I N T R O D U C T I O N
This report is prepared for an internship at MODI SRIVASTAVA & ASSOCIATES in Vadodara. The purpose was to learn the practical content of the course and apply it in real life to meet the requirements of the B. Arch course (Bachelor of Architecture).
The purpose of the internship was to familiarize yourself with practical aspects, apply theoretical knowledge and clarify career goals. Therefore, I successfully completed the intern ship and compiled this report as a summary and conclusion, that I have drawn from the internship experience.
A C K N O W L E D G E M E N T
I would like to express my sincere gratitude to Ar. Hitesh Modi and Ar. Amit Srivastava for giving me this opportunity as a trainee in their team, and guiding me throughout my journey into a world of responsible practice.
I would also like to convey my gratefulness to our intern ship coordinator Harsh Sharma, who have given their valuable time despite having their busy schedule. I would like to thank Ar. Kinjal Thakkar for her guidelines and help over the time of my internship.
Lastly, I would like to extend my gratitude to Ar. Nirali Vaghela, Ar. Maitri Sheth, Ar. Pankaj Suthar, Vedant Thakkar, Mann Metha, Henee Patel, Praveen Suthar, Harshil Shah, and other staff members, co-interns for their co-operative support.
The time at MODI SRIVASTAVA & ASSOCIATES was very inspiring and supportive to my career through which I have gained valuable work experience that will help make a favourable impression on me as a potential future employer.
C
N T
N T S
B H A R A T T R I V E D I
Savli Road,Vadodara
RESIDENTIAL BUNGALOW (EXTENSION , ARCHITECTURAL AND INTERIOR)
R A M E S H P A T E L S T E R P
Radhakrishna Circle, Akota,Vadodara
COMMERCIAL OFFICE BUILDING (ARCHITECTURAL AND INTERIOR)
D r. N I T I N A G R A W A L
Akota,Vadodara
PEDIATRIC HOSPITAL (ARCHITECTURAL AND INTERIOR)
N I L E S H J A S H W A L
Alka Society, Akota,Vadodara
RESIDENTIAL BUNGALOW (ARCHITECTURAL AND INTERIOR)
H O T E L S A I K R U P A
3rd Floor, Jan Mahal ,Vadodara
GUEST HOUSE (INTERIOR)
T E T H Y S J A L A R A M
Anand-Bhalej Road, Anand
SHOP (INTERIOR)
B H A V E S H D O S H I
Gotri ,Vadodara
PENTHOUSE (INTERIOR)
O
E
O T H E R S 01 09 21 27 37 52 46 59
A
01 B H A R
T T R I V E D I Savli Road, VADODARA R E S I D E N T I A L B U N G A L O W (EXTENSION , ARCHITECTURAL AND INTERIOR) EXISTING LAYOUT 2 OVERLAPPING LAYOUT 3 NEW CONSTRUCTION - 4-8 Ÿ LOWER GROUND FLOOR Ÿ UPPER GROUND FLOOR Ÿ FIRST FLOOR Ÿ SECOND FLOOR Ÿ VIEWS
2 CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: EXISTING LAYOUT AREA GROUND FLOOR DATE 9/04/21 R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA 9/04/21 9'-8" [4 1/2"] 9'-10" [4 3/4"] 1 1'-4" [5 1/4"] 11'-0" [5 1/4"] 13'-4" [6 1/4"] 9'-10" [4 3/4"] 1 1'-1 1" [5 3/4"] 3'-10" [1 3/4"] 7'-10" [3 3/4"] 10'-2" [4 3/4"] 1 1'-2" [5 1/4"] 37'-9" [1'-5 3/4"] 37'-6" [1'-5 3/4"] 43'-7" [1'-8 1/2"] 48'-6" [1'-11"]37'-9" [1'-5 3/4"] 3'-0" [1 1/2"] 4'-0" [2"] 6'-7" [3"] 7'-3" [3 1/2"] 8'-3" [4"] 4'-4" [2"] 2'-3" [1"] 6'-1" [2 3/4"] 2'-9" [1 1/4"] 2'-1" [1"] 2'-2" [1"] 5'-5" [2 1/2"] 2'-5" [1 1/4"] 2'-11" [1 1/2"] 3'-4" [1 1/2"]3'-3" [1 1/2"]3'-1" [1 1/2"] 4'-6" [2 1/4"] 3'-4" [1 1/2"] 4'-1" [2"] 3'-6" [1 3/4"] LIVING ROOM 17' x 13'-4" DINNING 9'-10" x 11'-11" BEDROOM 9'-8" x 9'-10" TOILET 4' X 6'-7" BEDROOM 11'-0" x 11'-4" KITCHEN 10'-2" x 11''-2" R O AD L VL. 0'-0" MAIN ENTR Y GA TE UP UTILITY 7'-3" x 26'-3" 26'-3" [1'-0 1/2"] UP 1'-2" [1/2"]5'-1 1" [2 3/4"] 1'-4" [3/4"] 5'-0" [2 1/4"] 7.5 MT(24'-7") WIDE ROAD 82'-7" [3'-3"] 87'-9" [3'-5 1/2"]NORTH SOUTH EAST WEST O 37'-9" [1'-5 3/4"] 7.5 MT(24'-7") WIDE ROAD 87'-9" 49'-3" [1'-1
3 R O AD L VL. 0'-0" MAIN ENTR Y GA TE(pr oposed) 7.5 MT(24'-7") WIDE ROAD KITCHEN 15'-3" x15'-3" NORTH SOUTH EAST WEST REMO TE OPERA TED GA TE R O AD L VL 0'-0" FOYER 9'-9" x 15'-3" CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: OVERLAPPING LAYOUT AREA GROUND FLOOR DATE 17/04/21 R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA 17/04/21 UP SOIL FILLING UP TO +LVL 9'-0" PLANTER 1 2 3 4 5 6 7 8 9 10 11121314151617181920212223 PLINTH LEVEL + VL. 2'-0" SKY LIGHT LIFT 5'-3" x 10'-0" PLANTER OPEN SPACE 7'-1" x 13'-5" + LVL. 0'-6" LIVING ROOM 13'-3 x16'-5" Plot area 7243.98 sq.ft OTHER SCHEDULE: TO RETAIN TO DEMOLISH NEW BUILT UP BEAM 7.5 MT(24'-7") WIDE ROAD
4 R O AD L VL. 0'-0" MAIN ENTR Y GA TE(pr oposed) 7.5 MT(24'-7") WIDE ROAD STORE ROOM 33'-11" x 10'-5" WAITING AREA 13'-11" x 13'-10" OTS 13'-11" x 4'-9" LIFT 5'-3" x 10'-0" KITCHEN 15'-3" x15'-3" BEDROOM 17'-9" x15'-8" NORTH SOUTH EAST WEST REMO TE OPERA TED GA TE war dr obe CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: AREA GROUND FLOOR DATE 07/05/21 R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA 07/05/21 side table tomanot side table 1 2 3 4 5 6 7 8 9 10 TOILET 13'-11" x8'-5" OTS 13'-11" x 4'-9" PASSAGE 27'-11" x 9'-10" SOIL FILLING UP TO +LVL 9'-0" OTTA 8'-9" x 8'-9" + LVL. 12'-6" PLANTER UP 1 2 3 4 5 6 7 8 9 10 11121314151617181920212223 OPEN SPACE 7'-1" x 13'-5" + LVL. 0'-6" PARKING + LVL. 2'-0" LOWER GROUND FLOOR LVL+ 2'-0" PLANTER PLANTER NEW CONSTRUCTION LAYOUT 11 13 14 15 16 17 18 19 20 12 LIVING ROOM 12'-10" x16'-5" war dr obe UP SKY LIGHT COLUMN FROM BELOW COLUMN TERMINATED FLOATING COLUMN Plot area 7243.98 sq.ft PLINTH : 2'-0" SLAB TOP - SLAB TOP : 10'-6" 7.5 MT(24'-7") WIDE ROAD
5 NORTH SOUTH EAST CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: NEW CONSTRUCTION LAYOUT AREA UPPER GROUND FLOOR DATE R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA R O AD L VL. 0'-0" MAIN ENTR Y GA TE 7.5 MT(24'-7") WIDE ROAD FOYER 13'-11" x 11'-5" OTS 14'-8" x 4'-9" LIFT 5'-3" x 10'-0" 1 2 3 4 5 6 7 8 9 10 1113 14 15 16 17 18 19 20 21 22 DINNING 13'-3 x8'-5" side table ottoman side table KITCHEN 15'-3" x15'-3" STORE 9'-9" x5'-9" vertical unit (mw+oven) LIVING ROOM 19'-3" x14'-4" GARDEN +LVL 9'-0" TOILET 13'-11" x8'-5" PARENTS BEDROOM 17'-9" x15'-8" OTS POOJA 13'-3" x 7'-3" war dr obe war dr obe SKY LIGHT TOILET 3'-9" x5'-7" UTILITY 9'-9" x12'-9" REMO TE OPERA TED GA TE SEATING DECK 40'-7 2" x 8'-6 1 2 " OFFICE 13'-11" x 13'-10" UPPER GROUND FLOOR LVL+ 12'-6" (11'-0" SLAB TOP TO SLAB TOP) OTTA 8'-9" x 8'-9" + LVL. 12'-6" PLANTER UP 7 8 9 10 11121314151617181920212223 OPEN SPACE 7'-1" x 13'-5" + LVL. 0'-6"PLANTER PLANTER 1 2 3 4 5 6 + VL. 12'-6" + VL. 12'-0" 12345 DOWN SEATING DECK 20'-9" x 26'-9" + LVL. 12'-6" WEST 12 DOWN UP COLUMN FROM BELOW COLUMN TERMINATED FLOATING COLUMN 07/05/21 07/05/21 7.5 MT(24'-7") WIDE ROAD
6 NORTH SOUTH EAST WEST CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: AREA FIRST FLOOR DATE R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA OTS 14'-8" x 7'-3" LIFT 5'-3" x 10'-0" 1 2 3 4 5 6 7 8 9 10 11 OTS 12'-10" x 7'-3" DW side table side table ottoman side table side table ottoman side table NIYAL'S BEDROOM 19'-3" x 15'-3" TOILET 15'-6" x 12'-0" TOILET 13'-11" x 10'-3" DAUGHTER'S BEDROOM 20'-0" x 25'-3" TOILET 15'-6" x 12'-0" BALCONY 14'-9" x 4'-11" BALCONY 12'-10" x 8'-5" war dr obe dr obe war dr obe dr obe wardrobe wardrobe BALCONY 17'-9" x 8'-3" TV PASSAGE 5' WIDE SKY LIGHT UP study table MASTER BEDROOM 17'-0" x 17'-8" BALCONY 17'-9" x 12'-6" BALCONY 34'-8" x 11'-9" GARDEN +LVL 9'-0" 7.5 MT(24'-7") WIDE ROAD FIRST FLOOR LVL+ 23'-6" (11'-0" SLAB TOP TO SLAB TOP) + VL. 23'-6" + LVL. 0'-6" 1 2 + LVL. 12'-0" NEW CONSTRUCTION LAYOUT 13 14 15 16 17 18 19 20 21 22 12 COLUMN FROM BELOW COLUMN TERMINATED FLOATING COLUMN 07/05/21 07/05/21 7.5 MT(24'-7") WIDE ROAD
7 NORTH SOUTH EAST CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJALTHAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: AREA SECOND FLOOR DATE R E / / DRAWING NO SHEET 1 OF 1 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY REV DATE DESCRIPTION DRAWN BY CHECK BY REV NO R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGLOW PROJECT CODE: RE - 19/01 PROJECT ADDRESS: A4/115 ,SIDDHARTHA BANGALOW'S SAMA SAVLI ROAD,BARODA. CLIENT: BHARAT TRIVEDI DATEJUMANA 9825282930 JUMANA OTS 14'-8" x 7'-3" LIFT 5'-3" x 10'-0" 1 2 3 4 5 6 7 8 9 10 11 garden OTS 12'-10" x 7'-3" DWside table ottoman side table TOILET 15'-6" x 12'-0" BALCONY 18'-0" x 8'-1" SKY LIGHT UP SON'S BEDROOM 17'-0" x 17'-8" MULTIPURPOSE ROOM+ STUDIO 26'-6" x 18'-1" TERRACE GARDEN 7.5 MT(24'-7") WIDE ROAD SECOND FLOOR LVL+ 34'-6" (14'-6" SLAB TOP TO SLAB TOP) WEST + LVL. 0'-6" 1 2 + LVL. 12'-0" 13 14 15 16 17 18 19 20 21 22 23 NEW CONSTRUCTION LAYOUT + LVL. 34'-6" + VL. 34'-6" COLUMN FROM BELOW COLUMN TERMINATED FLOATING COLUMN 07/05/21 07/05/21 SMALL WATER BODY 37'-9" [1'-5 3/4"] 7.5 MT(24'-7") WIDE ROAD 87'-9" [3'-5 49'-3" [1'-1
8 MAIN ENTRANCE : STAIRCASE RAISED GARDEN: LVL+ 9'-0" SEATING DECK NEAR OFFICE
02 R A M E S H P A T E L Radhakrishna Circle, VADODARA C O M M E R C I A L O F F I C E B U I L D I N G (ARCHITECTURAL AND INTERIOR) TYPICAL FLOOR PLAN 10 ELEVATION 11 RAMP DETAIL 12 UG WATER TANK 13 FABRICATION DETAIL 14-15 TOILET DETAIL 16-17 FURNITURE DETAIL 18-19 3D 20 02 R A M E S H P A T E L Radhakrishna Circle, VADODARA C O M M E R C I A L O F F I C E B U I L D I N G (ARCHITECTURAL AND INTERIOR) EXISTING LAYOUT 2 OVERLAPPING LAYOUT 3 NEW CONSTRUCTION - 4-8 Ÿ LOWER GROUND FLOOR Ÿ UPPER GROUND FLOOR Ÿ FIRST FLOOR Ÿ SECOND FLOOR Ÿ VIEWS OFFICECONFERENCE HALL
WEST ELEVATION
1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SCALE- 1:XXX SITE AREA XXXXXSQ.M. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 CONTACT DETAILS: PROJECT DESIGNER PROJECT HEAD PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING PROJECT CODE: PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota CLIENT: RAMESH PATEL DATE DRAWING TITLE: FIRST FLOOR WORKING DRAWING AREA FIRST FLOOR DATE R E 1 9 / 0 1 H K / 1 1 DRAWING NO. SHEET OF NORTH JUMANA 18/02/21 AR. HITESH MODI AR. KINJAL THAKKAR 9426621992 9825282930 RAHUL SHAH 9898064560 SUNIL SHAH 9408848005 OLD CENTERLINE RETAINED NEW/ REVISED CENTERLINES PLEASE FOLLOW DIMENSIONS FROM ARCHITECTURAL DWG AND STRUCTURAL DETAILS FROM THE STRUCTURAL DWGS. NOTES: JUMANA PARAWALA COM - 19/17 18/02/21 NAME SILL LINTEL WIDTH V 0'6" 1'0" W2 0'6" 21'3 1 2 W3 0'6" 17'1" D1 0'0" 4'0" D2 3'0" D3 8'0" 3'0" D4 2'6" 0'0" 0'0" 0'0" W 0'6" TO MATCH BEAM BOTTOM 10'9 1 2 TO MATCH BEAM BOTTOM TO MATCH BEAM BOTTOM TO MATCH BEAM BOTTOM TO MATCH BEAM BOTTOM V1 0'6" 2'0" TO MATCH BEAM BOTTOM TO MATCH BEAM BOTTOM TO MATCH BEAM BOTTOM LIFT 4'-7" x 5'-3" UP 01 02 03 04 05 06 07 08 09 10 11 12 13 18 17 16 15 14 19 22 21 20 COMMON TOILET PANTRY CONFERENCE ROOM RECEPTION+WAITING D2 D3 D3 fabricated planter space (no civil work) W V ELECTRICAL DUCT 11" eq eq eq eq 3'-3" 3'-3" 12" eq eq 3'-3" 3'-3" 11" eq eq eq eq 3'-3" 13"13"3'-3" 6" 3'-6" 6" 6" 2'-0" 6" 9" 2'-0" 10'-9 1 2 2'-3" 6" 5'-3" 6" 9'-6" 4 1 2 2'-9" 10'-9 1 2 2'-9" 5'-3" 10'-4 " 4'-0" 4'-6" 4 1 2 26'-6" 19'-10 3 4 27'-9 3 4 11 1 4 4 1 2 7'-9" 3'-3" 4 1 2 1'-2" 4 1 2 3'-6" 1'-0" 4'-1 3 4 4'-6" 15'-10 1 2 10'-6 1 4 17'-8 1 4 R3'-0" 30'-514 2'-0" 10'-9 1 2 2'-3" 7'-9" 5'-6" 9'-10 3 4 13'-3" 13'-3" 11'-9" 3'-0" 42" 9'-6" 9" 2'-3" 3'-0" 6'-6" 2'-3" 3'-0" 4 1 2 4'-3 1 2 9'-9" 3'-3" 41" 2'-9" 4 " 5'-42" LVL +13'6" sunk slab above FABRICATION EXTEND2'-0"2'-0" 3 4 3 4 " 2' EQ EQ EQ EQ 2' 22'-1014 3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 2'-0" 3" 3" 3" 3" 3" 3" 3" 3" SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE Fixed glass Open doorFixed glassOpen door Fixed glass Section size as per given by vendeers EQ EQ EQ EQ EXPOSED BRICKWORK D2 2'-0" 8'-0" 3'-6" 6" 7'-6" 3'-6" 6" 7'-6" 3'-6" 6" GROUND LEVEL lvl 0.00 PLINTH LEVEL lvl+2'-0" LINTEL LEVEL lvl+10'-0" 68'-0" GROUND FLOOR lvl+13'-6" SLAB TOP SILL LEVEL lvl+14'-0" SILL LEVEL lvl+25'-6" LINTEL LEVEL lvl+21'-6" FIRST FLOOR lvl+25'-0" SLAB TOP LINTEL LEVEL lvl+33'-0" SECOND FLOOR lvl+36'-6" SLAB TOP SILL LEVEL lvl+37'-0" LINTEL LEVEL lvl+44'-6" THIRD FLOOR lvl+48'-0" SLAB TOP 7'-6" 3'-6" 6" SILL LEVEL lvl+48'-6" LINTEL LEVEL lvl+56'-0" FOURTH FLOOR lvl+59-6" SLAB TOP 7'-6" 3'-6" LINTEL LEVEL lvl+67'-6" TERRACE FLOOR lvl+68-0" SLAB TOP 5'-0" 6" 3'-0" FIXED GLASS FIXED GLASS FIXED GLASSFIXED GLASSOPEN DOOR OPEN DOOR FIXED GLASS FIXED GLASS FIXED GLASSFIXED GLASSOPEN DOOR OPEN DOOR FIXED GLASS FIXED GLASS FIXED GLASSFIXED GLASSOPEN DOOR OPEN DOOR FIXED GLASS FIXED GLASS FIXED GLASSFIXED GLASSOPEN DOOR OPEN DOOR Aluminium wood frame Or Charcoal finish Openable window 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Glass to glass fixed joint Fabricated WPC sheet Stone frame As per site (9'-6") 2'-0" As per site (9'-6") Glass to glass fixed joint Fabricated WPC sheet Stone frame Glass to glass fixed joint Fabricated WPC sheet Stone frame 2'-0" EQ EQ EQ 2'-0" 3 4 9" 9" 2'-0" As per site (9'-6") As per site (10'-0") 2'-0" As per site (9'-6") 2'-0" 2'-0" Glass to glass fixed joint Stone frame Fabricated WPC sheet Aluminium wood frame Or Charcoal finish Openable window Aluminium wood frame Or Charcoal finish Openable window Aluminium wood frame Or Charcoal finish Openable window Handle as per selection Handle as per selection Handle as per selection Handle as per selection EQ 2'-0" EQ EQ EQ 2'-0"EQ 2'-0" EQ EQ EQ 2'-0"EQ 2'-0" EQ EQ EQ 2'-0"EQ 9" 9" 3 4 " 3 4 3 4 3 4 9" 9" 9" 9" 3'-3"3'-3" 3'-3"3'-3" 3'-3"3'-3" 3'-3"3'-3" 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SCALE- 1:XXX SITE AREA XXXXXSQ.M. SIGN ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 CONTACT DETAILS: PROJECT DESIGNER PROJECT HEAD PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING PROJECT CODE: PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota CLIENT: RAMESH PATEL DATE DRAWING TITLE: WEST ELEVATION AREA DATE R E 1 9 / 0 1 H K / 1 1 DRAWING NO. SHEET OF NORTH AR. HITESH MODI 9825282930 RAHUL SHAH 9898064560 SUNIL SHAH 9408848005 NOTES:
COM 19/17 18/02/21 AR. KINJAL THAKKAR 8779247310 9426621992 18/02/21 Katra joint Katra joint Katra joint Katra joint FIBER GLASS POTS TO BE MADE BY AGNI FIBRE JUMANA PARAWALA JUMANA 10
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: AREA DATE 21/12/20 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE CLIENT: MR. RAMESH PATEL RE - 19/13 JUMANA PARAWALA AR. KINJAL THAKKAR 9426621992 04 02/02/21JUMANA RAHUL SHAH 9898064560 SUNIL SHAH 9408848005 PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, AkotaRAMP DETAIL PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING 2'-3" 5'-0" 7'-0" GROUND LEVEL lvl 0.00 PLINTH LEVEL lvl+2'-3" GROUND FLOOR lvl+13'-6" SLAB TOP SILL LEVEL lvl+14'-0" D1 CONFERENCE ROOMRECEPTION + WAITING 3" 2'-3" 6 FEET WIDE FOOTPATH +2'-3"PLINTH BEAM LVL. -3" FROM PLINTH LVL. KOTA DRAINAGE CHANNEL +6" FROM ROAD LVL. 6" 5' HT. WALL FROM PLINTH LVL PLANTERS PLANTERS EXPOSED BRICK WALL PLANTERS STONECRETE WALL 5' HT. FROM PLINTH LEVEL PLANTERS 10" 2" 3'-9" 25'-0" 19'-3" STILT PARKING STILT PARKING GRASS PAVERS SECTION AA' ENTRY GATE 2'-3" 49'-0" KOTA A EXPOSED BRICKWORK 5' HT. WALL FROM PLINTH LVL PLANTERS MATCH WITH COLUMN LINE PLANTERS STONECRETE WALL PLANTERS STONECRETE WALL GRASS PAVERS PLANTERS 2'-3" 2'-6" 20'-8" 11'-0" 1'-0"35'-2" COMPOUND WALL EXPOSED BRICK WALL 5' HEIGHT FROM PLINTH LVL STONECRETE WALL 5' HEIGHT FROM PLINTH LVL 2'-3" 5'-0" 7'-0" GROUND LEVEL lvl 0.00 PLINTH LEVEL lvl+2'-3" GROUND FLOOR lvl+13'-6" SLAB TOP LAWN SECTION BB' SLOP TOWARDS ROAD KOTA STONE 1'-0" 6"9" DETAIL A 5'-0" PARKING(two wheeler) RCC wall (stamp concrete) LIFT 15 D1 slope 1'-5" ramp PARKING sliding gate bamboo plantations exposed brick wall (exposed concrete ceiling) exposed brick wall DB 3" plantation 0" Underground water tank Capacity: 5,000 size: 3'6" (b)* 7'0" (l)* 7'0" (d) borewell 12
SECTION B
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. DRAWING TITLE: NORTH AREA UNDERGROUND WATER TANK DETAIL DATE 04/05/21 ER 91 3/ 1 9 DRAWING NO. /E GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 1 SHEET 1 OF 2 9825282930 9426621992 #CONTACT NUMBER MODI SRIVASTAVA & ASSOCIATES MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 Email:modisrivastava@yahoo.co.in/gmail.com REVISION HISTORY: REV. DATE DESCRIPTION ISSUED FOR DRAWN BY CHECK BY REV. NO. PRESENTATION CONSTRUCTION APPROVED/ CHECKED BY QUOTATION/ TENDER 02 APPROVAL DRAWN BY ISSUED BY PROJECT CODE: DATE DRAWING TITLE: PROJECT ADDRESS: CLIENT: MR.RAMESH PATEL 04/05/21 RE - 19/13WASHROOM TILLING DETAIL JUMANA JUMANA AR KINJAL LIFT 4'-0" x 5'-3" 04 05 06 07 08 09 10 11 12 13 16 15 14 exposed brick wall Underground water tank Capacity: 5,000 L size: 3'6" (b)* 7'0" (l)* 7'0" (d) borewell 11'-4" as per site approx_35'-21 4 " 6" 3'-6" 6" 4'-6" rem 15'-10 1 4 "8'-0" 7'-6" 8'-10 1 2 8'-0" 11'-4" 8'-0" 15'-10 1 4 " 11'-4" 8'-0" 2'-4" 9'-6" 41 2 " 3'-7 1 2 " 1'-0" 11'-4" rem 15'-10 1 4 " 6" 15'-10 1 4 "6"11'-4" as per site approx_35'-21 4 " R.C.C RETAINING WALL 6" THICK STEEL AS PER REQUIREMENT 20 MM THICK WATER PROOFING LAYER AA SECTION A PLAN 1'-0" 4'-6" 3'-6" 7'-0" 8'-0" B B
2'-0" 2'-0" MH 2'0" X 2'0" (L X W) PVC HEAVY MANHOLE 7'-0" 10" THICK PCC 10" 12 MM THICK SCREED 6MM THK TILES (OPTIONAL) VATTA GROOVE R5" MH 2'0" X 2'0" (L X W) PVC HEAVY MANHOLE DETAIL A 10" 20 MM THICK WATER PROOFING LAYER 12 MM THICK SCREED 6MM THK TILES (OPTIONAL) VATTA 6" THICK PCC R.C.C RETAINING WALL 6" THICK STEEL AS PER REQUIREMENT 5'-6" 5'-0" 2'-0" 7'-0" 6" 7'-0" 6" PVC STEPS TO FIX IN WALL 2' X 2' X 6" DEEP CHAMFER BELOW MANHOLE 8"1 1 2 8" 1 1 2 R5" 10" R.C.C RETAINING WALL 6" THICK STEEL AS PER REQUIREMENT 20 MM THICK WATER PROOFING LAYER 12 MM THICK SCREED VATTA 6MM THK TILES (OPTIONAL) 10" THICK P.C.C STEEL ROD GROOVE PARKING(two wheeler) LVL +1'6" RCC wall (stamp concrete) LIFT 4'-0" 5'-3" UP 13 D1 slope 1'-5" electric sliding gate bamboo plantations exposed brick wall (exposed concrete ceiling) lvl 1'-0" exposed brick wall lvl 3" plantation lvl 0" Underground water tank Capacity: 5,000 3'6" (b)* 7'0" (l)* 7'0" (d) borewell NOTE: Underground water tank Capacity: 5,000 L size: 3'6" (b)* 7'0" (l)* 7'0" (d) DETAIL A 13
DETAIL
DETAIL
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: AREA DATE 03/03/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 03/03/21JUMANA DRAWING TITLE: CLIENT: MR.RAMESH PATEL RE - 19/13 JUMANA ELEVATION DETAILS ELEVATION DETAILS RAHUL SHAH SUNIL SHAH 9898064560 9408848005 PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota NOTES: KANDLA GREY STONE FROM KALINGA. cantilever staircase 09 08 10 11 12 13 07 08 09 10 11 12 13 AS PER SITE (10'-9") 1'-5" 14 15 16 14 16 15 SECTION BB' OUTSIDE 1'-5" INSIDEA' FIRST FLOOR lvl+13'-6" SLAB TOP SILL LEVEL lvl+14'-0" SILL LEVEL lvl+25'-6" SECOND FLOOR lvl+25'-0" SLAB TOP Section size as per given by vendeers Fixed glass Section size as per given by vendeers Fixed glass EQ EQ EQ EQ STAIRCASE PLAN UP 01 02 03 04 05 06 07 08 09 10 11 12 13 18 17 16 15 14 19 22 21 20 6" 9'-6" 4 " 10'-4 1" A' A FIXED GLASS SHUTTER GLASS
B ALUMINIUM WOOD FRAME OR CHARCOAL FINISH OPENABLE WINDOW 1" 1" 1 2 " 1 2 " FIXED GLASS SHUTTER GLASS HINGE AS PER APPRO.
