Jing Guo Portfolio 2013-2017 Selected Works Email: guoj5@mail.uc.edu Tel: +1 513-302-6615 Address: 605 Lowell Ave., Cincinnati, Oh45220 Linkedin: https://www.linkedin.com/in/jing-guo721292a6/
i
Biography
4
01 Rammed Earth Freeform Shell
6
02 Pseudo Vertical
24
03 Athenaeum in Columbus
42
04 Interior Renovation
52
05 Perfessional
60
Other Works
72
ii
CONTENT
I don’t think that architecture is only about shelter, is only about a very simple enclosure. It should be able to excite you, to calm you, to make you think. Zaha Hadid
Biography The pursuit for art and beauty is my born instinct. Grew up with my fine art teacher father, I had significant influence on painting, art exhibition and museums. While architecture was still a vague impression for me after I graduated from civil engineering background. At that time, I know it is the supreme embodiment of beauty and sophistication. Architectures always fascinated me with their grand scale and style. Digital fabrication and computational aided design forwarded the architectural design and construction in another level. It also brought the ancient Greek “Master Tekton (Builder)” concept back to the modern, which meant architects were not only creating spatial effects, but also they were closely elaborating the construction of buildings.
WORK EXPERIENCES 5.2016-8.2016 Beijing
8.2015-12.2015 Cincinnati
5.2015-8.2015 Cincinanti
1.2015-5.2015 New York
9.2011-9.2012 Shanghai
Architecture Intern at Zaha Hadid Architects (Beijing Office) Involved in Design Development stage. Autodesk CAD, Revit, Rhino, Maya, Grasshopper, Adobe Suite. Detail Development, Animations, Presentation Drawings, Rendering. “Beijing New Airport interior”, “Wangjing SoHo”, “Galaxy SoHo New Pavilion”, “infinitus plaza”.
Architecture Intern at GBBN Architects Involved in Schematic Design and Design Development stage. Autodesk Revit for documentation drawing. Detail Development, Edit Programs, Presentation Diagram.
University of Cincinnati, College of DAAP Graduate Assistant
Architecture Intern at Perkins Eastman Involved in Design Development with Autodesk Revit, Detail Development, Edit Programs, Presentation Diagram.
Architectrue Assistant at Shanghai DMD Architecture & Interior Co., Ltd Assisting in schematic design, model making and drafting. Initial Concept Design. “Public Bicycle Service System Design”.
3.2011-7.2011 Beijing
Civil Engineer Designer Intern at China Construction Design International (CCDI) Designing and analyzing structures, producing construction drawings, “Harbin West Railway Station”, “The Stadium of Shanxi Province”.
8.2010
China Pingyao International Photography Festival
Pingyao
Booth Designer Assistant.
5.2010
Beijing Architecture Competition
Beijing
6.2009-8.2009
Team Leader, Designing, drawing and modeling.
Construction Engineer Intern at AAAA Construction Group
Taiyuan
Onsite supervising, coordinating, quality, Zhong Zheng Garden Residential
8.2008
Beijing 2008 Summer Olympic Games
Beijing
Urban Service Volunteer, Decoration Designer of the service kiosks.
EDUCATION 9.2013-5.2017
University of Cincinnati, College of DAAP, School of Architecture Master of architecture
9.2007-9.2011
Beijing City University, Department of Urban Construction Bachelor of Engineering in Civil Engineering
This study focuses on applying earth as a traditional building material to explore the possibility of new architectural language that considers the physical properties and cultural significance of earth architecture by using a computationalaid form finding method.
01 RAMMED EARTH Freeform Shell Construction Instructor: Christoph Klmmet | Master of Thesis Project | 2016. 9 - 2017. 4 | Individual
01 ARCHITECTURE
8
Precedent Study of Earth Architectures Earth is one of the oldest and most widely used materials for thousands of years. As demonstrated by the historic evidence, nearly every country in every continent has a rich heritage of earthen buildings. From the world’s highest land Tibet to the Niles shore in Egypt or the rich valleys in the south east of China, archaeologists’ findings have proven that earth as a building material inspired our ancestors and affected the way we build.
