Josh Aylett - Architecture Portfolio 2020

Page 1

Joshua Aylett MArchD, BAhons Architectural Portfolio 2020



Contents

///////

Residential Squam Lake Residence | Center Harbor, NH Groendyke Cabin | Enid, OK Groendyke Garage | Enid, OK Urban Sanctuary | Seattle, WA Lee Residence | Las Vegas, NV Overlake Residence | Medina, WA Beverly Hills Residence | Beverly Hills, CA Hong Kong Villa | Deep Water Bay, HK Simonyi House Extension | Medina, WA

/////// Photographic Documentary Unfinished [Spain] Potential in Ruin - In Progress /////// Masters Portfolio Systems Diversion | Unfinished Madrid | Design Studio 1 EATC | International Architectural Regeneration and Development ///////

Education New Music School | The Dragon School, Oxford New Science Block | Cheney School, Oxford New Porter’s Lodge | Pembroke College, Oxford University Science Oxford Headington | Science Oxford

///////

Industrial + Transportation I-Block Conveyor | Jaguar Land Rover Ebbw Vale Mechanical Link | Bleanau Gwent County Borough Council Test Facility | Changan Automobile Co. UK Damson Parkway Distribution Compound | Jaguar Land Rover

/////// Gallery + Exhibition Headlsburg Gallery | Healdsburg, CA Oxford School of Architecture | End of Year Show 2015 + 2016 ///////

Full Portfolio Time-line


///////

Residential

Squam Lake Residence Center Harbor, NH Olson Kundig 2019

A new build residence located on a woodland site set back from Squam Lake. The house is designed as a vacation getaway for the client and extended family. The 5,000sf residence is designed to float amongst the trees, with the main level cantilevered above the ground with the lower level below the center of the house rooted in the landscape. The main level includes 3 bedroom suites, open plan kitchen and living spaces, craft studio, window daybeds and utility room. The lower level includes a large entertainment living room, bathroom and utility + storage areas. Duties included: 3D Design in Revit, Renderings and visual presentations, construction documentation, consultant coordination and construction administration. C

SD

DD

CD

CA

Floor Plan and Model Photos


SD Proposal Imagery


///////

Interior Details and Renderings



///////

Jamb Details Window Construction Details

Head and Sill Details


Interior Renderings for Bathroom Designs


///////

Residential

Groendyke Cabin Enid, OK Olson Kundig 2019

A new build cabin located on the highest point in Enid, Oklahoma lending panoramic views of the surrounding landscape. The cabin includes a master suite, large living room and kitchen for entertaining, roof terraces on the upper level, with two guest suites and the main entry on the lower level. Duties included: 3D modelling and design from early concept phase. Render production and visual imagery for client presentations and design progression. Design development and construction detailing in Revit. Involvement in Construction Administration, shop drawing review and consultant coordination during construction. C

SD

DD

CD

CA

Plan and Material Palette


Groendkye Cabin Construction Photos


///////

REVEAL SHOWN AS GREY

A9.01

REVEAL SHOWN AS GREY

4"

7

7'-10" VIF A9.01 1'-11 1/4"

1'-11 7/8"

7

1'-11 1/4"

4"

7'-10" VIF 1'-11 1/4"

1'-11 7/8"

4" 1'-11 7/8"

1'-11 1/4"

1"

SLOTS FOR CABLE CHASE

4" 1'-11 7/8"

1'-3 7/8"

1'-3 7/8"

REFER TO 'JACK BOX' FOR PIVOT HARDWARE.

1'-11 1/4"

1'-11 1/4"

1"

SLOTS FOR CABLE CHASE REFER TO 'JACK BOX' FOR PIVOT HARDWARE.

1'-3 3/4"

3 A9.01

3/4"

3/4"

1'-3 3/4"

3 A9.01

1" 1"

5

4

SCALE: 1" = 1'-0"

2 A9.01

SCALE: 1" = 1'-0"

7'-10"

A9.01 A9.01

5

4

A9.01 2'-8"

+/- 1/16" REVEAL

9

RECORD CABINET - CLOSED SCALE:

1'-11 1/8"

RECORD

9

SCALE:

NTS

WALL BELOW

1'-11 3/8"

4"

4"

WALL BELOW

NTS

2'-8"

+/- 1/16" REVEAL

1'-11 1/8"

RECORD CABINET - FRONT

4

7'-10"

1"

project:

A9.01

4

RECORD CABINET - FRONT 1'-11 1/8"

1'-11 1/8"

2 A9.01

Groendyke House

1"

1'-11 3/8"

1"

SCALE: 1" = 1'-0"

5

6"

CL

1'-11 7/8"

CL

OF PIVOT

SCALE: 1" = 1'-0"

OF PIVOT 1'-11 7/8"

1'-11 1/4"

1'-11 1/4"

1'-11 7/8" 3/16" STL PLATE PULL

1'-11 3/8"

RECORD CABINET - BACK

2"

1"

5

6"

RECORD CABINET - BACK 3/4"

1"

2"

3/4"

1'-11 3/8" 1"

CL

OF PIVOT

CL

OF PIVOT 1'-11 7/8"

3/16" STL PLATE PULL

1/4" DIAMETER ROD, TYP 1/4" DIAMETER ROD, TYP

2"