C ALUMINIUM WOOD FRAME OR CHARCOAL FINISH OPENABLE WINDOW 1" 1" 6" 6" 6" 1 1 4 " 1" 1 2 " 1 1 4 " KADLA GREY STONE OUTSIDE 09 10 DETAIL A ALUMINIUM WOOD FRAME OR CHARCOAL FINISH OPENABLE WINDOW KADLA GREY STONE 3'-3" 7'-9" 4 1 21'-2" 2" 13'-3" ALUMINIUM WOOD FRAME OR CHARCOAL FINISH OPENABLE WINDOW openableshutter OPENABLE SHUTTER FIXED GLASS FIXED GLASS4'-9" 4'-9" FIXED GLASS LIFT FIRST FLOOR lvl+13'-6" SLAB TOP SILL LEVEL lvl+14'-0" SECOND FLOOR lvl+25'-0" SLAB TOP A B C SECTION AA' D DETAIL D 4'-9" AS PER SITE (10'-3") 1" POP PUNNING 6MM X 6MM POP FINISH 6" 6" 6"1 1 4 " 1" 1 2 " 1 1 4 " KADLA GREY STONE CLEAR GLASS 09 10 BEAM INSIDE ALUMINIUM WOOD FRAME OR CHARCOAL FINISH OPENABLE WINDOW STEPS KADLA GREY STONE POP PUNNING 6MM X 6MM POP FINISH LIFT 4'-7" x 5'-3" B B' 6" 1 2 " 11 12 13 09 10 BEAM DETAIL A' STEPS SECTION SIZE AS PER GIVEN BY VENDEERS CLEAR GLASS STEPS CLEAR GLASS BEAM DAATA 6mmX6mm D3 SLOPE 14
SECOND FLOOR lvl+25'-0" SLAB TOP
LINTEL LEVEL lvl+21'-6"
SILL LEVEL lvl+14'-0"
FIRST FLOOR lvl+13'-6" SLAB TOP
LEVEL
SECOND FLOOR lvl+36'-6"
TOP
SILL LEVEL lvl+25'-6"
FIRST FLOOR lvl+25'-0" SLAB TOP
FIXED GLASS FIXED GLASS FIXED GLASSFIXED GLASSOPEN DOOR OPEN DOOR 1 2 3 4 Fabricated WPC sheet 2'-0" As per site (9'-6") Glass to glass fixed joint Stone frame Fabricated WPC sheet Aluminium wood frame Or Charcoal finish Openable window Handle as per selection 2'-0" 2'-0" 3 4 " 3 4 " 9" 9" 3'-3"3'-3" Katra joint 3'-6" 6" 7'-6" 3'-6" 6"
SLAB
SILL
lvl+37'-0"PRADEEP PATELS CABIN WPC Sheet MS Section size given by fabricator WPC Sheet A MS Section size given by fabricator Katra joint CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: AREA DATE 03/03/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 03/03/21JUMANA DRAWING TITLE: CLIENT: MR.RAMESH PATEL RE - 19/13 JUMANA ELEVATION DETAILS COMMON TOILET PANTRY 11 1 4 " R3'-0" 30'-5" 9'-9" 2' EQ EQ EQ EQ 2' 22'-10" 3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 2'-0" 3" 3" 3" 3" 3" 3" 3" 3" SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE Open door Fixed glass Fixed glass Fixed glass Fixed glass Open door MS Section size given by fabricated 9" 9" WPC Sheet Kandla grey Stone frame Clear glass Beam 6" 6"1 1 4 " 1" 1 2 " 1 1 4 " 1'-9" 3" DETAIL A OUTSIDEINSIDE Aluminium wood frame Or Charcoal finish Openable window 2' Waterproofing 2'-3" 3" 2'-3" A A' OUTSIDEINSIDE ELEVATION DETAILS SECTION AA' WEST ELEVATION PLAN 22'-3" 20'-9" 4'-2"4'-2" 4'-2" 4'-2" MS Section size given by fabricated 3" 3" 1'-9" 3" 2'-3" 3" 1'-9" 3" 2'-3" 8 1 2 " MS Section size given by fabricated MS Section size given by fabricated NOTES: FIBER GLASS POTS TO BE MADE BY AGNI FIBRE. KANDLA GREY STONE FROM KALINGA. RAHUL SHAH SUNIL SHAH 9898064560 9408848005 PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota 1" Daata 6mmx6mm 15
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT VAIBHAV PATEL PRAVEEN HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: WASHROOM TILLING DETAIL AREA DATE 20/01/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9824334717 9099093840 #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 20/01/21JUMANA DRAWING TITLE: PROJECT ADDRESS: MITTAL BHAI 787833443330 CLIENT: MR.RAMESH PATEL RE - 19/13 ARIF MALEK 9824024187 JUMANA WASHROOM TILLING DETAIL COMMON TOILET ELECTRICAL DUCT TILE DROP +TILE THICKNESSA B C D 3'-6" 1'-0" rem 3'-9" as per site (aprrox_8'-3") as per site (aprrox_5'-5") TILING LAYOUT PLAN R2'-7" 1'-6" 4 1 2" thk. ledge wall as per site (9'-9") SB11 Internal window frame finished with stone (as per selection) Internal door frame finished with kandla grey stone NT WHITE TILE_(1600mmx800mm) 3mmx3mm spacers all around start start full tile(2'-3") rem SLOPE SLOPE rem (5") full tile(2'-7") 5" door AD ELEVATION DA 5'-3" EQ EQ 10'-0" 3'-0" 42 8'-3" 2'-5"2'-5" 1'-11" 1'-11" Internal door frame finished with stone (as per selection) 1'-4" wall hung wc Flush 1'-11" 4 " thk. ledge wall (Concealed flush tank) WHITE TILE_(1600mmx800mm) 3mmx3mm spacers all around 1'-0" 9" 4mm Groove POP Punning DUCT A B window 2'-10"3'-5" 8'-3" 1'-9" 1'-9" 1'-0" 1'-11" 3'-6" 4'-5" ELEVATION BC pull out drawer B C D ELEVATION AB 2'-0" 6" 6" 10'-0" SB 55 EQ EQ 4" 5'-41 2 41 2 4'-7" TILE DROP +TILE THICKNESS 10'-0" wall hung urinal Drawer pull out drawerDrawer Niche Niche 1'-0" 1'-5" 1'-0" Front finished with vineer (as per selection) 1 1 2 thk. counter top finished with stone (as per selection) 1'-2" 6" 1"6" 1 1 2 1" 2'-10" 2'-71 2 "2'-3" 6" 6" 1 2 1 1 2 4" 1'-2" 1 2 1 2 full tile 4'-11" Drawer Finish as per selection rem FULL TIME EQ EQ 1'-2" start start wall mounted tap as per selection Profile light Mirror cladded on ply full tile rem 3mm x 3mm groove rem Katta joint in stone 4 1 2 1'-0" 1'-10 1 2 5'-3" 1'-10 1 2 1" thk redwood frame polished as per selection 3mm x 3mm groove 4mm Groove 5" 5" 5" 5" 5" 5" 5" 5" wall mounted tap as per selection 1 " thk. counter top finished with stone (as per selection) concealed basin (as per selection) Drawer Front Finish as per selection divided into equal parts 1'-9" 12"Spot light WHITE TILE_(1600mmx800mm) 3mmx3mm spacers all around start start Reference line WHITE TILE_ (1600mmx800mm) 3mmx3mm spacers all around Indirect light Indirect light 4mm Groove A B 6" dia exhaust fan 6" EQ EQ 4" rem (5") full tile(2'-7") rem (5") full tile(2'-3") rem(2'-3") full tile(5'-3") As per site(5'-5") COMMON TOILET ELECTRICAL DUCT TILE DROP +TILE THICKNESSA B C D 1'-9" 1'-9" concealed basin 3'-6" 1'-0" rem (3'-9") as per site (aprrox_8'-3") as per site (aprrox_5'-5") 2'-2" 4'-9" R2'-8" 1'-6" 1'-11" 3'-0" wall hung wc 4 1" thk. ledge wall 3'-2 1 2 As per site (9'-9") SB11 wallhung urinal Internal window frame finished with kandla grey stone Internal door frame finished with kandla grey stone 1 1 2" thk. counter top finished with white stone as per selection Mirror cladded on ply_ ply 3" recesssed from all around 2" 3" 2" 3"rem Indirect light NT health faucet below toilet paper holder above 2'-5" 2'-5" 2'-3" SLOPE SLOPE 1'-11" 3'-6" R5" EQ (1'-7") EQ (1'-7") 3'-1" As per site (5'-5") wall hung wc as per selection wall hung urinal as per selection 1'-0" Reference line Indirect light D C ELEVATION CD 3'-101 21'-11 2 " 5'-41 2 " 4'-0" 10'-0" 2'-4" 6'-0" 3'-8" 1'-7" 2'-4" 4mm Groove toilet paper holder health faucet 1'-10"2'-10" 1'-0" 1'-5" cock 4 1 2 " thk. ledge wall 41 2 " WHITE TILE_(1600mmx800mm) 3mmx3mm spacers all around 5" 5" 5" 5" 5" 5" 5" 5" divided into eq parts 5" 5" 5" 5" 5" 5" rem rem full tile Indirect light 4 " thk. brick wall Tile Plaster Indirect light Detail-A Counter finished with stone (as per selection) 1'' gap for opening Detail-B 19mm thk. ply +4mm mdf + laminate finish as per selection Handel for data BASIC LAYOUT PLAN 16
Detail-a
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT VAIBHAV PATEL PRAVEEN HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH WASHROOM TILLING DETAIL 12/04/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9824334717 9099093840 #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 12/04/21JUMANA DRAWING TITLE: PROJECT ADDRESS: CLIENT: MR.RAMESH PATEL RE - 19/13 ARIF MALEK 9824024187 JUMANA PARAWALA 8780508475 WASHROOM TILLING DETAIL Ar KINJAL T. #NAME OF CONSULTANT #CONTACT NUMBER wall hung wc Flush A B C 2'-0" vent start 1'-2" rem 1'-2" 4" 1 1 2 " 2'-10" 1'-0" 3'-10" rem 6'-2" as per site approx_10'-0" full tile rem start 2'-0" rem full tile rem full tilerem 1'-0" 1'-0" door concealed basin C D D A toilet paper holder health faucet start start full tile rem full tilerem rem 1'-3" 3 44" 1 1 2 2'-11" rem 7'-2" as per site approx_10'-0" A B CD TILE DROP +TILE THICKNESS healthfaucet 1 2 1'-4" 4'-0" as per site approx_10'-0" 3 4 1'-1"openable shutter 2'-0" 3'-2" as per site approx_5'-2" TILE DROP 4 thk. ledge wall as per site approx_4'-7" as per site approx_4'-7" 41 2 " B ELEVATION AB ELEVATION BC 2'-7" 2'-6" as per site approx10'-0" full tile rem full tile ELEVATION CD as per site approx_5'-2" openable shutter wall mount tap 1'-7" 1" 1'-8" as per site approx_4'-61 2 ELEVATION DA +TILE THICKNESS 1'-2" 2'-0" as per site approx_5'-2" 1'-0" 1'-0" 2'-0" rem 2'-7" BASIC LAYOUT PLAN PLAN wall hung wc counter top basin thk. ledge wall 1'-7" 6" rem 1'-1" eq eq rem 3'-2" SB46" A B CD TILE DROP +TILE THICKNESS as per site approx_4'-7"2'-0" rem 2'-7" start full tile rem full tile TILING LAYOUT PLAN PLAN counter top basin thk. ledge wall healthfaucet wall hung wc rem 2'-6" 2'-71 2 " as per site approx_5'-2" start start 1'-7" 1'-7" cock 2'-6" rem 2'-8" Internal door frame finished with kandla grey stone Internal door frame finished with stone (as per selection) 1 1 2" thk. counter top finished with kandla grey stone 1 1" thk. counter top finished with kandla grey stone kandla grey stone Groove 4mmx 4mm 3 4 thick grove for opening 1 1 2 thk. counter top finished with kandla grey stone 1" thk redwood frame polished as per selection full tile 5'-3" rem 4'-8" 3'-3" 1'-5" 1'-10" 1'-0" 2'-10" 2'-0" rem 2'-7" Spot light 3" wall hung wc as per selection wall hung wc as per selection 3 4 10" 3 4 exhaust fan SB46" A B CD TILE DROP +TILE THICKNESS healthfaucet electrical layout PLAN wall hung wc counter top basin 4 thk. ledge wall SB46" start 2'-6" rem 2'-8" Internal door frame finished with kandla grey stone DL2 ON/OFF EXHAUST FAN ON/OFF SB-4 @HT.4'6" (2M) 2'-3" 2'-3" as per site approx_4'-7" 2'-7" 2'-7" as per site approx_5'-2" A 1 " thk. counter top finished with kandla grey stone DL2 Counter finished with kandla grey stone 3/4'' gap for opening
19mm thk. ply +4mm mdf + laminate finish as per selection Handel for data katra joint 17
1" thk half round real wood frame finished with polish to match veneer
top finished with veneer
as per approved
katra joint in real wood frame
Handel for data drawer finished with veneer polished as per approved sample
real wood round leg finished with polished to match veneer
finished with veneer
with
top finished with veneer polished as per approved sample
drawer finished with veneer polished as per approved sample 1" thk half round real wood frame finished with polish to match veneer
Handel for data
real wood round leg finished with polished to match veneer
round
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: AREA DATE 10/05/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 10/05/21JUMANA DRAWING TITLE: CLIENT: MR.RAMESH PATEL RE - 19/13 JUMANA ELEVATION DETAILS FURNITURE DETAIL RAHUL SHAH 9898064560 SUNIL SHAH 9408848005 PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota D3 AR. KINJAL SB7 SB7 drawer shutterdrawer drawer shuttershutter drawer drawer TV 6" 1'-6"
drawer drawer
polished
sample
1'-4" 11 1" 2" 1'-1" 2'-0" 2'-0" 6" 1" 7 1 1" 7 1 1" 1'-4" 1 (till glass)13'-2" 2'-6" 8'-2" 2'-6" ELEVATION PLAN 1" 2'-0" 2'-0" 2'-0" 2'-0" 1" 2'-0" 6" 1'-6" 1" 7 2 1" 7 2 1"1"1" 1'-3 1 2 1" 3" 2" 7'-4" 2" 3" 3" 1" 7'-6" 1" 3" 2'-6" 8'-2" 2'-6" 13'-2" 1'-4" 2'-0" top
polished as per approved sample drawer finished
veneer polished as per approved sample 3'-6" 7'-5 SECTION through drawer DETAIL A DETAIL C 1 2 " 1" 1" thk half round real wood frame finished with polish to match veneer 3mmx3mm grooveDETAIL B top finished with veneer polished as per approved sample Handel for data drawer finished with veneer polished as per approved sample DETAIL C 3 4 DETAIL B 6" 3" 2 1" 1" 1" 3" 3" skirting finished with kota stone drawer finished with veneer polished as per approved sample 1" thk half round real wood frame finished with polish to match veneer real wood round leg finished with polished to match veneer DETAIL A 1'-4" 11 " 1" 2" 1'-1" 2'-0" 2'-0" 6" 1" 1" 1'-4" 1 1'-4"openable shutter top finished with veneer polished as per approved sample drawer finished with veneer polished as per approved sample 1" thk half round real wood frame finished with polish to match veneer real wood
leg finished with polished to match veneer SECTION through shutter 18
finished with veneer
finished with veneer polished as
finished with veneer polished as per approved sample
ELEVATION storage detail
SECTION storage detail
finished with veneer
top finished with veneer
as per approved sample
match veneer
joint in real wood
light
1" thik ply
veneer
finished with veneer
finished with veneer
drawer 4'-6"
top finished with veneer
as per approved sample
polished
with
sample
PLAN storage detail
top finished with veneer polished as per approved sample
thk half round real
frame finished with polish to match veneer
thik ply finished with veneer
as per approved sample
with veneer polished as per
strips
ELEVATION
1'-11"
1 2 " 1" 1" thk half round real wood frame finished with polish to match veneer 3mmx3mm groove DETAIL A top finished with veneer polished as per approved sample Handel for data drawer finished with veneer polished as per approved sample 3 4 " 1" DETAIL B drawer front finished with veneer polished 3 4 " Handel for data DETAIL C 16mmx12mm strips polished to match veneer 3 4 " 1 2 " 1 2 " 1 2 " DETAIL D CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: AREA DATE 10/05/21 R E 1 9 / 1 3 E / 9 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 02 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 10/05/21JUMANA DRAWING TITLE: CLIENT: MR.RAMESH PATEL RE - 19/13 JUMANA ELEVATION DETAILS FURNITURE DETAIL RAHUL SHAH 9898064560 SUNIL SHAH 9408848005 PROJECT ADDRESS: A-23, Sunita Co-op. Society, near Radhakrishna circle, Akota D3 AR. KINJAL SB4 drawer drawer drawer drawer drawer drawer shutter SB4
drawer drawer drawer 5'-6" 1'-4" 2'-6" 5'-6" (eq)1'-4"(eq)1'-4"(eq)1'-4"(eq)1'-4" 1"1" 3" 2'-3" 1" 11 1" 5 1" 6" 1" 1" 1'-6" 1" 6" 1" shuttershutter
2'-6" 3" 1" 11 1 2 1" 6" 1" 6" 1" 1'-4" 1'-4" 3"1'-1" top
polished as per approved sample Handel for data drawer finished with veneer polished as per approved sample 3"skriting finished with veneer polished as per approved sample 2'-8" 7'-101 2 top
polished as per approved sample 1" thk half round real wood frame finished with polish to match veneer 1" thk half round real wood frame finished with polish to match veneer shutter
per approved sample Handel for data 3"skriting
DETAIL A DETAIL B 2'-6"
polished
shutter finished
veneer
as per approved
(eq)1'-4"(eq)1'-4"(eq)1'-4"(eq)1'-4" 1"1"
4'-6" 1'-3" 2'-6" 1" 2'-4" 1"
1" 2'-0" 1 4" 2'-0"11 2 16 MM REM 16MM drawer
polished as per approved sample
finished with
polished as per approved sample 1" thk half round real wood frame finished with polish to
karta
back
sport
polished
1"
polished
1"
wood
drawer finished
approved sample 12mm 16mmx12mm
polished to match veneer 2'-0" 1'-3" 1'-9" 1 drawer 1" thik ply finished with veneer polished drawer finished with veneer polished 1" 4" 1'-7" 1" 4"drawer finished with veneer polished 1" thik ply finished with veneer polished drawer
mandir detail SECTION mandir detail mandir drawer detail DETAIL C DETAIL D color as per selection 19
OPTION 1 OPTION 2 OPTION 3 20
03 D R. N I T I N A G R A W A L Akota, VADODARA P E D I A T R I C H O S P I T A L (ARCHITECTURAL AND INTERIOR) TYPICAL FLOOR PLAN 22-23 SECTION 24 INTERNAL LAYOUT 25-26 GRID LAYOUT
MODI
20 16 15 17 14 13 12 11 10 18 19 21 UP DOUBLE HIGHT FOYER 23'9"X11'-11" CAR ENTRY CAR EXTI 132'-02 [40.24] 38'-6" [11.73] 57'-8 1 2 " [17.59] 6'-4 1 2 [1.94] 13'-7 1 2 " [4.15] 8'-0" [2.44] 17'-7 1 2 " [5.37] 12'-1" [3.69] 28'-7 1 2 " [8.72] 28'-10"[8.79] 7'-112"[2.17] 7'-112"[2.17] 39'-71 2 [12.08] 80'-10" [24.64] 1 2 3 4 1 2 3 4 A B C E A B C E D D F F 28'-41 2 [8.64] 20'-0" [6.10] 14'-0" [4.27] 23'-111 2 [7.30] 22'-10" [6.96] 24'-0" [7.31] 21'-21 2 [6.47] CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH AREA DATE 16/04/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930
SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 16/04/21 DRAWING TITLE: PROJECT ADDRESS: AKOTA , VADODARA CLIENT: DR. NITIN AGRAWAL RE - 19/13 LEGEND: 04 JUMANA HOSPITAL UPPER BASEMENT FLOOR 6'-11" [2.11] 4 1 2 " [0.11] 11'-9" [3.58] 4 1 2 [0.11] 11'-9" [3.58] 4 1 2 " [0.11] 6'-11 1 2 [2.11] 9'-3" [2.82]23'-9" [7.24] CAR LIFT 11'-9"X23'-00" CAR LIFT 11'-9"X23'-00" KINJAL T JUMANA UPPER BASEMENT FLOOR LVL -10' LOWER BASEMENT FLOOR LVL -20' SWP 1 7 3 4 2 8 5 6 9 20 16 15 17 14 13 12 11 10 18 19 21 UP LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11" CAR LIFT 11'-9"X23'-00" CAR LIFT 11'-9"X23'-00" LOBBY 13''-3"x11'-8" LOBBY 7''-3"x20'-9" EMERGENCY ROOM 19''-3"x16'11" PHARMACY MEDICAL ROOM 19''-3"x12'-11" MULTIPURPOSE ROOM (AS PER DETAIL) 47'-11"x38'-6" CAR ENTRY CAR EXTI MAIN CAR ENTRY MAIN CAR EXIT MAIN ENTRY EMERGENCY ENTRY DUCT 13'-3"x4'-8" 72'-41 2 [22.06] 23'-9" [7.24] 24'-0 1 2 " [7.33] 23'-9" [7.24] 11'-9" [3.58] 4 1 2 [0.11] 11'-9" [3.58] 4 1 2 " [0.11] 4 1 2 " [0.11] 41 2 [0.11] 1'-11 1 2 " [0.59] 7'-10 1 2 " [2.40] 1'-11 1 2 " [0.59] 57'-8 1 2 [17.59] 6'-0" [1.83] 7'-8 1 2 " [2.34] 19'-71 2 [5.98] 1'-0" [0.30] 1'-0" [0.30]1'-0"1'-0"[0.30][0.30] 2'-0" [0.61] 3'-7 1 2 " [1.11]7'-8 1 2 " [2.34] 24'-7 1 2 " [7.51] 7'-8 1 2 [2.34] 11'-1" [3.37] 13'-9" [4.20] 6'-2 1 2 [1.89] 3'-7 1 2 " [1.11]11'-4" [3.45]1'-5 1 2 " [0.45] DOUBLE HIGHT FOYER 23'9"X11'-4" 7'-8 1 2 [2.34] 10'-8 1 2 " [3.27] 10'-5" [3.18] 10'-0" [3.05] 27'-22 [8.29] 16'-10 1 2 " [5.14] 19'-3" [5.87] 7'-10 1 2 " [2.40] 6'-3" [1.91] 7'-10 1 2 " [2.40] 6'-3" [1.91] 7'-3" [2.21] 9" [0.23] 12'-10 1 2 " [3.92] 9" [0.23] 9" [0.23] 9" [0.23] 19'-3" [5.87] 11'-10" [3.60] 6'-71 2 [2.02] 6'-71 2 [2.02] 48'-3" [14.71] 38'-6" [11.74] 23'-0" [7.01] 6'-11" [2.11] 6'-11 1 2 [2.11] 6'-2 1 2 " [1.89] PINTH LVL +2'-0" ROAD LVL +0'-0" PINTH LVL +2'-0" PINTH LVL +2'-0" 6'-4 1 2 " [1.94] 13'-7 1 2 " [4.15] 8'-0" [2.44] 17'-7 1 2 [5.37] 12'-2 1 2 [3.72] MAIN ENTRY 24'-7 1 2 " [7.51] 7'-8 1 2 [2.34] 11'-1 1 2 " [3.39] DOUBLE HIGHT FOYER 1'-11 1 2 " [0.59] 7'-10 1 2 [2.40] 1'-11 1 2 [0.59] GROUND FLOOR lvl +2' 22
MODI
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH AREA DATE 16/04/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930
SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 16/04/21 DRAWING TITLE: PROJECT ADDRESS: AKOTA , VADODARA CLIENT: DR. NITIN AGRAWAL RE - 19/13 LEGEND: 04 JUMANA HOSPITAL UPPER BASEMENT FLOOR KINJAL T JUMANA OTS 7'-6"X38'-6"38'-6" [11.74] 7'-6 " [2.30] TERRACE 11'-8"X38'-6" 20 16 15 17 14 13 12 11 10 18 19 21 UP 11'-8 [3.56] 21'-21 2 [6.47] 14'-9" [4.50] 7'-6 " [2.30] 21'-21 2 [6.46] 14'-9" [4.50] 58'-91" [17.93] 41 2 [0.11] 11'-8 [3.56] 114'-9" [34.98] 38'-6" [11.74] 1 2 [0.11] 38'-6" [11.73] 58'-91" [17.93] MULTI PURPOSE ROOM 38'-6"X58-5" MULTI PURPOSE ROOM 21'-3"X58-5" 13'-3" [4.04] 13'-7" [4.15] 4'-7 1 2 [1.41] 13'-3" [4.04] DUCT 13'-3"x4'-7" 38'-6" [11.74] LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11"7'-10 1 2 [2.40] 6'-3" [1.91] 7'-10 1 2 [2.40] 6'-3" [1.91] 1 2 3 4 1 2 3 4 A B C E A B C E D D F F FIRST FLOOR OTS 7'-6"X38'-6" 38'-6" [11.73] 11'-8 [3.56] 6'-11" [2.11] 24'-7 1 2 [7.51] 6'-11" [2.11] 15'-0" [4.57] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38]11'-1" [3.38] ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" ROOM 11'-1"X15'-0" 15'-0" [4.57] 15'-0" [4.57] 15'-0" [4.57] 15'-0" [4.57] 15'-0" [4.57] 15'-0" [4.57] 15'-0" [4.57] 20 16 15 17 14 13 12 11 10 18 19 21 UP 7'-6 " [2.30] 38'-6" [11.74] ROOM 10'-0"X15'-0" 15'-0" [4.57] 10'-01 2 [3.06] ROOM 10'-0"X15'-0"15'-0" [4.57] 10'-01 2 [3.06] 7'-0" WIDE PASSGAE 7'-0" WIDE PASSGAE 7'-0" WIDE PASSGAE PASSGAE 11'-10"X13'-3" 13'-3" [4.04] 11'-10" [3.60] OTS 11'-8 "X38'-6" 1 2 3 4 1 2 3 4 A B C E A B C E D D F F 15'-0" [4.57] 15'-0" [4.57] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38] 11'-1" [3.38] LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11"7'-10 1 2 [2.40] 6'-3" [1.91] 7'-10 1 2 [2.40] 6'-3" [1.91] SECOND FLOOR-FORTH FLOOR 23
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH AREA DATE 6/05/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 6/05/21 DRAWING TITLE: PROJECT ADDRESS: AKOTA , VADODARA CLIENT: DR. NITIN AGRAWAL RE - 19/13 LEGEND: 04 JUMANA HOSPITAL KINJAL T UPPER BASEMENT FLOOR 1 7 3 4 2 8 5 6 9 20 16 15 17 14 13 121110 18 19 21 UP LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11" CAR LIFT 11'-9"X23'-00"LOBBY 13''-3"x11'-8" DUCT 13'-3"x4'-8" DOUBLE HIGHT FOYER 23'9"X16'-3" DOUBLE HIGHT FOYER 4.OPEN PARKING UP ramp up UP main entry 13'-3" [4.04] 6'-7" [2.02] 6'-7" [2.02]13'-5" [4.09] 4'-5" [1.33] 6'-3" [1.91] 6'-3" [1.91] 7'-11" [2.40] 13'-3" [4.04]4'-9" [1.45] 4'-9" [1.45] EMERGENCY LOBBY 13'-3"x17'-8" 17'-8" [5.37] 13'-3" [4.04] ramp up LVL ± 6" LVL ± 6" LVL ±1'-6" LVL ±1'-6" LVL ± 2'-0" LVL ± 2'-0" ENTRY EXIT ENTRY EXIT reception table waiting area waiting area pharmacy room 8'-5"X13'-3"13'-3" [4.03] 8'-5" [2.57] 13'-0" [3.95] 3 2 1 3 2 1 LVL ±1'-6" LVL ±2'-0" 9'-0" [2.74] 13'-3" [4.03] 9'-0" [2.74] 12'-11" [3.92] OPD Room 9'-0"X13'-3" OPD Room 9'-0"X13'-3" OPD Room 9'-0"X13'-3"12'-11" [3.92]OPD Room 9'-0"X13'-3" 9'-0" [2.74] OPD Room 9'-0"X13'-3" 9'-0" [2.74] OPD Room 9'-0"X13'-3" 13'-3" [4.03] 13'-3" [4.03] 9'-0" [2.74]9'-0" [2.74] waiting area 11'-8" [3.54]waiting area 7'-10" [2.38] 19'-3" [5.87] 13'-7" [4.15] 11'-4" [3.47] emergency word 19'-3"x11'-4" examination 9'-5"x10'-8" 9'-5" [2.88] 10'-8" [3.24] 1 7 3 4 2 8 5 6 9 20 16 15 17 14 13 12 1110 18 19 21 UP LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11" CAR LIFT 11'-9"X23'-00"LOBBY 13''-3"x11'-8" DUCT 13'-3"x4'-8" DOUBLE HIGHT FOYER 23'9"X16'-3" DOUBLE HIGHT FOYER 2. EMERGENCY PARKING 173.82 SQ FT 1.EMERGENCY PARKING 276.83 SQ FT 4.OPEN PARKING 1089.39 SQ FT 318.04SQ FT UP ramp up UP main entry 13'-3" [4.04] 6'-7" [2.02] 6'-7" [2.02]13'-5" [4.09] 6'-3" [1.91] 6'-3" [1.91] 7'-11" [2.40] 13'-3" [4.04] 4'-9" [1.45] 4'-9" [1.45] lvl + 11' cafe &waiting 19'-3"x16'-0"16'-0" [4.88] 19'-3" [5.87] F.toilet 13'-3"x10'-1" GROUND FLOOR (+2'-0") upper GROUND FLOOR (+11'-0") JUMANA 25
2. EMERGENCY PARKING 173.82 SQ FT 1.EMERGENCY PARKING 276.83 SQ FT 4.OPEN PARKING 1089.39 SQ FT ramp up main entry terrace 7'-6"X30'-6" TERRACE 11'-8"X38'-6" 20 16 15 17 14 13 12 11 10 18 19 21 UP MULTI PURPOSE ROOM 21'-3"X58-5" DUCT 13'-3"x4'-7" LIFT 6'-3"x7'-11" LIFT 6'-3"x7'-11" Room 11'-4"X10'-0" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" Room 11'-4"X10'-0" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" TOILET 7'-11"X4'-6" 8'-0" [2.44] 4'-6" [1.37] 6'-11" [2.12] LIFT 6'-3"x7'-10" 7'-10 1 2 [2.40] 6'-3" [1.91] LIFT 6'-3"x7'-10" 7'-10 1 2 [2.40] 6'-3" [1.91] 20 16 15 17 13 12 18 19 21 UP 11 14 1 7 3 4 2 8 5 6 9 10 12'-5" [3.78] 6'-7" [2.02] 6'-8" [2.02] 13'-3" [4.04] OTS 11'-8"X37'-6" OTS 7'-7"X32'-5" 7'-7" [2.30] MULTI PURPOSE ROOM 20'-9"X37-6" MULTI PURPOSE ROOM 30-4"X37'-6" 20'-9" [6.34] 37'-6" [11.42] 37'-6" [11.42] 37'-6" [11.42] 30'-4" [9.25] 32'-5" [9.87] LOBBY 13'-3"X12-5" TERRACE 27-9"X37'-6" 27'-9" [8.45] 11'-8" [3.56] 37'-6" [11.42] 2. EMERGENCY PARKING 173.82 SQ FT 1.EMERGENCY PARKING 276.83 SQ FT 4.OPEN PARKING 1089.39 SQ FT ramp up main entry CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH AREA DATE 6/05/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 6/05/21 DRAWING TITLE: PROJECT ADDRESS: AKOTA , VADODARA CLIENT: DR. NITIN AGRAWAL RE - 19/13 LEGEND: 04 JUMANA HOSPITAL JUMANA UPPER BASEMENT FLOOR TYPICAL FLOOR PLAN (+2'-0") FIFTH FLOOR PLAN (+11'-0") KINJAL T 26
04 N I L E S H J A S H W A L Alka Society, Akota, VADODARA R E S I D E N T I A L B U N G A L O W (ARCHITECTURAL AND INTERIOR) HOME THEATRE 28 • PLAN • WALL ELEVATION • WARDROBE DETAIL SON’S ROOM DETAIL 31 • PLAN • WALL ELEVATION • WARDROBE DETAIL PARENTS ROOM: BED DETAIL 34 MASTER BEDROOM: WARDROBE 35-36
M.S.A HOUSE
MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
A B CD PLAN OPEN SHELVES IN THE NICHE CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: LAYOUT PLAN HOME THEATRE AREA SECOND FLOOR DATE 08/02/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 2 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 08/02/21 HOME THEATER TERRACE 7'-9" 26'-4" TERRACE TOILET CUT-OUT IN CEILING FOR PROJECTOR SCREEN PROJECTOR SCREEN (AS PER SELECTION) WARDROBE / STORAGE (AS PER DETAILS) SOFA CUM BED PER SELECTION / DETAILS PINE WOOD STRIPS PANELLING PINE WOOD STRIPS PANELLING PINE WOOD STRIPS PANELLING AR.KINJAL CORNER LOUNGER SOFA PER SELECTION / DETAILS 1'-6" 4'-81 2 " 7'-8" 1'-6" as per site approx_15'-41 2 " 3'-4" 7'-21 2 " 2'-31 2 " 4'-21 2 " 6'-21 2 " 3'-2" HOME THEATER 15'-5" x 12'-10" 13'-7" 2'-6" 10'-4" 28
ELEVATION DA
M.S.A HOUSE
SRIVASTAVA & ASSOCIATES
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
/ ISSUED
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL T. PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: WALL ELEVATIONS HOME THEATRE AREA SECOND FLOOR DATE 08/02/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN
MODI SRIVASTAVA & ASSOCIATES
MODI
16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 14/10/20 STORE 4'-8" 9'-4" HOME THEATER 15'-5" 12'-10" 7'-9" 26'-4" 15'-2" 13'-9" TOILET 5'-3" 12'-10" AR. KINJAL T ELEVATION BC 14 drop pop ceiling 14 drop pop ceiling TOILET DOOR PINE WOOD STRIPS (DIMENSIONS TO MATCH WITH THE FLOORING TILES WIDTH) INDIRECT LIGHT PHOTOFRAMES WITH IMAGES RELATED TO CINEMA 6'-0" RECLINER SOFA AS PER SELECTION / DETAILS 3'-6" 5" 1'-6" 6" 1'-6" 6" 1'-6" 6" 1'-6" 6" 1'-6" 5" 2" 8 1 drop pop ceiling 2'-0" 1'-8" PINE WOOD STRIPS PANELLING PHOTOFRAMES WITH IMAGES RELATED TO CINEMA PINE WOOD STRIPS PANELLING 8 1 drop pop ceiling 14 drop pop ceiling 14 drop pop ceiling ELEVATION AB roller curtain photo frame photo frame photo frame photo frame open shelf 2'-1" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-10" open shelf open shelf open shelf open shelf open shelf open shelf WINDOW WARDROBE 1'-7" OPEN SHELVES IN THE NICHE ARTEFACTS AS PER SELECTION IN THE OPEN SHELVES PROJECTOR BOX 9'-0" 10'-0" 2'-3" 2'-3" 2'-3" 2'-3" 6"6" CORNER LOUNGER SOFA PER SELECTION 8'-0" 14 drop pop ceiling 14 1 drop pop ceiling ELEVATION CD PINE WOOD STRIPS (DIMENSIONS TO MATCH WITH THE FLOORING TILES WIDTH) 6'-0" RECLINER SOFA AS PER SELECTION / DETAILS PASSAGE DOOR 8 1 " drop pop ceiling PROJECTOR SCREEN 1'-2" 1'-6" 6" 1'-6" 6" 1'-6" 1'-2" 5" 1'-6" 6" 1'-6" 5" PHOTOFRAMES WITH IMAGES RELATED TO CINEMA2'-0" 1'-8" PINE WOOD STRIPS PANELLING PHOTOFRAMES WITH IMAGES RELATED TO CINEMA PINE WOOD STRIPS PANELLING
14 1 " drop pop ceiling 14 2 drop pop ceiling projector screen TERRACE DOOR 8 1 drop pop ceiling 2'-3" 7'-3" 7'-3" 7'-8" PINE WOOD STRIPS PANELLING WARDROBE FINISHED 3'-4" 29
M.S.A HOUSE
SRIVASTAVA &
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL T. PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: HOME THEATER WASHROOM WARDROBE DETAIL AREA SECOND FLOOR DATE 10/02/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
MODI
ASSOCIATES 16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 10/02/21 4'-8" 9'-4" 15'-5" 12'-10" TERRACE AR. KINJAL T Drawer Drawer Niche 6" 6" wall hung wc 412" thk. ledge wall (Concealed flush tank) Flush Clear mirror TOILET 5'-3" x 12'-10" 1'-6" 9" 5" 5'-6"4'-5" 412" thk. ledge wall (Concealed flush tank) 2'-9" 2'-5" 3'-4" 5"2'-1" 1'-6" 4 1 2 13'-7" 2'-6" 2'-11" 4 1 2 3" 2'-0" 2'-4 1 2 1'-1" 2'-1" 5" Clear mirror Adjustable shelf Adjustable shelf Adjustable shelf A A SECTIONAL ELEVATION A Shower area 3'-9" 3" Shower area 1'- 7 1 2 1'-1" 1'-2" 9" 3" 2'-10" 2'-9" 4'-0"1'-11" B B B B 3" 3'-4" Tile finish as per selection 1" OFFSET FOR PROFILE LIGHT Indirect light 5" 3'-9" AS PER SITE ( APPROXIMATE 5'-2") 3" 9"3'-4" 13'-7" PLAN (HOME THEATER WASH ROOM) pull out drawer pull out drawer 6" 6" 3" 1'-2" 9" 4'-0" 5" 4'-0" 2'-10" 9" Indirect light SECTION B 412" thk. ledge wall (Concealed flush tank) Tile finish as per selection Tile finish as per selection Clear mirror with back light 10'-10" 1 1 2 " A 1'-9" 1'-11" 4'-0" 5'-2" WPC sheet with color ELEVATION A 1'-5" 1'-6" 1'-1" WARDROBE PLAN (HOME THEATER WASHROOM) Glass adjustable shelf Indirect light 1" 11" 1" 2'-0" 1"1'-0" 1" 1'-3" 1 2 1'-3" 3" 5'-4" 1'-3" 1'-5" 8'-0" 1'-1" 2'-1" 5" Glass 1'-2" 3" skirting finished with veneer polished as per approved sample A B C A Wooden frame (laminated) Wooden frame (laminated) clear mirror glass shutter C Clear mirror 1'-1" 2'-1" 5" 4 1 2 brick wall Adjustable shelf Adjustable shelf Adjustable shelf Table top basin Adjustable shelf Adjustable shelf Adjustable shelf Channels Glass shelf Indirect light 1'-6" ELEVATION B STORAGE 1" 11" 1" 2'-0" 1"1'-0" 1" 1'-3" 1 2 1'-3" 1'-5" 5'-4" 1'-5" 8'-0" 1'-6" OPEN SHELF 1'-3" Wooden frame (laminated) Adjustable shelf Adjustable shelf Adjustable shelf Channels Wooden frame ELEVATION C PRODUCT STORAGE 1" 11" 1" 2'-0" 1"1'-0" 1" 1'-3" 1 2 1'-3" 1" 6" 1" 6" 3" 5'-4" 1'-3" 1'-5" 8'-0" 1'-2" OPEN SHELF Glass shelf Glass 3" 1 1 2 Counter finished with stone (as per selection) 1'' gap for opening 19mm thk. ply +4mm mdf + laminate finish as per selection Detail-A 30
M.S.A HOUSE
SRIVASTAVA & ASSOCIATES
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KHUSHBOO JOSHI PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: SON'S BEDROOM AREA FIRST FLOOR DATE 12/1/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
MODI
16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATE AR. KHUSHBOO JUMANA P 12/1/21 UP 31 DN BEDROOM 11'-9"x12'-11" BEDROOM 11'-9"x12'-11" TOILET 16'-3"x14'-11" TOILET JUMANA BEDROOM 12'-9" x 13'-8" A B wardrobevertical storage study table indirect light behind the panel 1'-6" 2'-0" 5'-7" 2'-0" 5" 1'-8" 6" 3'-7" 2'-0" 1'-6" 2'-0" 5'-8" 1" 1" 1" 5" 6'-7" 6'-2" 6'-7" toilet entry 2" mattress size 6'-6" x 6'-0" bed wallpaper on panelling behind bed indirect light behind the panel main entry mirror drawer mirror PLAN C D 31
MANISHA, MANISHA
PADRA
(0265)
VADODARA-20
BC
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KHUSHBOO JOSHI PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: SON'S BEDROOM FURNITURE DETAILS AREA FIRST FLOOR DATE 12/1/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16-
CHAR RASTA, OLD
ROAD,
PH.:
2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGALOW PROJECT CODE: RE - 19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATE 12/1/21 AR. KHUSHBOO JUMANA P ELEVATION AB ELEVATION
ELEVATION CD ELEVATION DA TOILET 5'-3"x12'-10" palmet roller curtain drawer drawer drawer vertical storage wallpaper as per selection on panelling with indirect light roller curtain veneer finish bed DRAWER DRAWER door veneer finish drawer wardrobe drawer drawer drawer drawer JUMANA P veneer finish wardrobe veneer finish drawer indirect light indirect light groove to open drawer 1'-6" 3" 8" 9" 9" 3" 1'-6" 4'-0" 1'-6" 6mm groove in veneer 2'-0" 1" 4" 2" 2" 3" 3" 5" 10" 6'-1" 6" 1" 1" 2'-0" 5" 5" 6" 10" 3"5" 6'-6" 2" 2" 5'-3" 2" 6" 1'-1" 3'-3" 6'-6" 3'' skirting 9" 9" 6" 3" 3'-7" 2'-0" indirect light 1'-6" 4" HYDRAULIC STORAGE 6" thick mattress HYDRAULIC STORAGE 6" thick mattress 6" profile handle indirect light on caster bronze mirror drawer drawer Bedroom door Toilet door sliding shutter sliding shutter double glass shutter with sandwich fabric (fabric same as that of bedback wallpaper) veneer finish drawer veneer finish frame groove to open shutter 1" 2'-8" 2'-8" 1" 3'' skirting 6" 6" 2" Mirror 5'-6" 9" 1'-0" 1'-0" 1'-0" 1'-0" 11" 2'-0"2'-0" veneer finish top openable shutters downlight glass shutters with aluminium profile soft board Adjustable glass shelves 32
B
Tile finish as per selection
1
mirror with back light
Detail-A
Counter finished with stone (as per selection)
3/4'' gap for opening
19mm thk. ply
mdf + laminate finish as per selection
M.S.A HOUSE
SRIVASTAVA &
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
Indirect light
412" thk. ledge wall (Concealed flush tank)
finish as per selection
top basin
finished with stone (as per selection)
Clear mirror(12" TH)
3 4"x1" for handle
lightDetail-B
WPC sheet with color
Glass shelf