9
01 ARCHITECTURE
Humus
clay (binding)
Topsoil Subsoil
silt (aggregates)
Weatherd rock fragment
sand (aggregates)
aggregates =
Bedrock
loam LOAM COMPOSITION
EARTH PROFILE
BALL DROPPING TEST
GRAIN DISTRIBUTION MIXING EARTH
1
2
RIBBON TEST FRAME WORK
3 SEDIMENTATION TEST
10
4
MOVEABLE FRAME SYSTEM
RAMMERS
RAMMED EARTH ARCH TYPE 1
RAMMED EARTH ARCH TYPE 2
1
2
1
2
3
4
3
4
5
6
5
6
The first test purely focuses on the raw local earth without adding any supplements in. The positive volume in the plywood mold represented a 2D arch shape.
This test focused on the prefabricated rammed earth component to estimate the friction and strength for the individual piece. Also, the overall stability of the arch structure consisting of earth component should be tested after assembling.
11
01 ARCHITECTURE FLOW DIAGRAM OF THREE PROCESS Design Process
Constraints
From Finding
Architecture and tectonics
Structure
Tessellation
Fabrication and installation Voussoir geometry
Analysis process
Materialisation process Fabrication
Installation
FORM FINDING TO FABRICATION Discrete Element Analysis
Input surface
Control Diagram
Compressiononly Surface
1 Form-Finding
2 Materialization TNA Solver
12
Tesselation Stereotomy
Rapid Prototyping
Fabrication
3 Realization
Formwork
DESIGN ITERATOINS WITH DIFFERENT FORMS OPEN EDGE
TWO OPEN
OPEN EDGE W/ OPE
EDGE VAULT
VAULT
EDGE VAULT
NING VAULT
DOME W/ OPENING &OPEN EDGE
MULTIPLE OPENINGS TIMBREL VAULT
DOME
DOME W/ OPENING
RENDERING
MESH REPRESENTATION
COLORED DIAGRAM
3D PERSPECTIVE
FORCE DIAGRAM
FORM DIAGRAM
ENCLOSED
SYMMETRIC FREE FORM W/ OPENING
SEQUENCE OPENING DOME
COMPLEX FREE FORM
RENDERING
MESH REPRESENTATION
COLORED DIAGRAM
3D PERSPECTIVE
FORCE DIAGRAM
FORM DIAGRAM
ASYMMETRIC FORM W/ OPENING
13
01 ARCHITECTURE
Great Wall Site
1.5h Dunhuang
Gansu, China
Dunhuang SITE LOCATION
14
Driving Time
SITE PLAN
Linear representation
2D deformation
Blending program
FORM FINDING PROCESS
15
01 ARCHITECTURE
1
2
3 INTERIOR RENDERINGS
16
EXPLODED AXONOMETRIC rm Fo sh e M
S ed llat e s Tes
Le 1st
ls hel
vel
1
2
el Lev nd u o rgr de Un
3
Mesh form
Form diagram
TNA diagram 17
01 ARCHITECTURE
Motors Support sheets Metal cylinder Modified square units Earth infill Model side board
EARTH PANELING TOOL PROPOSAL
Cork-clay-trass-lime mixture Reinforced concrete base Foam-glass filling
FOUNDATION DETAIL
Roof 16’ 10”
Level 0 0’ 0” Level -1 9’ 6”
18
WINDOW AND FLOOR DETAILS
Surface finish Rammed earth floor Clay mortar Heating Pipe Foil Footfall sound insulation Wooden or concrete subfloor
Rammed earth panel Curtain system
Double glazing panel
INSTALLATION WITH IN-FLOOR HEATING
Load-transferring surface Non-load-transferring side Registration notch Curve surface on extrados
Underfloor air distribution Prefabricated concrete slab
Curve surface on intrados
Rammed earth Ceiling Rammed earth wall
RAMMED EARTH PANEL ASSEMBLING
Trass-lime mortar Rammed earth floor
Rammed earth
Cork-clay-trass-lime mixture
Filling
Foam-glass filling Concrete foundation
RAMMED EARTH STAIR
SECRION FACING NORTH
19
01 ARCHITECTURE
20
RENDERING FACING WEST
21
01 ARCHITECTURE
3D PRINT MODEL
22
DISCRETE MODEL ASSEMBLING
MODEL DETAILS
CNC SITE MODEL
23
02 PSEUDO VERTICAL Grids | Shifts | Infills | Gaps | Voids Instructor: Mara Marcu | Design Studio | 2016. 1 - 2016. 4 | Individual This studio engaged in the ongoing redefinition of an otherwise obsolete architectural typology - the skyscraper. To understand the “verticalscape� as a self generating, autopietic entity, this work explored utopical skyscraper through form finding process by using different media.