REVEAL SHOWN AS GREY

REVEAL SHOWN AS GREY

2"

4"

8

4"

8

A9.01

A9.01 principal architect TOM KUNDIG

RECORD CABINET - PLAN

1

7/8"

SCALE: 1 1/2" = 1'-0"

0

1'

2'

RECORD CABINET - PLAN

1

3'

0

6

Custom Credenza Design

10

SCALE: 1 1/2" = 1'-0"

RECORD CABINET - FRONT OPEN

1'

2'

SCALE:

drawn by WF, JA

NTS

3'

checked by

SCALE: 1" = 1'-0"

6

8 1/4"

10

RECORD CABINET - FRONT OPEN

date 10.25.2018

SCALE: 1" = 1'-0"

1'-10"

CL

EQ

1'-3 7/8"

EQ

1 1/2"

1 1/2" 2 1/2"

2 1/2"

revisions:

1'-10"

EQ

1'-3 7/8"

EQ EQ

no.

date

by

1'-1 5/8"

WALL BELOW

EQ

1'-6 3/8"

EQ

1'-6 3/8"

1'-1 5/8"

CONSTRUCTION DOCUMENTS

4" WALL BELOW

1/8"

5 1/8"

RECORD SCALE:

job no. 18025

8 1/4"

CL EQ

project manager W. FRANKLIN

RECORD CABINET - OPEN 7/8"

4"

10.25.2018

NTS


Stair Design


///////

Residential

Groendyke Garage Enid, OK Olson Kundig 2019

A detached garage built on the same site of the Groendyke Cabin. The client requested a garage space for a large vehicle and additional recreational vehicles. The project was conceived and constructed in a very short time-frame using the same materials as the larger cabin. Duties included: Concept design and construction documentation drafting. Design updates and site progress review during construction.

C

SD

DD

CD

CA Groendyke Garage Plans, Detail and Rendering


Groendyke Garage Construction Photos


///////

Residential

Urban Sanctuary Seattle, WA Olson Kundig 2019

A condominium remodel in the historic Pioneer Square Neighborhood of Seattle. The scope of work includes opening up the wall between the new unit and the client’s existing condo residence. The expansion will provide the client with an additional guest suite on the lower level with an elevator that connects to a large living room office upstairs. The upstairs living room opens up to the clients existing kitchen through a large barn door. Duties included: Site survey and measurements to create the Revit model accurate to the existing conditions. Design of the remodel proposal including renderings and client presentations. Produced the Permit application and construction documentation. Consultant coordination and on site progress review during demo and construction. C

SD

DD

CD

CA


Material Palette and Rendered Section


///////

Residential

Lee Residence Las Vegas, NV Olson Kundig 2018

A new build residence located in a luxury development on the periphery of Las Vegas. The house optimizes the SouthWest views towards Diamond Hill and the mountains beyond. The main hallway acts as a gallery space for the clients art collection - leading towards an uninterrupted view of the mountains in the distance. The design incorporates solar shading and passive cooling to reduce the heat load in the living areas of the house. Duties included: Design and Revit model production from early SD. Developed render imagery and client presentations. C o n s t r u c t i o n documentation and permit drawings. Involvement in contractor and consultant coordination. C

SD

DD

CD

CA

Materials Pallette, Model and Site Plan


Floor Plan and Renders


///////

Construction Details



///////

Residential

Overlake Residence Medina, WA Olson Kundig 2019

A new build residence for a Tech Executive client located in Medina, a high end neighborhood on the East side of Lake Washington. This project has an ambitious sustainability agenda and is seen as an office case study to develop and pioneer high-end sustainable design. Duties included: Involvement from early concept design and production of the initial proposal documentation. Development of the Revit model and early visuals. Involvement in client presentations and consultant coordination from an early phase in order to define the sustainability benchmarks. Produced the SD and DD documentation.

C

SD

DD

CD

CA

Overlake Residence Plan


Site Plan, Elevation and Entry Rendering


///////

Living Room Rendering


Section Perspective at Stair

Section Perspective at Kitchen


///////

Residential

Beverly Hills Residence Beverly Hills, CA Olson Kundig 2019

Concept design and feasibility study for the demolition of an existing residence and new construction of a 10,000sf single family home in Beverly Hills. The proposal includes large living and entertainment spaces along with a master suite and two guest suites in the main body of the house. The library office are located across a reflecting pool seen from the main entry. Opposite is the garage and back of house suite, which sits below a tennis court. An additional detached guest suite is located on site. Duties included: Development of the concept design presentation including plans, renderings, fee proposal and sustainability goals. C

SD

DD

CD

CA


Library View Rendering - Day and Night


///////

Residential

Hong Kong Villa Deep Water Bay, HK Olson Kundig 2018

Concept proposal for a residential development project on a hillside site of Deep Water Bay. The proposal includes two luxury residences designed to maximise the dramatic views of the site. The homes sit on top of a parking level with garages, back of house spaces and the main entry met with a waterfall at the back of the property. The main level hosts all the entertainment areas, including a terrace and infinity pool. The upper level contains 4 bedroom suites. Duties included: Produced high quality renderings and rendered floor plans for the developer presentation. Main Level

C

SD

DD

CD

CA

Upper Level


Proposal Rendering of Terrace


///////

Residential

Simonyi House Extension Medina, WA Olson Kundig 2017

A new living quarters extension to a residence located in Medina, just outside Seattle, WA. The existing house was designed by a local architect in the 1980’s and was later extended to include an art gallery, indoor pool and library. The house went under a full renovation in 2009. The new extension will become the main living quarter of the building and the existing house will become a larger gallery, office and library for the owner. Duties included: Production of existing building model and design progression in the working Revit model. Construction of the physical model for the client presentation.

