Rosatom Global Development for South African Perspective (Nikolay Drozdov)

Page 1

ROSATOM

STATE ATOMIC ENERGY CORPORATION “ROSATOM”

Rosatom Global Development: South African Perspective Nuclear Africa 2014 Congress

Nikolay Drozdov Director, International Business, State Corporation “Rosatom” President, JSC “Rusatom – International Network”

March 18-20, 2014 Midrand, South Africa


Rosatom: an overview

www.rosatom.ru

2


Rosatom offers complete solution from uranium supplies to NPP construction operation and decommissioning Key Activities of Rosatom*

Guaranteed supply of complete life-cycle products and services Flexible capabilities of NPP supply from components and services to turn-key and BOO projects

Fuel fabrication Mining TVEL

Conversion and enrichment TVEL Tenex

Gas centrifuges manufacturing TVEL

www.rosatom.ru

15 research organizations

ARMZ

Being a state corporation Rosatom is taking advantage of unique industry access to privilege resources

* Boxes include names of key Rosatom’s subsidiaries in the relevant sector

Research and development

Power equipment NPPs engineering and services & construction AEP ASE SPbAEP Gidropress NiAEP OKBM NUKEM Technologies

Spent nuclear fuel treatment Nukem Technologies Mayak, GHK

Atomenergomash Rusatom Service

Power Generation Rosenergoatom

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

3


Nuclear Innovation – Variety of Applications

Nuclear Icebreaker Fleet - #1 nuclear fleet in the world - Assures stable functioning of Northern Sea Route

Fast Reactors (Gen IV) - #1 fast neutron reactor in the world - #1 operating fast neutron reactor in the world - Broad development programme

Small and Medium Size Reactors - Variety of different designs with referent parameters - #1 floating NPP in the world is being built - #1 successful public-private partnership for developing SMR

Radiation Technologies - Isotope production - Nuclear medicine - Irradiation facilities www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

4


Rosatom - Key figures

40+ countries

Revenue

Current Rosatom business presence

275 000 people

EBITDA

Number of employees

30 nuclear units Simultaneous implementation

Contract portfolio for the 10-year term * - 2012 Annual Report figures

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

5


Rosatom Global Operations

#1 in key segments

5 continents. More than 40 countries.

Europe Finland, Sweden, the Netherlands, Belgium, Germany, France, Spain, GB, Switzerland, Czech Republic, Slovakia, Hungary, Lithuania, Bulgaria, Slovenia

in uranium enrichment

CIS Russia, Ukraine, Kazakhstan, Belorussia, Armenia

North America USA, Canada, Mexico

in new NPPs construction

Asia China, Japan, South Korea, Vietnam, India, Bangladesh, Mongolia MENA Turkey, Libya, Morocco, Algeria, Egypt, Iran, Jordan

Latin America

Russian electricity generation Venezuela, Argentina, company, 25,2 GWe installed capacity Brazil

Australia Africa Namibia, South Africa, Tanzania

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

6


Target Map of Rosatom Regional Marketing Offices

Prague Kiev

Astana

Paris Istanbul

New York

Beijing

Mumbai

- Regional office Singapore

Rio de Janeiro

Johannesburg

North America: USA (New York)

Western Europe: France (Paris)

Eastern Europe: Ukraine (Kiev)

Latin America: Brazil (Rio de Janeiro)

Middle East and Northern Africa: Istanbul

China (Beijing)

Central Europe: Czech Republic (Prague)

Central and Southern Africa: South Africa (Johannesburg)

India (Mumbai)

www.rosatom.ru

Middle Asia (Astana) South-Eastern Asia (Singapore)

The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

7


Post Fukushima: responsible vendor approach

www.rosatom.ru

The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

8


Fukushima accident haven’t strongly affected the plans for nuclear energy development globally Eastern Europe

North America

Western Europe

150

135

38

24 24

32 29

Russia 31

Korea

113 113 114 114 111 99

120 123 114114

47 44

34 32 24 24

38 38 2012 2020 2030

30 31

2012 2020 2030

China

2012 2020 2030

120 124

21 21

74

2012 2020 2030

18

MENA

54

22

India

13

Installed capacity 12 12

-12%

17 11

2012 2020 2030

South Africa 652

36 37 37

South-East Asia

2012 2020 2030

-11%

World

62 2012 2020 2030

19 19

Latin America

66

26 27

10

GW, reference scenario

Japan* 2012 2020 2030

34

2012 2020 2030

5 5 10 7

9,4 7

588 2012 2020 2030

2012 2020 2030

Rosatom’s portfolio

515 460 2012 2020 2030

21

365 365 12

2012

2020

2030 2010 2011

Rosatom’s scenario before Fukushima

Rosatom’s scenario after Fukushima

www.rosatom.ru

Source: Rosatom analysis

* Does not include national nuclear power program potential strategy revision (to be revised shortly) The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

9


Nuclear – the only source that meets all the challenges

Affordability of electricity

GHG emissions free & environmental friendly

Fighting with “energy hunger” of growth regions

Meeting UNFCCC targets

Social & economical benefits Giving the boost growth and supporting sustainable development www.rosatom.ru

The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

10


Nuclear power brings more than just energy Additional gains from nuclear energy development

Growth of demand in other sectors of economy

Job creation

Industry and construction sector development

Electricity export opportunities

Development of science and education

Social infrastructure development

Tax payments growth Country’s reputation growth at regional level

Energy security development

content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and www.rosatom.ru The its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the info rmation.