01 ARCHITECTURE
Diagram of Interiority This is an initial documentation of 6 precedents within the existing 587 skyscrapers currently found in New York City. Each tower is shown in a split axon, aiming at identifying typologies within their organization. Looking into canonical architecture and nonpedigreed precedents, this analysis clearly shows between function and structure in different scales.
26
27
01 ARCHITECTURE
28
29
01 ARCHITECTURE
Pseudo-Vert 30
Diagrams of Exteriority PseudoVertical 2 is a radical vertical proposition generated by the fragmentation of existing condominium tower types and their reassembly in a porous collective. By finding the source of inspiration and potential resolution in the very surreal culture of congestion itself, each precedent is modified by thier special organization and form characteristic. It aimed at seeking a paradoxical interior urbanism where individual units simultaneously look onto themselves and at one another, this studio is fondant color coded, extremely formal and highly optimistic.
tical Habitat 31
01 ARCHITECTURE
Ornament Unit Model and Aggregation (left page) - This cell design combined with single sheet of circular paper and a string to hold the entire structure from 2d to 3d form. This positive and negative shape also provide connection for the overall affregation. Microorganic Pattern (right page) - The condominium and office tower in NYC created the density of this unique urban landscape. In the future, digital manipulation will help people to customize their demands to form the entire building in a organic style. It more likes a cell growth.
32
33
01 ARCHITECTURE
Paper Model Abstraction
Digital Model Representation
Aggregation Axonometric View The cell unit designed in Digital Project represented the curvature for each surface. The software provided continued calculation for aggregation in order to form this variation of geometry.
34
Aggregation Top View
Aggregation Section View
35
01 ARCHITECTURE
Manifesto “Metabolism” is a theory of architecture contending that “buildings and cities should be designed and developed in the same continuous way that the material substance of a natural organism is produced. Comparing with future’s urbanism development, energy crisis and high density population make us to think about what is the future’s strategy during the ‘resource war’ period. With the technology achievement in the future, ‘Neo-Metabolism’ will continue this futuristic idea and push it to another level. High-performance structure will support the capsule space in some extreme conditions. The dynamic arrangement of space gives more flexible opportunities to squeeze the functional spaces in a high density context. So architecture should response the social structure change in the future to fulfill the need we have.
36
Site Condition The High Line public park has become one of New York’s most popular public spaces recently. This fresh adaptation of a unique piece of urban infrastructure in 8 years has been drew attention for many of famous architects to make their mark along the 1.4-mile-long landmark in Chelsea. Increased density of this area is required more public space. Proposed pier will provide compost and recycling from local waste consumption. Recyclable material will be formed to structure units for building envelope. This endless repeation will help the expansion of the future development. This recycling and mold making process also can provide construction material for other purpose.
