Ar.Kashyap Shah - Undergraduate Portfolio

Page 1


PERSONAL STATEMENT Knowledge and Experience are what I perceive and accept every day as a new challenge to make it a learning experience. Apart from Architectural learning, I explore my creativity through traveling to new places and by interacting with different people leading to new perspectives and experiences.

Calligrapy Hand Rendering Physical Model Making Laser Cutting N: Ar. Kashyap Nimesh Shah M: +91 9167583366 E: kashyap.n.shah@gmail.com A: A-504, Vasant Aradhana Tower, Mahavir Nagar, Kandivali(west), Mumbai - 400067. EXPERTISE

3D Printing

Archi Cad Autodesk Ecotect Adobe Photoshop Adobe Illustrator Adobe InDesign Rhinoceros Sketchup V-ray Render Lumion XYZ Print (3D Printing)

Analytical Thinking Problem Solving Microsoft OS

QUALIFICATIONS 2019- Completed B.Arch. Pursued Bachelors degree in Architecture from Aditya college of Architecture, Boriwali (west),Mumbai. 2014 - 19. 2014 - Completed 12th. Passed 12th from T.P. Bhatia college of Science, Kandivali (west),Mumbai. 2012 - 14. 2012 - Completed 10th. Passed 10th from Don Bosco High School, Borivali (west),Mumbai. 2000 - 12. LANGUAGES Hindi

2017-18 - MALIK ARCHITECTURE, FORT, MUMBAI. Interned for 5 months -Worked on Complete replanning of exsiting commercial building. -Interior designing of luxury residential flats. -Prepared BOQ of interior of 7 storey Building and flats. -On site experinence and dealing with various aspects.

2018 - Painted 50 Columns of Borivali West Skywalk. We students of ACA paninted around 50 columns of skywalk in Borivali (W) as “Borivali beautifivation project” under BMC 2016 - Volunteered in International Design Competition (IDC) Design competition hosted by our college, across 177 countries, was in core the team.

Mac OS

English

@Kashyap.shah03

ACHIEVEMENTS

Autodesk AutoCad Autodesk Revit

@KashyapShah_

EXPERIENCE

SKILLS

CONTACT

@Kashyap Nimesh Shah

Marathi Gujarati

2016 - Volunteered in ‘ARGHYA-Borivali Design Fair’ Annual fest of our college, held for 3 days and was Leading the core team. 2016 - Participated in REDBULL Soapbox Race. The Red Bull Soapbox Race is an international event. Its an outrageous downhill race, racers are welcomed to build their own soapbox and compete against gravity. 2015 - Painted King Circle Railway Station. We painted of the “King Circle” Railway Station. 2014 - Volunteered for Art Installation of ToyBank. Toybank is a NGO who’s approach is to develop programs and initiatives particularly focusing on the behavioral and mental growth of at-risk children. 2011 - Participated in State level Scouts (Pioneering). The national Scout jamboree is a gathering, or jamboree, of thousands of members of the Boy Scouts of India, Held in Hyderabad, Andhra Pradesh.


Transit Oriented Development Institute Campus Design Professional Practice Affordable Mass Housing Heritage Preservation Centre Multi-Facilty Centre Working Drawing Individual Projects Community Centre


Transit Oriented Development Location:

Dahisar East, Maharashtra, India.

Brief:

Exploring opportunities created by Transit stops and develop the area around it as well as transit stop itself, giving everyday commuters and people living around an excuse to stop and socialise while creating an expression of civic identity to boost local pride.

Semester: Mentor:

10 / 2019 Ar. Samir Hingoo Ar. Rita Nayak

Lumion, Sketchup, Photoshop



Abstract: As Cities start to develop and urbanize, transportation or transit development plays a major role in it. In the processes of development of a city many different challenges are faced, particularly in transport sector. Technological advancement of transit systems is not the only solution, but also the planning and development in and around the transit at micro level. In the past few decades, Transit-Oriented Development (TOD) has emerged as a popular and an influential planning concept in many cities. Transit Oriented Development presents unique opportunities for Indian cities to meet the challenges of rapid motorization, rising inequity, deteriorating quality of the urban realm and climate change. It is a crucial means of coordinating relatively intensive land uses and multiple transportation modes. This book deals with the detailed aspects of how a city like Mumbai develops the need of TOD with it’s increasing pace of urbanisation. It also concentrates on developing a prototype design module in which crucial means of using relatively intensive land uses and multi-modal transit hubs are incorporated.

Transit Oriented Development

Dahisar East Metro Station

Growth of a City Mobility/ Transportation

Land Use What is TOD? Background Measuring TOD

Benefits of TOD

Robert Cervero’s TOD in India principles Density Diversity Design Distance Destination accessibility.