Indirect light
shelf's
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL T. PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: WASH ROOM DETAIL SONS ROOM AREA FIRST FLOOR DATE 11/02/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
MODI
ASSOCIATES 16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 11/02/21 AR. KINJAL T TOILET 8'-6" x 6'-0" wall hung wc 412" thk. ledge wall (Concealed flush tank) Flush 1'-11" Drawer Drawer 6" 6" Shower areaClear mirror 2'-0" 1'-5" 1'-5" 3" 3'-5" 8'-6" 4'-0" 4'-0" 9" 2'-0" Storage (clear mirror) 1'-1" 1'-2" SECTIONAL ELEVATION A Tile finish as per selection A A B B 1'-5" 1'-5" C C pull out drawer pull out drawer 6" 6" 3" 1'-2" 9" 4'-0" 1'-10" 5" 4'-0" 2'-10" 9" Indirect light SECTION B
Tile
Clear
10'-10" Table
1 1 2 A Counter
1'-8" 1'-9" 5" 9" SECTION C 10'-10" 10"
toilet paper holder health faucet 1'-10" 2'-10" 1'-0" 1'-5" cock 1'-4" 1'-9" 2'-0"
+4mm
3" 1
2
PLAN (SON'S ROOM WASH ROOM) 4'-10" 3" 3'-5" 3'-1" 8'-2" 2'-10"6'-0" 2'-10"1'-5"2'-10" 2'-0" 2'-10" 3" 3'-5" 8'-6" 3 4 1 2 Indirect
4'-0" 1" 8" 1" 1 2 2'-10" 1'-5" 1'-5" 1'-3"1'-3" 10" B B B SECTION A 1" 2'-8" 1" B 2'-10" 1'-5"1'-5" 11" 1" 9" 1" 7" 1" 9" 1" 7" 1" 4'-0"Clear mirror Adjustable shelf's Adjustable shelf's Adjustable shelf's Adjustable shelf's 2'-10" Clear mirror 1 2" Thick WPC sheet with color Adjustable
Bead for supporting shelf's 11" 1" 9" 1" 7" 1" 9" 1" 7"1" 1" 4'-0"
SECTION B 10"
WPC sheet with color A
2'-10" PLAN 412" thk. ledge wall (Concealed flush tank) Tile finish as per selection BEDROOM 16'-3"x14'-11" 12'-2"x6'-9" 33
M.S.A
MANISHA, MANISHA
PADRA
(0265)
RASTA,
VADODARA-20
FRONT
SIDE ELEVATION BED
PLAN
DETAIL AT
DETAIL AT
SECTION THROUGH BED
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: PARENTS BED DETAILS AREA GROUND FLOOR DATE R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16-
CHAR
OLD
ROAD,
PH.:
2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE 19/25 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATE 06/05/2021JUMANA JUMANA 6/5/2021 OPTION 1 (WHEN BEDS ARE JOIN ) DRAWER DRAWER DRAWER DRAWER 6" thick mattress drawer finish with veneer same as master bedroom (as per selection) bed finish with veneer same as master bedroom (as per selection) fabricated bedback, finished with batik pattern as per selection veneer finish bedback as per selection indirect light
ELEVATION BED 9" 1'-6" 3" 2'-6" 3" 3" 2'-6" 3" 1'-6" 9" 9" 1'-6" 6'-0" 1'-6" 9" as per site approx_10'-6" 3"5" 6" 6" 1" 1" 1'-6" 3 mm skirting finished as per selection 2" 9" 9" 9" 9" 9" 9" 9" 9" 9" 9" 9" 9" 9'-0" 41 2 41 2 " 2'-9" 3" 9" R6" 2" 41 2 41 2 3'-9" 6" thick mattressDRAWER DRAWER 9" 2'-9" 3" 3'-9"
top openable hydraulic storage pu finished bed bottom A 1'-6" top openable hydraulic storage top openable hydraulic storage bed bed side table side table 2'-11" 2'-11" 1" 3" 2'-6" 3" 3" 2'-6" 3" 3'-0" 3'-0" 1'-6" 1'-6"1'-6" 1'-6" 1" 2'-3"2'-3" fabricated bedback, finished with batik pattern as per selection veneer finish bedback as per selection
drawer finish with veneer same as master bedroom (as per selection) bed finish with veneer same as master bedroom (as per selection) 1" 1" 1'-6" 4'-11" 1" 6" 6'-6" 3" 7'-0" 4 1 2 veneer finish same as bedback as per selection 1'-6" 7'-6" 2'-2" wall paint as per selection
top openable hydraulic storage 6" thick mattress 4 1" 1" 1" 6'-3" 2" 1" 6" 6'-6" 7'-0" 6" 1" 9" 2" 8" 1'-1" 5" 1'-6" 5" grove to open bed 9" 2'-9" 3" 3'-9" 4 1 2 1"1" 1'-6" 4'-9" 3" 6" 6'-6" 7'-0" DRAWER DRAWER DRAWER DRAWER side table 3" 3" 1'-6" 1'-6" 3" 2" 8" 2" 3" 1'-6" 3/4" 6" 6"3/4" 5" 1'-6" 2" 1'-0" 2" 3/4" 3/4" 1'-4" 3/4" 1'-6" 3/4" 1"1"5" 5"3/4" 5" 1'-6" 3" 2" 8" 2" 3" 1'-6" SIDE TABLE drawer finish with veneer same as master bedroom B side edges to be done soft round 1"6" mattress soft round
A 3" 5" 8" 5" 1'6" pu finished bed bottom bed finish with veneer same as master bedroom (as per selection)
b groove to open the drawer 3 4 " PU finish drawers 1' 3 4 " 34
SECTIONAL ELEVATION A
SECTIONAL ELEVATION C
M.S.A
SRIVASTAVA
MANISHA, MANISHA
RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 /
Email:modisrivastava@yahoo.co.in/gmail.com
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL T. PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: MASTER BEDROOM WASHROOM WARDROBE DETAIL AREA SECOND FLOOR DATE 3/03/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
HOUSE
MODI
& ASSOCIATES 16-
CHAR
PH.:
2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 3/03/21 AR. KINJAL T 3'-3" 10" Lockable drawer Trolley drawer Trolley drawer drawer LOOSE SHELF LOOSE SHELF LOOSE SHELF LOOSE SHELF SECTIONAL ELEVATION B 1'-2" 1" 6" 1" 9" 1" 6" 1" 9" 1" 7" 1" 5" 1" 9" 1" 9" 1" 9" 3" 1" 8'-0" Bead for supporting shelf's Top and bottom laminate finish 3" skirting finished with veneer polished as per approved sample Finished with veneer polished as per approved sample 2'-0" 1'-9" 3" A B B A A 1'-11" 10 2 " 2'-0" C C Clear mirror 1 2 " Thick WPC sheet with color Adjustable shelf's Bead for supporting shelf's Indirect light Glass shelf B Finished with veneer polished as per approved sample WHITE MARBLE AS PER SELECTION 1" 1'-2" 1" 1"6" 1" 1" 8" 1" 1" 6" 1" 1" 8" 1" 1" 6" 1" 1" 1'-5" 1" 7" 1" 6" 3" 5'-0" 1'-6" 1'-6" 8'-0"
1" 1" 1'-8" 1" 1" 1" 1" 1'-7" 1" 1" 1" 1'-7" 1" 1" drawer drawer 3" skirting finished with veneer polished as per approved sample Finished with veneer polished as per approved sample 1'-11" 3'-9" 1'-11" 1" 1'-9" 1'-9" 1" 5'-8" 5'-0" 1'-6" 1" 3 4 6" 3 4 6" 3" 5'-0" 1'-6" 1'-6" 8'-0" Finished with veneer polished as per approved sample Clear mirror OPEN SHELF 1" 6'-10" 1" 9" 3" Finished with veneer polished as per approved sample groove to open the shutter BEADING TO SUPPORT SHELF Finished with veneer polished as per approved sample Groove to open the shutter Katra joint in veneer SLIDING SHUTTERSLIDING SHUTTER drawer drawer drawer drawer Trolley drawer Trolley drawer Lockable drawer LOOSE SHELF LOOSE SHELF Trolley drawer Trolley drawer Lockable drawer LOOSE SHELF LOOSE SHELF Bead for supporting shelf's Top and bottom laminate finish LAMINATE 3" skirting finished with veneer polished as per approved sample Finished with veneer polished as per approved sample B B
C C 1'-2" 1" 6" 1" 9" 1" 6" 1" 9" 1" 7" 1" 5" 1" 9" 1" 9" 1" 9" 3" 1" 8'-0" 1'-11" 3'-9" 1'-11" 1" 1'-9" 1" 1'-9" 1" 5'-8" 5'-0" 1'-6" 1" 3 4 6" 3 4 6" 3" 5'-0" 1'-6" 1'-6" 8'-0" Finished with veneer polished as per approved sample Clear mirror OPEN SHELF ELEVATION A groove to open the shutter 3 4 " 1 2 " 1" DETAIL A Finished with veneer polished as per approved sample Bead for supporting shelf's Clear mirror(12" TH) 3 4"x1" for handle3 4 1 1 2 Indirect light Detail-B WARDROBE PLAN (MASTER BEDROOM WASHROOM) 1'-6" 2" 1" 3" 1 2 10" 10 1 2 " WHITE MARBLE AS PER SELECTION WHITE MARBLE AS PER SELECTION Clear mirror 1 2" Thick cosmetic storage Finished with veneer polished as per approved sample 1'-10" 3'-9" 5'-8" drawer drawer drawer drawerWooden legs finished with veneer polished as per selection Wooden legs finished with veneer polished as per selection Wooden legs finished with veneer polished as per selection TOILET 12'-2" x 6'-9" stone wall 1.5" thick 2'-1" 11 2 " drawer stone wall 1.5" thick 4'-0" stone wall 1.5" thick 4'-0" stone wall 1.5" thick 4'-0" 35
SECTIONAL ELEVATION A
SECTIONAL ELEVATION
M.S.A HOUSE
SRIVASTAVA &
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
Email:modisrivastava@yahoo.co.in/gmail.com
ELEVATION
CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KINJAL T. PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: MASTER BEDROOM WASHROOM WARDROBE DETAIL AREA SECOND FLOOR DATE 6/03/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES
MODI
ASSOCIATES 16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 00 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE:RESIDENTIAL BUNGALOW PROJECT CODE: RE-19/65 PROJECT ADDRESS: C/15,ALKA SOCIETY,AKOTA,VADODARA CLIENT: MR.NILESHBHAI JAISWAL DATEJUMANA P JUMANA PARAWALA 6/03/21 AR. KINJAL T TOILET 12'-2" x 6'-9" 1" 1'-21 2 1" 1" 5" 1" 1" 8" 1" 1" 5" 1" 1" 8" 1" 1" 6" 1" 41 2 1" 9" 1" 9" 1" 9" 3" 6'-11" 10" 3" 8' 1" 2'-9" 1" 2'-1" 7" 1"2'-11" 2'-1" 8" 5'-8" 1 2 81 2 " 1" 1"8" 1" 1" 6" 1" 1" 8" 1" 1" 6" 1" 1" 8" 1" 1" 51 2 1" 1'-2" 1" 1" 1'-11 2 " 3" 5'-4" 1'-2" 1'-3" 3" 8' 3" skirting finished with veneer polished as per approved sample Finished with veneer polished as per approved sample Finished with veneer polished as per approved sample Groove to open the shutter Katra joint in veneer OPENABLE SHUTTER OPENABLE SHUTTER drawer drawer drawer Bead for supporting shelf's Indirect light Glass shelf Clear mirror 1" 6'-10" 1" 9" 3" 7' 9" 3" 2'-11" 2'-1" 8" 5'-8" 1" 1'-41 2 " 1'-41 2 1" 2'-1" 7" 1" 8' WPC sheet with color drawer Clear mirror Trolley drawer Trolley drawer Lockable drawer LOOSE SHELF LOOSE SHELF LOOSE SHELF LOOSE SHELF drawer drawer A B C
BEADING TO SUPPORT SHELF groove to open the shutter BEADING TO SUPPORT SHELF Finished with veneer polished as per approved sample Bead for supporting shelf's Glass shelf 2'-11" 2'-1" 8" 5'-8" 3" 1'-11 2 " 1" 1" 1'-2" 5'-4" 5'-4" 1'-2" 1'-6" 8' CLEAR MIRROR COSMETIC STORAGE DRAWER Glass 1 2 thick WPC sheet with color A DRAWER Finished with veneer polished as per approved sample 1" 1'-9" 1" 11" 1" 2'-1" 7" 1" C 1'-11" 1' 2'-1" 8" 2'-11" 2'-9" 5'-8" B C C A A DETAIL A 1" 1 2 "1 2 " groove to open the shutter Finished with veneer polished as per approved sample DETAIL B 4" 1" indirect light niche 1'-2" 1" 6" 1" 9" 1" 6" 1" 9" 1" 7" 1" 41 2 " 1" 9" 1" 9" 1" 9" 3" 11 2 8' drawer drawer Lockable drawer Trolley drawer Trolley drawer drawer LOOSE SHELF LOOSE SHELF LOOSE SHELF LOOSE SHELF
B Bead for supporting shelf's Top and bottom laminate finish Finished with veneer polished as per approved sample 2' 1'-9" 3" SECTIONAL
C Glass shelf Bead for supporting shelf's Finished with veneer polished as per approved sample NICHE Finished with veneer polished as per approved sample WHITE MARBLE AS PER SELECTION Wooden legs finished with veneer polished as per selection Glass 1" thick 1 2 " 81 2 " 1" 1" 8" 1" 1" 6" 1" 1" 8" 1" 1" 6" 1" 1" 8" 1" 1" 51 2 " 1" 1'-2" 1" 1" 1'-11 2 3" 5'-4" 1'-2" 1'-3" 3" 8' 1" 1'-01 2 " 1 2 1'-2" 3" skirting finished with veneer polished as per approved sample ELEVATION A WARDROBE PLAN (MASTER BEDROOM WASHROOM) 2" 3" 1" 61 2 1" 61 2 " Finished with veneer polished as per approved sample Finished with veneer polished as per approved sample 1'-2" 1'-10"2' 36
05 H O T E L S A I K R U P A 3rd Floor, Jan Mahal, VADODARA G U E S T H O U S E (INTERIOR) TYPICAL FLOOR PLAN 38 GUEST AREA 39 • RECEPTION DETAIL • FOYER DETAIL • LOGO WALL DETAIL • SAMPLE BEDROOM DETAIL MAIN DOOR DETAIL 44 DORMITORY 45 • RECEPTION DETAIL
FLOOR PLAN WASH ROOM LAYOUT 38
ELECTRICAL LAYOUT
NORTH M.S.A HOUSE 7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 13/03/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. AREA SITE AREA 475.50 SQ.MT. DATERECEPTION DETAIL guest area KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC STRUCTURAL PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM AR.KINJAL THAKKARPROJECT HEAD AR. AMIT SRIVASTAVAPROJECT DESIGNER CONTACT DETAILS: AR. KINJAL JUMANA 13/03/21 v grove (on 6mm thick mdf) finish ASHBERRY 7366 bronze mirror 6mm-8mm thk as per selection tv as per selection electrical room 3'-0" 4" 3'-11" 4" 2'-10" 5'-11" 16'-5" 4'-8" 9'-7" 2'-0" 4'-10" 4'-8" 11'-6" 4'-10" 21'-0" 1" 3'-6" 4'-1" 1'-0" 7'-9" 8'-8" 7'-9" 2'-0" 2'-0" 3'-7" A A 5'-1" R6"1'-0" concrete finished as per selection EQ 1'-5" EQ 1'-5" B B C C D D E E SB(c)5 A SB(c)5A SB(c)3 SB(c)3A SB(c)3B SB(c)4A SB(c)4B
RECEPTION & WAITING 4630X5000mm +300mm LVL 4'-8" 4'-8" 4'-8" rem5'-5" 5'-5" rem SB3 1'-1" 9" 6" SB5 SB6 4'-6 1 2 " 4" DL4DL4 HL2 GYPSUM CEILING AT BEAM BOTTOM AFTER FALSE CEILING HEIGHT (8'-3") WP2 2'-81 2 " 2'-81 2 " 1'-6" 4'-3" 4'-3" 1'-6" 10'-6" 11'-61 2 " 3' 1'-10"wp4 6" DL4 6"6"pp pp pp CCTV eq eq SB(c)5 6" 6" CCTV EQ EQ EQ EQEQ EQ KC SD SD SD 3' HL23'-01 2 " 3'-01 2 " DL5 DL5 DL5 DL6 DL6 DL6 SP SP eq 8'-91 2 " 2'-81 2 " 2'-10" 2'-10"5'-10 1 2 " SB(c)5A (@ht. 2'-8") (8M) DL4(a) ON/OFF ONLY HL2(b) ON/OFF ONLY AC(g) ON/OFF ONLY DL5(c) ON/OFF ONLY (2WAY SB(A)1 SWITCH a) DL6(d) ON/OFF ONLY WP4(e) ON/OFF ONLY WF1(f) ON/OFF ONLY SB(c)5 (@ht. ABOVE LINTEL LEVEL 7' AS PER REQUIREMENT ) (2M) WF1 PP ONLY SB-(C)3 (@ht. 4'-2") (8M) 6 AMP PP + SWITCH ON/OFF 15 AMP PP + SWITCH ON/OFF 2 BLANK SWITCH ON/OFF (for TATA SKY SET UP BOX) SB(c)3A(@ht. 3'-1") (4M) note: as per furniture detail FOR T.V. SB(C)3B (@ht. 1'-2") (8M) 4 5AMP PP INT. 4 SWITCHES ON/OFF ONLY SB(c)3A SB(c)3 SB(c)5A SB(c)3A SB(c)3B SB(c)4A SB(c)4B HL2 SB(c)4A(@ht. 3'-1") (4M) note: as per furniture detail SB(C)4B (@ht. 1'-2") (8M) 4 5AMP PP INT. 4 SWITCHES ON/OFF ONLY false ceiling 21'-0" 1 1 2 9'-7" 2'-0" 4'-10" REM (PASSAGE) 4'-8" 11'-6" 4'-10" 2'-0" 9" 1 1 2 6'-9" 4'-9" 2'-6" paint RHINESTONE 0740 v grove (on 6mm thick mdf) finished with color ASHBERRY 7366 match with ceiling line 7'-3" hanging lights as per selection dusty black profile light hotel logo(as per design) hotel name R3" R3" concrete finished as per selection 7'-3" 3" 1 1 2 " 3" skirting 3'-4" 6" 1 1 2 " 2'-6" 2'-4" 2'-4" 4'-5" 1 1 Finished with MDF + paint ASHBERRY CODE:7366 Louvered shutter 1 2 thk Wooden frame 9" 4'-0"4'-3" 4'-9" 2'-6" 7'-3" tv as per selection profile light 5'-11" 2'-0" 4'-11" 7" 2'-11" 1" 1'-0" 5'-11" 7'-6" 3'-0" 16'-5" match with ceiling line 7'-3" concrete finished as per selection SECTION ELEVATION BB 9" 6" 2'-0" 10" 3'-4" paint RHINESTONE 0740 front of the table finished with MDF finished with pu Louvered shutter storage as per detail 3" false ceiling 3" skirting as per selection SB(c)5A sofa as per selection front of the table finished with MDF finished with pu front of the table finished with MDF finished with pu bronze mirror 6mm-8mm thk as per selection PLAN SECTION ELEVATION AA 3" 1 2 " 3" 1 2 " detail A 3 4" thk ply v grove (on 6mm thick mdf) finished with color ASHBERRY 7366 2" 1 1 2 " 3 4 " mdf finished with pu profile light detail B DN 39
SECTION ELEVATION
NORTH M.S.A HOUSE 7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 13/03/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SHEET 1 OF 1 DRAWING NO. SCALE- 1:XXX SITE AREA 475.50 SQ.MT. DATERECEPTION DETAIL guest area KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC STRUCTURAL PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM AR.KINJAL THAKKARPROJECT HEAD AR. AMIT SRIVASTAVAPROJECT DESIGNER CONTACT DETAILS: AR. KINJAL JUMANA 13/03/21 shutter shutter DRAWER DRAWER DRAWER DRAWER 7'-3" 8'-0" 1'-0" 3'-8" 3'-4"2" 1" 5"1" 5"1" 1'-0"3" 2'-6" 1'-10" 1'-9" 1'-6" 1'-6" 1'-10" 2" 2" 7'-9" 3'-7" 2'-11" 2'-1" 7'-9" 16'-5" DRAWER concrete finished as per selection B SECTION ELEVATION CC 1'-0" 9" 3'-4" 3 4 " 9" 2'-0" 6" MDF finished with pu paint RHINESTONE 0740 false ceiling 3" skirting as per selection concrete finished as per selection PHOTO FRAME PHOTO FRAME PHOTO FRAME photo frame as per selection sofa as per selection 4'-10" 1'-11" 9'-7" 4" 3'-11" 4'-10" 11'-6" 16'-4" 2" 1" 5"1" 5"1" 1'-0"3" 2'-6" EQ EQ EQ EQ 9'-7" DRAWER DRAWER shutter DRAWER DRAWER DRAWERDRAWER 9"10" 1'-10" 6" 2"9" 3 4 3'-4" MDF finished with pu false ceiling 8'-0" 4'-8" 3'-4" 10'-0" 1'-11" 9'-7" 1'-10" SECTION ELEVATION DD 2" C concrete finished as per selection concrete finished as per selection 1'-2" 1'-2"4'-9" 3'-1" 3'-1" 2'-3"4'-9" 2'-0" WI-FI based central controller 1" 1'-4" 1" 1" 1'-4" 1" false ceiling 10'-1" ELEVATION AA 3" skirting finished with veneer polished as per approved sample 2'-1" 1 2 " grove 8'-0" 3" 1'-6" 1'-6" as per site 3'-0" 1" thk Wooden frame Finished with MDF + paint ASHBERRY CODE:7366 Louvered shutter 1" 2'-10" 1"as per site 3'-0" AS PER SITE 4' 4" 2'-0" EQ 1'-5" EQ 1'-5" 1" 1'-10" 1" Finished with paint ASHBERRY CODE: 7366 Louvered shutter B B reception STORAGE detail
