Keys Breeze February 2020

Page 26

Architectural Control APPLICATION SUBMITTAL PROCESS By Linda Callahan, Architectural Control Department Manager ALL EXTERIOR IMPROVEMENTS to your property must be submitted to the Architectural Control Committee (ACC)

in the form of an application for review. Work cannot commence until you have received approval for your project from the ACC. The following is an outline of the submittal process. 1. Application is submitted to the ACC for consideration. 2. TKPOA front desk staff collects all necessary review fees and compliance deposits and confirms that all necessary documents are signed by the property owner. 3. Architectural Control Department (ACD) Staff conducts a field inspection and photographic records are taken to include with the submittal. 4. The proposed project is then added to the ACC meeting agenda. 5. After ACC has reviewed the application during a regularly scheduled meeting, staff generates an approval/ denial letter. 6. A digital copy of the processed application is recorded and the original application including all related documents is then filed in the owner’s property lot file. The City of South Lake Tahoe (CSLT) Building Department requires approval from TKPOA for issuance of a building permit. ACC applications are available at the TKPOA pavilion front desk located at 356 Ala Wai Blvd., South Lake Tahoe, California or on the TKPOA website at www.tkpoa.com. You may also call the ACD office at (530) 542-6444, ext. 240 and we will be happy to email an application to you.

Keys Breeze

|

FEBRUARY 2020

|

26


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.