GENERAL TERMS OF BIDDING .........................................................................................7

The 2 TPD Waste to Energy system consists of 5 subsystems. These subsystems are 1) Feed Subsystem; 2) Gasifier Subsystem; 3) Gas Cleanup Subsystem; 4) Steam Generation Subsystem and 5) Auxiliary Subsystem.

The feed preparation and delivery equipment will be supplied by others.

Further technical details including –1) Process Flow Diagram 2) Process Description for the plant 3) Heat and Mass Balances and Potential Energy Output 4) Utility Requirements 5) Equipment list and specifications areprovided in the Appendix 1 of Scope of Supply.

The appendix also includes the necessary design drawings of the pilot plant.

It is the responsibility of the bidder to review, understand the technical requirements of the bid. Any deviation from the technical details may result in the bid being disqualified.Hence the bidder is advised to review the detailed scope of supply

provided in the Appendix 1thoroughly.

5. SCHEDULE OF BIDDING PROCESS

Date of RFQ Last date for receiving queries Reponses to the queries by KITS Bid Due Date Opening of Bids Letter of Award(LOA) Validity of Bids Signing of Acceptance letter 23.08.2021

31.08.2021

15.09.2021 17.09.2021 05.10.2021 60 Days of Bid Due Date Within 7 days of award of LOA

2TPD 190821 Page 6 of 11