BB Finished with laminate as per selection DIVISION AS PER CLIENT REQUIREMENTS A false ceiling 1" thk grove for handle 2" 2" 3 4 " 3 4 " DETAIL C concrete finished as per selection concrete finished as per selection paint RHINESTONE 0740 1" 1" 1" 1/2" 1" 1/2" Finished with paint ASHBERRY CODE:7366 Fixed LouversDETAIL A 40
DOOR
GLASS DOOR
false ceiling
hanging lights as per selection
profile light
ganpati murti as per selection
ledge veneer finished as per selection indoor plant as per selection
granite as per selected
profile light
B
1"
B
A
veneer
A
ganpati murti as per selection
black granite as per selected
water proofing layer brick wall(as per site)
to 18 mm
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 1318 H 3/03/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA FOYER DETAIL DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: JUMANA 3/03/21 AR. KINJAL
1" or 1.5" thk wooden
black
1'-10" 1'-8" 1" 3'-6" 1'-3" 2'-9" 1'-10" 6'-5" 8'-3"
thk wooden ledge
finished as per approved selection katra joint in black granite planter bed(real plants) black granite as per selected ramp as per detail SB(c)1 hl1 wp1 FL1 FL1hl1 2'-5"1'-1"1'-1"3'-9"1'-3" 10"10"6" 2'-7" 9'-1" 1' 4'-2" 4' 1'-7" 11'-8" 11'-8" 2'
12
thk
1'-10" 1'-8" 1" 3'-6" 1'-3" 2'-9" 1'-10" 6'-5" 8'-3" 5" 1" 9" 1" 5" 5" 10" 5" 1'-7"
detail
SECTIONAL ELEVATION AA' SECTION BB' PLAN ELECTRICAL PLAN 9'-8" 2'-7" 7' 1" 2'-7" 4" 6'-4" 4" 1" 1'-7" 6" 1' 1" 2'-7" 3'-1" 6' top finished veneer polished as per approved selection top finished veneer polished as per approved selection 1" or 1.5" thk wooden ledge veneer finished as per selection ganpati murti top finished veneer polished as per approved selection 2'-3" 3" 1" 2'-7" 1'-3" 4' 1'-3" 8'-2" 1'-3" 4' 1'-3" 1'-10" 2'-9" detail A COLUMN v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 detail B detail B 3" 1 2 " 3" 1 2 " top finished veneer polished as per approved selection profile light 2" 1.5" 1" 3 4" thk ply 9' 2' v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 A 41
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 1.318 H 4/03/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA FOYER DETAIL(main entrance) DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. SCALE- 1:XXX KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: JUMANA 4/03/21 AR. KINJAL black granite as per selected HOTEL SAI KRUPACOLUMN profile light Hotel logo as per selection indoor plant as per selection corridor (as per site) katra joint in black granite planter bed(real plants) (indoor plant as per selection) black granite as per selected Hotel logo as per selection with back light ELEVATION AA' AA B B 1'-11" 10'-1" 5" 9'-4" 5" 2' 1" 9'-11" 1"12' 1" 1'-6" 1" 5" 10" 5" 1'-8" PLAN 2'-9" 7'-2" 1'-10" 2'-1" 2'-11" 2'-1" 1'-10" 9' 2' 10'-1" 3'-7" 2'-11" 3'-7" 12' black granite as per selected 12 to 18 mm thk water proofing layer1'-10" 7'-2" 9' 5" 1" 9" 1" 5" 5" 10" 5" 1'-7" SECTION BB' 1'-10" 2' Hotel logo as per selection 1'-9" 2'-11" 2'-6" wp1FL2 FL2hl1 3'-5" 1'-7" 1'-7" 10" 3'-5" ELECTRICAL PLAN profile light detail A 3" 1 2 " 3" 1 2 " 3 4" thk ply brick wall(as per site) 3'-7" 2'-11" 3'-7" detail A v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 v grove (on 6mm thick mdf or cement sheet) RAW STEEL 8313 42
NORTH M.S.A HOUSE 7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 2/02/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SHEET 1 OF 1 DRAWING NO. SITE AREA 475.50 SQ.MT. DATEGUEST AREA : BED ROOM 4 DEATIL KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC STRUCTURAL PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM AR.KINJAL THAKKARPROJECT HEAD AR. AMIT SRIVASTAVAPROJECT DESIGNER CONTACT DETAILS: AR. KINJAL JUMANA 2/02/21 To be packedSB2 SB3 SB4 SB7 SB6SB5 SB8 SB4aSB1 SB9 BED DETAIL TV WALL DETAIL STORAGE UNIT DETAIL WARDROBE D RM. DB 1 1 2 6'-0" 3'-3" 1'-0" 3'-3" 1'-8" 3'-3 1 2 5'-5" 1'-101 2 1'-8" 3'-0" 2'-0" 2'-51 2 " 5'-5" 2'-6" 7" 1'-101 2 4'-9" 41 2 " AS PER SITE (9'-3") 1'-7" AS PER SITE (15'-1112") 5'-0" 2'-51 2 " 8'-6" AS PER SITE (10'-4 1 2 ") ROOM 04 10'-4"X10'-10" PLAN A BC ledge finished with approved as per sample mirror cladded on plywood with veneer finished frame AS PER DETAIL drawer drawer false ceiling @beam bottom SECTION AA floor raised upto +12" 6" mattress 3mm groove 3" skirting same as flooring tile 3" wide ply strips finished with laminate column Top and bottom finished with laminate as per selection Drawer finished with laminate as per approved sample Ply finished with laminate 1'-0" 5" 10'-0" 3'-3" 5'-2" 1'-7" 1" 4" 1" 1'-6" 6" 10'-10" 1'-10" 5'-5" 1'-10" 1'-9"2" 5'-1" 2" 9'-1" 3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3" false ceiling @beam bottom floor raised upto +12" DOOR Elevation BC TV drawer drawer katra joint mirror caldded on ply 112"thk.x112"wide laminated ply wood frame ledge finished with approved as per sample 3" skirting finished same material use flooring paint as per selection 6'-9" 3" eq eq 3'-2" 1'-6" 1'-6" 10" 8" 1'-0" 7'-0" 11'-0" 1'-3"2'-0" 3'-6" EQ EQ EQ 1'-9" 8'-6" 7" 2'-6" 5'-5" eq eq eq 2" 2'-3" 0" AREA Fridge window SB4a SB4 floor raised upto +12" false ceiling @beam bottom Elevation AB 3'-0" 1'-0" 8'-5"11'-0" 2'-9" divided in to 5eq part eq eq 1 1 2 " eq 1 1 2 " eq 1 1 2 " eq 1 1 2 " 7" 2'-0" 7" rem(2'-8") rem(5'-10") as per site (aprrox_4'-6") as per site (aprrox_10'-4") 1'-6" 2'-0" 1'-8" 1'-8" paint as per selection shutter finished with laminate as per approved as per sample 3"openable skirting finished with laminate approved as per sample 6mm mirror cladded on ply Detail at A 112" thk ply 3/4" 1'1/2" A 43
HOTEL
HOTEL
ELEVATION
SECTION AA
NORTH M.S.A HOUSE 7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 12/02/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SHEET 1 OF 1 DRAWING NO. SITE AREA 475.50 SQ.MT. DATEDOOR DETAIL KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC STRUCTURAL PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM AR.KINJAL THAKKARPROJECT HEAD AR. AMIT SRIVASTAVAPROJECT DESIGNER CONTACT DETAILS: AR. KINJAL JUMANA 12/02/21 OUT SIDE LOBBY AREA INSIDE door as per detail 2 thk. wooden frame finished with polished as per approved sample 6mm groove 2' 9' 11' plaster pop punning SECTION AA false ceiling 9" plasterpop punning 2" thk wooden frame 6mm groove grove to open door COLUMN door openable with 180 (as per site)5'-11" 2" 5'-6" DETAIL A DETAIL B PLAN 2" DETAIL C A A INSIDE OUT SIDE LOBBY AREA 6mm 2 4'-3"(rem) 11" 2" 2" 2 6mm 5'-9" 5'-6" 3" 3" 3" 11' (as per site) 2 thk wooden frame Brass finished 5'-10" ELEVATION 2'-11" 6MM 2 7'-11" 2'-11" 8'-1" katra joint in wooden frame 4" 4" 4"AC grill 4" x 4" grove to open door 2' thick finished with ASHBERRY (7366) mdf door finished with paint ASHBERRY (7366) v grove 3"X3"
SAI KRUPA 5'-6" 2"2" 5'-6" 2"
SAI KRUPA wooden door v grove mdf door finished with paint ASHBERRY (7366) ramp as per detail INSIDE OUT SIDE LOBBY AREA DORMITORY OUT SIDE LOBBY AREA INSIDE DORMITORY as per site( aprrox_3'-11")2" 3'-6" 2 8" 9" as per site( aprrox_3'-11")2" rem 2" door openable with 180 HOTEL SAI KRUPA 2" DETAIL B 2" 2'-4" 9" 2" 2"2" 2" 6'-10" 7' 2" 6'-10" 2'-9" 2" thk wooden frame Brass finished mdf door finished with paint ASHBERRY (7366) grove to open door 2' thick finished with ASHBERRY (7366) v grove 3"X3" DETAIL C HOTEL SAI KRUPA 6mm groove katra joint in wooden frame 2 thk. wooden frame finished with polished as per approved sample 2 thk. wooden frame finished with polished as per approved sample 6mm groove pop punning plaster glass door paint RHINESTONE 0740 PLAN
MATCH WITH LINTEL LEVEL 7' as per site( aprrox_3'-11")2" rem 2" 2'-9" 1'-3" 2'-10" 6'-10" mdf door finished with paint ASHBERRY (7366) wooden door grove to open door 2' thick finished with ASHBERRY (7366) pop punning plaster 6mm groove 2" thk wooden frame glass door (pivot) GLASS DOOR ELEVATION 1'-10" 2" pop punning plaster grove to open door 2' thick finished with ASHBERRY (7366) 2" 1 2 " 1 2 " 2" thk wooden frame DETAIL B 2" 7" rem 2" 6 mm3" pop punning plaster 2 thk wooden frame mdf door finished with paint ASHBERRY (7366) door openable with 180 DETAIL A DETAIL C 6 to 8mm thk mdf as per selection finished with ASHBERRY (7366) 3" 1 2 " 3" 1 2 " 3" 1 2 " 3" 1 2 " 2" MAIN DOOR DETAIL: GUEST AREA MAIN DOOR DETAIL: DORMITORY AREA AREA 44
NORTH M.S.A HOUSE 7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL THIRD FLOOR 9825172577PINAKIN BHAI JUMANA 12/02/21DATE CLIENT: MR. SATISH, MR. VIJAY, MR KAMLESH, MR. MAHESH PROJECT ADDRESS: 3RD FLOOR- JAN MAHAL RE - 19/81 PROJECT CODE:PROJECT TITLE: GUEST HOUSE ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SHEET 1 OF 1 DRAWING NO. SITE AREA 475.50 SQ.MT. DATE KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC STRUCTURAL PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM AR.KINJAL THAKKARPROJECT HEAD AR. AMIT SRIVASTAVAPROJECT DESIGNER CONTACT DETAILS: AR. KINJAL JUMANA 12/02/21 false ceiling drawer drawer shutter STORE AS PER DETAIL 2'-6" 1 1 2 6" 6" rem 3" 3 4 3 4 3 43'-3" 3 4 3'-5" 11'-2" 5'-5" 5'-9" 2'-0" 2'-5" 1'-0" paint as per selection door as per selection top finished with mdf+paint R2" 2'-2" 3" drawer front finished with laminate as per selection 3" skirting finished with laminate as per selection shutter finished with laminate as per selection back finished with laminate as per selection 9" ELEVATION CD C D RECEPTION storage sofa reception table 3'-5" 1'-9" R3" DETAIL A front finished with mdf +paint as per selection 1'-10" 3 4 " 3 4 " table top finished with laminate as per selection drawer front finished with laminate as per selection 5'-5"1'-4"(eq) 1'-4"(eq) 1'-4"(eq) 1'-4"(eq) chair as per selection table side finished with laminate as per selection tv 11'-2" 5'-5" 5'-9" shutter finished with paint as per selection PLAN A B CD false ceiling shutter shutter PHOTO FRAME shutter shutter PHOTO FRAME PHOTO FRAME 11'-2" 5'-5" 5'-9" 2'-0" 1'-0" 2'-5" 3" 5'-3" 3" 3" 4'-2" 2'-4" 1'-2" 2'-6"3'-3" 9" 6" 2'-0" match with ceiling line 8'-0" 7" 1'-4" 4" 1'-4" 4" 1'-4" 7" R3" R3" paint as per selection photo frame as per selection sofa as per selection front finished with mdf +paint as per selection 3mm groove profile light 2" wide laminate patti shutter finished with paint as per selection 3mm groove 2" wide patti divided in to 4eq part 5'-5"1'-4"(eq) 1'-4"(eq) 1'-4"(eq) 1'-4"(eq) 3" 7'-9" ELEVATION AB A B main door as per detail store door as per selection storage DRAWER DRAWER 2'-0" 4'-0" 2'-6" shutter 12'-3"1'-1" 1 1 2 6" 6" rem 3" 3 4 " 3 4 " 3 4 " 1'-9" 1120" 1'-10"2'-6" 3'-3" 9" 3 4 karta joint MATCH WITH ceiling line 8'-0" 3" 7'-9" 10" 3" 3'-0" 3'-11" false ceiling top finished with mdf+paint drawer front finished with laminate as per selection 3" skirting finished with laminate as per selection shutter finished with paint as per selection paint as per selection profile light sofa as per selection 9" 1" 11 2 3" rem 11 2 false ceiling DETAIL A B C 4 3 4 ELEVATION BC 1 1 2 " 3 4 " 3 4 " Handel for data 1 1 2" thk. ply finished with laminate 11 2 " mild filleted edge DETAIL A 3" 3" 3" skirting finished with laminate as per selection shutter finished with mdf+paint as per selection DETAIL B OPTION 1 OPTION 2 OPTION 3 RECEPTION DETAIL dormitory area 45
06 T E T H Y S J A L A R A M Anand-Bhalej Road, ANAND S H O P (INTERIOR) FURNITURE + ELECTRICAL LAYOUT 47 WALL ELEVATION 48 FURNITURE DETAIL 49 • RECEPTION DETAIL • DISPLAY RACK DETAIL • DISCUSSION TABLE DETAIL SHOP-4 13'0" X 54'6" CL.HT.- 12'0" 5' 6'-4 1 2 " 46'-101 2 " 3' 5" 12'-7" 19'-101 2 " 2'-6" 19'-3" 2'-6" 18'-101 2 " 3" 4'-6" 2' 1 1 2 " 2' 3'-9 1 2 2'-6"2'-6" 5' 5" 1'-1014 " 1'-10 1 4 " 4'-6" W3 V V D 7'6"WIDE PASSAGE 55'-3" 63'
1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: NOTES: SCALE- 1:XXX SITE AREA XXXXXSQ.M. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 CONTACT DETAILS: PROJECT DESIGNER PROJECT HEAD PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING PROJECT CODE: PROJECT ADDRESS: TERRACE DEV'S RED SQUARE OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM DATE DRAWING TITLE: FIRST FLOOR WORKING DRAWING AREA FIRST FLOOR DATE R E 1 9 / 0 1 H K / 1 1 DRAWING NO. SHEET 1 OF 2 NORTH JUMANA P. 24/02/21 AR. HITESH MODI 9825282930 COM 19/17 AR.KINJALTHAKKAR 9426621992 JUMANA PARAWALA SHOP-4 13'0" X 54'6" CL.HT.12'0" TOILET 6'0" X 5'0" 6" UP CL.HT.- 12'0" 7'6"WIDEPASSAGE 5' 2' 5" 1'-101 4 " 1'-101 4 " W3V V D GRID SIZE:2'X2' PENTRY RECEPTION DISPLAY RACK-1 (ADJUSTABLE) DISPLAY RACK-2 (ADJUSTABLE) DISPLAY RACK-3 (ADJUSTABLE) 2' X 2' FRIDGE LIVE PUMP (POTATO STONE FLOOR) PRODUCT DIAGRAM AND DESCRIPTION WALL -(POTATO STONE FLOOR) -PRINT ON MDF DISCUSSION TABLE STORY OF JALARAM -HISTORY AND TIMELINE TV -1 TV -2 TV -3 WELSPUN PVC WOOD FLOOR AR. KINJAL T. AC-1 DISCUSSION TABLE2'-6" 4'-6" 1'-6" 1'-6" 1'-6" 1'-6" 9" 9" 2'-3" 1'-6" 9" AC-2 4'-5"3" 3'-5" 8'-2" 2' 3'-2" 3" 6'-6" 3" 6'-6" 3" 2'-6" 3" 6'-6" 3" 12'-3" 2'-6" 5'-4" 6' 5'-3" 13'-10" 35'-7" 3" 8'-3" 4'-6" 8'-6" 4'-6" 55'-3" 12'-9" 3" 2' 4'-2" 4'-6" 2'-3" 13'-2" 5' 4 1 2 " 13'-7" 1 1 2 " 35'-7" 3" 4'-4"4'2' 1'-2" 10'-4" 1'-2" 13'-9" 6' 5'-4" 2'-6" 5' 1' 6' 7'-3" 2'-6" 13'-9" 5'-5" 3'2'-3"5'-9"2' 13' 101 2 "4'-41 25'-9"2' 11 2 " 3' 1'-9" 11 2 " 4'-9" 2'-10" 6'-11" 7' 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: NOTES: SCALE- 1:XXX SITE AREA XXXXXSQ.M. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 CONTACT DETAILS: PROJECT DESIGNER PROJECT HEAD PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING PROJECT CODE: PROJECT ADDRESS: TERRACE DEV'S RED SQUARE OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM DATE DRAWING TITLE: ELECTRICAL DRAWING AREA FIRST FLOOR DATE R E 1 9 / 0 1 H K / 1 1 DRAWING NO. NORTH JUMANA P. 10/03/21 AR. HITESH MODI 9825282930 COM - 19/17 AR.KINJALTHAKKAR 9426621992 JUMANA PARAWALA TOILET 7'6"WIDEPASSAGE 5' 2' 5" V D RECEPTION AR. KINJAL T. SB-01 (@ht. 3'-8") (2M) DL1(a) ON/OFF ONLY WP1(b) ON/OFF ONLY(for logo back light) DL1(a) DL1(a)DL1(a) WP1(b) SB-02 (@ht. 3'-8") 6M) C02(a)\C05(d) ON/OFF ONLY WP2(b) ON/OFF ONLY WP2(b) WP2(b) WP2(b) WP2(b) FAN2(d)/ FAN4(a) TL2(c) ON/OFF ONLY FAN2(d)\FAN4(b) ON/OFF TL2(c) RL4(c) SB-04 (@ht. 3'-8") (8M) FAN4(a)\FAN2(d) ON/OFF ONLY + REGULATOR HL4(b) ON/OFF ONLY RL4(c) ON/OFF ONLY C02(a)\ C05(d) WP5(b) WP5(e) TL5(a)TL5(a) TL5(a) TL5(a) TL5(a) C02(a)\ C05(d) C02(a)\ C05(d) C02(a)\ C05(d) C02(a)\ C05(d) C02(a)\ C05(d) C02(a)\ C05(d) C02(a)\ C05(d) SB-05 (@ht. 3'-8") 8M) C05(d)\C02(a) ON/OFF ONLY TL5(a) ON/OFF ONLY FAN5(c)ON/OFF + OPERATION WP5(b) ON/OFF ONLY WP7(b) DL7(a) DL7(a) DL7(a) WP7(b) SB-07 (@ht. 3'-8") (4M) DL7(a) ON/OFF ONLY WP7(b) ON/OFF ONLY SB-08 (@ht. 3'-8") (4M) WP8(a) ON/OFF ONLY 5AMP PP INT. + SWITCH WP8(a) SB-09 (@ht. 3'-8") (3M) 15AMP PP INT.+SWITCH HL11(a) RL11(b) DISCUSSION TABLE SB-11(@ht. 3'-8") 6M) AC11(c) ON/OFF HL11(a) ON/OFF ONLY RL11(b) ON/OFF ONLY AC11(c) SB-12 (@ht. 1'-10") (6M) note: as per furniture detail 2 5AMP PP INT. + SWITCH WP14(b) DL14(a) SB-14(@ht. 3'-8") 3M) DL14(a) ON/OFF ONLY WP14(b) ON/OFF ONLY WF(c) ON/OFF ONLY SB-14a(@ht. 7'-1") 2M) EXHAUST FAN PP ONLY 3'-9" 4'-10" 6'-9" 3'-6" 3'-6" 9'-7" 6'-2" 8'-4" 3' 2'-8" 5'-7" 3'-11" 6'-5" 2'-6" 3'-3"6'-6"4' 0" 6'-8" 4'-5 1 2 4'-5 1 2 4'-5 1 2 4'-5 1 2 6'-8" 4'-5 1 2 EQ EQ EQ EQ 35'-7 1 2 " note: as per furniture detail 4'-1" 5'-5" 1'-8" FAN5(c) FL2(f) FL2(e) ON/OFF FL2(f) SB-02B (@ht. 3'-8") (6M) AMP PP + SWITCH ON/OFF AMP PP + SWITCH ON/OFF WP5(e) ON/OFF ONLY SB-6A (@ht. 3'-8") (3M) 5AMP PP INT.+SWITCH note: as per furniture detail SB-10 (@ht. 4'-2") (8M) AMP PP + SWITCH ON/OFF 15 AMP PP SWITCH ON/OFF BLANK SWITCH ON/OFF (for TATA SKY SET UP BOX) 4'-7" 2'-3" 9'-6" 1'-5" 1'-4" TL2(c) TL2(c) TL2(c) 8780508475 RL7(d) ON/OFF ONLY SB-06B (@ht. 1'-10") (6M) 5AMP PP note: as per furniture detail NETWORK CENTER (@ht. ABOVE LINTEL LEVEL 8' AS PER REQUIREMENT) note: as per specification CONDUIT PIPE WF11(d) ON/OFF FOR FAN WF11(d) SB-10A (@ht. 3'-3") (3M) note: as per furniture detail 2'-10" FOR LIVE PUMP SB-13 (@ht. ABOVE LINTEL LEVEL 8' AS PER REQUIREMENT (2M) A.C PP ONLY FOR T.V. SB-06C (@ht. 1'-10") (6M) 5AMP PP SB-06A (@ht. 3'-3") (3M) 3 SWITCHES ON/OFF ONLY SB-10B (@ht. 1'-10") (6M) 3 5AMP PP INT. SWITCHES ON/OFF ONLY WP15(a) SB-15 (@ht. 3'-8") (8M) WP15(a) ON/OFF ONLY 5AMP PP INT. SWITCH 5AMP PP INT. + SWITCH W3V 1'-5" 3'-1" CCCTV C CCTV C CCTV C CCTV C CCTV CCCTV HL4(b) DISCUSSION TABLE SB-06 (@ht. 4'-2") (8M) AMP PP + SWITCH ON/OFF 15 AMP PP SWITCH ON/OFF BLANK SWITCH ON/OFF (for TATA SKY SET UP BOX) FOR T.V. SB-05A (@ht. ABOVE LINTEL LEVEL 8' AS PER REQUIREMENT (2M) A.C PP ONLY AC5(f) TL5(a) AC5(f) ON/OFF ONLY FOR R.O point 2" 6' 2'-8" 2'-1" 7' PENTRY SINK 10/03/21 6'-8" note: as per furniture detail SB-06C (@ht. 1'-10") (6M) 5AMP PP RL2(f) PROFILE LIGHT ON/OFF ONLY RL2(f) RL4(d) ON/OFF ONLY RL4(d) 10/3/21 3'-3" 47