Mumbai

Case Stuides

Transbay Transit Center Parc Central Vadodara Bus station Vashi Railway Station

Data Collection

Comparative Analysis

Marol Metro Station Dahisar Metro Station JVLR Metro Station Borivali Metro Station

Site Analysis Design Program Design Intent

The transportation hub should be located in the heart of the neighborhood, within a 400 meter, or 10-minute walk from residents. TOD comprise a mix of commercial, residential, and institutional developments built to support a transportation hub and to encourage non-motor vehicle mobility options, such as biking and walking. A TOD area could encompass a radius of as little as 400 m or as much as 800 m from a transit station.

- Dahisar is the end of Mumbai City because of which there are many people from Mira-Bhayander, Thane and even Vasai, Virar that travel towards Mumbai through Dahisar toll plaza and create traffic congestion in and around it. - Giving job opportunities and public transport facilities will help reduce some amount of traffic congestion flowing towards inner part of the city. -According to the MMRDA in Dahisar, east and west metro line are connected in a loop. Giving it a better east west connection than anywhere else in Mumbai. - Intercity Bus services, private and public can be started from Dahisar as it will give a sooner exit from the city.


Traffic Analysis Road Network

Concept Diagrams

Transit Nodes

Metro Lines

Circulation Diagrams

Master Planning

Google Sketchup, Photoshop


Lumion, Sketchup, Photoshop

AutoCad, Photoshop


Lumion, Sketchup, Photoshop

AutoCad, Sketchup, V-Ray, Photoshop


S.W.D

S.W.D

.D S.W ±0.0M

±0.0M

D

BUS/AUTO LANE 9 M WIDE ROA

+0.45M

±0.0M

+0.45M +0.15M

+0.9M

+0.9M

+0.9M +0.9M

S.W.D

+0.9M

+0.15M

+0.45M

+0.15M

+0.9M

.D S.W

+0.15M +0.45M

+0.15M

+0.45M +0.9M

±0.0M

±0.0M

S.W.D

±0.0M +0.9M

DROP MANHOLE

IC22

+0.15M

.D S.W

-2.34M S.L.±0.0M

S6

TE IVA

R CA

M

E WID

AD RO

D OA ER

PR

IC21

S.W.D

S.W.D

+0.3M

+0.15M

-2.25M S.L.±0.0M

US

B IT Y

NE

LA

6M

WID

C ER

-2.16M S.L.±0.0M

S.W.D

IC20

INT

+0.15M

.D S.W ±0.0M ±0.0M

+0.15M

IC19 -2.07M S.L.±0.0M

IC18

-1.98M S.L.±0.0M

IC17

-1.89M S.L.±0.0M

IC16

-1.8M S.L.±0.0M

IC15

-1.71M S.L.±0.0M

IC14

-1.62M S.L.±0.0M

IC13

-1.53M S.L.±0.0M

IC12

-1.44M S.L.±0.0M

IC11

-1.35M S.L.±0.0M

IC10

-1.26M S.L.±0.0M

IC9

-1.17M S.L.±0.0M

S.W.D

IC8

-1.08M S.L.±0.0M

IC7

GT2 -0.99M S.L.±0.0M

IC6

-0.9M S.L.±0.0M

IC5

IC4

-0.81M S.L.±0.0M

S.W.D

-0.72M S.L.±0.0M

IC3

SLOPE 1:100 -0.63M S.L.±0.0M

GT1 IC2

-0.54M S.L.±0.0M

IC1

-0.45M S.L.±0.0M

S.W.D S.W.D

METRO BRIDGE

SERVICE LAYOUT (GROUND FLOOR) 2M

4M

6M

SCALE 1:200

20MM THK GEO TEXTILE 20MM THK GEO TEXTILE

10MM THK CROSS GRID

10MM THK CROSS GRID

30MM FILTERING LAYER

30MM FILTERING LAYER

GROWING SUBSTRATE

GROWING SUBSTRATE

10MM THK WATERPROOFING DRAINAGE PIPE

10MM THK WATERPROOFING DRAINAGE PIPE 150MM THK WALL 150MM THK RCC SLAB

600 X 300 MM THK INVERTED RCC BEAM

600 X 300 MM RCC BEAM

150MM THK RCC SLAB

ALLUMINUM C SECTION 30 x 30

150MM THK WALL

RAIN SCREEN KALZIP METAL PANEL

GREEN SLAB

SCALE 1:20

PEDESTRIAN RAMP SCALE 1:20

Sketchup, Lumion, Photoshop


PANEL 100x100MM BOX SECTION 100x100MM BOX SECTION

PAVEGEN V3 FINISHED FLOOR

150MM THK RCC SLAB DETAIL A

RCC SLAB 500MM DIA COLUMN

STEEL STRUCTURAL MEMBERS

METRO BRIDGE - SECTION SCALE 1:20

DETAIL B 2000MM DIA RCC COLUMN

90MM THK PAVEGEN TILES 150MM THK RCC DECK SLAB 20MM THK REINFORCEMENT BAR 150MM THK PCC BED STEEL DECK STUDS

METRO BRIDGE PLAN SCALE 1:100

SHEAR CONNECTOR 90MM THK PAVEGEN TILES PRIMARY BEAM - ISMB 450 150MM THK RCC DECK SLAB SECONDARY BEAM - ISMB 300 20MM THK REINFORCEMENT BAR 10MM THK PLATE STEEL DECK ISA 75758 STUDS 10MM THK PLATE SHEAR CONNECTOR ISA 75508

