Building Construction 1 [ARC 1523]

Page 1

Table of Contents: Project 1: Experiencing Construction: Experiencing, documentation and analysing CONSTRUCTION PROCESS Learning Outcomes: 1. Produce a complete documentation (pictures, sketches and drawing) and analysis of construction elements 2. Understand and explain construction elements and its components. 3. Understand current construction technology on local construction sites 4. Explain current material and technology in relevance to present construction industry

Project 2: Intergrated Construction Detailing / Drawings Learning Outcomes: 1. Select suitable structural elements for their design project. 2. Design and apply a structural element for their design project.

Architecture Design Studio 2 [ARC1126]

Environmental Sustainable Design [ARC1413]

Building Construction 1 [ARC1523]

Architecture Culture And History 2 [ARC1323]


Project 1: Experiencing Construction: Experiencing, documentation and analysing CONSTRUCTION PROCESS

Architecture Design Studio 2 [ARC1126]

Environmental Sustainable Design [ARC1413]

Building Construction 1 [ARC1523]

Architecture Culture And History 2 [ARC1323]


Project 2: Integrated Construction Detailing / Drawings

(A) Facade Construction Details (1) North Facade

Architecture Design Studio 2 [ARC1126]

Environmental Sustainable Design [ARC1413]

(2) West Facade Joints are doweled or dovetailed with mortises and tenons

Folding walls height (2500 3500)

Top Rail Stile

Insulating Glass

(C) Pole Foundations

Bottom Rail

Embedment Length for Steep Slopes1525 to 2440 for uphill poles

Floors should be designe and constructed as a diaphragm to transfer the rigidity of uphill poles to the rest of the structure.

Wall Width (500 - 600) 1-3/8” , 1-3/4” (35, 45)

Building Construction 1 [ARC1523]

Embedment Length for Steep Slopes1220 to 2135 for downhill poles

(B) 8 - Shaped Spiral Stairs - 26” (660) minimum clear width. - Larger diameters are safer and easier to ascend and descend. 90 degrees landing platform may be a square, rectangle or quarter of circle. The required headroom should be achieved within three quarters of a circle.

Embedment Length for Flat Slopes1220 to 1525

Architecture Culture And History 2 [ARC1323]


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.