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL FIRST FLOOR 9825172577PINAKIN BHAI JUMANA 1318 H 09/03/21DATE PROJECT CODE:PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA FURNITURE ELEVATION DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. SCALE- 1:XXX KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: 8779247310PARVEEN SUTAR 09/03/21 AR. KINJAL PROJECT ADDRESS: TERRACE DEV'S RED SQUARE , OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM COM - 19/17 TV11'-3" 1'-7" 19'-2" 2'-6" 19'-3" 2'-6" 11'-4" 12'-9" 2'-8" 2'-9" 6'-6" 3" 6'-9" 2'-6" 0" 6'-9" 3" 5" 5'-10" 1' 5' 2'-6" 5'-4" 9" 4'-6" 9" 54'-9" 8'-3" 4'-6" 12'-9" 9"2'-8" 3' 2'-6" 2'-6" 2'-6" 6" 1'-6" 1'-6" 1'-6" 2'-6"3' 11'-3" 1'-7" 1'-8" 8' 1'-7" 9'-8" 2" 1'-10" 11"9"11" 9" 5' 41 2 " 6'-6" 2'-6" 4'-71 2 " 11 2 " 33'-11 2 " 2'-6" 3"5' 41 2 " 13'-71 2 " 11 2 " 35'-71 2 " 3" 67'-9" 3' TV PLANTER BED LIVE MODEL DISCUSSION TABLE (as per design) RECEPTION TABLE (as per design) DISPLAY RACK (as per design) STORAGE (as per design) STORAGE (as per design) PANTRY (as per design) DISCUSSION TABLE (as per design) BRONZE MIRROR (as per design) BRONZE MIRROR (as per design) PROFILE LIGHTPROFILE LIGHT SOFA (as per design) WATER CYCLE GRAPHIC WALL (AS PER DESIGN) 9'-8" 1'-7" 6' 2'-9" 2'2'-3" 8'-3" 4'-9" 13' 2' 1'-7" 2'-6" DISCUSSION TABLE (as per design) TOILET 6'0" X 5'0" 6" UP CL.HT.12'0" 7'6"WIDE PASSAGE 5' 2' 5" 1'-1014 " 1'-10 1 4 V V D PENTRY DISCUSSION TABLE ELEVATION A ELEVATION B ELEVATION C 9'-8" 1'-5"wall hung Flush WASHROOM (as per design) AC (as per selection) 3'-8" 7'-1" 4'3'-8" 2'-6" 3'-8" 1'-5" 3'-8" 4'-2"3'-8" 2'-6" 2'-6" 2'-6" A A B C C 8'-3" 3" 6'5'-41 42'-6"3'-9"1'6'1'-6"3"6'-6"3"2'-6" 3" 6'-6"3"6'-6" 3"2'-81 2 " 2'-5" 8'-3"11'-71 4 " 2'-6"12'-3"7'2'-6"18'-101 2 " 9" 1'-6" 1'-6" 1'-6" 9" 63'-3" 3'-1" 2'-6" 1'-5" W3 3' 1'-9" 13'-71 2 " 6'-6" 2'-6" 4'-71 2 " 6' 2'-1 1 2 2' 1'-3" 3' 1'6' 1'-6" PLAN DISCUSSION TABLE (as per design) LIVE MODEL HANGING LIGHT MAIN DOOR GLASS (as per selection) 1'-7" 9'-8"11'-3" 8' 101 2 " 3" 4'-11 2 " 1'-4" 4' 5" 2' 6'-7" 4' 2'-5" 13' D ELEVATION D 7'-8" RECEPTION AREA DISPLAY RACK (as per design) STORAGE (as per design) PASSAGE PERSONAL CABIN DISCUSSION TABLE STORAGE (as per design) LIVE MODEL PLANTER BED logo(as per design) WATER CYCLE GRAPHIC WALL (AS PER DESIGN) 1'-8" HANGING LIGHT GLASS (as per selection) 2'-8" 12'-9" 12'-9" 1'-11" 1'-11" logo(as per design) grove (on 12mm thick mdf cement sheet) 3'-6" PROFILE LIGHT PROFILE LIGHT B D detail DISPLAY RACK (as per design) GRAPHIC WALL (as per design) PUMP DISPLAY (as per design) 4' 4'4'-2" 3" 1 2 " 3" v grove (on 6mm thick mdf or cement sheet) color as per selection detail A detail 3' 1'-7" 11'-3" detail B BRONZE MIRROR PLY(1/2") SLAB PROFILE LIGHT 2' 6" 50mm 8" 9" 8" 1' 7" WIDE ASS GE HISTORY WALL (AS PER DESIGN) 1'-10" 1'-5" LOFT TANK (as per dimension) 6'-3" Testimonials 7'-9" 3'-8" 2'-8" 7'-8" 3'-8" 48
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL FIRST FLOOR 9825172577PINAKIN BHAI JUMANA 1318 H 28/03/21DATE PROJECT CODE:PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA RECEPTION TABLE DETAIL DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. SCALE- 1:XXX KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: 28/03/21 AR. KINJAL PROJECT ADDRESS: TERRACE DEV'S RED SQUARE , OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM COM - 19/17 JUMANA DISCUSSION TABLE TV 2'-6" HANGING LIGHT COLUMN drawer drawer drawer drawer shuttershutter drawerdrawerdrawerdrawer drawer shutter drawer drawer cabinet cabinet drawer drawer 3'-4" 2'-6" 3" 2'-2" 1 1 2 7'-9" 7'-9" 4'-9" 2'-0" 5'-10" 3'-7" 2'-3" 1 1 2 1" 6'-0" 2'-3" 3'-7" 1'-6" 6'-3" 3" 5'-9" 3" 3'-4" 2'-6" 3" 2'-3" 3'-4" 3" 3'-1" 7" 2'-6" 6'-0" 3'-8" 2'-3" 11 2 " 1" 1'-0" 3'-7" 2'-2" 1'-3" 1'-3" 1'-3" 3" 1'-8" 3" 2'-6"3"1'-0" 3 4 " 6" 3 4 " 6" 1 1 2 " 6'-2" 6'-2" 7" 1'-8" 10" 2'-6" 3" 1'-0" 3 46" 3 46" 7'-9" 6'-3"1'-6" 3'-4" 3" 2'-3" 10" 9" 1" 7'-9" 1'-6"6'-3" 10" PROFILE LIGHT DISPLAY RACK AS PER DESIGN T.V. AS PER SELECTION AC. AS PER SELECTION 2'-0" 3" 7'-3" 3" 2'-6" 2'-3" 2'-0" 7'-9" 2'-6" 2'-3" 9" 1 1 2 THK PLY FINISHED WITH 3" WIDE VENEER STRIPS POLISHED AS PER APPROVED SAMPLE (V-GROVE) CEMENT FINISHED AS PER APPROVED SAMPLE DRAWER FRONT FINISHED WITH CEMENT FINISHED AS PER APPROVED SAMPLE BRONZE MIRROR AS PER SELECTION BRONZE MIRROR AS PER SELECTION HANGING LIGHT AS PER SELECTION 3" SKIRTING FINISHED AS PER APPROVED SAMPLE PROFILE LIGHT DRAWER PROFILE LIGHT 1'-1" 3'-4" 1'-1" CABLE MANAGER 1 1" THK PLY FINISHED WITH 3" WIDE VENEER STRIPS POLISHED AS PER APPROVED SAMPLE (V-GROVE) 3" SKIRTING FINISHED AS PER APPROVED SAMPLE 1 1 2 " THK PLY FINISHED WITH 3" WIDE VENEER STRIPS POLISHED AS PER APPROVED SAMPLE (V-GROVE) CEMENT FINISHED AS PER APPROVED SAMPLE 1 1 2 " THK PLY FINISHED WITH 3" WIDE VENEER STRIPS POLISHED AS PER APPROVED SAMPLE (V-GROVE) CEMENT FINISHED AS PER APPROVED SAMPLE 1'-8" 6" 6" 3'-1"1'-8" WATER CYCLE GRAPHIC WALL (AS PER DESIGN) BRICK CLADDING CEMENT FINISHED AS PER APPROVED SAMPLE A B CD DISCUSSION TABLE RECEPTION AREA DISPLAY RACK (as per design)(as per design) WATER CYCLE GRAPHIC WALL (AS PER DESIGN) 49
SECTION ELEVATION B
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL FIRST FLOOR 9825172577PINAKIN BHAI JUMANA 1318 H 17/03/21DATE PROJECT CODE:PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA DISPLAY RACK DETAIL DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. SCALE- 1:XXX KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: 17/03/21 AR. KINJAL PROJECT ADDRESS: TERRACE DEV'S RED SQUARE , OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM COM - 19/17 WIDE ASS GE JUMANA 10 1 2 1" 3'-10" 1" 3'-10" 1" 10 1 2 1'-10" 1 1 2 1'-0" 1 1 2 2'-7 1 2 1 1 2 2'-4 1 2 1 1 2 1'-4 1 2 9'-8" 1" 3'-3 1" 3'-31 2 1" 3'-31 2 1" 3'-3 1" 3" 1" 3'-32 1" 3'-31 1" 1" 3'-31 2 1" 3'-32 1" 3'-31 1" 3'-31 2 1" 2'-6" 3" 1" 3'-31 2 1" 3'-31 2 1" 13'-7"(divided into 4 eq parts) 2'-6" 7'-4" (divided into 2 eq parts) 23'-5" LVL 0+2'-1" CEMENT FINISH ON PLY WOOD + MDF 1 THICK ADJUSTABLE WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION detail A 10" 1" 1'-9" MS SUPPORT B B ELEVATION A ELEVATION A (FOR MS SUPPORT)
9'-8" 1" 3'-3 " 1" 3'-31 2 1" 3'-31 2 " 1" 3'-3 " 2'-6" 3" 1" 3'-32" 1" 3'-31" 1" 7'-4"(divided into 2 eq parts) 23'-5" BRONZE MIRROR CLADDED ON PLY 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATED 1 " THICK ADJUSTABLE WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION detail B detail B 1 1 2 THICK ADJUSTABLE WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION BRONZE MIRROR CLADDED ON PLY 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATED 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATED 11'-3"11'-3" 11'-3" 11 1 2 1 1 2 1'-0" 1 1 2 2'-1 1 2 1 1 2 1'-6" 1 1 2 1'-10 1 2 1 1 2 1'-0" 1 1 2 6" 1'-10" 1 1 2 1'-0" 1 1 2 2'-7 1 2 1 1 2 2'-4 1 2 1 1 2 1'-4 1 2 3" 1 1 2 2'-4 1 2 1 1 2 2'-4 1 2 1 1 2 2'-4 1 2 1 1 2 1'-9 1 2 9'-8" 3'-31 2 3'-32 3'-31 3'-31 2 1 " THICK WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION 1" SQUARE MS SECTION, FINISHED WITH POWDER COATED 1" SQUARE MS SECTION TO SUPPORT WOODEN SHELF, FINISHED WITH POWDER COATED CEMENT FINISHED CEILING C C 2'-6"13'-7"(divided into 4 eq parts) SECTION ELEVATION C 9'-8" 11'-3" 1 THICK WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION 1" SQUARE MS SECTION, FINISHED WITH POWDER COATED 1" SQUARE MS SECTION TO SUPPORT WOODEN SHELF, FINISHED WITH POWDER COATED 3" 1 1 2 2'-4 1 2 1 1 2 2'-4 1 2 1 1 22'-4 1 2 1 1 21'-9 1 2 2" 1" 2'-5" 1" 2'-5" 1" 2'-5" 1" 1'-11" 1'-11" 1" 2'-5" 1" 2'-5" 1" 2'-5" 1" 2" 3'-11 3'-111 3'-7"(divided into 4 eq parts) 2'-6" 7'-4"(divided into 2 eq parts) 23'-5" 1'-9" 3'-11 " 3'-41 2 PLAN (LVL 0+2'-1") 33 " B B 1 1 2 THICK ADJUSTABLE WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION detail C MS ROUND ROD FOR SUPPORT BRONZE MIRROR CLADDED ON PLY 1" 3'-3 1" 3'-31 2 1" 3'-31 2 1" 3'-3 1" 2'-6" 1 " THICK WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION 1" SQUARE MS SECTION, FINISHED WITH POWDER COATED 3" 1 1 2 R12" adjustable wooden shelf, finished as per selection ms supports for shelf detail A 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATED R12 " R1" ms supports for shelf 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATEDdetail B ms fixed supports for storage 1'-8" 1"1'-9" 4" 1" R1" 1 " THICK ADJUSTABLE WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION MS ROUND ROD FOR SUPPORT 1" ROUND MS ROD SECTION, FINISHED WITH POWDER COATED detail C 1 1 2 1" 1" 1" SQUARE MS SECTION TO SUPPORT WOODEN SHELF, FINISHED WITH POWDER COATED 1 1 2 THICK WOODEN SHELF, FINISHED WITH POLISH AS PER SELECTION 1" SQUARE MS SECTION, FINISHED WITH POWDER COATED detail D REFERENCE IMAGES 1 2 1'9" 4" REFERENCE IMAGE FOR STORE AREA 1'-7"1'-7" 1" SQUARE MS SECTION, FINISHED WITH POWDER COATED 1" SQUARE MS SECTION TO SUPPORT WOODEN SHELF, FINISHED WITH POWDER COATED 1'-7" 1'-7"1'-7" detail D CEMENT FINISH ON PLY WOOD + MDF 50
PLAN (DISCUSSION TABLE)
7984410585 9898516226 VIRAL BHAVSAR(AVDHOOT) MR. SUNIL FIRST FLOOR 9825172577PINAKIN BHAI JUMANA 1318 H 24/03/21DATE PROJECT CODE:PROJECT TITLE: PROPOSED COMMERCIAL OFFICE BUILDING ISSUED BY DRAWN BY APPROVED/ CHECKED BY CONSTRUCTION APPROVAL QUOTATION/ TENDER PRESENTATION ISSUED FOR 01 REV. NO. CHECK BY DRAWN BYDESCRIPTIONDATE REVISION HISTORY: 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 MODI SRIVASTAVA & ASSOCIATES Email:modisrivastava@yahoo.co.in/gmail.com M.S.A HOUSE MODI SRIVASTAVA & ASSOCIATES 9825052600 9426621992 SIGN / ISSUED 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. GENERAL NOTES: SHEET 1 OF 1 DRAWING NO. /F/02ER STRUCTURAL DATEAREA AR. AMIT SRIVASTAVA DISCUSSION TABLE DETAIL DRAWING TITLE: NORTHSITE AREA 475.50 SQ.MT. SCALE- 1:XXX KEY PLAN: SETTING OUT NOTE: PLUMBING ELECTRICAL HVAC PROJECT MANAGER/ CO-ORDINATOR PROJECT TEAM PROJECT HEAD AR.KINJAL THAKKAR PROJECT DESIGNER CONTACT DETAILS: 24/03/21 AR. KINJAL PROJECT ADDRESS: TERRACE DEV'S RED SQUARE , OPP.YOGI PETROL PUMP,ANAND-BHALEJ ROAD ANAND CLIENT: TETHYS JALARAM COM - 19/17 JUMANA TOILET 6'0" X 5'0" CL.HT.12'0" 2' V V D 3'-1" 2'-6" 1'-5" W3 3' 1'-9" 13'-7 " 6'-6" 2'-6" 4'-71 2 6' 2'-1 1 2 PLAN STORAGE (as per design) PASSAGE PERSONAL CABIN DISCUSSION TABLE STORAGE (as per design) DISCUSSION TABLE 3"1'-3" 1'-3" R112" 3'-0" 3'-0" 3" 2'-0" 3" 2'-6" 1 1 2 1 1 2 " 2'-3" 2'-6" 3" 11 2 " 5'-3" 3" 6'-0" B B ELEVATION AA 3" 5'-6" 3" 11 2 " 5'-41 2 " 11 2 " 6'-0" 5'-6" 1 1 2 " SQUARE MS SECTION, FINISHED WITH POWDER COATED KATRA JOINT C C 1'-6" 1 1 2 " SQUARE MS SECTION, FINISHED WITH POWDER COATED MOVABLE STORAGE CABLE MANAGER PLAN (DISCUSSION TABLE) CHAIR AS PER SELECTION 11 2 " Drawer Drawer Shutter 6" 3 4 6" 3 4 " rem 9 1 2 3" 2'-2 1 4 1'-6" 11 2 " 1'-3" 11 2 " 1'-6" 2'-11 2 " GLASS PARTITION 1 1 2 THK MDF FINISHED WITH VENEER AS PER SELECTION 1 1 2" THK MDF FINISHED WITH VENEER AS PER SELECTION SB 10 height at 3'-8" SB 10A height at 3'-3" SB 10B height at 1'-10" SB 11 height at 3'-8" SB 12 height at 1'-10" (beneath table) 3" 2'-0" 3" 2'-6" 1 1 2 " 1 1 2 " 2'-1 1 2 " 1 1 2 1 1 2 2'-4 1 2 2'-6" ELEVATION BB 1 1 2 SQUARE MS SECTION, FINISHED WITH POWDER COATED KATRA JOINT 11 2 " 1'-9" 11 2 "2'-0" ELEVATION CC 3" 2'-0" 3" 2'-6" 6" 3 4 6" 3 4 " rem 9 1 2 3" 2'-2 1 4 3 4 " 1 1 2 1 1 2 2'-6" Drawer Drawer Shutter 1 2" THK MDF FINISHED WITH VENEER AS PER SELECTION 1 1 2 " SQUARE MS SECTION, FINISHED WITH POWDER COATED TOP OF THE DRAWERS FINISHED WITH CEMENT FINISH AS PER SAMPLE CEMENT FINISH AS PER SAMPLE CASTLE ON WHEEL rem 1'-101 2 " 2'-0" 11 2 " Detail A 1 1 2" THK MDF FINISHED WITH VENEER AS PER SELECTION 1 1 2 " SQUARE MS SECTION, FINISHED WITH POWDER COATED KATRA JOINT 3" 3'-71 2 " 3" 4'-11 2 " 1 1 2 " 1 1 2 2'-3" 2'-6" 11 2 " 3'-41 2 " 11 2 " 3'-71 2 ELEVATION AA R112" 3" 11 2 " 3'-41 2 " 11 2 " 3" 4'-11 2 " 3" 2'-0" 3" 2'-6" eq eq 4'-11 2 " 1 1 2 " SQUARE MS SECTION, FINISHED WITH POWDER COATED CABLE MANAGER
CHAIR AS PER SELECTION 1 1 2 THK MDF FINISHED WITH VENEER AS PER SELECTION 1 1 2" THK MDF FINISHED WITH VENEER AS PER SELECTION SB height at 3'-8" REFERENCE IMAGE 1 1 2" THK MDF FINISHED WITH VENEER AS PER SELECTION 3 4 " 3 4 " FRONT OF THE DRAWERS FINISHED WITH CEMENT FINISH AS PER SAMPLE TOP OF THE DRAWERS FINISHED WITH CEMENT FINISH AS PER SAMPLE DETAIL A OFFICE TABLE DISCUSSION TABLE OFFICE TABLE DISCUSSION TABLE 51
07 B H A V E S H D O S H I Gotri, VADODARA P E N T H O U S E (INTERIOR) CEILING + ELECTRICAL LAYOUT 53 • LIVING ROOM • MASTER BEDROOM • DEEP’S BEDROOM POWDER TOILET DETAIL 58 LIFT DUCT DUCT UP 13581011 13 14 15 16 17 18 19 20 21 22 6 DN 12 ELEC. D2D2 CUT-OUT opening opening DOUBLE HT.LIVING ZUBIN'S BEDROOM 17'0" X 22'8" 385 S.FT. DEEP'S BEDROOM 20' X 17'5" 347 S.FT. 6'0" WIDE PASSAGE 250.5 S.FT. LIVING ROOM 42'8" X 26'10" 1134 S.FT. DINING ROOM 16' X 26'10" 425 S.FT. WATER BUBBLER SINK KITCHEN 15'3" X 21'11" 330 S.FT. NORTH SOUTH W E S T E A S T SERVANT'S ROOM 10'0" X 7'7" 91.5 S.FT. WASH AND UTILITY AREA 15'3" X 6'3" 94 S.FT. STORE 11'8" X 6'10" 66 S.FT. LIFT UP TOILET 6'10" X 4'4" LVL +6" MOTHER'S BED ROOM 15'3" X 19' 282 S.FT. TOILET 7'6" X 16'6" 125 S.FT. TOILET 9' 8" X 12' 2" 118 S.FT. DRESS 9'8" X 9'7" 95 S.FT. SHAMPOO STATION/ STORAGE TOILET 3'4" X 6'2" 22.6 S.FT. STAIR,LIFT & PASSAGE 370 S.FT. OWNER'S LOBBY 7'4" X 7'6" 56 S.FT. CHOWKDI 8'-11" 13'-2 1 18'-11" 6" 7'-6 1'-2 23'-4" 5'-10" 17'-4" 2'-9" 2'-0" 2'-6" 3'-0" 2'-10 4'-0" 19'-10 3'-10" 6" 4'-0" 8'-3" 4'-0" 3'-2" 10'-10 2 3'-0" 12'-2 4'-0" 5'-7 3'-6" 7'-4" 3'-0" 7" 3'-3" 6" 3'-0" 9'-0 4'-0" 1'-46" 2'-9" 2'-1 2 3'-3" 6" 3'-9" 9" 6'-10" 9" 3'-7" 22'-8" 5'-11" 3'-9" 10'-10 14'-8" 16'-11" 9'-8" 17'-5" 4'-0" 8'-1" 3'-4 8'-10"5'-3" 14'-1" 5'-5 12'-5 10'-0 4'-0" 20'-2" 20'-2" 2'-8" 3'-0" 4'-0" 4'-0" 9'-8" 5'-8" 5'-8" 5'-7" 4'-0" 1'-8 16'-11 16'-11 22'-8" 7'-4"1'-1" 3'-7" 3'-0" 2'-4 7'-2" 1'-0" 2'-11" 8'-1" 2'-2" 2'-11" 5'-1 1 2 17'-5" 8'-12 10'-9" 19'-10 2'-6" 10'-9" 1'-0" 14'-3" 3'-5" 8'-10" 2'-0" 4'-4 15'-101 24'-0" 11'-5 3'-11" 5'-8 6'-1 8'-10" 9'-6 8'-10" 12'-0" 8'-10" 2'-0 3'-3 13'-11 6'-3 1'-8 15'-11" 15'-2" 3'-48'-1"3'-0" 5'-0 9'-7" 7'-2" 2'-1" 8'-10" 4'-3" 4'-11" 6'-82 3'-1" 3'-9" 3'-10" 3'-0" 3'-74'-101'-5 4'-3 1 2 3'-3" 13'-10" 71'-5 58'-4 1'-9 1 6'-1 3'-2" 3'-10" 8'-10" 2'-3"1'-111 2 9" 9" 19'-5" 1'-0" puja corner tv unit side table dressing table center table tv unit FAMILY ROOM 14'-1" x 19'-5" rain shower side table side table tv unit DRESSING AREA X 5" tabletable 5'0" X 4'-2 WASHING MACHINE DISH WASHER MACHINE DRYER NT TV UNIT
approx_32'-8"
5'-0" 4'-0" 1'-0" rem 6'-8" 1'-0" 4'-0"
2'-6" 2'-6" 2'-0" 2'-0" 1'-0" 3'-4" 3'-4" 1'-0" 2'-0" 2'-0" 2'-6"
3'-0"false
MODI
MODI SRIVASTAVA
MANISHA,
5'-0" 5'-11"
wall point in centre of top of lintel of lower window and sill of top window in double height living area.
2'-6" eq 2'-11" 5'-11"
point in passage to be in b/w the beam bottom and lintel.