37
01 ARCHITECTURE
Voronoi Tessellation
Provide shortest distance between each space
3
4
Defining Program by Cells
This step organized programs on purpose
Outline of the Recycling Pier
Clear program and space marked up in detail
Extrude Cells to Provide Storefront
Underground and 1st level assigned by its function
Peeled Surfaces Create Building Envolopes Each curvature surface formed with cell structures
Diagram of Form Generation
38
2
1
Master Plan
Section 39
01 ARCHITECTURE
1. View from factory
3. View from bridge
40
2. View from amphitheatre
4. Viiew from pier hub
41
03 Athenaeum in Columbus Integration | Construction | Details | technology Instructor: Anton Hoffmann | Studio Project | 2014. 9 - 2014. 12 | Individual
01 ARCHITECTURE
Location:
Washington St. Columbus Indiana
Building Type: Public Space
Function:
Providing public museum for city.
Concept for program: From this noli map, there are several pubilc areas in the south side of street. In order to service people with better founction. I use the south of the site to create the auditorium with a floating box to trap people’s attation. Using a middle gallery connects with private spaces. The shapes of the different sections represent the founctions. 1. Setback
2. Extrusion
3. Split
4. Excavation Diagram of Building Form
44
Privte
N
Semi Privte
Public Space
Public Space
Entrance
Semi Public
Public Space
S Public Space
N NOLLI PLAN
Program Concept Diagram
Site Plan Major architecture for public service
1st Floor Plan Service for lobby, Cafe, Gift shop, Museum Art Storage
45
01 ARCHITECTURE
46
Section Perspective Details
47
01 ARCHITECTURE
1. Marble Panel 2. Frame 3. Insulation 4. Vapor Barrier 5. CMU 6. Drywall
1
2
3
4
5
6
1. Glass Layer 2. Low-E Window Film 3. Glass Layer 4. Window Frames 5. Insulation 6. Coping
1
2
3
4
5
6
1. HOLEDECK Slab 2. Ventilation Pipes 3. Steel Reinforcement 4. Window Frames 5. Wire Tray
1
48
2
3
4
5
Building Form
Glazing System HAVC System
Circulation
Wall System
Structure
49
01 ARCHITECTURE
Model Iterations
50
Section Details Model 51
04 Interior Renovation Seven Hills Neighborhood Houses Instructor: James Postell | Metro-Lab | 2015. 5 - 2015. 8 | Teamwork
01 ARCHITECTURE
SITE INFORMATION: Seven Hills Neighborhood Houses is a one-stop social service agency offering a wide array of client-driven services to individuals, children, families, and seniors. Founded in 1961 with the merger of the West End’s Findlay Street Neighborhood House and the East End’s Riverview Neighbors House. WORK INTENTION: This MetroLAB Graduate Archtecture studio works with the Seven Hills Neighborhood Houses Center to help transform selected and limited interior spaces at Seven Hill Neighborhood House.
SCOPE OF WORK: 1- Modular Table 2- Bulletin Board 3- Coat Rack 4- Printer Stand 5- Podium 6- Projection Screen 7- Carpeting
54
Baltic Birch
Homasote
LED
Metal
Acrylic
6 5
4 3 2 1
1. Acrylic Hooks 2. Acrylic Fins 3. Panels 4. MDF Base 5. Wood Frames 6. French Cleat Hanger
55
01 ARCHITECTURE
Pin-up Wall and Table Details
56
57
01 ARCHITECTURE
58
Comparison of Before and After Renovation
59
05 Perfessional Perkins Eastman | GBBN | Zaha Hadid Architectural Intern | Coop | 2013 - 2016 | 4 Month Per Each
02 PERFESSIONAL
NO. NO.
8 8
8
8
8
7.9
7.9
7.9
DATE 10/31/2014 11/21/2014 03/13/2015 05/29/2015
ISSUE Exterior Envelope Pricing Pkg. Schematic Design Submission Exterior Envelope Bid Package 100% DD Submission
DATE 10/31/2014 11/21/2014 03/13/2015 05/29/2015
ISSUE Exterior Envelope Pricing Pkg. Schematic Design Submission Exterior Envelope Bid Package 100% DD Submission
NO.
