Architectural Portfolio

Page 1

Architectural Portfolio Selected Postgraduate & Professional Projects

Karishma

Garg

Email:karishmagarg.kg@gmail.com

1 Phone:+61415851515


CONTENTS


01

Academic|Postgraduate

02

Academic|Postgraduate

Community within the Ruins

Sharing thre Sacred: A Place for Refuge

03

04

Major Design & Research Studio Housing - Individual 2021

Academic|Postgraduate

Green Vein

Gardening as a Communal Activity Mixed Use-Individual 2019

05

Professional

High Performance Studio: Research & Design Individual 2020

Professional

The Horse Ranch

Architecture (Under Construction) Graduate of Architecture 2021-2022

06

Professional

The Four Units

Dudley House

07

08

Professional

Professional

Architecture Graduate of Architecture 2021-2022

Architecture Renovation Graduate of Architecture 2021

studio A ‘The future premise’

Dichotomous House

09

10

Relocation Proposal Volunteer 2020

Architecture (Under Construction) Architect (Project Lead) 2018-2019

Professional

Academic|Undergraduate

Interior & Architecture (Built) Architect 2017-2018

Thesis Individual 2016

South View School: Institutional

Sustainable School


Community within the Ruins ‘From the room to the city’

Graduation Studio|Postgraduate|Individual | Housing

Year: 2021 Location: Macarthur Street, Ultimo, Sydney Softwares: Rhino, ArchiCAD, Adobe Creative Suite, Physical Modeling

Project Description The study of the migration pattern of Sydney established the issue of the housing market which is lack of inclusivity in terms of demography, amenities and cost. This drove the research question for this project which investigates the ownership of spaces and its effect on inclusivity. Different levels of sharing form the core experience with the slow progression of spaces as one moves from the public ground plane to their private units. The concept of cluster flats is used to break the confines of a traditional apartment and instead form a multi generational living typology where social interactions are experienced with the insertion of public thresholds through communal spaces in each cluster. The idea of a ruin is achieved by inserting a new structure within the existing warehouse and exposing the trusses and brick facade; thus creating green pockets that set diverse environments driving interactions at various levels; therefore creating a community within its ruins.

4


The Research Question The project aim to investigate the OWNERSHIP of spaces and its effect on INCLUSIVITY in a housing model.

Collective v/s Individual Public v/s Private

Size Cost Diversity in People

Does challenging the ownership of spaces create an inclusive housing model that caters to a diverse socio-economic group?

5


Household Size

Household Size

Migration Outwards

Migration Outwards

Migration Pattern

Migration Inwards

Migration Inwards

Age Group Over 49

Age Group 18-49

Household Size

Household Size

Lone Person

Family

Two Person

City Centre

Group Assisted Care

Multigeneration Cluster Housing Lone Person

6

Two Person

Family

Group


Levels of Sharing Private

Unit

Cluster

Semi-Private

Building

Semi-Public

Comminuty

Public

aring l v/s Individual

Sectional Progression

Plan Progression

Unit Level

Cluster Level

Floor Level

Design Principles

Informal Social Interaction Sharing Sharing Informal Social Interaction Downsizing atAtall Communal v/s Individual Communal v/s Individual AllLevels Levels Informal Social Interaction At All Levels

Downsizing Informal Social Interaction Downsizing At All Levels

7


The Built Form Solar Analysis Massing Solar Access Existing Context

Massing Solar Access Height of Neighboring Residential 24m

Level Height

Exisitng Context

Height of Neighboring Residential 24m

D= 20m

H =30m

W=103m

Overshadowing from High Rise

Constraints

Constraints

Finalised Rough Mass The built form was refined by looking at the context

8

existing building.

and


The Built Form The Built Form Response to Context & Exsiting Building Response to Context & Exsiting Building

The Built Form

Re

Define Edges Structural Insert

Response to Context & Exsiting Building Define Edges Define Edges

Structural Insert

Demolish & Define Connect Connect

Demolish & Define Structural Insert Demolish & Define GSPublisherVersion 0.22.100.100

Connect

Define the Ruin

GSPublisherVersion 0.22.100.100

Define the Ruin Define the Ruin Green Interactions

Green Interactions Green Interactions 9


Functional Program The Community Level

Open Market

PAINTER’S GARDEN

PAINTER’S GARDEN BOH

ASSISTED CARE

DIGITAL L

OPEN MARKET

SUMMER GARDEN FOOD HUB

GOODS LINE

10

The Ground Plane


LIBRARY

Functional Program The Community Level

The Ruin Garden

WOOD WORKSHOP

METAL WORKSHOP

OPEN GYM

CYCLE CENTRE

WORKSPACE

RUIN GARDEN

BAKERY

SUSHI RESTAURANT

11


Functional Program The Community Level

The Entrance

Commun

The Groou

Logitudinal Section 12


Functional Program The Community Level

The Entrance Staircase

nity Level

und Plane

13


Functional Program The Building Level

The Sky Terrace

Key

KINDERGARTEN

GREEN BRIDGE

TOILETS

ROOF BELOW F

DW

W

DR

F

DW

14

Sky Terrace Level Plan

DR

W

DR

W

W

OPEN ZONE


Functional Program The Building Level Cluster Level

Key Communal Space Detail Section

SKY TERRACE THE SKY TERRACE

Key Communal Space- Detail Section

herVersion 0.5.100.100

SKY TERRACE

NAP AREA CRECHE GREEN BRIDGE

DAYCARE

RUIN GARDEN BELOW F

DW

W

ACTIVITY AREA

W

W

W

DR

DR

DR

F

DW

ROOF BELOW

15


Functional Program The Cluster Level SKY TERRACE BELOW

ROOF GARDEN

ROOF TERRACE F

DW

F

DW

W

DR

DR

W

W

W

W

DR

W

W

W

DR

DR

DR

F

DW

F

DW

Key

STUDIO 1 PERSON LONE PERSON

TWO BEDROOM 2-3 PERSON SMALL FAMILY 60 sq m

WINE TIME WITH A BOOK

EVENING DINE AT CONVERSATIONS THE BIG TABLE GAME ZONE

KITCHEN F

DW

RUMMAGE THROUGH SHARED STUFF

OM N

W

W

W

LAUNDRY DR

ONE BEDROOM 2-3 PERSON, COUPLE 50 sq m

DR

DR

GARBAGE DW

F

LETS READ

W

KITCHEN

GROUP STUDY OR EAT TOGETHER

SIT BACK & PLAY

WATCH THE HUSTLE & BUSTLE

OOM ON MILY

THREE BEDROOM 3-4 PERSON, LARGE FAMILY 75 sq m

16

Typical Cluster Plan

STUDIO 1 PERSON 25 sq m


Functional Program The Unit Level

Key

Key Communal Spaces at Unit Level

EVENING CONVERSATIONS

DINE AT THE BIG TABLE

WINE TIME WITH A BOOK

F

Two Bedroom Unit with Communal Spaces

17


18

Front Facade


19


Sharing the Sacred A Place of Refuge

Cohesion of People, Belief Systems and Environment

Academic|Postgraduate|Individual | High Performance Studio

Year : 2020 Location : UNSW, Sydney, Australia Area : 1200 sq.m Technical Skills : Hand Sketching & Painting, Rhino, Adobe InDesign, Adobe Photoshop, Adobe Illustrator

Project Description A place where people of all beliefs come together in mutual support and also enhances the local Environment. ‘Shared Sacred’ is reinterpreted as a Garden and ‘Individual Sacred’ as Pastoral Care. Light -weight construction of bamboo domed tents with a shading device like the canopy of a tree to Allow regeneration on site. The project allows re-wilding of the site and provides a spiritual place for people to interact and share within nature.

