²
802
DG01 860 18
968
3365
Guest Room
4367
18 m²
WG09
274
Beam and Block floor to specialist details
846
885
DG05
19 P05-19
Ensuite
1 P06-13
750
1761
3 m²
944
1881
585
Cupboard
RWP
846
DG10
WG08
MH
DG09
RWP SVP
IC
665
17 P05-17
Entrance Hall 5 m²
922
2475
724
100
Boilers
Cupboard
DG13
2025
562
746
ngs, rendering, Tasks: Client meetings, rendering, Tasks: Client meetings, rendering, ority and building local planning authority and building local planning authority and building , co-ordination control control applications, co-ordination applications, co-ordination tween external of information between externalexternal of information between photoshopping, consultants, consultants, photoshopping, photoshopping, or planningtechnical and technical drawings for planning and drawings for planning and oses, technical construction purposes, technical construction purposes, technical nd BIM software details using and BIM software detailsCAD using CAD and BIM software ormation. and schedules of information. and schedules of information.
E
493
340
P03-01 -
922
Involvement: Stages Stages 2-5 Involvement: 2-5
800
1018
2-5
894
CurrentCurrent design stage: design 5stage: 5
100
e: 5
29 P05-29
3318
418
Bookshelf RWP SVP
698
1827
3235
1030
235
Budget:Budget: £300,000 £300,000
51
600
WG06
DG07
1810
Garage
1003 2813
25 m²
30 P05-30
DG08
IC N
MH
P03-02
Site photograph of the front of the house during construction
Photograph of the front of the house Photograph duringPhotograph construction of the front of the house of the front of theduring houseconstruction during construction
16
18 WILLIAMSBURG HOTEL PRACTICE: MICHAELIS BOYD
NEW YORK, USA
THE WILLIAMSBURG HOTEL
16 16 16
THE WILLIAMSBURG HOTEL THEWILLIAMSBURG WILLIAMSBURG HOTE THE HOTEL
NEW YORK, USA PRACTICE: MICHAELIS BOYD
Summary: A £30m new build commercial, hotel project located in the city of New York, US.
Summary:Summary: A £30mA new build Summary: A£30m £30m newbuild build new commercial, hotel project located commercial, hotel project located commercial, hotel project located in the cityinofthe New York, US. in the city of New York, city of New York, US.US.
t: The Wythe Hotel group.
Client: The Wythe Hotel group.
Client: The Wythe Hotel group. Client: The Wythe Hotel group. Client: The Wythe Hotel group.
t: Developer
Client: Developer
Client: Developer Client: Developer Client: Developer
et: £30m
Budget: £30m
Budget: £30m Budget: £30m Budget: £30m
: CAD drawings; plans and ations, photoshopping ations for presentations.
Tasks: CAD drawings; plans and elevations, photoshopping visulations for presentations.
Tasks: CAD drawings; plans and Tasks: CAD drawings; plans and Tasks: CAD drawings; plans and elevations, photoshopping elevations, photoshopping elevations, photoshopping visulationsvisulations forvisulations presentations. presentations. for for presentations.
: Exterior render of the ground RXWVLGH EDU VSDFH IDFLQJ :\WKH ue in Brooklyn, New York.
Right: Exterior render of the ground ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH Avenue in Brooklyn, New York.
Right: Exterior render ofrender the ground Right: Exterior render of the ground Right: Exterior of the ground ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH ÁRRU RXWVLGH EDU VSDFH IDFLQJ :\WKH Avenue inAvenue Brooklyn, New York.New Avenue in Brooklyn, New York. in Brooklyn, York.
mary: A £30m new build mercial, hotel project located e city of New York, US.