300 X 800MM THK RCC BEAM ISA 75758 300 X 800MM THK RCC BEAM PRIMARY BEAM - ISMB 450 ISA 75758 18MM THK BASE PLATE PRIMARY BEAM - ISMB 450 18MM THK BASE PLATE

16MM THK BASE PLATE PRIMARY BEAM - ISMB 450 ALLUMINUM C SECTION 30 x- 30 SECONDARY BEAM ISMB 300 10MM THK PLATE RAINSCREEN KALZIP METAL PANEL ISA 75758 10MM THK PLATE

300 X 800MM THK RCC BEAM ISA 75758 300 X 800MM THK RCC BEAM PRIMARY BEAM - ISMB 450 ISA 75758 18MM THK BASE PLATE PRIMARY BEAM - ISMB 450

ISA 75508

DETAIL A SCALE 1:10

16MM THK BASE PLATE ALLUMINUM C SECTION 30 x 30 RAINSCREEN KALZIP METAL PANEL

18MM THK BASE PLATE

DETAIL A SCALE 1:10

1500MM DIA 32MM THK CIRCULAR COLUMN 10MM THK BASE PLATE 300 X 600MM BEAM

500MM CIRCULAR COLUMN

1500MM DIA 32MM J-ANCHOR BOLT THK CIRCULAR COLUMN 10MM THK BASE PLATE 2000MM DIA RCC COLUMN

J-ANCHOR BOLT

DETAIL B SCALE 1:10

2000MM DIA RCC COLUMN


Lumion, Sketchup, Photoshop


Institute Campus Design Location:

Kharivali Village, Wada, Palghar, Maharashtra, India.

Brief:

To design Deemed University in Wada, Palghar By studing the needs and requirement of near by villages and fullfilling it for their futher growth.

Semester: Mentor:

9 / 2018 Ar. Rita Nayak and Ar. Jayant Sahasrabudhe


Administrative Building

Master Planning ABOUT

• Palghar is the 36th district of the state M

• The district has a total of 8 talukas includ • Palghar District has 4,69,699 hectares of • In District the literacy rate is 66.65%.

• District average rainfall is about 2458mm

S e c t i o n A A’

CONCEPT

Solid Mass

Welcoming vista as it is the main entry of university.

Section CC’

Section BB’

Increasing height for dominance effect.

Creating powerful yet welcoming gesture.

• The lakes are placed such that they divid which further helps placing the programs

• The site is further divided into three differe

NE Elevation

• The Diagonal flow of the site leads to dia

ognizing the nodal points around the site

• The programs are planned around the pe

Lifting left side as well for volumetric massing.

recreational zones could be planned in b SW Elevation

Lifting right side for parking space below and create view for trustee’s office

MA STER LAYOUT

Ground Floor Plan

First Floor Plan

Roof Plan


Agricultural College

Maharashtra.

ding Palghar, Dahanu and Wada. Section BB’

the total geographical area.

m.

Single Solid Mass

Section CC’

Window punctures for cross-ventilation

NW Elevation

de the whole site into two different zones around these two lakes.

ent zones - public, semi-public &private.

Horizontal projection for weather protection + area of roof is same as floor area

agonal planning of the programs and rec-

e which would acts as interactive zones.

Combining horizontal

eriphery of the site so that the maximum

wall + Area of roof is increased

between the structures.

projection with vertical

SW Elevation

while floor area remains the same.

Ground Floor Plan

First Floor Plan

Roof Plan


Professional Practice Firm: Semester: Duration: Mentor:

Malik Architecture 8 / 2017 Nov 2017 - Mar 2018 Sir Ar. Kamal Malik Sir Ar. Arjun Malik

Auto Cad, Illustrator


MALIK ARCHITECTURE Fo r t, M u m b a i


UTI MUTUAL FUNDS - BANDRA KURLA COMPLEX Location: BKC, Mumbai. Type: Interior. Status: Proposed. Scope Of Work: Planning, Designing, Drawings, 3D Sketchup

E

N

S W

Proposed Terrace Plan -Option 2

By 3D Artist

2st Floor NORTH WING

By 3D Artist

By 3D Artist

SOUTH WING CANTEEN AREA GRID 4'X4'


SANGOLDA - SANTACRUZ WEST Location: Santacruz, Mumbai. Type: Interior. Status: In Progress.

LONAVLA HOTEL - LONAVLA Location: Lonaval. Type: Commercial Status: In Progress.

Scope Of Work: Planning, Designing, Drawings, 3D Sketchup, B.O.Q.

Scope Of Work: Physical Model

D1

6'-0"

2'-11"

1'-10"

2'-8"

EQ

1'-6"

4'-0" 6'-1"

EQ

Budgetary Cost Estimate : Interior Work of Apartment at Sangolda Tower, Santacruz 10th Floor.