C

SD

DD

CD

CA

Simonyi House Plan and Extension Render


Model Photos


///////

Photographic Documentary

Unfinished [Spain] Spain 2017

[Espacios] Inacabados is a 35mm film photodocumentary exposing the condition of unfinished Spanish Architecture, 10 years after the 2007-8 economic crisis. [Espacios] Inacabados seeks to engage with architectural sites around Spain that exist in a state of perpetual incompleteness. The series of images draw comparisons among the various developments in an effort identify similarities in the unfinished sites across Spain, in order to define an architectural typology. Through this process, significance is placed on the contemporary ruins by portraying them as the object in focus, in the same way that desired architecture is photographed or represented.

The body of work is positioned as a dialogue that raises questions about the state of Architecture and development going forward in Spain. The goal is to question the integrity of those responsible for Spain’s unfinished developments; from project conception to construction execution. [Espacios] Inacabados should be read as a part of the wider critique of the actions of autonomous development authorities, banks and the construction industry that gave rise to Spain’s Architectural typology known as ‘perpetual incompleteness’.



///////



///////

IN

Photographic Documentary

SS

P

RE ROG

Potential in Ruin Spain + Italy 2020

A photographic documentation of some of the most notorious modern ruins in Southern Europe and a handful of the most successful adaptive reuse projects in Italy and Spain. The research proposal is aimed to question the abundance of unfinished and abandoned buildings at a time when sustainable development is a serious target in the architecture industry. Can adaptive reuse inspire radical projects at abandoned sites like these, or will they forever remain as monuments of economic crisis. The project documents numerous unfinished buildings across Sicily ranging from residential to civic and infrastructure that were abandoned for various reasons. A condition famous throughout Sicily. In comparison, the offices of RCR Arquitectes [Spain], Ricardo Bofil [Spain] and Studio AMAA [Italy] are shown as an example of radical regeneration of previously abandoned buildings. Together, the work alludes to the potential for these abandoned sites to become something new. This research proposal took inspiration from Incompiuto Italiano, a study of unfinished buildings across Italy, and was presented to the Olson Kundig Office in Seattle, WA.



///////

Student Design Projects

Systems Diversion: Deviation, Appropriation and Regeneration Ciudad Valdeluz, Guadalajara, Spain DS1 | ‘Urbanicidio’ Unfinished Madrid Oxford Brookes University, MArchD 2016

This portfolio aims to explore the potential of the redundant buildings located in the unfinished urban developments on the periphery of Madrid. Following the crash of the housing market and the economic downturn of 2008, millions of homes have been left unoccupied across Spain. Despite the abundance of housing located in Madrid, immigrants created informal squatter settlements on the outskirts of the city. This type of insurgent behavior reinforces the exploration of alternative uses for redundant building structures in the unfinished Spanish ‘Ghost Urbanizations’.

The design response explores the potential to develop the Ciudad Valdeluz master plan as a collective act of insurgency, defined as an active revolt or uprising. The project incorporates the studio ethos of luxury and austerity to regenerate the incomplete development in Valdeluz on the outskirts of Madrid – a failed example of capitalist development in a boom period. Focusing on the ‘post urban inhabitant’ - the citizen of the unfinished urbanization identified by Ballesteros (2008), the design identifies the steps to acquiring citizenship by rebelling against the modernist agenda set out by the architect’s urban master plan.

The design compositions are explored through a body of research supporting the position of reuse and recycling in times of economic scarcity. The project ties together social and site research that centers on mapping material resources across the unfinished landscape. The architectural interventions use the environment and the landscape of discarded building materials for positive reuse. The final resolutions are a speculative response formulated and composed through a design methodology; one possible outcome to a design process that is open to infinite alternative outcomes.

Post Urbanizacion Mixed Media Collage


‘The future of generations of Madrid residents to come. These residents, like primitive men and women or rather, like post-urban inhabitants - will have to re-think their surroundings and patterns of life in places where the street is no longer the street. Here, the overlaying of functions has been eliminated, buildings are icebergs floating in isolation, and contact is reduced to the absolute bare minimum’ (Ballesteros, M. 2008).