11


Rosatom safe and mature VVER technology is one of the most referenced‌ VVER Global Fleet

Finland

Russia

Germany Ukraine

Bulgaria

Armenia China Iran

Czech Republic Slovakia

Hungary

India

Country

Constructed

In operation

Armenia

2

1

Bulgaria

6

2

China

2

2

Czech Republic

6

6

Finland

2

2

Germany

6

-

Hungary

4

4

Iran

1

1

India

1

1

Russia

17

17

Slovakia

6

4

Ukraine

15

15

TOTAL

68

55

All Russian designed reactors, including 37 VVER units operating outside Russia, successfully passed stress-tests, among those - 18 VVER units in 5 EU countries Rosatom actively supported and is confident in the results www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

12


…and is highly welcomed worldwide… Great Britain Czech Republic 2 Slovakia 1 Hungary 2

4

Finland 1 Belorussia 2

Nigeria

2 Brazil 4

Argentina 2

Russia 9

Ukraine 2 Kazakhstan 2 5 Armenia China 1 Turkey 2 4 2 India Bangladesh 2 Vietnam 3 2 Jordan 12 2 Malaysia 2 Saudi Arabia Indonesia 2 2

South Africa 8

30

22

In progress Tendering process/ negotiations

30

Potential

Rosatom NPP construction perspective backlog – more than 80 units www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

13


‌ being a part of Rosatom unique integrated NPP construction solution Energy Solution

Modern NPP design (Gen III+) NPP construction and life cycle management support (fuel, services, modernization) Operation & maintenance

Regulation, Infrastructure and Public acceptance

Industrial Solution

Creation and development of regulatory base NFC facilities construction, SNF & RW management, Social-political programmes support

Rosatom Integrated Solution

NPP equipment manufacturing, service & works localization, Technology transfer, Certification of local suppliers, participation in Rosatom third countries projects

Financial Solution

Knowledge, skills, human capital Personnel education & training (incl. traineeship on NPP sites),

BOO projects implementation;

R&D base development,

Partnership projects

State credits,

NPP operation experience exchange

- basic principle

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

14


Akkuyu NPP project profile Key parameters Akkuyu is the first Rosatom’ foreign NPP project configured on BOO principles

• Project value – $ 20 bn. • Implementation period – 2011-2023 • Legal basis – Intergovernmental Agreement of May 12, 2010

• Reactor design – NPP-2006 (VVER-1200) • Total capacity – 4 800 MW (4 units)

• PPA period – 15 years, fixed price terms

Project highlights • First NPP project in Turkey

Turkey

• Sound Russian and Turkish State encouragement • Strong support to Turkey with regulatory system establishment and personnel training

Site – Akkuyu, province Mersin, Turkey

• The project is implemented in close cooperation with Turkish partners, involvement of Turkish suppliers mainly in civil construction

• International investors are welcome to join the project with up to 49% Akkuyu SPV stake

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

15


Rosatom and South Africa – sustainable and prominent cooperation

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

16


Rosatom is not new to Africa and understands its needs Key principles of Rosatom activities

Tunisia

Morocco Algeria

Industrial partnership (localization)

Egypt

Job creation

Investment attraction

Niger Senegal

Sudan

Infrastructure development

Nigeria Ghana

IGA for NPP construction signed in 2012

Social responsibility CAR Uganda

Tanzania Uranium exploration and mining projects development since 2008 Uranium enrichment product supplies since 1995 PBMR fuel project implementation in 2000-s MoU with NECSA signed in 2012 Marketing office opened in 2012

Case: Mkuju River project

Kenya Uranium exploration and mining project acquired in 2011

Biggest mining project in Tanzania Social infrastructure development (water, energy, roads)

Zimbabwe Namibia Botswana

South Africa

More than 5000 local jobs to be created

Strict fulfillment of environmental requirements and supporting initiatives around Selous park

content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and www.rosatom.ru The its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the info rmation.

17


Rosatom already has a successful story of mutually beneficial cooperation with South Africa Pebble Bed Modular Reactor Starting 2000, Nukem Group was involved in the construction of the PBMR fuel plant: • 4 contracts with PBMR were signed throughout the project timeline

• The project was terminated by the decision of the SouthAfrican Government in 2009.