DATE 10/31/2014 11/21/2014 03/13/2015 05/29/2015
ISSUE Exterior Envelope Pricing Pkg. Schematic Design Submission Exterior Envelope Bid Package 100% DD Submission
8
8
8
2' - 0"
2' - 0"
8
2' - 0"
2' - 0"
2' - 0" 2' - 0"
08-GL-01
1' - 1"
1' - 1"
1' - 1"
00-EWS-04 07-AL-03
07-AL-03
08-GL-01
08-GL-01
00-EWS-04
00-EWS-04 09-AL-01
09-AL-01
09-AL-01
07-AL-03
03-PCJ-02
03-PCJ-02
6"
6"
6"
03-PCJ-02
8"
8"
03-PC-01
8"
07-INS-04
1' - 9"
1' - 9"
1' - 9"
07-INS-02
07-JS-01 03-PC-02
03-PC-01
03-PC-01
07-WP-07
07-WP-07
07-PC-01
07-PC-01
07-RF-01
07-RF-01
03-PC-01 07-INS-04
03-PC-01
07-INS-02
07-INS-02
07-INS-04
09-GWB-01
07-JS-01
07-JS-01
09-GWB-01
03-PCJ-01
03-PCJ-01
07-INS-02
07-INS-02
09-GWB-01
09-GWB-01
07-JS-01
07-JS-01
07-JS-01
03-PCJ-01
03-PCJ-01
05-AL-01
05-AL-01 05-AL-01
03-PC-03
03-PC-03
03-PC-03 03-PC-01
07-INS-04
07-INS-04
03-PCJ-01
03-PCJ-01
03-PC-02
03-PC-01
03-PC-01
07-INS-02
09-GWB-01
09-GWB-01
03-PC-02
03-PC-01 07-INS-04
2ND FLOOR 148' - 1 1/2"
03-PC-03
03-PC-03 03-PC-03
2ND FLOOR 148' - 1 1/2"
2ND FLOOR 148' - 1 1/2"
3RD FLOOR 161' - 7 1/2"
3RD FLOOR 161' - 7 1/2"
3RD FLOOR 161' - 7 1/2"
2' - 3"
2' - 3"
2' - 3"
07-WP-07
07-PC-01
03-CON-01
07-RF-01
03-CON-01
03-CON-01
07-FP-01
07-FP-01
05-STS-01
05-STS-01
3' - 0"
3' - 0"
3' - 0"
07-FP-01
07-FP-01
05-STS-01
05-STS-01
07-FP-01
05-STS-01
05-STS-01
7TH FLOOR - MECH. 217' - 10 1/2"
7TH FLOOR - MECH. 217' - 10 1/2"
7TH FLOOR - MECH. 217' - 10 1/2"
03-CON-01
03-CON-01 03-CON-01
07-FP-01
KEY PLAN
KEY PLAN KEY PLAN 03-CON-01
07-FP-01
07-FP-01
00-EWS-04
00-EWS-04
05-STS-01
05-STS-01
1' - 6"
07-FP-01
05-STS-01
1' - 6"
08-GL-01
08-GL-01
07-AVB-01
07-AVB-01
07-AVB-01
09-GFS-01
09-GFS-01
07-AL-02
07-AL-02
09-GFS-01
Construction Manager: Lend Lease 200 Park Avenue New York, NY 10166 Civil / Site: Langan Engineering 360 West 31st Street New York, NY 10001
5
SECTION - PRECAST PANEL PARAPET AT WINDOW 1 1/2" = 1'-0"
5
SECTION - PRECAST PANEL PARAPET AT WINDOW 5 1 1/2" = 1'-0" SECTION - PRECAST PANEL SOFFIT AT SOUTH FACADE 2 1 1/2" = 1'-0"
SECTION - PRECAST PANEL PARAPET AT WINDOW 1 1/2" = 1'-0"
SECTION - PRECAST PANEL SOFFIT AT SOUTH FACADE SECTION - PRECAST PANEL STACK 2 1 1/2" = 1'-0" JOINT 3 1 1/2" = 1'-0"
SECTION - PRECAST PANEL SOFFIT AT SOUTH FACADE 2 1 1/2" = 1'-0"
SECTION - PRECAST PANEL STACK JOINT 3 1 1/2" = 1'-0"
8
1' - 8"
1' - 8"
00-EWS-04
08-GL-01
08-GL-01
00-EWS-04
00-EWS-04 09-AL-01
09-AL-01
09-AL-01
2' - 0"
2' - 0"
2' - 0"
Construction Manager: Lend Lease 200 Park Avenue New York, NY 10166
Construction Manager: Lend Lease 200 Park Avenue New York, NY 10166
Civil / Site: Langan Engineering 360 West 31st Street New York, NY 10001
