ARCHITECTURAL DESIGN STUDIO 5 PROJECT FINAL PROJECT
2
DIAGRAMS . PERSPECTIVE
10a.m. At 10 morning, Maybank shadow will cast on our site’s elevation.
1p.m. At the noon time, site’s roof will be exposed to direct sunlight.
5p.m. At 5 evening, pedestrian walkway will be fully shaded .
TIOW TZE JINN . 1101P13103