Other cooperation areas

www.rosatom.ru

Enriched Uranium Products & Nuclear Fuel • Russian JSC “Tenex” is a traditional supplier of enriched uranium products to South Africa’s Koeberg NPP

• Russian VO “Izotop” collaboration with NTP Radioisotopes Pty. on radioisotope products supply

A consortium of Rosatom’s organizations participated in the isotope reactor construction tender (DIPR project) until it was frozen early in 2012. A Memorandum of Understanding between ASE-NIAEP, Nukem Technologies and NECSA was signed on November 25, 2013 (strategic partnership in design, engineering, procurement and construction of complex capital buildings).

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

18


Russian - South-African Cooperation in Nuclear Field – Prospective Cooperation

A new era of Russian – South-African cooperation backed by strong presidential support from both sides

There is great potential for the development of our cooperation in energy sector, first of all, in nuclear power. Russia is ready to provide South Africa assistance not only in the construction of NPP units (based on cutting-edge technologies), but also in creation of the whole national nuclear industry – from uranium mining, NPP and research reactors construction up to design and nuclear power equipment manufacturing.

Vladimir Putin, President of the Russian Federation (March 27, 2013)

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

19


Russian - South-African Cooperation in Nuclear Field – Prospective Cooperation Strategic partnership in nuclear field: comprehensive support in re-establishment of South African Nuclear Energy cluster and further joint activities on global market (in particular, in Africa)

Construction of research reactor Nuclear fuel cycle: guaranteed supply

Industrial development

Construction of new NPPs (9,6 GW) Personnel education and training

Financing support Other related areas

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

20


Partnership with Rosatom in localization could bring numerous opportunities to South Africa‌ Localization interaction subjects Savings from local deliveries

Revenue generation

Development of base for safe operation of new NPP Diversification of supplies

Rosatom

Local Suppliers

Government of South Africa

Technology transfer

Profits

Higher taxes amounts from salaries & company profits

Higher employment Improved GDP per capita Multiplication effects

Rosatom localization program is a Win-Win Strategy to support RSA economy through involvement of local suppliers into nuclear program www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

21


…and result in significant effects to South Africa’s economy

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

22


Rosatom has already started active dialogue with South Africa’s nuclear industry

 The 1st Regional Forum of Nuclear Suppliers “Atomex – Africa” was organized by Rosatom and held in Johannesburg on November 25, 2013  The Forum was attended by more than 200 participants from around 40 companies  Rosatom presented its approach to working closely with South African suppliers of goods and services

This is just the beginning of the long journey of successful and fruitful cooperation

Join us at the International Forum “ATOMEXPO 2014” (9-11 June, 2014, Moscow, Gostiny dvor)

6th

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

23


Rosatom’s marketing office in Johannesburg

The re-established office will perform the role of the regional coordination hub for Rosatom’s activities not only in the Republic of South Africa, but also in the whole region of Central and Southern Africa

Mr. Alexander Kirillov

Sandton Convention Centre 161 Maude St, Sandton 2196, South Africa

Director, South African office, JSC “Rusatom – International Network” Nigeria Ghana

Kenya

 Rosatom’s Marketing Office in South Africa was opened in July, 2012 as a branch of JSC “Rusatom Overseas”

 In April, 2014 the office will be reopened as the subsidiary of JSC “Rusatom – International Network”

www.rosatom.ru

Tanzania

Namibia

Contact information: E-mail: aikirillov@rosatom.co.za Phone: 011 784 2554/2552/2469

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

24


Thank you for your attention!

Nikolay Drozdov Director, International Business, State Corporation “Rosatom” President, JSC “Rusatom – International Network” E-mail: NiSDrozdov@rosatom.ru Phone: +7 (499) 949-25-37 www.rosatom.ru

24


Back-Up Slides

www.rosatom.ru


Rosatom Gen III+ NPP design

What is VVER? (Water-Water Power Reactor)

Protection from outer impacts

Forefront of nuclear technology – Generation 3+ reactor Proven and mature solutions – 1400 reactor years of total operating time

A high level of internal safety gained through evolution of design

Most demanded capacity suitable for various grid conditions – 10001200 MWe

Long – run facility – design lifetime of the main equipment: 60 years

High performing source of supply – availability factor ≈ 92 %

www.rosatom.ru

Hurricanes, tornadoes

Airplane crash Snow load

Tsunamis, floods

Outside explosions Earthquakes

 Meets all current Russian and international safety standards and the IAEA requirements  Widely referenced by utilities  EUR certified

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.


Construction of a nuclear power plant brings numerous opportunities to suppliers Potential for external sourcing

Exclusive Russian supply NSSS**

Civil construction & engineering*

~10-15% Other Equipment

~50% ~35-40%

Examples of realized supplies • • • • • •

Valves, pumps and piping (6%) Other equipment (5%) Air cooling systems (3%) Turbine and generator equipment (6%) Electrical equipment (9%) I&C (6%)

Rosatom is ready for and has extensive experience in sourcing & localizing goods and services for new NPP construction projects

~ 15% - Russian supply ~ 30-40% - local content

~ 45-50% - global sourcing

Orders volume for 2013-2030 – more than $300 bln.

* Including design, project management, erection and commissioning works, training , etc. **Nuclear steam supply system

www.rosatom.ru

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.