///////

Ciudad Valdeluz Site Mapping

Unfinished Developments Around Madrid


PR WR ER BM SM FR CW MC

-

0000 0100 0200 0300 0400 0500 0600 0700

PROCESSOR APPARATUS WATER RETICULATION ELECTRICAL RETICULATION BUILDING MATERIALS SCRAP MATERIALS FOOD RETICULATION COMMUNITY WELLBEING MARKETING COMMUNICATION

[Hydro-Bank] HR - 0107

[Truman Show Home] MC - 0703

[Dodgy Ground] MC - 0704

[Body Shop] CW - 0603 [Planetary Depot] BM - 0302

[Disused Depot] BM - 0301

[Guard Tower] CW - 0604 [Found-a-tory] PR - 0001

[Commune] CW - 0601

[Terminal] HR - 0106 ER - 0204 [Guerrilla Gardens] FR - 0502

[Twisted Transistor] HR - 0105 ER - 0203 [Electric Avenue] ER - 0201

[Propagation Plots] FR - 0503

[Terminal] ER - 0205

[The Brakery] SM - 0401

[Dodgy Ground] MC - 0702

[Truman Show Homes] MC - 0701

[Bazaar] FR - 0504

[Estación] MC - 0705

[Reticulation Point] HR - 0104 [Taller de-cap[ac]itación] SM - 0402

[Cementious Sculpture Works] SM - 0403

[Planetary Depot] BM - 0303

[Reticulation Point] HR - 0103

[Hydro-Bank] HR - 0102

‘Duda Valdeluz’ Site Plan

‘Duda Valdeluz’ Site Model

[Hydro-Loop] HR - 0101


///////

90° 60°

60°

45°

[Electrical Reticulation Network]

45°

30°

EX

HA - 104

PV - W981

315°

360° 00°

DP - X19

ST 011

225°

FP 523

180°

45°

135° 90°

Solar Power Modulator [ER - 0200X]

Solar Power Modulator Composite Drawing


Environmental Regulation Tower Composite Drawing

Environmental Regulation Tower [CS - 0901]


///////

Found-a-tory | Control Systems Composite Drawing

Found-a-tory | Control Systems [PR - 0001]


Found-a-tory | Foundry Composite Drawing

Found-a-tory | Foundry [PR - 0001]


///////

Student Design Projects

Evora Alternative Technology Centre Convento Sao Bento de Castris, Evora, Portugal International Architectural Regeneration and Development Oxford Brookes University, MArchD 2015

This is a comprehensive regeneration proposal for the Convento Sao Bento de Castris, a 13th century convent located in Evora Portugal. The project is articulated through a number of stages including an appraisal of the existing building, a proposed outline business plan, and proposed programme that have been developed based on the critical analysis of the current Economic, Social, Site Conditions and Educational background data in Evora and the wider Alentejo Region. The regeneration proposal is contextualized through precedent research and the feasibility of the proposal has been outlined through a three phase masterplan. The reuse strategy makes a clear intention to depart from the historical layout and function of the Convent by employing a creative strategy to achieve an outward looking Design and Research Centre. The Phase One design proposal focuses on three key areas of intervention for the provision of an Accommodation Wing, Library and Communal Cafe, and Materials Workshops. The design interventions are presented through visual imagery, detail design and through traditional architectural drawings.

Research Facilities Entrance Public Entrance Service Access

Phase 3 Masterplan


Research Facilities Entrance Public Entrance Service Access

Phase 1 Masterplan Years 0 - 3

Research Facilities Entrance Public Entrance Service Access

Phase 2 Masterplan Years 3 - 5

Research Facilities Entrance Public Entrance Service Access

Phase 3 Masterplan Years 5 - 10

Initial Site Strategy


///////

Internal Cloister View


Workshop and Cloister View


///////

External

Internal

Library Shelves Glass Panel Railing Steel Edge Profile Steel Plate Anchors

Portuguese Oak Floor Boards Plywood Sheet

Chemical Bonded Resin

Steel C-Profile Support Steel Cantilever Support Beam Anchored through Existing Wall Steel Plate Welded to Cantilever Support Beam

_Section Detail Proposed Mezzanine and Existing Wall Junction 1:20 @ A3

Internal Details

Cafe and Library View


_The Non-Cloister The removal of the East Wing opens up the Cloister to be directly accessed from the wider extents of the site. This now encourages the expansion of Materials Research studies from the workshops to the rest of the building, ultimately contributing to the wider regeneration of the building in later phases.

_Cafe and Communal Spaces The Cafe Bar at ground level serves as a rest point for visitors and students of the Centre. The lounge areas encourage people to stay and enjoy the space.

_Links to Accomodation Wing The widened openings leading out of the Library travel towards the West Wing around the new 3-sided Cloister. _Materials and Research Library Shelving on First and Second Floors for the display and storage of literary and material research. This becomes the focus of the Centre, housing and expressing the embedded knowledge gained through experimental research and application.

_The Chapel Exhibition Hall The EATC utilises the Chapel as a function space, exhibiting the work produced by the students of the centre and other researchers throughout the year.

Cafe and Library Perspective Section


///////

Metals Workshop Internal View

_Metals Workshop


tion Workshop

_Digital Fabrica

Digital Fabrication Workshop Internal View


///////

Education

New Music School The Dragon School, Oxford Ridge and Partners LLP 2014

Design of a state of the art dedicated Music School including recital hall, rehearsal spaces, music teaching and individual practice rooms located at the heart of the Dragon School site in Oxford. Each of the spaces in the building are designed according to specialist specifications in order to provide the highest quality learning environment both inside and outside the dedicated teaching spaces. Duties included: Production of a Revit model that was used to develop a full set of drawings presented in client design review meetings and the formal planning submission, and would later be used as the central BIM model for design team collaboration. C

SD

DD

CD

CA

New Music School Revit Model


New Music School Elevations


///////

New Music School Plans

Ground Floor Plan

First Floor Plan


Second Floor Plan

Roof Plan


///////

New Science Block Cheney School, Oxford Ridge and Partners LLP 2014

Demolition of existing science classrooms and design provision of a new 1800sqm Science and Teaching block building. Duties included: Development of design concept and feasible options. Produced presentation images to convey design options in client design review meetings. Additional involvement during the detail design stages including the production of 2D drawings and modelling bespoke elements in Revit. This project was developed using level 2 BIM.