Civil / Site: Langan Engineering 360 West 31st Street New York, NY 10001
Landscape: RGR Landscape 115 5th Avenue New York, NY 10003
Landscape: RGR Landscape 115 5th Avenue New York, NY 10003
Structural: Severud Associates 469 7th Avenue New York, NY 10018
Structural: Severud Associates 469 7th Avenue New York, NY 10018
MEP: BR+A Consulting Engineers 105 Madison Avenue New York, NY 10016
MEP: BR+A Consulting Engineers 105 Madison Avenue New York, NY 10016
Envelope Consultant: Vidaris, Inc. 360 Park Avenue South, 15th Floor New York, NY 10010
Envelope Consultant: Vidaris, Inc. 360 Park Avenue South, 15th Floor New York, NY 10010
Detail drawings in Revit
8
08-GL-01
3 Structural: 1 1/2" = 1'-0" Severud Associates 469 7th Avenue New York, NY 10018
Envelope Consultant: Vidaris, Inc. 360 Park Avenue South, 15th Floor New York, NY 10010
8
8
1' - 8"
JOINT
PRECAST PANEL STACK
MEP: BR+A Consulting Engineers 105 Madison Avenue New York, NY 10016
8
8
Landscape: RGR Landscape 115 5th Avenue SECTION New York, NY 10003
09-GFS-01 Owner: New York Methodist Hospital 506 6th Street Brooklyn, NY 11215
09-GFS-01 Owner: New York Methodist Hospital 506 6th Street Brooklyn, NY 11215
09-GFS-01 Owner: New York Methodist Hospital 506 6th Street Brooklyn, NY 11215
07-AL-02
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
07-AL-01
07-AL-01 07-AL-01
08-GL-01
1' - 6"
03-CON-01 03-CON-01
00-EWS-04
1' - 1"
1' - 1"
1' - 1"
07-AL-03
07-AL-03
07-JS-01
07-INS-04
07-INS-02 8"
07-INS-02
09-GWB-01
09-GWB-01
07-JS-01
07-JS-01
1' - 9"
03-PCJ-01
3RD FLOOR 4" 161' - 7 1/2"
4"
6"
03-PCJ-01
03-PC-03
03-PC-03 03-PC-03
4"
03-PC-02
03-PC-02
07-WP-07
07-WP-07
07-PC-01
07-PC-01
07-RF-01
07-RF-01
03-PC-02
GROUND FLOOR 124' - 7 1/2"
07-WP-07
2' - 3" 07-PC-01 07-RF-01
7TH FLOOR - MECH. 217' - 10 1/2"
07-INS-04 SEAL
PROJECT TITLE:
GROUND FLOOR 124' - 7 1/2"
New York Methodist Center for Community Health LOADING DOCK 124' - 3" 03-CON-02 04-ST-01
541 6th Street Brooklyn, NY 11215
7TH FLOOR - MECH. 217' - 10 1/2"
7TH FLOOR - MECH. 217' - 10 1/2"
PROJECT TITLE:
New York Methodist Center for Community Health GROUND FLOOR 124' - 7 1/2"
LOADING DOCK 124' - 3" 03-CON-02
541 6th Street Brooklyn, NY 11215
DOB No:
320576952
04-ST-01
03-CON-01
New York Methodist Center for Community Health 541 6th Street Brooklyn, NY 11215 PROJECT No: 52341.00 DOB No:
320576952
320576952
DRAWING TITLE:
DRAWING TITLE:
EXTERIOR FACADE SECTION DETAILS
SEAL
SEAL
07-INS-04
PROJECT TITLE:
PROJECT No: 52341.00
PROJECT No: 52341.00 DOB No: DRAWING TITLE:
9"
9"
08-GL-01
1' - 5"
05-STS-01
08-GL-01
9"
00-EWS-04
05-STS-01