‘The greatest single antidote to violence is conversation, speaking our fears, listening to the fears of others, and in that sharing of vulnerabilities discovering a genesis of hope.’ 20

-Jonathan Sacks, The Dignity of Difference


8m 4m 2.5m Bio-mass Energy

RWT

110m

Sectional System Diagram for Rewilding the Urbanscape

43m Plan

21


The Shared Space Diagrams The Shared Space Identified

SPACE - IDENTIFIED

Extension to Gathering & Node of Interaction

22

The Shared Space Proposed

The Shared Space Nature + Creation

THE SHARED SPACE - NATURE + CREATION

The Garden Universally Accepted

Domed Sanctuaries with Shaded Canopy

THE SHARED SPACE - PROPOSED

Gathering Space (Co-mingling) & 6 Sanctuaries (Individual)


Interior of Multifaith Space

Entrance- The Gathering

23


24

Individual Faith Pods


25


Green Vein

Gardening as a Communal Activity Housing : Mixed Use

Academic|Postgraduate|Individual Year : 2019 Location : ‘Hellhole’ Sandstone Quarry,14 Wattle Street Pyrmont/Ultimo Site Area: 1.2 Ha Softwares : Archicad, Adobe InDesign, Adobe Photoshop, Adobe Illustrator, Physical Model (Laser Cutting)

Project Description The project addresses the problem of social isolation occurring in apartments of cities by using gardening as a means of interaction and gathering. A Green Vein is introduced vertically along the façade through vines and horizontally through gardening spaces that act as zone for social interaction by intermingling spaces for dining and playing. A mixed-use development is proposed in response to the historical and public nature of the site. A range of apartment types are integrated to allow greater flexibility to choose from, welcoming a range of residents be it a family, student, or young professionals.

26

Entrance to Site with Heritage Boundary


Building Section through Communal Space

27


Design Development Planning

The Site Principle Diagrams

Exisitng Movement

Proposed Movement

Site Plan

Datum-Communal spaces

Scale

Section through Sandstone Wall

Redefining-Central mass

28

Section through Communal Garden

Datums as /function


Design Development Plan & Elevation

Form

Insertion of Circulation Elements

Redefining Shape The Curve

Green Vein Zones of Interaction.

The Building Principle Diagrams

First Floor, Lvl 6000mm Entrance

Elevation with Green Vines

Typical Floor Plan Communal Spaces

29


30

Green Vein Communal Space-Dining Area with Indoor Gardening


31


The Horse Ranch

Class 10a Building into a Habitable Space Dukes Workshop Professional

Role: Graduate of Architecture Year : 2021-2022 Location : Jirrima Cres, Cooroibah, Qld Software Skills: Archicad Responsibilities : Design schemes involving digital massing and visualization, understanding of council codes, height & biodiversity restrictions. Other Contributions : All documentation from DD to DA stage.

Project Description The brief of this project was to transform the farm into a space for retreat for the client to live in, where he could spend his days caring and training horses, amidst a Bali conceptualized oasis. TO achieve this firstly, the existing shed on the farm, originally used a residence had to be bought up to the standards that meet the codes for habitability as per the council. However, the main challenge was to inculcate the conceptual theme of Bali into the project, which was achieved by linking the various existing structures on site with a covered walkway clad with bamboo and thatch roof. An additional thatched roof cabana (bure) was added serving as an outdoor barbecue, linking the pool to the entire house, and thereby extending the usability of the expanse outdoor space on the site. Additional landscape elements mimicking an oat along with bamboo cladding were proposed to transform the site into an oasis.

32

Ariel View Site Picture


View from Main Entrance Proposed Covered Walkway

33


B

Documentation Floor Plan

C 25,258

150

2,906

150

1,250

1,780

900

2,715

3,894 831

3,330

D

695

2,700 260

F

D 05

D 06

storag

W 04

laundry

600 2,150 900

2,380 150

cinem 30.84

lounge

D 10 F

1,585

F

proposed

proposed

kitchen

dining

D 08

D 09 F

exis D 01

900

W 02

proposed garden

1,585

52.34 m2 W 01

1,050

5,870

5,918

study 16.27 m2

P

Attic Floor Plan 150

175

2,990

110

2,200

660

135

pantry

115 975

6,080 6,020

1,490

5,789

F

W

A

150

D 02

D 04

D 03

Ground Floor Plan

900

3,200

200

900 8,700 9,100

34

Ground Floor Plan

B

3,200

900 200

550 1,885

150 600

C


18

130

2,921

2,700 375

100

750 1,220 750 992

2,841 150 300 900 1,000

W 05

W 07

W 06

All dimensions checked on site

COMMENTS REVISION NOTES

W 08

Revisions are shown in orange

age 4,990

8

130 2,700 375

ema 4 m2 ge

W 05

W 06

W 07

studio 10.75 m2 bathroom 5.83 m W 11

W 10

18 130 ma xisting m2 covered 2,700 375 walkway

2,921 F

A

storage

concrete or stone

exisitng F

A

storage 4,990

D 07

2,841 F 150 300 750 1,220 750 992 900 1,000 studio guest W 05 W 07m2 W 08 10.75 m2 W 06 10.45

100

W 10

steel

F

D 07

bathroom

existing

exisitng

F 5.83 m2

F bathroom

storage

exisitng car port entry

550

sting covered

A

bathroom tiles MATERIALS KEY existing concrete slab wall to be demolished level grass timber

600

walkway ema 4 m2

timber decking REVISION NOTES glass MATERIALS KEY Revisions are shown in orange steel wall to be demolished RFI's bathroom are shown tiles in green timber All dimensions checked on site existing concrete slab concrete or stone COMMENTS level grass timber decking glass

1,885

W 09 W 11

wall to be demolished COMMENTS

W 08

bathroom

age

AllMATERIALS dimensionsKEY checked on site

timber

guest 10.45 m2 existing W 09

2

RFI's are shown in green

exisitng

bathroom existing 2,921 2 100 2,841 150 5.83 m bathroom 300 750 1,220 750 992 900 1,000

150

70.00 m xisting covered

F

F

2

walkway

proposed cabana

levelstringy grass bark SBARK

exisitng car port entry

70.00 m

600

2

easement

TT

tea tree

NOT FOR CONSTRUCTION.

