1 minute read

VERIFICATION OF INFORMATION.....................................................................................8

Such misrepresentation/ improper response shall lead to the disqualification of the Bidder. If such disqualification / rejection occurs after the Bids have been opened and the Lowest Bidder gets disqualified / rejected, then KITS reserves the right to:

1. considerthe remaining bids for evaluation 2. take any such measure as may be deemed fit in the sole discretion KITS, including annulment of the Bidding Process.

11.CONTENT OF THE BIDS

11.1.Part A - Technical Bid

Item Description

1 Detailed technical proposal including specifications and overall GA drawings, if applicable. 2 List all items from technical evaluation criterionlisted in Section 13.1 3 Corporate Profile 4 Engineering personnel and support staff details. These details must indicate the capability for mechanical and process design and production of manufacturing quality drawings 5 Fabrication and assembly facility details 6 Provide details for the experience of assembling, installing, integrating and commissioning at least one waste to energy plant, of similar or higher capacity preferably based on rotary kiln gasification technology 7 Reference letters for supply of waste to energy projects preferably of rotary kiln gasification technology of equal or higher of the requested capacity in the bid 8 Delivery Schedule The equipment should be delivered within 9 months from award of contract and installed within 12 months from award of contract.

All equipment must be available for periodic inspections by a team designated by KITS and any rectification necessary shall be implemented at vendor’s cost. These rectifications should not affect the delivery schedule.

2TPD 190821 Page 9 of 11