/ LEGEND FIRST FLOOR & ROOF STRUCTURAL 1. Lysaght Spandek, 0.48 BMT, Colourbond Finish 6. Universal wind bracing bracket support from roof purlins at their midspan. Comprised of a 20mm diameter mild steel rod. 7. Plywood for mounting Spandek Cladding. 9. Two C20024 Lysaght Purlins fixed to 89x89 SHS. Additional purlin provides pitch of the roof. 10. 125 x 75 x 6.0- UA 11. Lysaght Flashing 12. .55 BMT colourbond roof sheeting 13. Lysaght roof flashing 14. 150 PFC 15. 50 x 50 x 5 UA 16. 90 x 45mm timber stud framing. 90 x 45 MGP10 Studs with Noggins every 450mm. 20. 150 PFC, Bolted onto decorative I beam. 21. Zip Screws for attaching roof sheeting to spacers. 23. 50x50x6 EA welded to a bottom plate, welded to 150 PFC to transfer roof load from Purlins. 24. C20024 Lysaght Cee Section Purlin. 28. C20024 Cee section for attatching cladding system. 30. 230 PFC.
5
g e d
ll a f
1
2
3 4 6
5
7
9 13
10
8
11
12
14 15
16 FIRST FLOOR & ROOF ARCHITECTURAL 2. Alucobond Parapet Detail
e d 5
17
23
l
al f g
18
21
3. CSR Bradford Anticon 130 Roofing Blanket, incorporating medium duty Thermofoil. R3.0
22
4. Galvanised Wire Safety Mesh, Ausmesh 300, installed in accordance with AS/NZS 4389. 5. Eaves Gutter. Fielders. 250mm, .55BMT with a Colourbond fixed through the roof. 8. 150mm valley gutter, attached with timber packing on top of PFC. Timber is fixed to the curved stud wall. 17. CSR Bradford Breatherfoil Antiglare vapour permeable sarking membrane. 18. Bulk insulation in all exterior timber studs.
3d
eg
26
25
24
Finish. Curtom made gutter support brackets are dirrectly
fa
ll
27 29
19
28
30
19. Alucobond top hat sections for attaching Alucobond cladding. 12mm sections act as battens for 30mm top hat sections which use industrial tape to mount the alucobond cladding. 22. CSR Ashgrid 110mm metal spaces installed over blanket. 25. Alucobond cladding, fixed to 12mm top hat sections
31
20
which are attached to timber studs inside a Lysaght Cee Section Purlin.
32
26. 110mm Downpipe 50mm setback from ALucobond cladding, with gutter brackets as necessary. 27. bulk insulation 29. Rondo Keylock and Duo systems for screw up plasterboard ceilings and laid in tile ceilings respectively. Different brackets are used depending on the system. 31. AWS Commercial Series Faceline 150mm Framing Suite
33
with slotted sub-sil section fitted to all windows and head channel fitted to all windows to allow for structural movement. 32. 4mm Alucobond, Light Grey 104. 1200 x 450 panel.
N
DETAIL DRAWING 1: ROOF & BUILDING ENVELOPE JUNCTION
ASSESSMENT 1: AXONOMETRIC DETAIL DRAWINGS SECTION F | AT 1:10 SCALE JONATHAN STATHY | 914203 TUTOR: PETAR PETROV | TUTORIAL 6
/ LEGEND FIRST FLOOR & ENVELOPE STRUCTURAL
34 33
36. 89x89x6 SHS 37. 2400 wide x 450 deep beam with rebars 39. 450 deep x 300 wide edge beam to support lecture theatre as part of a two way slab system 40. Bondek, permanent formwork. 41. N16 Bars supported by ligatures, resting on bar chairs. 42. Post tensioning end, with an Onion end. 4 Cables inside of a tendon. 44. N24 Bars resting on ligatures on bar chairs. 45. 600 wide x 450 deep edge beam 46. 400 x 300 concrete column
36 33
37 33 35 33 39 33 33
FIRST FLOOR & ENVELOPE ARCHITECTURAL
33
40
50 33 41 33
45 33
42 33
44 33 43 33
33
46 33
47 33 48 33
49 33
50 33 50 33
DETAIL DRAWING 2: FIRST FLOOR & BUILDING ENVELOPE JUNCTION
N
34. 13mm Gyprock Plasterboard 35. Carpet 1 38. Alucobond Cladding 43. 75mm Bulk insulation above suspended ceiling. 47/48. Rondo Suspended ceiling system. 49. Two layers of fire rated 16mm plasterboard in addition to timber studs. 50. 310 UB 4.0. Decorative.
38 33
ASSESSMENT 1: AXONOMETRIC DETAIL DRAWINGS SECTION F | AT 1:10 SCALE JONATHAN STATHY | 914203 TUTOR: PETAR PETROV | TUTORIAL 6