TT 0.41210 402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

29A Jirrima Crescent 600

1,885

EPW

SBARK stringy bark

exisitng garage

Cooroibah Qld 4565 ABBREVIATIONS

Proposed

7,000

10,000 proposed cabana

550

NOT FOR CONSTRUCTION.

ABBREVIATIONS

150 150 150

550 5,600

8,600

steel ABBREVIATIONS bathroom tiles EPW easement

TT existing concrete slab tea tree

exisitng garage

600

70.00 m

2

600 7,000

proposed cabana

D 07

entry

7,000 600 1,885

W 10

glass

exisitng car port

150

W 11

F

550 5,600

W 09

timber decking

1,885

guest 10.45 m2

5,600 550 550 150

studio 10.75 m2

concrete or stone

TT 0.41210

exisitng garage

EPW

easement

TT

tea tree

Ground Floor Plan SBARK stringy bark

402 New South BAY 2028 Scale: Date: 5/06/2022 1:100Head Road, DOUBLE Ph: 02 9328 9944

Fax: 02 9328 9844 DA CONSTRUCTION. Status: FOR Checked By: AD NOT

29A Crescent ProjectJirrima No. Drawing No. exisiting pool 600

Cooroibah 4565 2202 Qld05

150

550 1,885

Proposed Page size: A3

600

10,000

150

Scale:

TT 0.41210

exisiting pool

Revision F

Ground Floor Plan

550

8,600

1:100

Date: 5/06/2022

Status: DA

Checked By: AD

Project No.

Drawing No.

402 New South Head Road, DOUBLE BAY 2028

2202

Ph: 02 9328 9944

05

Fax: 02 9328 9844

35


Documentation Floor Plan

B

C

9,100

1,780

2,975

2,100

955

3,075

120

5,605

150

W 14

W 13

ensuite

145

3,490

2,990

1,290

F

F

A

150

150

2,100

W 15

F

3,500

F

proposed

proposed

W 12

D 11

D 12 F

3,010

F

existing balcony

7,400

150

2,860

covere

F

master bedroom

lounge

150

2,860

12,100

2,795

F

8,800

150

150

9,100

First Floor Plan

36

First Floor Plan

B

C


18

130

2,921

2,700 375

100

750 1,220 750 992

2,841 150 300 900 1,000

W 05

W 07

W 06

All dimensions checked on site

COMMENTS REVISION NOTES

W 08

Revisions are shown in orange

age

RFI's are shown in green

existing

exisitng

bathroom

storage

bathroom 5.83 m

2

A

MATERIALS All dimensionsKEY checked on site wall to be demolished COMMENTS timber

ema 4 m2

concrete or stone

studio 10.75 m2

guest 10.45 m2 W 09

A

F

4,990 W 11

18

W 10

130

2,921 F

xisting covered 2,700 375 walkway

D 07

100

750 1,220 750 992

2,841 F 150 300 900 1,000

W 05

W 07

W 06

timber decking REVISION NOTES glass MATERIALS KEY Revisions are shown in orange steel wall to be demolished RFI's bathroom are shown tiles in green timber All dimensions checked on site existing concrete slab concrete or stone COMMENTS level grass timber decking glass

W 08

age 1,885

steel

existing

exisitng

5.83 m2

bathroom

storage

exisitng car port entry

A

bathroom tiles MATERIALS KEY existing concrete slab wall to be demolished level grass timber

600

550

bathroom

studio 10.75 m2

guest 10.45 m2

W 10

70.00 m xisting covered

D 07

F

F

2

7,000

proposed cabana

steel ABBREVIATIONS bathroom tiles EPW easement

F

5,600

W 11

timber decking glass

W 09

16,310

concrete or stone

150

ed walkway ema 4 m2

TT existing concrete slab tea tree levelstringy grass bark SBARK

exisitng garage

exisitng car port entry

550 550

proposed cabana

NOT FOR CONSTRUCTION.

ABBREVIATIONS

600 1,885

150

walkway

EPW

easement

TT

tea tree

600

SBARK stringy bark NOT FOR CONSTRUCTION. TT 0.41210

150

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

29A Jirrima Crescent Cooroibah Qld 4565 ABBREVIATIONS

550 7,000

1,885

5,600

EPW

easement

TT

tea tree

Ground Floor Plan SBARK stringy bark

exisitng garage

402 New South DOUBLE BAY 2028 Scale: 5/06/2022 1:100Head Road, Date: Ph: 02 9328 9944

Fax: 02 9328 9844

DA CONSTRUCTION. Status: FOR Checked By: AD NOT

29A Crescent ProjectJirrima No. Drawing No. Cooroibah 4565 2202 Qld05

exisiting pool

Proposed Page size: A3

600

600

Proposed

150

10,000 proposed cabana 10,400m2 70.00

150

Revision F

First Floor Plan

550

8,600

Scale:

TT 0.41210

1:100

Date: 5/06/2022

Status: DA

Checked By: AD

Project No.

Drawing No.

402 New South Head Road, DOUBLE BAY 2028

2202

Ph: 02 9328 9944

06

Fax: 02 9328 9844

37


Documentation Elevation

RIDGE 10.710

TOG 9.52

TOG 9.52

RIDGE 10.710

F.F.L

TOG 9.52 7.510

F.F.L

7.510

G.F.L

4.510

G.F.L

4.510

TOG 9.52

East Elevation

East Elevation

East Elevation

R

proposed cabana

T

R

proposed RH 8.09

cabana

T

RH 8.09

East Elevation

North Elevation

North Elevation

proposed cabana

proposed machine shed

RH 8.38 RH 8.09

existing garage

GSPublisherVersion 0.92.100.58

38

West Elevation

West Elevation


proposed cabana proposed machine shed RH 8.38 RH 8.09

proposed cabana

TOG 7.26

exisiting proposed machine shed garage RH 8.38

RH 8.09

exisiting TOG 7.26

garage

RH 10.710

TOG 9.52

RH 10.710

proposed

TOG 9.52

machine shed

TOG 7.26

proposed machine shed

TOG 7.26

RIDGE 10.710

TOG 9.52

402 New South Head Road, DOUBLE BAY 2028

TOG 9.52

Ph: 02 9328 9944

Fax: 02 9328 9844

29A Jirrima Crescent Cooroibah Qld 4565 Proposed 402 New South Head Road, DOUBLE BAY 2028 7.510 Ph: 02 9328F.F.L 9944 Fax: 02 9328 9844 North & East

29A Jirrima Crescent

Elevations

Cooroibah Qld 4565 Scale: 1:100 Date: 5/06/2022 Proposed Status: DA

Checked By: AD

Drawing No. North & East Project No.

Elevations 2202 G.F.L Scale:size: 1:100 Page A3

07 4.510 Date: 5/06/2022 Revision F

Status: DA

Checked By: AD

Project No.

Drawing No.