C

SD

DD

CD

CA

Science Block Presentation Imagery


Plans, Section and Elevations submitted for Planning Permit


///////

New Porter’s Lodge Pembroke College, Oxford University Ridge and Partners LLP 2014

Conversion of Pembroke College’s existing Porter’s Lodge, mail room and storage areas into a more formal and modern entrance to the College with a security check point. The entrance was amended to be fully accessible and secure, requiring students pass through a secure gate and visitors to pass through the Porters Lodge to enter the grounds of the College. Additional ground works were designed in the cloister to provide level access to all areas. Duties included: Production of 2D and 3D information for client presentations and a full drawing package for Planning Application.

C

SD

DD

CD

CA

New Porter’s Lodge Plan and Sections


Presentation Imagery of the New Porter’s Lodge


///////

Science Oxford Headington Science Oxford, Oxford Ridge and Partners LLP 2015

Design feasibility study for the new headquarters and mixed-use site strategy of Science Oxford Headington, including: Curioxity Centre GF Curioxity space 5000sqm 100 seat auditorium FF offices 5000sqm Cafe/Link Space Office Block 20,000sqm 55 No. parking spaces 10 No. Residential Units 15 No. parking spaces Duties included: Production of a digital 3D model, renders and drawings for a feasibility study illustrating the project proposal for the relocation the Science Oxford headquarters to a site in Headington, Oxford. C

SD

DD

CD

CA

Proposed Rendered Images


Proposed Mixed-Use Site Plan

Proposed Development Plan


Industrial + Transportation

I-Block Extension Jaguar Land Rover Ridge and Partners LLP 2013

TYBURN TRADING ESTATE

HIGH-LEVEL - FLAT Z BLOCK ROOF CONCRETE

PROPOSED I BLOCK ROOF METAL SHEET CLADDING WITH IN LINE ROOF LIGHTS

ROAD CANOPY METAL SHEET CLADDING

LOW-LEVEL I BLOCK ROOF METAL SHEET CLADDING

HIGH-LEVEL I BLOCK ROOF METAL SHEET CLADDING TENDER

CONVEYOR BRIDGE METAL SHEET CLADDING

REF DATE REVISION

DRAWN CHECKED

STATUS

SCALE@A1

DATE

DRAWN BY

23/10/13

CONVEYOR BRIDGE METAL SHEET CLADDING

Proposed Axonometric

PROJECT

I Block Conveyor CLIENT

Jaguar Land Rover ROAD CANOPY METAL SHEET CLADDING

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

Production of the BIM Proposed Axonometric Architectural model 1in Proposed Axonometric Revit. Generation of 3D visual images and drawings to compile a Tender package. Coordinated BIM drawing information between RIDGE Architecture, RIDGE Structural Engineering and other external design teams. This project was developed using level 3 BIM coordination.

REV

131330 - A117 FILE REFERENCE: -

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

TYBURN TRADING ESTATE

LOW-LEVEL - FLAT Z BLOCK ROOF CONCRETE

HIGH-LEVEL - FLAT Z BLOCK ROOF CONCRETE

HIGH-LEVEL I BLOCK ROOF METAL SHEET CLADDING

ROAD CANOPY METAL SHEET CLADDING

LOW-LEVEL I BLOCK ROOF METAL SHEET CLADDING

TENDER CONVEYOR BRIDGE METAL SHEET CLADDING REF DATE REVISION

DRAWN CHECKED

STATUS

SCALE@A1

DATE

DRAWN BY

23/10/13

JA

CHECKED BY

LS

DRAWING

CONVEYOR BRIDGE METAL SHEET CLADDING

Existing Axonometric

PROJECT

I Block Conveyor

ROAD CANOPY METAL SHEET CLADDING

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

TEL: 01993 815000 FAX: 01993 815001 www.ridge.co.uk

Also at Reading, Bristol, London and Leicester DRG NO

CD

CA

www.ridge.co.uk

DRG NO

Jaguar Land Rover

DD

TEL: 01993 815000 FAX: 01993 815001

Also at Reading, Bristol, London and Leicester

CLIENT

SD

Checker

DRAWING

Duties included:

C

CHECKED BY

JA

1

Existing Axonometric

Existing Axonometric

131330 - A104 -

FILE REFERENCE:

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

REV

06/12/2013 16:55:22

The design brief included the demolition and making-good of the I-Block wall nearest Z-block and the area between. The proposal consisted of an extension to the conveyor system that would be located within an extension to I-Block in the area between the I-Block and Z-Block buildings.

LOW-LEVEL - FLAT Z BLOCK ROOF CONCRETE

06/12/2013 16:53:12

///////


7

6

5.