8'-6"

EQ

3'-6"

6'-3"

2'-6"

GD1

6"

3'-

EQ

3"

12'-5"

3'-9"

1'-0"

5'-0"

EQ

2'-

6"

1'-

3'-4"

Fl. deck wood paint FC W/Part. glass

12'-0" 3'-2"

4'-3"

9'-5"

11'-8"

5'-10"

2'-9"

Fl. kota gypsum FC W/beam paint paint Wall

4'-8" 7'-0"

8'-11"

5'-1"

2'-6"

1'-6"

D1

3'-0"

6'-0"

UP

1'-6"

2'-6"

7'-9"

15'-5"

2'-1"

2'-0"

3'-2"

"

1'-6

3'-2" "

1'-6

2'-5"

1'-6

"

11'-6"

8'-3"

" 3'-0

3'-0"

2'-5"

2'-1"

HVAC WORK(VRV OPTION)(Approx)

18'-2"

4'-1"

5'-5"

LIST OF EXCLUSIONS

2'-11" 2'-3"

D1

EQ

13'-1" 3'-2"

17'-0"

1'-6"

EQ

SPECIAL FURNITURE FROM VENDOR (Bar, Dining Console, Master bed chest, Master Dresser) KITCHEN COUNTERTOP & FIXED FURNITURE – SUPPLY & INSTALLATION

4'-2"

8'-8"

6'-0"

INDUSTRIAL RACKING SYSTEMS FOR STORAGE

2'-0"

10'-9"

1'-2"

4'-0"

4'-10"

deck wood Fl. paint FC W/Part. glass

8'-0"

3'-5"

EQ

EQ

EQ

8'-3"

EQ

EQ

GD1

2'-5"

2'-6"

6'-10"

9'-5"

14'-6"

3'-3"

3'-5"

EQ

8'-7"

3'-7"

5'-0"

2'-0" EQ

2'-3"

GD1

2'-0"

Fl. tiles FC tw W/Part. b/p & tiles

EQ

EQ

6'-8"

0"

2'-4

3'-1"

5'-0"

EQ

6'-0"

1'-4"

1'-4" 2'-0"

4'-0"

Fl. tiles tw FC W/Part. b/p & tiles

1'-3"

ART / ART OBJECTS / PAINTING / ANTIQUES / RUGS / CURTAINS / BLINDS / FURNISHINGS / SOFTBOARDS/ WHITEBOARDS / BLACKBOARDS

1'-1

3'-6"

2'-8"

EQ

2'-4"

1'-5"

2'-9"

EQ

1'-9"

LOOSE FURNITURE

4'-8"

"

1'-5"

2'-0"

10'-6"

5'-7"

1'-3"

2'-0" 4'-0"

8'-3"

2'-0"

D1

1'-3"

1'-4"

2'-11"

tw flooring Fl. gypsum FC W/beam paint stain veneer/paint Wall

8'-3"

3'-4"

15'-7"

8'-2"

6'-0" 5'-11"

9'-5"

9'-5" 6'-5"

13'-10"

4"

5'-0"

13'-7"

1'-6"

2'-0"

5'-0"

3'-0"

2'-2"

8'-0"

3'-8"

5'-3"

D1

2'-8"

5'-5"

12,142,997 INR

GRAND TOTAL deck wood Fl. paint FC W/Part. glass

D1

2'-3"

9'-4"

1,052,669 INR 12,142,997 INR

2'-3"

3'-0"

tw flooring Fl. gypsum FC W/beam paint stain veneer/paint Wall

3'-7"

I

18'-2"

4'-9"

5'-0"

terrazo Fl. gypsum FC W/beam paint paint/tw Wall

6'-10"

4'-5"

CIVIL & MASONARY WORK CARPENTRY WORK GYPSUM WORK PAINTING & POLISHING WORK PANTRY PLUMBING WORK ELECTRICAL ( Approx)

2'-1"

13'-1"

D1

10'-2"

2,003,977 INR 6,414,039 INR 297,075 INR 605,325 INR 274,163 INR 327,750 INR 1,168,000 INR

a b c d e f g

3'-0"

2'-9"

2'-3" 1'-9"

1'-3"

2'-5"

8'-4"

GRAND TOTAL ANNEXURES

7'-11"

D1

3'-3"

5'-2"

Fl. tiles FC tw W/Part. tiles

Description

6'-0"

11"

1"

4'-2"

1'-7"

1'-6"

4'-0"

2'-6"

1'-1"

2'-5"

11"

2'-1"

2'-5"

19'-10"

2'-0"

21'-6"

terrazo Fl. gypsum FC W/beam paint paint Wall

Sr.