2202

07

Page size: A3

39


2,200 2,200

Documentation Cabana Detail

landscapping gravel

gravel landscapping

landscapping gravel

gravel landscapping

North Elevation North Elevation

North Elevation

landscapping gravel

gravel landscapping

landscapping gravel

gravel landscapping

East Elevation East Elevation

5,600 5,600 7,000 7,000

150 750 150 750 600 600

1,885 1,885

South Elevation

proposed cabana 2 70.00 mcabana proposed

750 150 1,885 1,885 40

First Floor Plan

750 150 600 600

Plan

8,600 8,600 10,000 10,000

150

750

150 750 600 600

1,885 1,885

1,885 1,885

750 150 750 150 600 600

70.00 m2


REVISION NOTES

Revisions are shown in o

RFI's are shown in green All dimensions checked

landscapping gravel

Section A

All sizing for timber and

footings TBC by enginee

2700

250

2,317

500

240

COMMENTS

gravel landscapping

Section A

landscapping gravel

Section B

1,885

Section B

gravel landscapping

600

150 750

ABBREVIATIONS EPW

easement

TT

tea tree

SBARK stringy bark

7,000

5,600

NOT FOR CONSTRUCTI

600

Ph: 02 9328 9944

Fax: 02

29A Jirrima Crescen

Cooroibah Qld 456 Proposed

1,885

750 150

402 New South Head Road, DOUBLE

View of Cabana

Cabana Scale:

1:100

Date: 5/06

Status: DA

Checked B

Project No.

Drawing N

41


Documentation Pool Detail

100

2952

100

2952

100

2952

100

2952

AA

Section CCSection

CC

100.99 m2

300

spa

11.39 m2

2,525

coping tiles 52 existing pool

700

300

27.55 m2

710

300

10,910 existing concrete pool 15,400

42

Pool Plan

Plan

300

3,180

8,345

Section AASection

4,520

1,800

1,200

2,952


All dimensions checked on site

COMMENTS

1,212

50 900 50

1,212

50 900 50

2,897

100

2,897

100

2,897

2,897

COMMENTS

1. Concrete s

1. Concrete slab to engineers details.

2. Satin stainless steel spiggots. REVISION REVISION NOTES NOTES

details.

2. Satin stain

Revisions Revisions areare shown shown in orange in orange RFI's RFI's areare shown shown in green in green AllAll dimensions dimensions checked checked onon sitesite

COMMENTS COMMENTS 1. Concrete 1. Concrete slab slab to to engineers engineers

Section BB90090050 50 1,212 1,21250 50

2,897 2,897

Section BB

2,636 100

100100

2,636 100

2,636 100

details. details.

2,897 2,897

2. Satin 2. Satin stainless stainless steel steel spiggots. spiggots.

2,636

25

2,636 100

2,636

25 MATERIAL concrete

Section BB BB Section Section BB

MATERIAL

concrete pavers glass

2,636 2,636100 100

Section DD

2,636 2,636100 100

concret

existing concrete slab

2,636 2,636 2525

concret glass

existing

MATERIAL MATERIAL

Section DD

concrete concrete concrete concrete pavers pavers glass glass

ABBREVIATIONS existing existing concrete concrete slab slab

Section Section DD Section DD DD NOT FOR CONSTRUCTION.

ABBREVIATI

ABBREVIATIONS ABBREVIATIONS

NOT FOR CO

402 New South Head Road, DOUBLE BAY 2028

NOT NOT FOR FOR CONSTRUCTION. CONSTRUCTION.

Ph: 02 9328 9944

Fax: 02 9328 9844

29A Jirrima Crescent Cooroibah Qld 4565 Proposed

Pool

Plan

Scale:

Date: 5/06/2022

Status: DA

Checked By: AD

402 New South He

Ph: 02 9328 9944 402 402 NewNew South South Head Head Road, Road, DOUBLE DOUBLE BAYBAY 20282028 Project No. Drawing No. Ph: Ph: 02 9328 02 9328 9944 9944

Fax:Fax: 02 9328 02 9328 9844 9844

29A Jirrim 2202 13 Crescent 29A 29A Jirrima Jirrima Crescent Page size: A3

Revision F

Cooroibah Cooroibah Qld Qld 4565 4565 Proposed Proposed

Pool Pool

Plan Plan

Plan

View of Pool

Cooroibah Proposed

Pool

Scale: Scale:

Date: Date: 5/06/2022 5/06/2022

DA DA Status: Status:

AD AD Checked Checked By: By:

Project Project No.No.

Drawing Drawing No.No.

Scale: Status: DA

43


The Four Units Residential Renovation Dukes Workshop Professional

Role: Graduate of Architecture Year : 2021-2022 Location : Cox Avenue, Bondi, NSW Software Skills: Archicad Responsibilities : Design schemes involving digital massing, sun study and visualization, understanding of council codes and restrictions. Other Contributions : All documentation from DD to DA stage.

Project Description This project comprised of 4 apartments (units) owned by three different clients, each wanting to maximize their internal usable space to achieve the most from the prime location of their property. The challenge involved visualizing the maximum achievable additional space that can be equitably added to each unit without overshadowing the neighbors and maintain the council height restrictions. The solution involved the bottom units to partially extend into the backyard in the form of an external deck and a light weight sun room to maximize the sun from the south. This resulted in adding an extra bedroom and a now larger & usable living space within the units. The upper units

44

View from Cox Avenue-North West Proposed

View from Cox Avenue


m Backyard

View from Backyard- South East Proposed

45


Documentation Site Analysis

28.79 RR

3

two brick

12.19

cox avenue

29.38 TG

R.L 23.51

32.39 RR

t

29.38 TG garbage bins

27.32 TG

29.56 RR 28.97 RR

singl brick

Site Analysis Plan 46

Site Analysis Plan


8

10

o storey residence

36.575 29.56 TG PAVED TIMBER

12

first floor

ground floor

balcony

terrace

SP 17191 site area 445.8 m2

two storey

R.L 22.06

12.188

SHED garden terrace

brick residence PAVED

30.65 TG

29.56 TG R.L 23.16

36.575

14

le storey residence

16

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

12 Cox Avenue, BONDI Option 1

Site Analysis Scale:

47

Date: 5/06/2022


Documentation Plans B

D

300

17,260

9,272

C

9,872

sun room

existing bed room

bedroom 2

bathroom

bedroom 3

kitchen

bathroom

lounge

kitchen

1 entry

2

sun room

existing bed room

bedroom 2

300

A garbage cans

300

16,660

B

Ground Floor Plan

300

D

17,260

300

B

sun room

store

existing bed room

F

UP

Ground Floor Plan

D

study

bathroom

kitchen

living

terrace

kitchen

living

terrace

P

3 C 4 GSPublisherVersion 0.95.100.48

F

existing bed room

store

study

bathroom

UP

sun room

A

150 5,475

P

140

1,000

1,730

140 1,790

700

5,835

20,169

48

First Floor Plan

B

300

3,081 3,781

D

70


Remove Storage

600 200 4,236

terrace

250 living

4,511

terrace

4,511

living

4,236

300

Remove Laundry

C

3,480 3,180

600

900

300

A

300 300

900

3,911

terrace

402 New South Head Road, DOUBLE BAY 2028 Fax: 02 9328 9844

12 Cox Avenue,

9,872

3,911

250

Ph: 02 9328 9944

BONDI

Option C 1

900

3,081

3,911

C

900

3,911

terrace

9,872

250

Ground Floor Scale:

Date: 5/06/2022

Status: 01 SK

Checked By: AD

Project No.