2'-11"
53 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE:
wall
SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: LIVING+PASSAGE AREA ELECTRICAL LAYOUT AREA DATE 09/04/21 R E 1 9 / 1 3 E / 9 3 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9825282930
SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com
& ASSOCIATES 16-
MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 01 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 09/04/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 AR. KINJAL T. JUMANA PARAWALA 8780508475 9426621992 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FOOT LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: 2'-7" 4" eq 2'-11" eq 2'-11" 5'-11" 6'-4" as per site approx_13'-2" false ceiling false ceiling 6w led light hanging light 6" 2'-7" 1'-0" 2'-2" 2'-2" 1'-0" 1'-0" @BEAM bottom @BEAM bottom VENEER CEILING @BEAM BOTTOM(COVED CEILING) indirect light 1'-0" WAY TO COMMON TOILET LIFT UP 1257891011 13 14 15 16 17 18 19 20 21 22 6 DN 12 ELEC. LIFT5' Wide Main door (floor swing) WAY TO SERVANTSROOM PSB2 PSB2 @HT.4'0" (4M) DL1psb ON/OFF WITH TWO WAY FROM SB1 DL2psb ON/OFF WITH TWO WAY FROM PSB-1 WP2psb ON/OF VIDEO DOOR PHONE POINT PSB1 @HT.4'0" (3M) DLpsb1 ON/OFF WITH TWO WAY FROM PSB-2 WP1psb ON/OFF WITH TWO WAY FROM PSB4 ON UPPER FLOOR 1 BELL SW POP CEILING LVL @ -1'-0" CLEAR HT FROM FLOOR +9'-3" POP CEILING LVL @ -1'-0" CLEAR HT FROM FLOOR +9'-3" 6'-7" 6'-10" 7'-4" UP STAIR,LIFT & PASSAGE SB-1(a) SB-2 SB-2a SB-8 SB-5 3'-10" 5'-10" 6'-2" 6'-2" 4'-2" 5'-3" 6'-1" 6'-1" 6'-1" 6'-1" 6'-1" 6'-1" 3'-1"2'-11" 6'-6" 3'-8" B SB-1 SB-2 @HT.4'0" (9M) CL1 ON/OFF WITH TWO-WAY FROM SB-1 CL2 ON/OFF WITH TWO-WAY FROM SB-1 WP2 ON/OFF WITH TWO-WAY FROM SB-1 WP3 ON/OFF HL1 ON/OFF WITH TWO-WAY FROM SB-10 ON UPPER FLOOR WP4 ON/OFF WP5 ON/OFF WITH TWO-WAY FROM SB-10 ON UPPER FLOOR 1 SW FOR WIFI CABLE FL1 ON/OFF SB-2a @HT.9" (3M) 15 AMP PP+SW SB-3 @HT.9" (3M) 15 AMP PP+SW SB-4 @HT.4'0" (11M) DL1 ON/OFF WITH TWO-WAY FROM SB-7 DL2 ON/OFF WITH TWO-WAY FROM SB-7 CL3 ON/OFF WITH TWO-WAY FROM SB-7 CL4 ON/OFF WITH TWO-WAY FROM SB-7 CL5 ON/OFF WITH TWO-WAY FROM SB-7 CL6 ON/OFF WITH TWO-WAY FROM SB-7 CL7 ON/OFF WITH TWO-WAY FROM SB-7 RL1 ON/OFF WITH TWO-WAY FROM SB-1 RL2 ON/OFF WITH TWO-WAY FROM SB-1 HL2 ON/OFF WITH TWO-WAY FROM SB-7 WP6 ON/OFF SB-4a @HT.9" (3M) 15 AMP PP+SW SB-7 @HT.4'-0" (10M) SB-7a @HT.9" (3M) 15 AMP PP+SW SB-5 @HT.4'0" (3M) WP7 ON/OFF 1 SW FOR WIFI CABLE FL2 ON/OFF SB-5a @HT.9" (3M) PP+SW FOR ROUTER 15 AMP PP+SW SB-5a SB-46" 5'-11" 6" FL2FL2 FL3 FL3 SB-9 @HT.9" (3M) 15 AMP PP+SW 6" SB-9 SB-8 @HT.4'0" (2M) WP1 ON/OFF CL ON/OFF TOILET LIGHT PSB1 3'-8" 3'-8" 11'-0" 22'-7" 4'-10" 4'-10" as per site approx_13'-2" 17'-4" 5'-11" 6'-1" 5'-1" 2'-3" 3'-9" 3'-0" 3'-0" 11" 11" 5'-0" 26'-8" 5'-0" 4'-0" 8'-8" 4'-0" 5'-0" 2'-6" 2'-6" 2'-0" 2'-0" 1'-0" 3'-4" 3'-4" 1'-0" 2'-0" 2'-0" 2'-6" 2'-6" 5'-0" 4'-0" 24'-5" 4'-0" 5'-0" 2'-0" 2'-0" 1'-0" 5'-7" 5'-7" 5'-7" 5'-7" 2'-0"1'-0" 2'-0" 2'-6" 2'-6" 42'-5" 2'-0" 6'-9" 8" 6'-5" 8" 6'-5" 8" 6'-9" 2'-0" 2'-0" 6'-9" 8" 6'-5" 8" 6'-5" 8" 6'-9" 2'-0" 2'-6" 8'-4" 1'-0" 1'-0" 8'-4" 8'-4" 1'-0" 1'-0" 8'-4" 2'-6" 2'-6" 8'-4" 1'-0" 1'-0" 8'-4" 8'-4" 8'-4" 2'-6"1'-0" 1'-0" 2'-6" 4'-5" 2'-0" 4'-5" 4'-5" 2'-0" 4'-5" 2'-6" 2'-0" 3'-11" 8" 3'-7" 8" 3'-11" 2'-0" 2'-0" 3'-11" 8" 3'-7" 8" 3'-11" 2'-0" HL HL HL SB-6 SB-6a SB-6b CL1CL1CL1CL1CL1CL1 CL2 CL2 CL2 CL2 CL2 CL2 CL2 WP1 WP2WP2WP3 WP4 WP5 WP5 WP5 CL2 CL3 CL3 CL3 CL3 CL3 CL3 CL3 CL3 CL3CL3 CL3 CL3DL1 DL1 DL1DL1 DL2 DL2 DL2 DL2 CL4 CL4 CL4 CL4 CL4 CL4 CL4 CL4 CL6 CL6 CL6 CL6 CL6 CL6 CL6 CL6 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL5 CL7 CL7 CL7 CL7 DL1(psb) DL1(psb) DL1(psb) DL2(psb) WP2(psb) WP1(psb) WP7 WP6 WP9WP8 RL1 DL1 ON/OFF WITH TWO-WAY FROM SB-4 DL2 ON/OFF WITH TWO-WAY FROM SB-4 CL3 ON/OFF WITH TWO-WAY FROM SB-4 CL4 ON/OFF WITH TWO-WAY FROM SB-4 CL5 ON/OFF WITH TWO-WAY FROM SB-4 CL6 ON/OFF WITH TWO-WAY FROM SB-4 CL7 ON/OFF WITH TWO-WAY FROM SB-4 HL2 ON/OFF WITH TWO-WAY FROM SB-4 WP9 ON/OFF FL3 ON/OFF RL2 A A 2'-7" 15w led light 6w led light hanging light hanging light 6w led light 2'-7" 2'-7" 6" SB-7a SB-7 32'-5" 5'-0" 2'-6" 8'-4" 1'-0" 1'-0" 8'-4" 8'-4" 1'-0" 1'-0" 8'-4" 2'-6" B 5'-0" 4'-0" 1'-0" rem 22'-5" 4'-0" 5'-0"1'-0" as per site approx_42'-5" 2'-6" 4'-5" 2'-0" 4'-5" 4'-5" 2'-0" 4'-5" 2'-6" as per site approx_32'-8" 6" 2'-6" 2'-6" 2'-0" 2'-0" 1'-0" 5'-7" 5'-7" 5'-7" 5'-7" 1'-0" 2'-0" 2'-0" 2'-6" 2'-6" 5'-0" 4'-0" 1'-0" rem 22'-5" 1'-0" 4'-0" 5'-0" as per site approx_42'-5" VENEER CEILING 6" SUSPENDED from beam bottom 3'-0" FALSE CEILING SECTION AA false ceiling false ceiling false ceiling false ceilingfalse ceiling 4" POP FALSE CEILING @BEAM BOTTOM VENEER CEILING 4" SUSPENDED from beam bottom VENEER CEILING 6" SUSPENDED from beam bottom POP FALSE CEILING @BEAM BOTTOM hanging light 15w led lightindirect light SB-3 DETAIL A DETAIL B SB:6a @3'-6"HT. 3 M SB:6 @2'-6"HT. ( 8 M ) SB:6b@1'-6"HT. (8 M) SBX SBXa SBXb 1" x 3 Conduit for all wires internally connected with each other 2" Flexible Conduit For HDMI CABLES PP for additional speaker PP for TV RGY Cable from TATA SKY PP FOR DVD Speaker pp PP for set top box ON-Off (a) of LCD On-Off (b) of DVD Player On-Off (c)of TATA SKY set up box On-Off (d)of Speaker WP6 (e) On-Off PP extra PROVIDE CAT6 CABLE rem 32'-5"5'-0" 5'-0" 5'-0" rem 16'-8" 5'-0" as per site approx_13'-2" as per site approx_70'-9" 3'-8" 6'-6" 3'-0" as per site approx_13'-2"as per site_3'-4"FL1 eq 6'-7" eq 6'-7" 5'-6" 5'-6" 3'-6" 11'-4" eq 11'-4' eq 11'-4' eq 8'-8" eq 8'-8" eq 2'-11" eq 2'-11" eq 2'-11" eq 2'-11" 8'-3" 6" 6" SB-4a 10" 4'-9" 4'-9" as per site approx_9'-6" 6" 2'-2" 2'-2" 3'-10" 3'-10" as per site approx_4'-4" 4'-7"4'-7" as per site approx_9'-2" 1'-8" VENEER CEILING 6" SUSPENDED from beam bottom VENEER CEILING 6" SUSPENDED from beam bottom VENEER CEILING 4" SUSPENDED from beam bottom POP FALSE CEILING @BEAM BOTTOM 4'-0" 4'-1" 8'-2" 5'-8" POP FALSE CEILING @BEAM BOTTOM VENEER CEILING @BEAM BOTTOM 3'-1" 1'-3" 1'-3" 1'-3" 1'-3" as per site 2'-5" 6" VENEER CEILING @BEAM BOTTOM VENEER CEILING @BEAM BOTTOM HL1HL1HL1 FL1 as per site approx_20'-7" 1'-0" 1'-0" 3'-4" 3'-4" 3'-4" 3'-4" 1'-0" 1'-0" 15'-3" rem 4'-4" 1'-0" 3'-4" 3'-4" 3'-4" 3'-4" 1'-0" 2'-2" 2'-2" VENEER CEILING @BEAM bottom VENEER CEILING @BEAM BOTTOM(COVED CEILING)1'-0"
eq
as per site
2'-7" 3'-2"
ceiling false ceiling false ceiling 15w led light 6w led light 6w led light hanging light 6w led light indirect light VENEER CEILING 4" SUSPENDED from beam bottom VENEER CEILING 6" SUSPENDED from beam bottom VENEER CEILING 6" SUSPENDED from beam bottom eq 2'-11" eq 2'-11"as per site approx_5'-11" POP FALSE CEILING @BEAM BOTTOM VENEER CEILING @BEAM BOTTOM VENEER CEILING @BEAM bottom POP FALSE CEILING @BEAM BOTTOM FALSE CEILING SECTION BB 6" 6" 2'-7" SB-1 @HT.4'0" (5M) CL1 ON/OFF WITH TWO-WAY FROM SB-2 CL2 ON/OFF WITH TWO-WAY FROM SB-2 WP2 ON/OFF WITH TWO-WAY FROM SB-2 RL1 ON/OFF WITH TWO-WAY FROM SB-4 RL2 ON/OFF WITH TWO-WAY FROM SB-4 SB-1a @HT.9" (3M) 15 AMP PP+SW 1'-0" 6" 1'-6" 6' eq eq 6" 4" VENEER CEILING 4" SUSPENDED from beam bottom VENEER CEILING 6" SUSPENDED from beam bottom INDIRECT LIGHT DETAIL A MILD FILLETED EDGE as per site approx_7'-4" C C 2'-7"2'-7" hanging light hanging light hanging light 6w led light VENEER CEILING @BEAM bottom false ceiling FALSE CEILING SECTION DD UPPER FLOOR 6"6" 1'-0" 1'-0" 3'-4" 3'-4" 3'-4" 3'-4" 1'-0" 2'-2" 1'-0" 15'-3" rem 2'-6" VENEER CEILING @BEAM bottom VENEER CEILING @BEAM BOTTOM(COVED CEILING) VENEER CEILING @BEAM bottom 5" FALSE CEILING SECTION CC UPPER FLOOR 6" 6" 3" 3" POP FALSE CEILING @BEAM BOTTOM VENEER CEILING 6" SUSPENDED from beam bottom INDIRECT LIGHT DETAIL B 6" MILD FILLETED EDGE
4'-8" 2'-0"
2'-0" 4'-8"
MODI
R1'-6"
R2'-9"
54 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT #NAME OF CONSULTANT #NAME OF CONSULTANT HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH MASTER BEDROOM FALSE CEILING LAYOUT AREA DATE 31/03/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED #CONTACT NUMBER #CONTACT NUMBER #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com
SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 31/03/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FLOOR LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: 04 fan to be in center if the room01 11/06 false ceiling rev02 17/06 furniture layout revision03 27/07 JUMANA AR. KINJAL T C C SEATING SBa SB1SB4 SB3 SB2 SB5 SB6a SB6 SB7SB5a SB1a SB11 9" PALMATE 3" PALMATEac 2 ac 1 A A 6" EQ EQ 6" 8'-10" EQ EQ POP ceiling @ beam bottom finished with paint as per selection 3'-6" 5'-2" 4'-1" 4'-1" 5'-3" 1'-9" 5'-8" 2'-0" 5'-8" 1'-9" 4'-8" 1'-3" 13'-9" 1'-3" 13'-4" 6" as per site aprrox_35'-11" FALSE CEILING SECTION C-C' 6" 1" 6" 1" rem 6'-6 1 2 1" 6"1" 6" BB FALSE CEILING SECTION A-A' false ceiling false ceilingfalse ceiling1'-3" false ceiling false ceiling false ceiling AC 2'-0" INDIRECT LIGHT 10"1'-3" 6" eq 1'-21/2" eq 1'-21/2" 12'-9" 8'-5" 8'-5" 5" 3'-6" 1'-3" 1'-3" 2'-9" 8'-2" 2'-9" 1'-3" 1'-2" 6" 4'-8" 1'-3" rem 13'-81 2 1'-3" 1'-2" as per site aprrox_35'-11" POP ceiling lvl @ -1'3"from slab finished with paint as per approved sample POP ceiling lvl @ -10"from slab finished with paint as per approved sample POP ceiling lvl @ -5"from slab finished with paint as per approved sample 6WT LED 6WT LED 6WT LED 6WT LED 6WT LED AC AC1'-3" PALMATE INDIRECT LIGHT Detail-A 1"X1" GROVE 2'-3" 1'-2 1'-21 2 1'-3" 2'-9" 4'-1" 4'-1" 5" 5" INDIRECT LIGHT 3'-6" 5'-2" 4'-1" 4'-1" 5'-3" 13'-4" 6" as per site aprrox_35'-11" POP ceiling lvl @ -1'3"from slab finished with paint as per approved sample 6WT LED 6WT LED15 WT LED 15 WT LED 2'-0" 1'-3" 10" 5" 9" 1'-0" 1'-0" 1'-3" 3'-5" 2'-0" 3'-5" 1'-3" 9" 2'-0" 1'-3" 8'-10" 1'-3" as per site aprrox_16'-10" POP ceiling lvl @ -1'3"from slab finished with paint as per approved sample POP ceiling lvl @ -10"from slab finished with paint as per approved sample POP ceiling lvl @ -5"from slab finished with paint as per approved sample 6WT LED 6WT LED 15WT LED 15WT LED INDIRECT LIGHT 9" 2'-0" 1'-3" rem 8'-10" 1'-3" 2'-6" 3" as per site aprrox_16'-10" 9" 1'-0" 1'-0" 1'-3" 3'-4" 3'-1" 1'-3" 1'-0" 1'-6" 2'-0"
4'-8" 2'-9" 9"
2'-0" 4'-8" 2'-9" as per site aprrox_16'-10" INDIRECT LIGHT eq 2'-5 1/2" eq 2'-5 1/2" eq 2'-5 1/2" eq 2'-5 1/2" rem 9'-10" 8"8" eq 2'-5 1/2" eq 2'-5 1/2" eq 2'-5 1/2" eq 2'-5 1/2" rem 9'-10" 8"8" 2'-5" 1'-3" 2'-9" rem 8'-2" 2'-9" 1'-3" 1'-9 1 2 1'-9 1 2 3'-7" 3'-7" 1'-9 1 2 1'-9 1 2
6" 1"6" 1" rem 11'-41 2 1"6" 1" 6" POP ceiling @-1'-3" from finished slab bottom 6" Detail-B 6" R1'-0" R5"2'-3" 4'-8" 2'-6" 1'-0" 1'-0" 3'-5" 3'-5" 5" Detail-C 1'-2" 13'-4" 6" POP ceiling @-10" from finished slab bottom POP ceiling @-5" from finished slab bottom POP ceiling @ beam bottom finished with paint as per selection POP ceiling @ beam bottom finished with paint as per selection 9" 2'-11" 3'-9" 3'-9" 2'-11"2'-9" 5'-8" 5'-8" 2'-9" DL1DL1 DL1 DL1 DL2DL2 DL2 DL2 CL1 CL1 CL1 CL1 CL2 CL2 CL3 CL3CL4 CL4 CL3 CL3CL5 CL5 TL1 WP1 CL6 CL6 CL6 CL7 CL7 CL7 RL1(indirect light ) RL3(indirect light ) RL2(indirect light in bed) RL4(indirect light ) RL4(indirect light ) RL3(indirect light )9" PALMATE WP2 SB10 SB9 SB8 2'-6"2'-6" 3" 1'-0" 1'-6" 2'-11" 3'-9" 3'-9" 2'-11" 2'-9" 1'-2" 2'-11" 3'-9" 3'-9" 2'-11" 6"1'-3" 1'-2" rem 13'-4" 2'-11" rem 7'-5" 2'-11" 6" 3" 6" 6" Detail-B indirect light POP ceiling @ -6" recessed from beam bottom finished with paint as per approved sample POP ceiling @ beam bottom finished with paint as per selection eq 3" eq 3" mild filleted edge 6" 2" 3"5" Detail-A indirect light POP ceiling @ -10" from slab finished with paint as per approved sample POP ceiling lvl @ -5" from slab finished with paint as per approved samplemild filleted edge FALSE CEILING SECTION B-B' FALSE CEILING PLAN POP ceiling @ -6" recessed from beam bottom finished with paint as per approved sample 1'-9" 5'-7" 2'-6" 5'-4" 1'-6" 3" 9" POP ceiling @ -1'3" from slab finished with paint as per approved sample INDIRECT LIGHT6" 1 " 1'-3" Detail-C
A
6"
1'-7"
2'-3"
A
CEILING
@ -1'-2" FROM
SLAB as per site approx_6'-9"
rem 5'-9"
1'-7"
1'-4"
6"
1'-4"
B B
light )
SB12
TL1
2'-1"
2'-6"
2'-1" WP1 6"
5'-9" as per site approx_6'-9"
rem 9'-5" 2'-2"
55 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT #NAME OF CONSULTANT #NAME OF CONSULTANT HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH MASTER BEDROOM:WASHROOM DRESSING FALSE CEILING LAYOUT AREA DATE 31/03/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED #CONTACT NUMBER #CONTACT NUMBER #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 31/03/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FLOOR LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: 04 fan to be in center if the room01 11/06 false ceiling rev02 17/06 furniture layout revision03 27/07 JUMANA AR. KINJAL T WP1 ON/OFF TL 1 ON/OFF 2 NOS. 5AMP PP + SW SB15 @HT.3'0" (8M) SB12 SB13 4" SB14 SB15 1'-6" 2'-8" 2'-8" 1'-6"1'-6" 3'-8" 2'-0" 3'-8" 1'-6" 4'-2" 4'-2" false ceiling false ceiling AA 3'-10" rem 8'-3" as per site aproox_12'-1" 1'-6" 2'-8" 2'-8" 1'-6" PLAN 6WT LEDINDIRECT LIGHT 9" DL1 ON/OFF CL1 ON/OFF RL1 ON/OFF INDIRECT LIGHT AC POINT ON/OFF SB12 @HT.4'0" (4M) DL1 CL1 5AMP PP FOR WALL FAN SB14 @HT.7'0" (2M) TOILET AREA OPERATION SW FOR FAN SB13 @HT.4'0" (2M) TL1 SECTION AA 3'-9" 3'-8" 2'-0" 3'-8" 3'-9" as per site (aprrox_16'-10") 3'-10" 3'-10" rem 8'-3" as per site (aprrox_12'-1") RL1 INDIRECT LIGHT 2'-3" 2'-3" POP CEILING LVL @ BEAM BOTTOM CLEAR HT FROM FLOOR +8'-1" POP CEILING LVL @ BEAM BOTTOM POP CEILING LVL @ -15" CLEAR HT FROM FLOOR +9'-0" POP CEILING LVL @ -15" CLEAR HT FROM FLOOR +9'-0" Detail-A 3'-7" 8'-5" 8'-5" 3'-10" 1'-3" B B 3'-9" 3'-7" 2'-4" 3'-7" 3'-9"1'-3" 6" 15WT LED 15WT LED 3'-9" 3'-7" 2'-4" 3'-7" 3'-9" false ceiling false ceiling CASSETTE AC as per site aproox_16'-10" elevation line DL1 DL1DL1 CL1 CL1 CL1 CL1 CL1 WP1 15WT LED POP CEILING LVL @ -15" CLEAR HT FROM FLOOR +9'-0" SECTION BB 6" rem 5'-9" 6" 6" 1'-7" 1'-4" 1'-4" 1'-7" 6" as per site aproox_6'-9" 6WT LED 6WT LED 15WT LED SECTION AA Detail-B TILE FINISH LVL@ APPROX 8' false ceiling INDIRECT LIGHT 8" 1'-2" POP CEILING LVL @ -1'-2" FROM FINISHED SLAB POP CEILING LVL @ -8" FROM FINISHED SLAB NT
SB13 SB13a rain shower 2'-5" 2'-5" 2'-5" 2'-5" CL1
as per site approx_9'-10" 1'-2" 1'-2" 2'-4" 2'-3" 2'-3" 4'-6" 6" 1'-10" 2'-10" 2'-10" 1'-10" 6" 1'-8"2'-6"
5'-3"
6"
RL1(indirect
POP
LVL
FINISHED
POP CEILING LVL @ -8" FROM FINISHED SLAB 6"
6" 1'-10" 2'-10" 1'-10" FAN 1 2'-10" R1'-0" 6" 6" DL1 6" eq 3'-4 1 2 eq 3'-4 1 2 as per site aproox_16'-101 2 CL2CL2CL2 DL1DL1 CL1CL1 CL1 1'-2" 8"false ceiling 2'-2"1'-10"5'-9"1'-10"3'-0"2'-3" 2'-2"rem 9'-5"5'-3" as per site aproox_16'-101 2 " 15WT LED POP CEILING LVL @ -8" FROM FINISHED SLAB 15WT LED15WT LED POP CEILING LVL @ -1'-2" FROM FINISHED SLAB TILE FINISH LVL@ APPROX 8' INDIRECT LIGHT POP CEILING LVL @ -8" FROM FINISHED SLAB SECTION BB
INDIRECT LIGHT POP CEILING LVL @ BEAM BOTTOM CLEAR HT FROM FLOOR +8'-1" 9'' 6" 3" 6" MILD FILLETED EDGE POP CEILING LVL @ -15" CLEAR HT FROM FLOOR +9'-0" DEATIL -A 6" 3" 3" 6" POP ceiling @ -8" from slab finished with paint as per approved sample POP ceiling @ -1'2" from slab finished with paint as per approved sample TILE as per selection INDIRECT LIGHT DEATIL -B mild filleted edge DRESSING AREA: CEILING PLAN WASHROOM : CEILING PLAN opening
1' 6" 1'-9"2'-3"
5" 3'-4" 1'-6" 3'-7" 2' 3'-7" 1'-6" 1'-5" 2'-3" 2'-2" 9" 3'-9" 12'-2" 1'-5" 4'-5" 9" as per site approx_22'-7"
CEILING
SB-3 @HT.2'0" (8M)
6" 2'-5"
1'-6" 1'-6" 4'-1" 4'-1" 1'-6" 1'-6" 2'-10" 2'-10"
1'-6" rem 11'-3" 1'-6" 5'-9"
SBa @HT.4'0" (2M)
CL1 on/ off with two way from
SB-2 @HT.2'0" (8M)
CL1 on/off
1'-6" 1'-6" 4'-1" 4'-1" 1'-6"
5"
from
on/ off & two-way from
FAN1 on/off with two-way
CL2 on/off indirect light for bed WP3 on/off (ht 2'0")
FAN 1 on/off + speed reg. with two-way from SB2(2M) 5 amp pp+ switch
ceiling lvl @ -6"
height
@
as per site approx_22'-7"
3'-9" 12'-2" 1'-5"
4'-5" 9"
3'-4" 1'-6" 3'-7" 2' 3'-7" 1'-6" 1'-5" 2'- 2 1 2 " 2'-2 1 2 " 9"
Detail-A
SBaMASTER SWITCH
B B
1'-6" 1'-6" 8'-3" 1'-6" 1'-5" 2'-10" 2'-10"
SB-4 @HT. 6" (3M)
AA
as per site approx_22'-7"
6'-1" 6'-1"
5'-7" 5'-7"
3' 4'-1" 4'-1" 3' 2'-10" 2'-10"
as per site approx_22'-7"
1'-6" 11'-3" 1'-5" 5'-9"
5 amp pp +switch
SB-4a @HT. 7'0" (3M)
5 amp pp +switch
14'-4"
eq eq
1'-5" 4'-5" 9"
1'-6" 3'-7" 2' 3'-7" 1'-6" 1'-5" 9"3'-9" 12'-2"
9" 2'-10" 3'-7" 3'-7" 3'-7"
SB-5 @HT. 4' (6M)
CL3 on/off FL1 on/off 5 amp pp +switch
SB-1 @HT.4'0" (5M)
5 amp pp+ switch DL2 on/off with two way from SB2 RL1ON/OF
DB SW included in SB-01
box outside deep's bedroom
false
with
56 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT #NAME OF CONSULTANT #NAME OF CONSULTANT HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DEEP BEDROOM FALSE CEILING LAYOUT AREA DATE 02/04/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED #CONTACT NUMBER #CONTACT NUMBER #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 02/04/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FLOOR LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: 04 fan to be in center if the room01 11/06 false ceiling rev02 17/06 furniture layout revision03 27/07 JUMANA AR. KINJAL T WARDROBE SENSOR LIGHT 9" DL2 DL2 DL2 DL2 DL1 DL1 CL2 CL2 CL2 CL2 CL3 CL3 CL3 FL1WP2 WP3 SB4 SB4a SB5 POP CEILING LVL @ -6" CLEAR HT FROM FLOOR +9'-6" POP CEILING LVL @ -12" CLEAR HT FROM FLOOR +9' POP CEILING LVL @ beam bottom CLEAR HT FROM FLOOR +7'-9" POP CEILING LVL @ -1'-9" CLEAR HT FROM FLOOR +8'-3" SB1 SB2 SB3 CL1 CL1 CL1 CL1 WP4
with two way
SBa DL2
SB1 DL1 on/ off
from SB3 WP2 on/off (ht 2'0") 5 amp pp+ switch
SB2
DB
above
ceiling
openable shutter in false ceiling FAN 1
INDIRECT LIGHT15WT LIGHT6WT LIGHT6WT LIGHT15WT LIGHT POP PUNNING, ROUND EDGE 6"6"detail a
1'-6" 2'-10" 2'-10" as per site approx_19'-11" 1' 6" POP CEILING LVL @ -12" CLEAR HT FROM FLOOR +9' POP CEILING LVL @ -6" CLEAR HT FROM FLOOR +9'-6" POP CEILING LVL @ -2'-5" 15WT LIGHT 15WT LIGHT 15WT LIGHT 6WT LIGHT INDIRECT LIGHT 1'-6" rem 11'-3" 1'-6" 5'-9" as per site approx_19'-11" FALSE
SECTION A-A' FALSE CEILING SECTION B-B' 9" 2'-10" 3'-7" 3'-7" 3'-7" as per site approx_14'-3" 4'4'4'4'1'-5" as per site approx_17'-5" 3'-8" 3'-6" 3'-6" 3'-6" 3'-3" FXDQ50NDV36 1.67TR 4'-5"4'-9" FXDQ50NDV36 1.67TR 4'4'4'4'1'-5" as per site approx_17'-5" 3'-8" 3'-6" 3'-6" 3'-6" 3'-3" FALSE CEILING PATTERN 6"eq eq6" POP ceiling
-12" from slab clear height @ +9'-0" from finished floor, finished with paint as per approved sample
POP
from slab clear
@ +9'-6"from finished floor, finished with paint as per approved sample indirect light mild filleted edge
15WT LIGHT
1'-3"
POP CEILING LVL @ -0'-15"
HT FROM FLOOR +9'-0"
ceiling
CASSETTE
2'-3" 1' 4'-2" 1' as per site approx_8'-5"
FALSE CEILING SECTION A-A'
B
15WT
POP CEILING LVL @ -0'-15"
HT FROM FLOOR +9'-0"
1'-3"
1'-3"
FALSE CEILING SECTION B-B'
B
15WT LIGHT
POP CEILING LVL @ -7" CLEAR HT FROM FLOOR +9'-8"
15WT LIGHT
7"
15WT LIGHT6WT LIGHT 6WT LIGHT
7"
1'-7" 2'-1" 2'-1" 2'-1"
rem 7'-11"
6" as per site approx_8'-5"
FALSE CEILING SECTION A-A'
B
POP CEILING LVL @-7" CLEAR HT FROM FLOOR +9'-8"
2'-1" 2'-1" 2'-1" 2'-1" 8'-5"
A
AREA: CEILING PLAN
false ceiling pop ceiling clear ht from floor +9'-0"
SB-8 @HT.3'0" *(8M)
switch for pp @SB9a WP5 on/of HL2 on/of PP+ switch
SB-8a @HT.1'6" *(6M)
5amp pp *height as per furniture detail
6" 7'-9"
6" 7'-9" as per site approx_7'-9"1'-9" 1'-9" 2' 2'
6" 1'-9" 1'-9" 2' 2'
FALSE CEILING SECTION B-B'
WASHROOM: CEILING PLAN
SB9 CL4 CL4
2'-1" 2'-1"2'-1"2'-1"
on/ off
on/off
on/off
eq 6" DL4 rain shower
2'-3" eq
POP CEILING LVL @ -7" CLEAR HT FROM FLOOR +9'-8"
DL5
1'-9" 1'-9" 8'-5"
WP6 2'-0" 2'-0"eq eq
EF-1
B
4'-2" 4'-2"
as per site approx_8'-5"
SB-9@HT.3'3" (8+2M)
A
on/ off (profile light behind mirror)
SW for wall fan
SW for exhaust
amp pp+ switch
SB-9a @HT.7'0" (2M)
AMP pp for fan
57 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL #NAME OF CONSULTANT #NAME OF CONSULTANT #NAME OF CONSULTANT HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DEEP BEDROOM: DRESSING AND WASHROOM FALSE CEILING LAYOUT AREA DATE 02/04/21 / 1 3 E / 9 1 SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED #CONTACT NUMBER #CONTACT NUMBER #CONTACT NUMBER 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 02/04/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FLOOR LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: 04 fan to be in center if the room01 11/06 false ceiling rev02 17/06 furniture layout revision03 27/07 JUMANA AR. KINJAL T POP CEILING LVL @ -0'-15" CLEAR HT FROM FLOOR +9'-0" 2'-0" 1'-3" 4'-8" 1'-3" DL3 DL3 DL3 TL1 1'-0" 2'-1" 2'-1" 1'-0" SB7 SB8 6" 10" eq WARDROBE SENSOR LIGHT DL3 WP5 10 1 2 " A SB-7 @HT.4'0" (4M) DL3 on/ off TL1 ON/OF 1'-2" 1' 2'-1" 2'-1" 1' 2'-3" rem 6'-2" as per site approx_8'-5" 2'
4'-8" 1'-3" 6" 9'-2" 6" as per site approx_9'-2" CASSETTE AC 2' 1'-3" 4'-8" 1'-3" 9'-2" 6" as per site approx_9'-2"
LIGHT 15WT LIGHT TRACK LIGHT
CLEAR
AC false
15WT LIGHT
CLEAR
WARDROBE
A
3nos.