1' - 5"
07-FP-01
00-EWS-04
1' - 5"
05-STS-01 08-GL-01
2' - 3"
07-FP-01
2' - 3"
07-FP-01 00-EWS-04
LOADING DOCK 124' - 3" 03-CON-02 04-ST-01
03-CON-01
03-CON-01 03-CON-01
62
03-PC-01
03-PC-01 03-PC-01 07-INS-04
3RD FLOOR 161' - 7 1/2"
3RD FLOOR 161' - 7 1/2"
8
8 8
8"
8"
1' - 9"
07-INS-02
03-PC-01
07-INS-04
1' - 9"
6"
03-PC-01
09-GWB-01
03-PCJ-01
6"
07-AL-03
03-PC-01 07-INS-04
EXTERIOR FACADE SECTION DETAILS
EXTERIOR FACADE SECTION DETAILS
SCALE: 1 1/2" = 1'-0"
SCALE: 1 1/2" = 1'-0"
PAGE: 03-CON-01 OF
0
PAGE:
OF
0
PROJECT: New York Methodist Hospital LOCATION: Brooklyn, New York City, USA TIME: 2015. 1 - 2015. 5 JOB DESCRIPTION: 2015 spring architectural intern in Perkins Eastman New York office, I helped team to produce Revit construction documents for New York Methodist’s new healthcare building. By using Revit to generate facade area data and transferring Cad drawings to Revit file for building requirement was also my duty during this intern. I helped team to produce detail drawings and interior layout for each room as well.
Facade Detail Iterations
63
02 PERFESSIONAL
Documentation Photo
64
Leica Lazer Scanning Image
Revit Interior Rendering
PROJECT: Cincinnati Union Terminal Renovation & Restoration LOCATION: Cincinnati, Ohio, USA TIME: 2015. 8 - 2015. 12 JOB DESCRIPTION: 2015 Fall - architectural intern in GBBN Architects, I mainly focused on Revit modeling and Cad plans in Schematic Design and Design Development stage. This renovation and restoration project has complex program and limited resources for transferring 1930 drawing to BIM. I worked with Revit team to model the entire site model, interior slab and detail components in the building. I also organized presentation board and other basic things.
65
02 PERFESSIONAL
70
PROJECT: Taft House Preservation LOCATION: 4300 Drake Road, Cincinnati, Ohio, USA TIME: 2016. 8 - 2016. 12 JOB DESCRIPTION: This preservation team project cooperated with Taft House current own to fully evaluate the entire house condition from exterior to interior in order to suggest the owner for future preservation and renovation. Our job is to analyze the house condition and document every details by using architectural drawings.
71
03 OTHER WORKS
Wood Chair made with one piece of stud Hand drawing pattern
72
Concrete Panel Casting Maya form finding | Vacuum Form mode | Multiple Materials 73
03 OTHER WORKS
Product Design Electronic Kettle | Rendering | Compact for traveling
74
Product Design Wood Stool | Scaled Model | Organic Form
75
03 OTHER WORKS
veneer
Product Design Veneer Lamp | Hand made | Bed Lamp
76
Photography By iPhone