Drawing No.

2012

02

Page size: A3

Revision

A

A

A

700

3,781

00

49


Documentation Attic Addition B

D

bedroom

5 M HEIGHT LIMIT storage

garden terrace

C garden terrace

14

bedroom

A

5,475

1,150

150

7,554

4,210

1,010

storage

150

4,360

6,525 3,855

2,670

Attic Floor Plan B North Elevation

D

RL 32.39 R.H.

Attic Plan

RL 32.39 ex

NON COMPIANCE 8.5 M HEIGHT LIMIT

RL 29.56 TOG

RL 29.56 RH RL 28.90 RH

Version 0.95.100.48

RL 27.23 RH

RL 26.0

RL 25.7

50

East Elevation

Boundary

14

Boundary

RL 2


900

RL 32.289 proposed roof

C

RL 29.38 attic

8,500

C

RL 29.38 TOG

A

900

9,872

terrace

5,660

3,911

RL 29.56 TOG

230

RL 32.39 existing roof

9,872

250

912

4,671

150

3,911

terrace

A 1,405

3,781

Boundary

700

150

3,081

3,150

4,671

RL 26.73 first floor

RL 23.58 ground floor

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

12 Cox Avenue, BONDI 402 New South Head Road, DOUBLE BAY 2028

xisting roof

RL 32.289 proposed roof

Ph: 02 9328 9944

12 Cox Avenue,

First Foor

BONDI

5,660

Option 1

Attic RL 29.38 attic

Scale:

Date: 5/06/2022

Status: 01 SK

Checked By: AD

Project No.

Drawing No.

2012

04

Page size: A3

Revision

RL 28.79 RH

Option 1

Fax: 02 9328 9844

Scale:

Date: 5/06/2022

Status: 01 SK

Checked By: AD

Project No.

Drawing No.

2012

03

Page size: A3

Revision

A

A

RL 26.73 first floor

02 TOG

3,150

73 TOG

24.50 TOG

10

402 New South Head Road, DOUBLE BAY 2028

RL 23.58 ground floor

Ph: 02 9328 9944

Fax: 02 9328 9844

12 Cox Avenue, BONDI Option 1

Attic Isometric

Elevations

51


905

509

Council Restrictions Proposed Sections

Site Boundary

5,660

garden terrace RL 29.56 TOG RL 29.56 TOG

8,500

2,650

RL 29.38 attic

2,400

RL 32.289 proposed roof

RL 32.39 existing roof

NON COMPIANCE 8.5 M HEIGHT LIMIT

RL 26.70 first deck

terrace

living

kitchen

3,150

RL 26.73 first floor

RL 23.58 ground floor

Long Section

Section A-A Section C-C

509

510

RL 23.07 ground deck

RL 32.39 RH

2,400

NON COMPIANCE

TOG 32.39 RH

store

store

study

study

14

Section B-B 52

Short Section

entry

2,400

RL 29.56 TOG

10

entry

250

Site Boundary

8.5 M HEIGHT LIMIT

Site Boundary

8.5M HEIGHT LIMIT


661

storage RL 29.38 TOG

NON COMPIANCE

RL 29.38 attic

8,500

RL 29.38 TOG

RL 32.289 proposed roof

8.5 M HEIGHT LIMIT 5,660

Site Boundary

RL 32.39 existing roof

3,150

RL 26.73 first floor

RL 23.58 ground floor

Site Boundary

RL 32.39 existing roof

5,660

RL 32.289 proposed roof

5,660

Site Boundary

RL 32.39 existing roof

RL 32.289 proposed roof

RL 29.38 attic

8,500

RL 29.38 TOG

RL 29.38 attic

RL 26.73 first floor

14

3,150

8,500

RL 26.73 first floor

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844 402 New South Head Road, DOUBLE BAY 2028

3,150

12 Cox Avenue, RL 23.58 ground floor

10

Ph: 02 9328 9944

Fax: 02 9328 9844

BONDI

12 Cox Avenue,

Option 1

BONDI Option 1

RL 23.58 ground floor

Sections Sections

Scale:

Date: 5/06/2022

Status: 01 SK

Checked By: AD Scale:

Date: 5/06/2022

Project No.

Drawing No.

Status: 01 SK

Checked By: AD

Project No.

Drawing No.

53


Dudley House Residential Renovation Dukes Workshop Professional

RIDGE 62.67

Role: Graduate of Architecture

RID

Year : 2021-2022 Location : Dudley Road, Rosebay, NSW

Responsibilities : Measuring and documenting existing building, design schemes involving digital massing, creating various project schedules. Other Contributions : All documentation from DD to DA stage.

1,220

3,180

Software Skills: Archicad TG 59.48

1,500

Project Description Interior renovation and kitchen extension from design concept to development application stage. This project involved extensive measurements on site to develop an accurate BIM existing model which was further used to produced proposed design concepts. The kitchen extension required accurate location of adjacent trees and existing structural systems to integrate the proposed structural amendments.

East Elevaton

RIDGE 62.67

RIDGE 61.83

CHIM 60.88

RIDGE 60.88

TG 59.48 TG 58.90

TG 58.89 TG 58.43

55.90

L 54.40

54

Exisitng West Elevation West Elevation 2D


Exisitng West Elevation Site Picture

55


Documentation Site Analysis

17

1-2 STOREY BRICK HOUSE

45.

boundary

existing 58.43 TG driveway

R.L 56.30

strip drain

R.L 57.30

fall

R.L 56.01 R.L 55.95

R.L 54.86

new landing R.L 55.46

7 6 5 4 3 2 1

58.89 TG

R.L 55.92 58.43 TG

15.24

dudley road

northern side garden

R.L 57.18

front garden

15

58.90 TG

61.83 R.R

existing pergola 60.88 R.R

1-2 STOREY BRICK HOUSE

boundary

southern side garden

45.

