EPCM - CONCEPT E --- Engineering P --- Procurement C --- Construction M --- Management
PLF / CUF PERFORMANCE O&M
Detailed Project Report – Financial Closure
ROI , IRR , DSCR , Debt : Equity
Capacity Utilisation Factor(CUF) =Energy measured (kWh) / (365*24*installed capacity of the plant).
Major Components of EPCM Site Selection and Feasibility Analysis Design [ DC/AC ] & Detailed Engineering - BOM Signing of Legal / Power Purchase Agreements Civil / Structural / Electrical Drawings CEIG/TNEB Approvals Procurement of Materials / Execution Strategy Installation of the Plant within the Time Schedule Synchronization and Handing over of plant TNEB / MNRE / TEDA Inspection
Site Selection & Feasibility VAO / DTCP / Statutory Approvals Dry and Non Agricultural land / PCB / Location of Substation and Transmission Grid Approachability of the land from main road Right Of Way Issues Availability of Resources – Water / Elecy / House Work force mobilization Shadow Free Land , Data of flood and storm 20 years Soil Test Report , Contour Mapping
Base Foundation For Structure
Design & Detailed Engineering DC design Structure Design according to Wind Speed PV Syst layout of the plant BOM preparation Procurement plan Site Mobilization Plan Installation Plan Commissioning Action Plan
Civil Work Heat & Rain
HOT TEMP > 45 DEG RAIN / STORM //
Weeds / Bushes // Design of all erection structure - Module Mounting, lighting post, lightning arrestor Design of trenches, water supply, Drainage etc…
Internal Roads & Land levelling
Structural Work Ground Mounted / Roof top / Stand Alone Wind Load calculations Selection of Structural Material /Hot Dip Galvanising Structural Analysis for the load Sasonal Tilting / Auto Tilting structure Construction, supply and erection the mounting
structures in the land
Panel Mounting Structure
DC Design DC Design Calculation Shadow free analysis String Combiner Box / MJB DC BOM preparation Panel layout diagram PV SYST generation report Generation Guarantee file
Skilled Manpower
SCADA No Network No Signal No Telephone Line Controls like Tripping / Closing Risky Remote Monitoring
Site Works 24 x 7
AC Design Selection of Inverters , Central vs String LT Cable Design LT Panel Transformer Design HT Cable Design HT Panel Relay & Control Panel Synchronization Check Panel Revenue Metering & Power Evacuation
Central Inverter Heat & Sound
Power Evacuation Delay in TNEB Works Construction Power
Bay & Space Availability Transmission Line Routing Protection & Tripping Systems
HT Cable Lying
Conventional – LT & HT panel
Compact SS & Power Evacuation Grid Availability Fluctuations Frequency Lower Monthly Shutdown Tripping Feeders Rain , Wind
1 MWp - Solar Plant in Tamil Nadu
23
600 kWp-Roof Mounted
24
On RCC Roof Reed Relays, Hosur – 50 KW
BGS School, Bangalore – 50 KW
KTV Foods, Chennai – 523KW
MRF, Chennai – 15.84 KW
On Metal Sheet and Asbestos Sheet Roofs Braga Industries, Chennai – 20KW
KTV Foods, Chennai – 523KW
Naga Mills, Dindugul – 600KW
KTV Foods, Chennai – 523KW
Quote – Thomas Alwa Edison
We Provide Professional Practical Solar Solution. Thank You ! Pls Contact
Kumar 9551663310
pk30051969@gmail.com
Technical Credentials NAME
DESCRIPTION
P. Kumar Vice President Engineering & Project.
•
•
Professional Engineer with 24 years of experience in Power Plant Engineering & Project Execution, Management, Operation & Maintenance.
•
2 Years in Auroville heading Renewable Power Sector.
•
15 Years served in Govt. Of Oman in charge of Power Generation & Distribution for Ministry of Defense.
•
Successfully Commissioned India’s FIRST 1 MWp Solar PV Plant under JNNSM Scheme .
•