4

3

2

1

450 630 1860

10040

10800

10650

02 Level 2 11000

A

B

C

500

D

6670

E

7140

F

5870

G

5850

H

5990

5325

J

K

665

3280

7

I Block Extension Ridge Height

L

6

5.

4

9150

3

2

1

450 630 1860

2473

10040

10800

10650

ALL WORKS TO EXISTING I BLOCK INCLUDING DEMOLITION OF Level 1 TO EXTERNAL 01 WALLS 02 Level 2 5000 BE UNDERTAKEN 11000 DURING WHITSUN AND I Block Extension SUMMER SHUTDOWNS.

1 14

Ridge Height

1

10650

9150

00 Ground Level I BLOCK

0 -01 Pit Slab Level 01 Level 1 -1000 5000

I BLOCK EXTENSION

2

2

Z BLOCK BUILDING

I BLOCK EXTENSION

2

EXISTING I BLOCK BUILDING Z BLOCK

10800

1

00 Ground Level I BLOCK

0 -01 Pit Slab Level 250MM DEEP PIT

NEW COLUMNS FOR I BLOCK EXTENSION LOCATED IN FRONT OF EXISTING EXTERNAL COLUMNS

EXISTING FIBRE OPTIC DUCT TO REMAIN IN PLACE AND PROTECTED AT ALL TIMES.

250MM DEEP PIT

MASONARY WALL REMOVED BETWEEN PIERS

3

Key Plan Proposed 1 : 1000

-1000

Z BLOCK BUILDING

I BLOCK EXTENSION

Z BLOCK

2040

DG01

585 m²

NEW TARMAC FOOTPATH WITH CHAMFERED PPC KERBING AROUND I BLOCK EXTENSION.

1

1860

4000

2 HR SHAFT WALL AGAINST EXISTING Z BLOCK BUILDING

EXTERNAL STAIRCASE AND SURROUNDING WALL REMOVED

1 : 100

DATE

DRAWN BY

17/10/13

J

H

G

F

E

D

C

B

A

Key Plan Proposed

CHECKED BY

JA

LS

2473

DRAWING

3280

665

5325

5990

5850

5870

7140

6670

REF DATE REVISION

500

SCALE@A1

I BLOCK EXTENSION

I Block Conveyor

EXISTING ROAD CANOPY

L

K

J

H

G

F

E

D

C

B

A

Jaguar Land Rover 3280

665

5325

5990

5850

5870

7140

6670

REF DATE REVISION PROJECT STATUS

500

SCALE@A1

REV

131330 - A112 00 Ground Level

Proposed Ground Floor Plan

FILE REFERENCE:

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

0 -01 Pit Slab Level 01 Level 1 -1000 5000

C

D 7140

E 5870

F 5850

G 5990

H 5325

665

J 3220

K

6

1 : 100

00 Ground Level

4

3

2

I BLOCK EXTENSION 1m DEEP 10040 450 PIT 630

1860

Proposed Sections

5.

I Block Conveyor TEL: 01993 815000

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

1 250mm DEEP PIT 10650

10800

FAX: 01993 815001 www.ridge.co.uk

CLIENT Also at Reading, Bristol, London and Leicester

Jaguar Land Rover 131330 - A111 FILE REFERENCE: DRG NO

REV

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

0 02 Level 2 -01 Pit Slab Level

KEY:

11000 -1000 TRISOMET 333 I Block Extension TATA ROOF CLADDING. Ridge Height

Proposed I Block Section 2

2

7

6

5.

4

3

2

I BLOCK EXTENSION 1m DEEP PIT

19150 : 100 1860

1

LS

DRAWING CLIENT

PROJECT

7

L 2473

CHECKED BY

JA

EXISTING ROAD CANOPY

Proposed I Block Section 2

2

DRAWN BY

Proposed Sections Jaguar Land Rover 06/12/2013 16:53:58

DRG NO

1 : 100

DATE

As indicated 16/10/13

I BLOCK EXTENSION

I Block THE COWYARDS TEL:Extension 01993 815000 BLENHEIM PARK FAX: 01993 815001 Ridge Height OXFORD ROAD WOODSTOCK, OX20 1QR www.ridge.co.uk

Proposed 00 Ground Floor Plan

DRAWN CHECKED

I Block Conveyor

01 Level 1 02 Level 2 5000 11000

9150

6670

LS

CLIENT

Also at Reading, Bristol, London and Leicester

500

CHECKED BY

JA

Proposed Sections TENDER

DG02

EXISTING EXTERNAL DOOR REPLACED FOR 2HR INTERNAL TIMBER FIRE DOOR AND RELOCATED TO AVOID CLASH WITH NEW COLUMNS

B

DRAWN BY

DRAWING

9150

2473

A

DATE

As indicated 16/10/13

I Block Extension Ridge Height PROJECT

DRAWN CHECKED

1 : 1000

STATUS

Proposed Ground 02 LevelFloor 2 Plan 11000

A122

EXISTING RETAINING WALL REMOVED AND REPLACED WITH NEW SUPPORTING REAR WALL

SCALE@A1

K

06/12/2013 16:53:56

10040

4(W) X 5.4(H) CRAWFORDS ECO SPEED ROLLER SHUTTER DOOR.