13 1-2 STOREY BRICK HOUSE

56

Site Analysis Plan

site analysis plan


REVISION NOTES Revisions are shown in orange RFI's are shown in green All dimensions checked on site

COMMENTS

MATERIALS KEY exisitng

brickwork to be demolished new brickwork

.72

timber to be demolished new timber

concrete to be demolished

pool area R.L 53.18

timber 59.48 TG

concrete or stone timber joinery

pool

SEC E 11

15.24

DP 6298 7 6 5 4 3 2 1

rear deck

glass steel balustrade timber decking

62.67 R.R

SITE AREA 696.7 m2

existing

16

slab below

COURTENAY rear garden R.L 53.08

ROAD

bathroom tiles pervious paving new tile on exisitng slab level grass

1,282

.72

terrace

12

4,690

R.L 55.31

6

ABBREVIATIONS CTR - centre line

18

NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

15, Dudley Road Rose Bay, NSW Proposed

57


Documentation Elevation & Section

RIDGE 62.67

Boundary

Boundary

RIDGE 62.67

TG 59.48 TG 58.89

D07

Boundary

UGF R.L 57.06

W09

Boundary

D08

TG 59.48

GF R.L 55.90 D08

D05

D06

W09

W06

TG 58.89

D07

LGF R.L 54.40 UGF R.L 57.06

GF R.L 55.90

D06

LGF R.L 54.40

south elevation

South Elevation Proposed

D05

W06

south elevation

RIDGE 61.83

RIDGE 60.88

new skylight TG 59.48

HT 58.69

TG 58.89 RIDGE 61.83

ne sky RIDGE 60.88

new skylight

UGF R.L 57.06 TG 59.48

HT 58.69

TG 58.89

GF R.L 55.90

UGF R.L 57.06

west elevation GF R.L 55.90

erVersion 0.90.100.52

58

West Elevation Proposed

west elevation


Revisions are shown in orange RFI's are shown in green All dimensions checked on site

COMMENTS

NOTES RIDGE 62.67

ALLOWANCES: SOUTH ELEVATION

MATERIALS KEY exisitng brickwork to be demolished

Boundary

new brickwork

RELOCATE RENNAI INSTANTANIOUS

timber to be demolished new timber

NEW AC VRV 2 BEDROOMS

concrete to be demolished timber

1,160

study

hallway

concrete or stone

2 JULIETTE BALCONIES

REVISION NOTES

glass

HANDRAILS

Revisions are shown in orange steel balustrade

NEW TIMBER DECK

RFI's are shown in green timber decking All dimensions checked on site bathroom tiles

HARD LANDSCAPING section A-A

COMMENTS pervious paving new tile on exisitng slab level grass

RIDGE 62.67 MATERIALS KEY

SOUTH ELEVATION

RIDGE 62.67

RIDGE 61.83

exisitng

TERMINATE EXISTING PLUMBING

new skylight

brickwork to be demolished ABBREVIATIONS CTR - centrenew linebrickwork

RELOCATE RENNAI INSTANTANIOUS

NOT FOR CONSTRUCTION: timber to be demolished DESIGN DEVELOPMENT new timber ONLY

RIDGE 60.88

NEW AC VRV 2 BEDROOMS

concrete to be demolished

NEW OPENING FOR MASTER ENSUITE

timberfirst floor hallway concrete or stone

2 NEW SKYLIGHTSPROPOSED POSITION FOR NEW AIRCON ALLOWANCE FOR JULIETTE BALCONY existing pargola

2 JULIETTE BALCONIES drawing room

HANDRAILS

2,490

Boundary

STORMWATER NOTES LIGHTING ALLOWANCES:

Short Section Proposed

2,660

timber joinery

1,500

kitchen

2 NEW SKYLIGHTS 1,190 1,160

4,150

1,800

Boundary

TERMINATE EXISTING PLUMBING

D

timber joinery

ground floor hallway entry RELOCATE RENNAI HW UNIT

glass D01 steel balustrade

W08

NEW TIMBER DECK

402 New South Headtimber Road, DOUBLE BAY 2028 decking Ph: 02 9328 9944

HARD LANDSCAPING LGF R.L 54.40

STORMWATER rear deck

section B-B

LIGHTING

RIDGE 62.67

new skylight

pool

Fax: library 02 9328 9844 bathroom tiles

15, Dudley Road Rose Bay, pervious NSW paving

Proposed new tile on exisitng slab

South & West level grass Elevations Scale: 1:100

Date: 15/10/2021

Status: PRICING

Checked By: AD

Project No.

Drawing No.

PR 05 2012 ABBREVIATIONS Page size: A3

Revision

CTR - centre line

E

NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

59


Documentation Detail Plan & Electrical Layout 4,900 855

840

870

REVISION NOTES

3,078

Revisions are shown in orange

terrace 3630

350

1990

RFI's are shown in green

600

All dimensions checked on site

2,710

D03

W05

D04

1,040

600

COMMENTS

MATERIALS KEY exisitng

W06

1,185

2,042

brickwork to be demolished

laundry

new brickwork timber to be demolished new timber

470

timber concrete or stone

1,562

D05

885

living room 64.24 m2

library

1,562

330

timber joinery glass steel balustrade timber decking bathroom tiles

470

pervious paving new tile on exisitng slab level grass

3,706

D02 D06

2,800

bathroom

5,380

linen

L

120

1100 120 330

961

120

concrete to be demolished

D01

ABBREVIATIONS CTR - centre line NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

600

305

W08

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

Fax: 02 9328 9844

15, Dudley Road Rose Bay, NSW

280

1,820

120

600

6,000

Living Room Floor 4,306 Plan Proposed living room

Proposed

600

Lower Ground Floor 2,420

2,414

rsion 0.90.100.52

Scale: 1:50

Date: 15/10/2021

Status: PRICING

Checked By: AD

Project No.

Drawing No.

2012

PR 09

Page size: A3

Revision

REVISION NOTES

E

Revisions are shown in orange

terrace

RFI's are shown in green All dimensions checked on site

COMMENTS ctr

ctr

ctr

LEGEND MATERIALS KEY pendant exisitng light oyester light brickwork to be demolished wall new light brickwork ctr

recessed down light timber to be demolished picture light new timber sensor light concrete to be demolished undercounter LED timber ctr

concrete or stone fan timber joinery switch glass GPO double steel balustrade TV timberGPO decking single bathroom wall tiles light perviousfan paving exhaust

ctr

new tile on exisitng slab

ctr

level grass

ABBREVIATIONS CTR - centre line NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