CLANDESTINE BAR ELEVATION A
1
1/2" = 1'-0"
4
CLANDESTINE BAR ELEVATION C 1/2" = 1'-0"
enders produced by the visual team at
*All renders produced by the visual team at
Internal Elevations of the “Clandestine Bar” space, Vectorworks and Photoshop
Internal Elevations of the “Clandestine Bar” space, Vectorworks
17
*All renders produced by the visual team by at the visual team at *All renders produced *All renders produced by the visual team at
NEW YORK,
20 18 THE SCRAPMAN’S ENTERPRISE : RECLAMATION OF CULTURE, POWER AND PROFITABLE GOODS The scrapman’s enterprise is a project located in the neglected neighbourhood of El-Raval, Barcelona, and follows the livelihood and passions of the scrapman and his apprentices. The proposed scheme contains: a series of workshop spaces, recycling spaces, living accommodation, meeting spaces, retail spaces and a secret underground workshop. An on-site furnace provides not only the ‘equipment’ to smelt collected scrap metal but also allows waste heat to be recycled for localised hot water heating within the building. Using scrap materials, scrapmen create dynamic architecture and art to revitalise neglected zones within their neighbourhood. Bespoke art pieces are also created within the building to depict historic stories unique to the neighbourhood and city. In this way the scrapmen are able to ‘tell the stories’ of the neglected people of El-Raval.
TUTOR: MATT LUCAS ASSOCIATED ARCHITECTS
22
21 19
SketchUp, Kerkythea and Photoshop Second Floor Plan: Vectorworks & Photoshop Exterior
elevatio of exte Kerkythe
24 20 THE TOTTENHAM STALEMATE PLATFORM M.Arch
TUTOR: PETER MORRIS & DOMINIC MCKENZIE PETER MORRIS ARCHITECTS & DOMINIC MCKENZIE ARCHITECTS
In August 2011 a riot errupted on the streets of Tottenham and lead to widescale destruction throughout the UK. The Tottenham Stalemate 3ODWIRUP LV D FHQWUH IRU FRQÁLFW resolution for members of the public and the police in an attempt to prevent reoccurences of the riots. The scheme is situated in the centre of the existing Tottenham police station. The proposed design utilises hexagonal shaped ETFE panels on the facade to create a friendly interactive facade and to increase the transparency throughout the building. Local artists and community groups are invited to produce art which is featured internally and externally as a celebration of the good things in Tottenham. In addition to this, WKH JURXQG ÁRRU FRQWDLQV DQ RSHQ auditorium where members of the public and the police task force can debate openly about issues that matter to them. This encourages the sharing of opinions and reduces animosity between the two groups, thus transforming the previous riot start point into a place of enjoyable communal interaction.
Exterior perspective from street view: ' 6NHWFK8S PRGHO UHQGHUHG ZLWK .HUN\WKHD DQG ÀQLVKHG RQ 3KRWRVKRS
25 25 21
SketchUp, Vectorworks & Photoshop SketchUp, Vectorworks & Photoshop
30 22 RENTAL PROPERTY ABROAD The Bodurin Project is a residential project located in the city of Lagos, Nigeria. It was initiated by Mr & Mrs Bodurin in Jan 2011. The main goals were to maximise the rental potential of a single building on the 810sqm plot of land available and to provide a permanent holiday home for their family of four and accompanying guests. The brief also required that there ZRXOG EH VXIÀFLHQW VSDFH IRU SDUNLQJ cars in the front of the house and also that the family annex would have it’s own separate access to the rest of the building. In addition to this, a small communal garden was added to the rear of the KRXVH DQG VRPH VKDGHG ÀUVW ÁRRU balconies to create a few attractive external viewpoints where residents can relax outdoors. With Lagos being a very densely packed city these spaces add a touch of ‘grass and sky’ to the surroundings which is always appreciated by residents.
On this page: 3D section perspective, SketchUp, Kerkythea & Photoshop. Ground floor plan
Floor plans and 3D internal perspectives : SketchUp, Photoshop & Kerkythea
32 MIXED MEDIA DRAWINGS
32
23
MIXED MEDIA DRAWINGS
24 OTHER INTERESTS BLOGGING & E-COMMERCE
Screenshot of my architecture blog - 168,101 views
Screenshot of my portfolio website
Screenshot of my online store