4000

I BLOCK EXTENSION

1 METRE DEEP PIT

7

L

DRAWN CHECKED

STATUS

250MM DEEP PIT

6

TENDER

1 : 100

REF DATE REVISION

1

630 450

1

NEIGHBOURS BOUNDARY WALL

1640

2

EXISTING I BLOCK BUILDING

Proposed I Block Section

TENDER

5.

10040

450

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

1 250mm DEEP PIT

630

10800

TEL: 01993 815000 FAX: 01993 815001 www.ridge.co.uk

Also at Reading, Bristol, London and Leicester

10650

DRG NO

REV

131330 - A111 FILE REFERENCE: -

BRENT MARTIN TRILITE 3.0kg/m2 TRAPEZOIDAL TRIPLE SKIN. NON FRAGILE ROOFLIGHT.

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

01 Level 1

I BLOCK LOWER LEVEL ROOF

CONVEYOR BRIDGE

5000 02 Level 2

10650

11000 I Block Extension Ridge Height I BLOCK

9150

3 00 Ground Level

2

1 I BLOCK EXTENSION

0

CANOPY

Z BLOCK

01 Level 1 5000 Proposed East Elevation

1 : 100

2

10800

1

Key Plan Proposed I BLOCK I BLOCK HIGH LEVEL ROOF

CONVEYOR BRIDGE

1 : 1000 3

1

I BLOCK EXTENSION

00 Ground Level 0

3 630

Z BLOCK

450

4

1

5.

TENDER

Proposed East Elevation TENDER 1 : 100

2 REF DATE REVISION

REF DATE REVISION

CANOPY

1 : 1000 SCALE@A1

10040

1 : 100

I BLOCK EXTENSION

DATE

DRAWN BY

17/10/13

JA

CHECKED BY

1

Proposed Roof Plan

2

3 10800

4

5.

630 450

6 10040

A

7

1860

B 500

02 Level 2

C 6670

D 7140

E 5870

F 5850

G 5990

H 5325

J

665 3280

K

L

CHECKED BY

JA

LS

Proposed Elevations

2473

TENDER

02 Level 2

I Block Conveyor 11000

11000

PROJECT REF DATE REVISION

DRAWN CHECKED

I Block Conveyor

STATUS CLIENT

Jaguar Land Rover

SCALE@A1

01 Level 1

01 Level 1

5000

5000

1

DRG NO

Proposed 03 Roof Plan

11000

REV

FILE REFERENCE:

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

01 Level 1 5000

10800

4 630 450

5.

6 10040

7

1860

Level 00 Ground 0 Level

Proposed Elevations

B 500

C 6670

D 7140

E 5870

F 5850

G 5990

H 5325

J

665 3280

K

L

LS

Jaguar Land Rover Proposed Elevations

2473

02 Level 2

2

Proposed South Elevation 1 : 200 01 Level 1 5000

Level 00 Ground 0 Level

0

Proposed West Elevation 1 : 200

CHECKED BY

CLIENT DRAWING

A

11000

00 Ground Level

3

JA

0

Proposed West Elevation

131330 - A114 1 : 200

3-

3

DRAWN BY

0

2

Proposed South Elevation 1 : 200

PROJECT

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

TEL: 01993 815000 I Block Conveyor FAX: 01993 815001 www.ridge.co.uk

Also at Reading, Bristol, London and Leicester CLIENT DRG NO

Jaguar Land Rover 131330 - A110 FILE REFERENCE: -

REV

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

THE COWYARDS BLENHEIM PARK OXFORD ROAD WOODSTOCK, OX20 1QR

TEL: 01993 815000 FAX: 01993 815001 www.ridge.co.uk

Also at Reading, Bristol, London and Leicester DRG NO

131330 - A110 FILE REFERENCE: -

06/12/2013 16:53:48

02 Level 2

Also at Reading, Bristol, London and Leicester

Proposed Roof Plan

10650

00 Ground Level THE COWYARDS TEL: 01993 815000 BLENHEIM PARK FAX: 01993 815001 OXFORD ROAD 0 WOODSTOCK, OX20 1QR www.ridge.co.uk 06/12/2013 17:11:40

Z BLOCK

2

DATE

As indicated 16/10/13

\\data-ox1\UserDocs\jaylett\My Documents\131330 I BLOCK CONVEYOR_JAylett.rvt

REV

06/12/2013 16:53:48

TYBURN TRADING ESTATE

1 : 100

DRAWN BY

DRAWING

DRAWING

PROJECT

7

1

DATE

As indicated 16/10/13

LS

10650

6

DRAWN CHECKED

Key Plan Proposed

STATUS

DRAWN CHECKED

STATUS

SCALE@A1

1860

1

I BLOCK EXTENSION

2

06/12/2013 16:53:56

250MM DEEP PIT

4

1 : 100 1

3 NO. NEW PITS INSTALLED TO EXISTING FLOOR SLAB.

Proposed I Block Section

1

NEW RAILING TO MATCH EXISTING TO NEW AREA OF FOOTPATH.


///////

Ebbw Vale Mechanical Link Bleanau Gwent County Borough Council Ridge and Partners LLP 2014

Architectural services to design a 20 person funicular lift as a part of a Regeneration Scheme in Ebbw Vale, Wales. Duties included: Production of a BIM Revit model following planning approval. Participation in the BIM coordination between specialist lift designers, Structural and Civil engineers. Updated drawings to construction status including plans, sections and elevations, details, cladding setting-out drawings and site drawings. Produced door elevations and schedules as well as internal cladding panel arrangement drawings to show the principle for internal cladding and lighting arrangements. This project was developed using level 2 BIM.