16'-5"

2'-0"

2'-9"

ANY EXTRA ACCESSORIES IN WARDROBES/STORAGES SUCH AS CUTLERY TRAY, TIE RACKS, ETC. (Hanger rod light & drawer channels, locks, etc. are included)

10th floor Plan

SANITARY FITTINGS & GEYSERS FROM VENDOR WINDOWS – REMOVAL, SUPPLY & INSTALLATION 3 LIGHT FIXTURES (INTEGRATED ,DECORATIVE Annexures ALL LIGHTING & FAN )

8'-10"

7'-4" 2'-1"

1'-3" 3'-8"

3'-2"

3'-6"

2'-0"

2'-6"

6'-9"

2'-1"

6'-8"

2'-6"

12'-9"

3'-0"

3'-0"

WASHING MASHINE DRYER

2'-0"

2'-1"

10'-4"

9'-8"

DATA & VOICE EQUIPMENT

of Apartment at Sangolda Tower, Santacruz 10th Floor.

Scope Of Work: Physical Mode

SUMMARY OF ANNEXURES

1'-6"

deck wood Fl. wooden pergola FC W/Part. glass

6'-0"

5'-8" 3'-6"

DISH WASHER

06/04/2018

MICRO PROCESSOR WIRING FOR MUSIC / AV SYSTEM Budgetary Cost Estimate : Interior Work

2'-4"

PALAMPUR - HIMACHAL PRADESH Location: Palampur. Type: Commercial. Status: Proposed.

2'-6"

ALL WHITE GOODS SUCH AS REFRIGERATORS (WINE COOLERS /MINI FRIDGES) , MICRO-OVEN, Sr. Description WATER PURIFIER, WASHING MACHINE, HOME THEATER, TVs ETC.

2'-9"

ELECTRICAL WORKS - (LIASIONING & LAYING CABLE FROM METER ROOM TO THE MAIN PANEL IN THE + UPGRADE OF OVER ALL CONNECTION CAPACITY, IF REQUIRED. A FLAT) CIVIL & MASONARY WORK INR 2,003,977

7'-5"

20'-2"

6'-8"

DN

UP

19'-0"

B C

INR 6,414,039 INR 297,075 INR 605,325 F PANTRY INR 274,163 ALL LIASIONING WORK FOR MUNICIPAL / SOCIETY APPROVAL FOR EXECUTION OF THE WORK. H PLUMBING WORK INR 327,750

1'-10"

1'-10"

1'-6"

2'-4"

1'-6"

1'-6"

2'-6" 3'-6"

3'-6"

6'-1"

4'-0"

8'-0"

15'-6"

D PAINTING & POLISHING WORK FIREFIGHTING SYSTEMS And All Window

2'-4"

26'-9" tile Fl. white stain FC W/Part. tile & b/p

2'-0"

5'-1"

1'-10"

1'-10"

1'-10"

4'-7"

1'-4"

2'-0

7'-8"

D1

ALL TAXES AS APPLICABLE

R/W granite Fl. gypsum FC W/beam concrete Wall stain veneer/bison

"

"

6'-0"

BREAK-UP OF ANNEXURES Sr. SCOPE OF WORK A CIVIL & MASONARY WORK 1 Masonry Work 2 Flooring & Dado 3 Basin Counters top

1'-3"

1'-0"

3'-3"

20'-4" R/W granite Fl. glass FC W/Part.

4'-9"

SD1 8'-7"

6'-8" 7'-5"

2'-3"

9'-3"

3'-0"

1'-6"

7'-6"

14'-6"

EQ

TOTAL

2'-8"

0"

"

7'-5"

1'-1

2'-4

7'-11"

11'-4"

2'-6" 2'-11" 2'-6"

1'-3"

4'-7"

EQ

GD1

3'-6"

1'-11" 1'-0"

2'-6"

EQ

8" 2'-6"

3'-10" 6'-5"

3'-2"

EQ

8"

14'-10"

INR 617,862 INR 1,264,725 INR 121,390

4'-8"

5'-0"

4'-0"

10'-0"

EQ

Fl. tiles FC tw W/Part. b/p & tiles

EQ

EQ

2'-6"

3'-2" EQ

1'-9"

tw flooring Fl. gypsum FC W/beam paint Wall white stain veneer 1'-6"

EQ

2'-7"

EQ

1'-7"

7'-3"

10"

2'-0" EQ

6'-0"

1'-9" EQ

2'-6"

1'-4"

3'-10"

5'-7"

2'-8"

GD1

2'-8"

1'-9"

7'-2"

4'-8"

2'-2"

D1 2'-11"

1'-4"

1'-9"

3'-2"

3'-0"

6'-0"

2'-2"

8'-10"

19'-7"

2'-8"

Fl. italian FC tw W/Part. italian

8"

5'-3"

6'-0"

2'-4"

2'-8"

Fl. kota gypsum FC W/beam paint paint Wall

D1

1'-4"

4'-9" 7'-0"

Fl. kota gypsum FC W/beam paint paint Wall

12'-0"

7'-0"

7'-0"

5'-7"

15'-6"

3'-5"

2'-0"

3'-0"

D1

11'-7"

4'-0"

3'-1"

6'-3"

12'-0"

1'-2"

2'-3"

1'-6"

3'-2"