ctr

ctr 402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

60

Living Room Electrical Layout Proposed

Fax: 02 9328 9844

15, Dudley Road Rose Bay, NSW Proposed

Electrical Ground Floor RCP Scale: 1:50

Date: 15/10/2021


4,900 855

840

Revisions are shown in orange

terrace 3630

870

REVISION NOTES

3,078 350

2,825

1990

140

RFI's are shown in green REVISION NOTES

600

5,889

All dimensions checked on site Revisions are shown in orange

280

COMMENTS RFI's are shown in green

1,650

1,100

1,655

1,100

1,745

870

All dimensions checked on site

1,014

280

W05

D04

943

D03

1,040

600

COMMENTS

MATERIALS KEY MATERIALS KEY exisitng exisitng

brickwork to be demolished

timber

3,459

1,725

120

timber joinery

timber joinery glass glass

steel balustrade

timber decking steel balustrade bathroom tiles

timber decking

pervious paving

470

1,382

D10

skylight

to be demolished concrete concrete to be demolished

concrete or stone

910

W09

new timber new timber

concrete or stone

120

D05

885

living firstroom floor hallway 7.83 m2 64.24 m2

library

1,562

D11

timber to timber be demolished to be demolished

timber

1,235

470

D01

new brickwork

800

D07

1,185

W06

bedroom 2 19.80 m2

961

bedroom 3 9.87 m2

2,042

brickwork to be demolished

laundry

new brickwork

bathroom tiles

new tile on exisitng slab

pervious level paving grass new tile on exisitng slab level grass

D02

master bedroom 19.58 m2

ABBREVIATIONS

D08

3,706

D09

D06

NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY ABBREVIATIONS

CTR - centre line NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

1,640

bathroom

CTR - centre line

4,275

master ensuite

1,725

first floor bathroom

5,380

linen

L

305

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

First Floor Plan Proposed

280

1,820

GSPublisherVersion 0.90.100.52

120

2,441

120

Proposed

600

9,439 1,706

4,892

First Floor

280

402 New South Head Road, DOUBLE BAY 2028 Scale: 1:50 Ph: 02 9328 9944

terrace

Fax: 02Date: 932815/10/2021 9844

Status: PRICING

Checked By: AD

2012

PR 10

REVISION NOTES 15, Dudley Road Drawing No. Project No. Rose Bay, NSW Revisions are shown in orange

first floor plan

600

Fax: 02 9328 9844

15, Dudley Road Rose Bay, NSW

W08

6,000

Proposed Page size: A3

600

Revision

E

REVISION NOTES RFI's are shown in green

All dimensions checked on site Revisions are shown in orange

ctr

2,420600 300 720

4,306

1,350

2,414 850

1520

Lower Ground Floor RFI's are shown in green COMMENTS

550

Scale: 1:50

ctr

Date: 15/10/2021

All dimensions checked on site

Status: PRICING Project No.

ng room

Checked By: AD

COMMENTS

Drawing No.

2012

PR 09

Page size: A3

Revision

ctr

E

550

LEGEND MATERIALS KEY LEGEND MATERIALS KEY pendant exisitng light pendant exisitng light

oyester light brickwork to be demolished

1,172

oyester light brickwork to be demolished

ctr

wall new light brickwork wall new light brickwork recessed down down light timber to recessed be demolished timber tolight be demolished picture light new timber picture light new timber sensor light

concrete to be demolished sensor light concrete to be demolished undercounter LED timber

undercounter LED timber

concrete or stone fan

concrete switch or stone fan timber joinery

ctr

575

timber joinery glass GPO switch double

550 575

300

ctr

steel balustrade TV glass GPO double timberGPO decking single

steel balustrade TV

bathroom wall tiles light

timberGPO decking single

perviousfan paving exhaust

bathroomnew wall tilestilelight on exisitng slab perviousfan paving exhaust level grass new tile on exisitng slab

ctr

level grass

3,175

ABBREVIATIONS CTR - centre line NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

ABBREVIATIONS CTR - centre line ctr

NOT FOR CONSTRUCTION: DESIGN DEVELOPMENT ONLY

550

ctr

402 New South Head Road, DOUBLE BAY 2028 Ph: 02 9328 9944

First Floor Electrical Layout Proposed

Fax: 02 9328 9844

15, Dudley Road Rose Bay, NSW Proposed

1845

1520

ctr550

61

Electrical First Floor RCP

402 New South Head Road, DOUBLE BAY 2028 Scale: 1:50

Date: 15/10/2021


studio A

‘The future premise’ Relocation Proposal

Volunteer|Group of 2|Architecture Year : 2021 Location : Sydney Softwares : Adobe Suite Contributions : Reinterpreting studio A’s vision for relocting their artistic space through grpahics and a storyline

Project Description Studio a works towards inclusivity through art. The artworks of their artists are displayed in various public domains in Sydney creating an engaging visual and experiential impact on its viewer. The bew building where the studio will be relocated should be a piece of art housing the artworks and artists of Studio A. It will be a flexible architectural open space that invites people to come in and spend time as a community engaging with the artworks and the artists. This will further encourage the artists to fulfil their artistic and economic aspirations. A proposal that merges the public realm with gallery spaces will immerse studio A directly with the people of Sydney. Pop up design spaces with galleries extending to the public seem to be the new future with a democratic design approach. This will create a signature statement for studio A and its artists, hopefully revolutionizing the experience of engaging with art making it an everyday pleasure rather than a pre-planned excursion. This is the kind of statement that we are planning to make through studio a by combining the artwork, artist and the building.

62

Picture Credits: studio A


Interior Exhibition Hall Render

63


64

Picture Credits: studio A


65


Dichotomous House High-end Residential

Professional (Under Construction) r+d studio

Role:Architect (Project Lead)|Group (2-3)|Architecture Year : 2018-2019 Location : Vasant Kinj, New Delhi, India Site Area : 2 Ha, Built Up: 1400 sq. m Software Skills Design Resolution: Archicad & Rhino Drawing Production: Archicad & Autocad Presenation & Rendering: Adobe Suite Responsibilities : Overseeing the project from Concept to Tender and construction on site. Other Contributions : Coordination with various stakeholders and attending regular meeting with clients.

Project Description Designed for a family of two couples- elderly and young, this residence is a binary of their spirits. It is a coalesce of two contrasting elements in form, materiality and spaces. The form is a composition of straight clean lines interrupted by quirky curves which evoke a sense of eccentricity in a stable geometry. The ground floor caters to the social spaces while the upper floor the private. A basement with sunken garden creates room for recreational spaces. The juxtaposition flows in materials also with corten steel having a rustic appearance sitting with white stucco finish. The architecture exudes emotions from two ends of the spectrum for its users from sombre to exciting as they move between the son’s wing and father’s wing or from the basement to the first floor.