3Nos.
DL4
CL4
DL5
WP6
1
1
5
5
detail a
DETAIL-A DRESSING
elevation area:45.05
CD elevation area:45.05 sq.ft
False
10" rem 3'-4" 10"
1'-3" 1'-4"
3'-3"
2'-10"
LEDGE WALL
5'-6"
ELEVATION AB
ELEVATION BC
stone
area:51.28
ceiling
rem 3'-4"
1" 1" 1'-1"
1'-4"1'-11" 3'-6"
6mm groove
DOOR
tile
cabinet
w.c.
rem 3'-4" 10"
ledge wall 4'-0" 7"
1'-6" rem 2'-7"
per site approx_5'-2"
D ELEVATION CD
as per site aprrox6'-4"
WALL
ELEVATION
LEDGE
SB-1aT.7'0" (2M)
5AMP PP WALL FAN
SB-1 @HT.4'0" (8M)
CL1ON/OFF NICHE LIGHT WP1 ON/OFF (MIRROR PROFILE LIGHT) 5 AMP PP+ SWITCH 1 SW FOR EXHAUST SW WALL FAN ON/OFF
ELECTRICAL LAYOUT
58 CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: SCALE- 1:XXX SITE AREA --- SQ.FT. NORTH DRAWING TITLE: POWDER TOILET: TILLING LAYOUT AREA DATE 20/04/21 R E 1 9 / 1 3 E / 9 3 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. 01 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT CODE: DATE 20/04/21JUMANA DRAWING TITLE: RESIDENTIAL PENTHOUSE INTERIOR PROJECT ADDRESS: 10TH FLOOR (UPPER), HERITAGE CORNER, GOTRI ROAD, VADODARA MITTAL BHAI 7833443330 NINTH FLOOR CLIENT: MR. BHAVESH DOSHI RE - 19/13 AR. KINJAL T. JUMANA PARAWALA 8780508475 9426621992 CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT COB (CL) FOOT LIGHT (FL) TRACK LIGHT (TL) SPLIT AC LEGEND: UP opening NT PLAN TOILET 6'-4" X5'-2" C DA B as per site aprrox_5'-2" eq eq eq eq 4'-0" 1'-2" as per site 3'-1" 2'-2" mirror cladded on ply counter top as per selection basin as per selection tap as per selection W/C 5'-2" 6" 6"SB1 6'-4"(as per site aprrox) 4'-0" 2'-3" LEDGE WALL DETAIL A floor area:32.45 sq.ft NT
TOILET 6'-4" X5'-2" C DA B as per site aprrox_5'-2" 1'-2" as per site 3'-1" 2'-2" CL1 SB1 6'-4"(as per site aprrox) CL1 1'-9" 2'-10" 1'-9" as per site aprrox_6'-4" 2'-7" 2'-7" HL1
SB1a False ceiling niche niche mirror cladded on ply statuario wall tile DRAWERDRAWER DRAWERDRAWER hanging light indirect light tap as per selection niche finished with veneer polished as per approved sampledrawer font finished with veneer polished as per approved sample karat joint in veneer 112" thk. counter top finished with stone as per approved sample as per site 5'-2" 10" 1'-8" 1'-8" 10" 2'-10" 1 1 2 6" 9" rem sport light basin as per selection 1'-4" 3 4 full tile 5'-6" rem 3'-3" 6mm groove A B w.c. False ceiling B C 1'-4" 3'-6"2'-10" 1 1 2 3 4 " 1'-3" hendal for data basin as per selection tap as per selection 112" thk. counter top finished with stone as per approved sample drawer font finished with veneer polished as per approved sample mirror cladded on ply indirect light
rem
as per site approx_6'-4"1'-2" SB1a BC elevation area:51.28 sq.ftAB
sq.ft statuario tile(110"X66") rem
rem 2'-10" full tile 5'-6" rem 3'-3" START Handel for data 6mm groove statuario tile B
ceiling statuario tile
1"
1" finished with stone as per selection katra joint in
wc indirect light sport light C
1'-5"
10"
7"
1'-1"
as
rem
full tile
False
statuario
1'-4" 3'-6" 2'-9" 2'-11 2 " as per site 3'-1" 1'-11 2 " 6mm groove 2" 1'-4" rem 3'-3"4'-0" match with lintel line (3'-11") 3" rem 3'-4" 3" counter top basin stone as per selection shutter finished with veneer polished as per approved sample Handel for data indirect light D A SB1 DA elevation
sq.ft START 7" rem 4'-1" 1'-1" rem 3'-3" full tile 5'-6" as per site 9'-10"
DA 19mm tile 4 1 2 " 19mm tile statuario wall tile karta joint selected stone mortar standard marble shutter finished in veneer + polish selected countertop basin katra joint 1 2" chamfered edge 4mmx4mm groove 19mm stone as per selection DETAIL-A C DETAIL-B DETAIL-C WHITE STATURIO TILES 66" X 110" 5'-6" 9'-2"
08 O T H E R S VADODARA R E S I D E N T I A L B U N G L O W (ARCHITECTURAL AND INTERIOR) SAURABH SHAH 60 • KITCHEN DETAIL GRISHMA DOSHI 62 • BEDROOM CEILING & ELECTRICAL • TOILET PLUMBING DETAIL
FRIDGE
A D B
C
KITCHEN
X 10'-10"
utility
A D B
C
KITCHEN
X 10'-10"
1'-9"
FRIDGE
12'-6"
cooking platform storage2'-3" 2' 1'-9" drawer serving platform pullout cabinet openable shutter
openable shutter store entry kitchen utility entrty drawer 2'-3" 4'-5" 2' 4'-9" 3'-3" 10' 2'-3" 2'-6" 2'-9" 7'-6" 2'-9" 1'-4" 1'-5" 10" 3'-9" 2'-2" 2'-1" 2'
12'-6"
6' 2'-3" 2'
serving platform pullout cabinet openable shutter
7'-1" 4'-5" 1'-3"1'-6" 2'-10" 3'-3" 4'-9" 2' 2'-3" openable shutter 10' kitchen
entrty storage entrty 2'-3" 1'-6" 2'-9" chimney unit 2'-2" 2'-1" 3' 1'-9" 1'-8" 10'-10" CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KHUSHBOO JOSHI PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: KITCHEN AREA GROUND FLOOR DATE 05/01/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGALOW PROJECT CODE: RE - 19/65 PROJECT ADDRESS: CLIENT: MR.SAURABH SHAH DATE 05/01/21 AR. KHUSHBOO JUMANA PARAWALA JUMANA PARAWALA 12'-6" 10'-10" DRAWING/DINING 17'-6" 18'-2" 4'-6" 7'-4 5'-0" 3'-0" UP PLAN PLAN overhead cabinet detail drawer vertical unit storagevertical unit 2' 60
SRIVASTAVA
MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20
(0265) 2255025 / 2252025
drawer drawer drawer drawer drawer pullout cabinet serving platformcooking hob as/selection ELEVATION A 1'-3" 5' 3' 1'-6" 10'-9" chimney unit pull out drawer pull out drawer pull out drawer openable shutter pullout cabinet ELEVATION B dry platform 1' 1'-2" 1'-5" 1'-5" 2'-6" 2'-6" 3" 6" 9" 2'-1" 1'-5" 1'-5" 10" 2'-9" 2'-3" 9" 2'-9" 5'-3" 1'-3" 1' 6" 10'-9" serving platform fridgeopenable shutter open shelf STORAGE VERTICAL UNIT store entry 3'-8" 1'-1" 1'-7" 2'-7" 8' 2'-9" 1'-8" 1'-8" 1'-9" 2' 2'-10" 6'-2" 2'-9" 8' drawer drawer openable shutter openable shutter cooking hob as/selection kitchen utility entry chimney unit 5' 4'-9" 2'-9" pull out drawer pull out drawer pull out drawer 9" 2'-1" 2'-1" 2'-6" 2'-6" 1'-10" 9" 2'-1" 2'-3" 5' 2' 12'-1" 2'-2" 2'-2" 2'-6" 2'-3" 2'-3" 1'-5" 1'-5" 10'-9" 2'-3" 3'-7" 2"6'-9" 3'-9" 4'-9" 7'-6" 11'-7" 10'-9" 2'-6" 3'-4" 2'-2" 2'-2" 2'-1" 9" 5'-10" 4'-5" 2'-3" 9" 13'-8" CONTACT DETAILS: PROJECT DESIGNER AR.HITESH MODI PROJECT HEAD AR.KHUSHBOO JOSHI PROJECT TEAM PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA 1600SQ.FT. NORTH DRAWING TITLE: KITCHEN AREA GROUND FLOOR DATE 05/01/21 R E 1 9 / 6 5 E / 0 DRAWING NO. SHEET 1 OF 3 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI
& ASSOCIATES 16-
PH.:
REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: RESIDENTIAL BUNGALOW PROJECT CODE: RE - 19/65 PROJECT ADDRESS: CLIENT: MR.SAURABH SHAH DATE 05/01/21 AR. KHUSHBOO JUMANA PARAWALA JUMANA PARAWALA KITCHEN 12'-6" 10'-10" DRAWING/DINING 17'-6" 18'-2" 4'-6" MANDIR 5'-0" 3'-0" ELEVATION DELEVATION C drawer drawer drawer PU finished drawers (color as per selection) Island chimney as per selection wall tiles as per selection 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 4mm clear glass with profile handle 6" 6" 1'-2" 1'-2" 8" 8" 10" 9"7" 6' 2'-9" 9"7" 2" 5" 5" 1'-2" 1'-7" 1'-3" 1'-3" 1'-6" 3'-6" 2'-9" 5" 5" 1'-2" 9" 3'-6" 7" 1' WALL COLOUR oven as per selection built-in microwave as per selection openable shutter openable shutter 1'-6" 1' openable shutter built-in microwave as per selection oven as per selection openable shutter 1'-8" 2'-11" 1'-8" 61
Detail-A
SB-4 (@ht. 1'-9") (8M)
C4(a) ON/OFF ONLY
DL1(b)/DL4(b) ON/OFF ONLY
F4(c)ON/OFF ONLY
F4 FAN SPEED OPERATION
5 AMP PP INT. + SWITCH note: as per furniture detail
SB-2a
SB-2 (@ht. 3'-0") (8M)
3-SWITCHES TO OPERATE SB2a PP RL2(d) ON/OFF ONLY STUDY TABLE
5 AMP 1PP + 1SWITCH
RL2(d)
5 AMP 3 PP3'-3"
SB-2a (@ht. 2'-0") (6M)
F1(c) F4(c) DL1(b) DL4(b) DL1(b) DL4(b)
C4(a)
SB-9 (@ht. 3'-6") (10M)
WF9(a) EXHAUST FAN ON/OFF
WP9(b) ON/OFF ONLY
HL9 (c) ON/OFF ONLY
RL7(c)
TL9(d) TL9 (d) ON/OFF ONLY
WF9(e) WF9(e) ON/OFF SWITCH TO OPERATE SB9a PP RL9(f) ON/OFF ONLY C9(g) ON/OFF ONLY
5 AMP PP INT. + SWITCH
note: as per furniture detail
SB-9a (@ht. 7'-1") (2M) PP FOR FAN
SB-10 (@ht. 7'-1") (3M)
TOWEL WARMER PP + SWITCH
note: as per furniture detail
WF10(a)
SB-9(a)
DL7(b)
DL1(b) ON/OFF 2 WAY WITH SB4 C1(a) ON/OFF ONLY RL1(c)
AC5(C)
SB-1 (@ht. 7'-1") (4M)
RL1(c) ON/OFF ONLY
F1(c)ON/OFF ONLY
SB-1(a) (@ht. 8'-0") (2M)
AMP PP INT. + SWITCH
Cera sheet inclined ceiling @ 1'-1"
C1(a) C1(a)
SB-1(a)
SB-5 (@ht. 1'-9") (8M)
RL5(a) BED LIGHT ON/OFF ONLY
WP 5(b) ON/OFF ONLY
SWITCH ON/OFF ONLY
5 AMP PP INT. + SWITCH note: as per furniture detail
SB-6 (@ht. 1'-9") (4M)
5 AMP PP INT. + SWITCH rain shower
SB-7 (@ht. 3'-6") (3M) DL7(a) ON/OFF ONLY
DL7(b) ON/OFF ONLY
RL7(c) ON/OFF ONLY
WF8(b)
SB-8 SB-8a
SB-8 (@ht. 3'-6") (3M)
WP8(a)
WP8(a) ON/OFF ONLY WF(b) SWITCH TO OPERATE SB8a PP TL8(c) ON/OFF ONLY
SB-8(a) (@ht. 7'-1") (2M)
PP FOR FAN
SB-8(b) (@ht. 2'-0") (3M)
INT. +
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM JUMANA PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: GRISHMA'S BEDROOM ELECTRIC AREA BEDROOM & BATHROOM DATE 17/03/21 R E 1 9 / 0 1 H K / 1 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: INTERIOR RENOVATION PROJECT CODE: RE - 19/01 PROJECT ADDRESS: 11, "KAILAS", CHAROTAR PARK SOCIETY, O.P. ROAD, VADODARA CLIENT: GRISHMA DOSHI DATE 17/03/21JUMANA AR.KINJAL LEGEND: CEILING FAN WALL/FLOOR FAN DOWN LIGHT (DL) HANGING LIGHT (HL) WALL POINT (WP) SWITCH BOARD (SB) CASSET AC ROPE LIGHT (RL) COB (CL) FLOOR LIGHT (FL) TRACK LIGHT (TL) SPLIT AC A A WARDROBE 3" DROP 1" DROP PLAN 6'-9" 6 1 2 12'-3" 15'-9" 12'-3" 6 1 2 6'-9" 15'-9" 1'-7" 6'-2" 4'-6" 4'-2" 3' 5'-1" 4'-6" 5'-10" 3'-2" 2'-4" TV UNIT SIDE TABLE SIDE TABLE 1'-6" OPENABLE SHUTTER OPENABLE SHUTTER OPENABLE SHUTTER STUDY TABLE SB-1 SB-2SB-3a SB-4 SB-5 SB-3 SB-6 SB-7SB-9 SB-10 6" SB-3b SB:3a (3'-6"HT. ) ( 3 M ) SB:3 (1'-9"HT. ) ( 8 M ) SB:3b (1'-3"HT.) (8 M) SB3 SB3a SB3b1" x 3 Conduit for all wires internally connected with each other 2" Flexible Conduit For HDMI CABLES PP for additional speaker PP for TV RGY Cable from TATA SKY RGY Cable from DVD Player PP FOR DVD Speaker pp PP for set top box ON-Off of LCD On-Off of DVD Player On-Off of TATA SKY set up box On-Off of Speaker 5 AMP PP + SWITCH C4(a) DL1(b) DL4(b) DL1(b) DL4(b)
C1(a) WP9(b) WP5(b)
7' 2' 3'-6" 3'-6" 2'-9" 2'-9" 2' 3'-2" 3'-10"RL5(a) 1'-8" 5'-2" 5'-1" 5'-1" 2' 2'-9" 2'-9"
EQ EQ
from slab finished 6"6" 6" EQ EQ 6" EQEQ5'-2"5'-2" 2' WALL HANG WCWF9(a) DL7(a)DL7(b)
15
AC(c)
5 AMP PP
SWITCH
ONLY 5'-6" 3'-10" 1'-6" 1'-6" SB-8b 1'-7" 1'-7" 5'-6"10'-4" 3'-5" 3'-5" 6 1 2 19'-7" 5'-2" 15w led light 15w led light 15w led light cera sheet ceiling suspended form slab finished as per site 15w led light AS PER SITE 3'-3" 3'-10" 3'-2" 2' 3'-4" 3'-5" 12'-3" 6'-9" 6 1 2 19'-7"
C C SECTION CC 9" B B 3'-11"3'-3" 1'-8" SECTION BB TL8(C) 10" 4' 6" 2'-4" NT 2' 2' 1'-9"1'-9" 9" 2'-11"3'-4" POP ceiling 15" drop 10" 15w led light 15w led light 15w led light Cera sheet ceiling at 1'1" suspended form slab finished Inclined POP ceiling from beam bottom 1'-8" 3'-6" 1'-8" 2'-9"2'-9" 10'-4" 15'-9" 3'-6" SECTION AA 15w led light indirect light Detail A Inclined pop ceiling from beam bottom 1' 8" beam bottom 15w led light 15w led light 15w led light POP ceiling at beam bottom 2'-6" 2'-3" 1'-6" 3'-11"1'-7" 10'-4" 5'-5" 15'-9" 2'-11" indirect light 9" pop ceiling at beam bottom 41 2 WARDROBE 9"
Inclined POP suspended ceiling at beam bottom indirect light 6" 2" 3" 5" suspended ceiling of cera sheets at 1'1" from finished slab 9" 2' 2' 1'-11" 1'-11" 2' 6" 2' HL9(c) eq eq 2'-4" 2'-5" 10'-4" POP ceiling at 1'1" suspended form slab finished eq eq 3'-10" 2' 2' 6" 1' RL9(f) C9(g) basin RL9(f) eq eq 10" 5'-6" note: as per furniture detail 5" 6" 5'-6" hand faucet below toilet paper holder above 1'-6" 11" niche NT slope health faucet below toilet paper holder above 62
Detail-A
CONTACT DETAILS: PROJECT DESIGNER AR. HITESH MODI PROJECT HEAD AR. KINJAL THAKKAR PROJECT TEAM JUMANA PROJECT MANAGER/ CO-ORDINATOR STRUCTURAL HVAC ELECTRICAL PLUMBING SETTING OUT NOTE: KEY PLAN: OTHER SCHEDULE: SCALE- 1:XXX SITE AREA XXXXXSQ.M. NORTH DRAWING TITLE: TOILET PLUMBING AREA BATHROOM DATE 17/03/21 R E 1 9 / 0 1 H K / 1 1 DRAWING NO. SHEET 1 OF 2 GENERAL NOTES: 1. ALL DRAWINGS & WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE FIRM OF MSA AND THE SAME MAYNOT BE DUBLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE FIRM. 2. ALL DIMENSIONS TO BE READ AND NOT MEASURED. 3. THE ARCHITECT MUST BE INFORMED OF ANY DISCREPANCIES LACK OF INFORMATION IN DRAWINGS OR IN CASE OF ANY REQUIRED ALTERATIONS BEFORE EXECUTION OF WORK. 4. LINTEL HT IS CONSIDERED FROM RESPECTED FLOOR LEVELS. 5. ALL HEIGHTS ARE FROM FINISHED FLOOR LVL IN CASE OF INTERIOR DWGS & UNFINISHED FLOOR LVL INCASE OF ARCHITECTURAL DWGS. SIGN / ISSUED 9426621992 9825282930 MODI SRIVASTAVA & ASSOCIATES M.S.A HOUSE Email:modisrivastava@yahoo.co.in/gmail.com MODI SRIVASTAVA & ASSOCIATES 16- MANISHA, MANISHA CHAR RASTA, OLD PADRA ROAD, VADODARA-20 PH.: (0265) 2255025 / 2252025 REVISION HISTORY: REV. DATE DESCRIPTION DRAWN BY CHECK BY REV. NO. R0 ISSUED FOR PRESENTATION QUOTATION/ TENDER APPROVAL CONSTRUCTION APPROVED/ CHECKED BY DRAWN BY ISSUED BY PROJECT TITLE: INTERIOR RENOVATION PROJECT CODE: RE - 19/01 PROJECT ADDRESS: 11, "KAILAS", CHAROTAR PARK SOCIETY, O.P. ROAD, VADODARA CLIENT: GRISHMA DOSHI DATE 17/03/21JUMANA Concealed basin spout as per selection spout diverter shower 1' 3' 4' 5'-11" 4 1 2" 3'-2" 5'-10" CLEAR MIRROR WARDROBE DOOR 15'-9" 3" 6'-8" 6'-8" GLASS DOOR wall mounted tap as per selection 3'-6" 2'-4" AS PER SITE As per site(6'-9") AS PER SITE(9'-8") AS PER SITE(8'-5") SB-9 SB-9(a) SB-9 SB-9(a) SB-7 1" DROP 1" DROP SECTION AA SECTION BB WINDOW EXHAUST FAN AS PER SITE(9'-8") 4' 5'-5" 3'-2" 5'-10" WARDROBE AS PER SITE(8'-5") 2' 1'-3" MIRROR SB-9 SB-9(a) 3'-6" 7'-1" SB-10 SECTION CC 1'-9" 1'-9" eq eq AS PER SITE (15'-9") 1'-6"11" AR.KINJAL T. 6" 2' 1' AS PER SITE 8" beam bottom 2'-6" 2'-3" 1'-6" 3'-11"1'-7"2'-11" 9" WARDROBE 9" WARDROBE 3" DROP 1" DROP PLAN 1" DROP 6'-9" 6 1 2 6'-9" 15'-9" 4'-6" 5'-10" 3'-2" 2'-4" 35MM GLASS DOOR SHUTTER 2'-4" SB-7SB-9 SB-10 2'-5" rain shower SB-8 SB-8a WP8(a) SB-9(a) EQ EQ 2' WALL HANG WCWF9(a) 5'-6" 3'-10" SB-8b 2'-6" 2' 2' TL8(C) 4' 6" 2'-4" NT 9 1 2 2' 2' A A B B C C NT slope slope 2'-4" 2' 2'-3" 2' 3'-10" 2' 1'-11" 1'-11" 1'-5" 6" 6" 6" 2'-3" 6" 2'1' 3" 6" 3'-6" 3 4 3 4 1'-11" 8" 3" 7" 2' 6" 1" 5'-3" 1' 2'-11" 1'-11" 1'-11" drawerdrawer drawer drawer drawer drawer drawer drawer 1' 4" till ceiling 1 thk. counter top finished with stone as per selection profile light 11 2 4" 1' profile light profile light 2'-10"3'-6"3'-10" 3'-8" 2' 1'-4" Glass partition drawer finished as per selection drawer finished as per selection 3 4 3" Skirting 3 4 3 4 3 4 2' 2'-4" 2'-5" Concealed basin 1 thk. counter top finished with stone as per selection 7" Drawer Drawer 1' 4" 11 2 2'-10" 4" 8" till ceiling eq eq 5'-3" Hanging light 3'-10" beam bottom as per site False ceiling False ceiling False ceilingFalse ceiling False ceiling 4" 8" 8" 3 4 A profile light profile light Counter finished with stone (as per selection) 1'' gap for opening
19mm thk. ply +4mm mdf + laminate finish as per selection Handel for data 2' 1'-9" 1'-9" 41 2 1'-6" 11" toilet paper holder health faucet cock WC wall hung wc 41 2 " 3'-2" 2'-4" 2'-4" 4' 5'-10" 5'-10" AS per site(15'-9") 1'-4" 1'-4" 3'-3" 1'-5" 1'-10" 2'-10" niche niche 7'-1" 2'-4" 4'6" 41 2 " 3" Skirting 1" DROP 1" DROP health faucet below toilet paper holder above (Concealed flush tank) 63
JAN MAHAL
MSU LAW BUILIDING
RAMESH PATEL NILESH JASHWAL
RAHUL
AGRAWAL
NILESH JASHWAL
SITES PHOTOGRAPHS 64