2'-3"

1'-8"

3'-3"

1'-5"

3'-3"

7'-9"

2'-3"

1'-3"

D1

INR 9,922,328

1'-6"

4'-5" 3'-9"

5'-0"

12'-0"

TOTAL

8'-3" 1'-6"

3'-2"

1'-4"

1'-6" 2'-2

5'-0"

1'-6"

1'-6"

2'-6"

2'-4"

R/W granite Fl. white stain FC W/beam paint Wall white stain veneer

CARPENTRY WORK GYPSUM WORK

AV SYSTEMS & LIGHTING AUTOMATION (cat-5, Cat-6,Conduiting, Pulling and Ferruling will be in our scope)

1'-10"

3'-0"

6'-1"

20'-2"

3'-0"

12'-4"

1'-6"

2'-6"

2'-6"

5'-1"

2'-3"

2'-4"

2'-3"

1'-2"

B 1 2 3 4

CARPENTRY WORK Wooden Ceiling & Flooring Wardrobes & Storage Doors, Partitions & cladding Glass work

C

GYPSUM WORK Gypsum work POP work PAINTING & POLISHING WORK Painting PU Coating Lamination work

F

PANTRY Storage Counter & Backsplash Finishes Plumbing fixtures

TOTAL

B

INR 6,414,039

TOTAL

C

INR 190,820 INR 106,255 INR 297,075 INR 214,397 INR 134,550 INR 256,378

TOTAL

4

D

INR 605,325 INR 164,575 INR 54,588 INR 55,000

Annexures

TOTAL

F

06/04/2018 INR 274,163

TOTAL

H

INR 327,750

Sr. SCOPE OF WORK H PLUMBING WORK Labour Charges

By 3D Artist

INR 2,003,977 INR 964,762 INR 3,048,588 INR 2,170,840 INR 229,850

11th floor Plan

D

A

INR 327,750

GRAND TOTAL

INR 9,922,328

LIST OF INCLUSIONS FOR CONTRACTOR Cleaning of site / removing of debris. No extra charges will be paid for the same work. All materials will be delivered & unloaded to the ground floor of the site, lifting charges to be

MARWAH OUTDOOR CAFE - SANTACRUZ Location: Santacruz, Mumbai. Type: Commercial. Status: In Progress. Scope Of Work: Sketchup


Lumion, Sketchup, Photoshop


Affordable Mass Housing Location:

Nilaje, Kalyan, Dombivali.

Brief:

Nilaje is one of the 10 villages prioritized for development and the proposed site is earmarked for Affordable housing under the Development Plan. The identified site is beside Nilaje Lake in Kalyan taluka. The 24 m wide DP road proposed, divides the site in two halves. The site on the West of the proposed road is to be considered for the Mass Housing. Proposed commercial hub as a part of the growth centre proposal to the North east of the site.

Semester: Mentor:

7 / 2017 Ar. Priyanka Kshatriya Ar. Rita Nayak


Vision Statement

• To design a home for people which gives them all the facilities without any discrimination. • Also giving them a privilege to of all modern amenities along with the provision to access the natural context of the site.

CONCEPT:

• The lake is the opportunity to enhance the value of the site, hence a waterfront connecting both Creating pocket terraces as a semi private interactive space. the sects of housing i.e. affordable and sale component gives them a common ground for a Also providing public community spaces in the central part, interactive space. th the which becomes a common interactive space between sale component and affordable housing.

ithout

ce a nd sale e.

Creating a harmonious balance between the income groups by SHILPHATA JUNCTION respecting the cultural similarities. SHILPHATA JUNCTION E.g. EWS and LIG share one building, and HIG and MIG share one NILAJE STATION

Providing maximum view of the existing lake adjoining the site. NILAJE STATION

SHILPHATA JUNCTION

SHILPHATA ROAD

LAKE

HDH ZONE

NILAJE STATION

APPROACH ROAD

GAOTHAN

R ZONE

SHILPHATA JUNCTION

CONCEPT:

NILAJE STATION

SHILPHATA ROAD

LAKE

HDH ZONE

APPROACH ROAD

GAOTHAN

R ZONE

NILAJE GAON

N

HIG

N

CONNECTIVITY

Creating pocket terraces as a semi private interactive space.

Concept

1st Podium Plan

MIG

NILAJE GAON

BIJANKUR HOPITAL KALYAN SHIPHATA POLICE STATION

Also providing public community spaces in the central part, CONNECTIVITY COMMUNITY • Creating pocket terraces as a semi private interactive space. KATAI NAKA TOLL which becomes a common interactive space between sale MIG A SPACE BIJANKUR HOPITAL SAI PETROLEUM LIG component and affordable housing. • Also providing public community spaces in the central part, which becomes common KALYAN SHIPHATA POLICEa STATION SHREE SANTOSHI MATTA MANDIR

Creating a harmonious balance the income by space between sale between component andgroups affordable housing. PETROLEUM NAFS (Fire SAI fighters academy) respecting the cultural similarities. • Creating a harmonious balance between the income groups bySHREE respecting the E.g. EWS and LIG share one building, and HIG and MIG share SANTOSHI EWS MATTA MANDIR HDH one APPROACHXPERIA ROAD MALL

interactive

KATAI NAKA TOLL XPERIA MALL

STATION

• E.g. EWS and LIG share one building, and HIG and MIG share one

ANDIR

my)

cultural similarities.