66

Physical Model of Funicular Arches Facade Development- South Elevation


Picture Credits : r plus d Studio

67


Design Exploration Funicular Arches Stage 01

Shape Development

Option 01 Straight Extrusion

68

Option 02 Intersecting Arches


Option 03 Offset Arches

Option 04 Rounded Offset Arches (Selected)

Option 05 Chamfered Sides

69


Design Exploration Funicular Arches Stage 02-Position Exploration

Step 01 Types of Fins

Step 02 Positioning

70

Staircase Exploration


Wall Section with Funicular Arch

71


Documentation Elevation Exploration NORTH ELEVATION

NORTH ELEVATION

ELEVATIONAL MATERIAL EXPLORATION OPTION 1-BROWN FINS WITH WHITE FINISH (WALLS) North Elevation

OPTIO

ELEVATIONAL MATERIAL EXPLORATION OPTION 1-BROWN FINS WITH WHITE FINISH (WALLS) CORTON STEEL

CORTON STEEL

PATINA FINISH

PATINA FINISH

20 72

Material Exploration Brown Fins with White Finish (Walls)

ZINC CLAD

ZINC CLAD

SMOOTH WHITE PAINT (WALLS)

SMOOTH WHITE PAINT (WALLS)

TITANIU


OPTION 2-SILVER FINS WITH WHITE FINISH (WALLS)

OPTION 2-SILVER FINS WITH WHITE FINISH (WALLS) TITANIUM CLAD

TITANIUM CLAD

Material Exploration Silver Fins with White Finish (Walls)

ZINC CLAD

ZINC CLAD

SMOOTH WHITE PAINT (WALLS)

SMOOTH WHITE PAINT (WALLS)

73


Documentation Staircase

First Floor Plan

74

Staircase Section


Site Image Courtesy r+d studio

75


Documentation Building Sections

Section Longitudinal

76

Section through Sunken Garden


77


Visualization Renders

Entrance

78

South Elevation


79


South View School K-12 Institutional Project

Professional (Built) r+d studio

Role:Architect|Group (2-3)|Interior Year : 2017-2018 Location : Remraam, Dubai Built Up: 5830 sq.m Technical skills: Autocad, Adobe Photoshop, Hand Sketching Responsibilities : Designing reflected ceiling plans and coordinating the design with MEP. Other Contributions : Designing interior elevation, furniture and flooring patterns of selected spaces, coordinating the visualization of renders.

Project Description The interior concept is based on the arid and sandy landscape of Dubai by representing Sand Dunes. The free form and granulated texture can be seen as a constant theme throughout the spaces within the school. For instance the undulating wooden baffled ceiling of the Junior Library, the use of wavy forms in the fin designed walls of the Reception. Thematic colors highlight the use of large public spaces and introduce a unique twist of energy to the otherwise mellow Dubai landscape. For instance lime green in the acoustic paneling of the Junior Multipurpose Hall, a combination of green and blue to the triangulated baffle ceiling of the Canteen.

80

Site Image: Interior Walkway Picture Credits: r+d studio


Built: Junior Library Picture Credits: South View School, Dubai & r + d studio, India

81


Documentation & Construction Admin Reception

Rendered Visualization

82

Site Photo Wooden Fin Wall


Elevation 01 Fin Design

Elevation 02 Fin Design

83


Documentation & Construction Junior Library

Rendered Visualization

84

Reflected Ceiling Plan Undulating Baffles


Site Image Undulating Baffle Ceiling

Detail Baffle Ceiling

Section Undulating Baffle Ceiling

85


Documentation & Construction Junior Multi-Purpose Hall

Rendered Visualization

86

Site Image Wooden Baffle Ceiling

Detail RCP Wooden Baffle Ceiling


Overall Reflected Ceiling Plan Wooden Baffle Ceiling

87


Documentation & Construction Cafeteria

Rendered Visualization

88

Site Image Colored Baffle Ceiling


Reflected Ceiling Plan Colored Baffle Ceiling

Isometric Detail Colored Baffle Ceiling

89


Sustainable School School Sustainable Architecture & Education Architecture & Education

Thesis Thesis Academic|Undergraduate|Individual Academic|Undergraduate|Individual Year: 2016 Year: 2016 Location: Teri Retreat,Location: Gwal Pahari, Gurugram, Haryana, India Teri Retreat, Gwal Pahari, Gurugram, Haryana, India Site Area: 22000 sq. m Site Area: 22000 sq. m Technical Skills : Autocad, Rhino,Rhino, AdobeAdobe Photoshop, DigitalDigital FabricaTechnical Skills : Autocad, Photoshop, Fabrication, Handsketching, Sketchup tion, Handsketching, Sketchup

Project Description This project proposes a sustainable organic design for a school Retreat for resource efficiency, environmental awareness and with the aim of merging sustainability with the This school’s curriculum byashowcasing architecture training. project proposes sustainable its organic design as fora living example for the students to gain practical The form consists of chamfered walls, sloping roofs and projections integrated a school knowledge with the aimfrom. of merging sustainability with the school’s with elements like brickits jaalis, stack ventilation and hollow for walls. The school complex is integrated curriculum by showcasing architecture as a living example with open in the form of courtyards consisting of trees and water bodies acting as micro the students topockets gain practical knowledge from. The form consists climates. Separate and and evening open spaces are alloted of chamfered walls, morning sloping roofs projections integrated with as per the analyses based on various environmnetal like solar, elements like brick jaalis, stack ventilationfactors and hollow walls.wind The and humidity. school complex is integrated with open pockets in the form of courtyards consisting of trees and water bodies acting as micro climates. Separate open spaces for morning and evening are alloted by analyzing various environmental factors like solar, wind and humidity.

90


Site Plan

Extension to existing primary school 4th to 12th Std 1-Parking 2-Teri Gram Research Centre 3-Teri Retreat Centre 4-Farming, Rose Gardening, Herbal and medicinal plants Drip irrigation-Harvested water 5-Vermicomposting 6 & 7-Cricket Field- Multipurpose for matches and school children 8-Golf Course 9-Prakriti Primary School Existing Pre-primary school-1st to 3rd std 10-Proposed Site for School 11- Greenery- Deciduous Trees 91


Climate Analysis Wind Analysis Winter-Nov to Feb

Spring- March

Solar Analysis

Summer- April to September

Form and Planning

Autumn-October

Contour & Drainage

Path of Water Flow Location of Roads & Drains

Final Massing Shade & Light

Winter

Morning

Zones Receiving Heat

Noon

Evening

Central Courtyard- Activity Space

West Zones- Activity Spaces

Noon

Evening

Summer

92

Morning Zone in Shadows West Zones- Activity Space

Central Courtyard- Activity Space


Ground Floor Plan Programs 1

4

Kindergarten School Block 2 Primary School Block 3 Creative Centre 3.1 Primary Dance & Dramatics Studio 3.2 Primary Music Room 3.3 Cafeteria 3.4 Primary Arts Studio 3.5 Primary Crafts & Clay Room 3.6 Audio Visual Room 3.7 Music Studio 3.8 Handicrafts & Pottery Studio 3.9 Woodwork Studio

Secondary School Block 4.1 Gym Teacher’s Room 4.2 Primary Staff Room

5

Admin Block

6

Semi-Open Entrance Foyer 7 Main Entrance 8 Senior School Block 8.1 Senior Staff Room 8.2 Language Classroom

9 Multi-purpose Hall 10 Senior & Primary Science Labs 10.1 Computer Lab 10.2 Chemistry Lab 10.3 Primary Library 10.4 Physics Lab 10.5 Senior Library 10.6 Home Science Lab

11 Kindergarten School Entry

5.1 Principal’s Room 5.2 Vice- Principal’s Room 5.3 Examination Centre 5.4 Conference Room 5.5 Medical Room 5.6 Stationery Room 5.7 Admission’s Office 5.8 Storage 5.9 Counsellor’s Office

Section AA’

93


94


95


96


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.