C

SD

DD

CD

CA

Mechanical Link Images 2015


Lower Station North Elevation

Lower Station Ground Floor Plan

Top Station Ground Floor Plan

Top Station North Elevation


///////

Test Facility Changan Automobile Co. UK Ridge and Partners LLP 2015

Chongqing Changan New Energy Automobile Company is set up by Changan and partners dedicated to the core technology development of hybrid vehicles, electric vehicles, fuel cell and other energy focused automotive technologies. The proposal for the first UK Changan test facility includes: Engine test areas, Electric hybrid test areas, Transmission test areas, Hydraulic tests areas, Workshops areas, Meeting rooms, Offices and control rooms, Stores, Plant rooms and passenger/goods lifts to store and plant areas. Duties included: Development of the Revit model, production of visual imagery and a drawing package for client design meetings and the Planning Application submission. C

SD

DD

CD

CA

Changan Test Facility Rendered Visualisations


Changan Test Facility Plans, Elevation and Aerial Views


///////

Gallery + Exhibition

Healdsburg Gallery Healdsburg, CA Olson Kundig 2017

A small private studio/gallery for a californian artist based in Healdsburg, CA. The design proposes the reuse of an garage originally constructed in the 1920’s as a minimal intervention art space. ‘Ribbon’ walls float off the existing concrete structure and provide display space for art. Many of the original features of the building are retained, including the steel garage doors which will close off the space when not in use. Duties included: Production of the Pre-Design pricing set including plans, elevations, sections and 3D imagery.

C

SD

DD

CD

CA

Gallery Diagram and External View


Wall Section, Plan and Building Section


Oxford School of Architecture End of Year Show Oxford Brookes University Oxford, UK 2015, 2016

Worked closely with the Exhibition Designer to manage the construction team consisting of 8 other students of architecture, to deliver the painting, assembly and construction of the 2015 End of Year Architecture Exhibition. Duties included: Management of the construction team and material deliveries, painting mdf sheets, and preparation of materials to construct the new walls within the studio and exhibition spaces over 3 floors of the Abercrombie building at the Oxford Brookes Headington Campus. The exhibition spaces hosted the work of over 500 students of Architecture in the Undergraduate, Postgraduate and Research courses and was open to the public for 2 weeks.



///////

Full Portfolio Time-line

Project Client Type Porters Lodge Relocation

Work Stages

Pembroke College

Education / Historic

SD,DD

I-Block/Z-Block New Conveyor

Jaguar Land Rover

Industrial

DD

Damson Parkway Compound

Jaguar Land Rover

Industrial

SD

New Science Block

Date

2013

2013

2013

Cheney School Oxford

Education

SD,CD

2013

Four Pillars Hotel

Oxford Spires

Commercial / Hotel SD,CD

2013

Building 7

Red Bull Technologies

Industrial

CA

2013

Body in White

Jaguar Land Rover

Industrial

CD

2013

Lords Farm Cottage

Oxford Preservation Trust

Residential / Historic

SD

2013

New Music School

The Dragon School

Education

DD

2014

Ducati Building Extension

MEPC Milton Park Ltd

Industrial

SD

2014

Ebbw Vale Mechanical Link

Bleanau Gwent County Council Transport

DD, CD, CA

2014

Oldbury House Refurbishment

TSB

CA

2014

Red Bull Driver Simulator

Red Bull Technologies

CD

2014

Test Facility

Science Oxford Headington End of Year Exhibition

Commercial / Historic

Industrial

Changan Automobile Co. UK

Industrial

Science Oxford

Education / Commercial

Oxford Brookes University

Installation

SD

2015

SD

2015

2015


Project Client Type End of Year Exhibition

Oxford Brookes University

Installation

33a Tavistock Avenue Website Extension Design

Oxonian

Cybsafe Ltd

Espacios Inacabados

Project Elevate

Healdsburg Gallery

Work Stages

Date

2016

Residential

Graphic Design

Freelance / Research

Photography / Graphic Design

2017

Space Needle Seattle

Public

CD

2017

Private Gallery

SD

2017

Simonyi House Extension

Residential

SD, DD

2017 - 2018

The Reef, Capitol Hill

The Reef

Commercial

SD

2018

Cyrus

SD, DD

2018

CD

2016

2017

Restaurant

Lee Residence

Residential

SD, DD, CD

2018 - 2019

Groendyke Cabin Beverly Hills Residence

Residential

All

2018 - Present

Residential

C

2019

Urban Sanctuary

Residential

All

2019 - Present

Hong Kong Villa

Residential

C

2019

Squam Lake Residence

Residential

SD, DD, CD, CA

2019 - Present

Overlake Residence

Residential

C, SD, DD

2019 - 2020

Olson Kundig Travel Fellowship Photography / Research 2020


Joshua Aylett MArchD, BAhons t: (732) 870 7262 e: joshua.j.aylett@gmail.com Web: https://issuu.com/joshuaaylett Linkedin: https://www.linkedin.com/in/joshuaaylett/


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.