Providing maximummaximum view of the view existingoflake thelake site. • Providing theadjoining existing

SHILPHATA NAFS ROAD (Fire fighters academy)

adjoining the site.

NILAJE LAKE

APPROACH ROAD

2nd Podium Plan

SHILPHATA ROAD HIG

MIG A KEY PLAN

MIG

NILAJE LAKE

COMMUNITY SPACE

LIG

N

types of areas throughout its ense green patch, on the west HDH n a linear manner facing the the lake are present in a cluster on the eastern part of the lake of land is undeveloped and ce. e and the high rise building on

EWS

d towards the HDH zones as

g towards the lake. hence it gives more scope to

Ground Floor Plan


HIG - MIG ODD CLUSTER PLAN

HIG - MIG EVEN CLUSTER PLAN

SECTION - BB’

S E C T I O N - A A’

South Elevation


5

Heritage Preservation Centre Location:

Orchha Complex, Madhya Pradesh, India.

Brief:

A design solution essentially with a deeper understanding of heritage potential and optimum usage of spaces for a growing small town with daily conflicts between the spaces trapped and identities lost; with obscure interfaces and diminishing characters, Involving study of growing population due to migration, The need for availability of sources of income or employment, The interconnectivity and Infrastructure of a city.

Semester: Mentor:

6 / 2016 Ar. Renuka Kale

Lumion, Photoshop Lumion, Sketchup, Google Sketchup, Photoshop



HERITAGE AND RESEARCH CENTRE

GUEST HOUSING ENTRY

Raja Ram Temple

Palkhi Mahal

Phool Baugh

Chattarbujh Temple

OPEN EXHIBITION

Chattarbujh Temple Chattarbujh Temple Major Attraction

Orchha Fort Raja Ram Temple

Raja Ram Temple

Chattarbujh Temple

Palkhi Mahal

Palkhi Mahal

Hardaul ki Baithak

Raja Ram Temple

Phool Baugh

Hardaul ki Baithak Phool Baugh

Palkhi Mahal Hardaul ki Baithak Phool Baugh

Sawan Bhado named after spring months subterran structure for retreat of orchha king and are persian cooling units for wind and ventilatio

SKILL DEVELOPMENT

SKILL DEVELOPMENT

TOURIST INFORMATION CENTRE

TOURISTMUSEUM INFORMATION CENTRE

Hot Wind

Change of temperature due to compression.

Orccha being rich in heritage has129 CENTRAL INFORMATION COURTYARD TOURIST CENTRE declared MUSEUMheritage site, including architectural heritage, natural herItage, GUEST HOUSING HERITAGE AND RESEARCHcreates CENTRE traditional heritage high quality OPEN EXHIBITION TOURIST INFORMATION CENTRE public and social space for the town ENTRY tourism and recreational development to CENTRAL COURTYARD OPEN EXHIBITION keep Orchha on the international map of tourism while still retaining its unique GUEST HOUSING cultural characteristics Orchha fort being TOURIST INFORMATION CENTRE most important among it.

Hardaul ki Baithak

SKILLHOUSING DEVELOPMENT GUEST MUSEUM TOURIST INFORMATION CENTRE PERMANENT HOUSING

GUEST HOUSING MUSEUM

HERITAGE AND RESEARCH CENTRE

HOUSING PERMANENTGUEST HOUSING

Cool Wind

PERMANENT HOUSING

HERITAGE AND RESEARCH CENTRE HERITAGE AND RESEARCH CENTRE MUSEUM Activities

HERITAGE AND RESEARCH CENTRE ENTRY CENTRAL COURTYARD GUEST HOUSING TOURIST INFORMATION CENTRE OPEN EXHIBITION Google Sketchup, V-Ray, Photoshop


B'

WN

Plan @ 8500mm

B'

Plan @ 5500mm

DO

B'

Plan @ 3500mm

B'

Plan @ 1300mm

+2.85

+2.85

+2.8

UP

5

A'

A'

-0.75

SEA TING

A'

STO 4M RAG X 6M E

A'

DISP 30MLAY ARE X 18M A

+4.5

ARE

A

+4.5

+5.2

5

-0.75

+5.2

5

+4.5

+4.5

MEN

HAN

MEN

T WO X 12.6 RKS HOP M

TOIL

ET

DISP 11.4 LAY M X ARE 19M A

-0.75

DIC RAF 7.6M

TOIL

ET

-0.75

+2.8

+4.5

UP

TRY

TUR 8M E ROO X 6M M

MAN

UP

DOW

SOU

5

HAN

M

DIC RAF 11.7 T M WO X 9.7MRKS

5

+6.4

5

+4.5

+2.8

+2.8

5

5

IN

SOU

IN

VEN 6M IR SHO X 4M P

+4.5

+4.5

WN

+2.8

5

UP

A.V. 12MROO X6MM

A.V. 12MROO X6MM

DO

UP

+2.8

5

+4.3

+4.3

5

5

HO

CAB 4M IN X 4M

5

AGE 3.3M R'S X 6MCAB

5

+1.

INAR 6M ROO X 4.5M

DISP 16.4 LAY M X ARE 14.4 A M

+6.4

+4.5

+2.8

MAN

+2.8

VEN 6M IR SHO X 4M P

M

SEM

P

UP

CAB 4M IN X4M

N

VEN 4M IR SHO X 6M P

UP

TUR 8M E ROO X 6M

VEN 6M IR SHO X 4M P

UP

SOU

LEC

ADM 8.6M IN X 3.8M

AGE 4M R'S X 6.5MCAB

SOU

-0.75

STO 5.7M RAG X 8ME

UP

5

DISP 16.4 LAY M X ARE 14.4 A M

PAN

UP

LEC

+6.4 5 DOW N

+6.4

5

5

A.V. 10M ROO X 8MM

DISP 11.4 LAY M X ARE 19M A

+6.4 5 DOW N

+6.4

5

+1. UP

+4.5

-0.75

WO

-0.75

+1.3

5

LIBR 10M ARY X 8M +2.8 5

UP

+0.9

STO 6M RAG X 4M E

5

+1.5

STO 8M RAG X 9M E

5

+5.3

5

FLAT

DO WN

+7.5

+4.3

+4.3

5

GU

EST

NAG 5M ER'S X 4M CAB

UP +7.5

+4.3

+4.3

+5.3

+7.1

5 GU

EST

5 HO USI

+7.1

5 HO USI

NG

NG

2BHK

IN

UP

B

5

FLAT

+1.3

MA

B

5

A'

WN ION

2BHK

EPT

UP

UP REC

B

CON 3.8MFERENC X 6M E

+7.3

STO 8M RAG X 9M E

REC 3.7MEPT +1. X 5MION

35

UP

Site Plan

5

DO

+1.2

SHOPS 2.4M X 2.4M +1.35

CON 3.8MFERENC X 6M E

+7.3

A'

+1.0

CLI 4M NIC X 3M

UP

A.V 4M .RO X 6MOM

B

A'

UP

LIBR 10M ARY X 8M

Google Sketchup, V-Ray, Photoshop

Section AA’

Google Sketchup, V-Ray, Photoshop

A'



Auto Cad, Google Sketchup, V-Ray, Photoshop

6

Multi-Facilty Centre Location:

Dhanukarwadi, Kandivali West, Mumbai, Maharashtra, India.

Brief:

Mumbai has a linear growth corridor. All the stations on the western and central line are along the main roads which act as the main arteries of the city along with highways. All the stations are at a close proximity of the main roads.The studio objectives are to explore the ideation of an architectural intervention of different uses and identifying the use of appropriate form for given function in the background of dense urban area of proposed metro station.

Semester: Mentor:

5 / 2016 Ar. Shishiir Saawant


INDIA India is one of the rapidly deveopleing country and hence has a growing mass rapid transit system

MAHARASHTRA Maharashtra being one of the major states of india.

Concept Model MUMBAI Mumbai being the financial captial is the fastest growig city

SITE Site is adjacent to upcoming mero 2 exit being a juction demands the need for a multifacilty hub near by.

Junction where two paths intersect; Junction nowadays in Mumbai means traffic and chaos. Incopraing Junction in my design for people as a community space. Giving a new meaning to it. Considering the future development there would be a major change in skyline. Breaking the sky line will create intrest for the user but doing something bizarre or dynamic will loose intrest making it disturbing to see it everyday.

Section AA’


Food Kiosk Convienence Store Guest Housing

Isometric View

Civic Centre Sport Centre

Auto Cad, Google Sketchup, V-Ray, Photoshop

Auto Cad, Google Sketchup, V-Ray, Photoshop


START TILE

Brief:

1

Working drawing of Residential Building proposed stilt + 5 floors having 2, 3 BHK on each floor. DETAIL A

TOWEL ROD

START TILE

DETAIL A

SCALE 1:10

115MM THK FINS FLUSH TANK

WALL FIXTURE (with provision of over head shower with 115 mm long bend pipe & wall flange)

W4

115MM THK FINS

SQUARE BASIN

Semester: Mentor:

B

600x300

LIVING ROOM 6188 X 3800

W1

B

D

600MM THK BEAM

W4

SINGLE LEVER BASIN SQUARE BASIN

D3

RCC CHAJJA ABOVE

H'

H' 450x300

SHOWER HEAD

B'

D'

23'

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

200MM THK SUNK

200MM THK SUNK

SECTION DD'

22

17

23

16

24

KITCHEN 2730 X 4300

15

25

14

26

150MM THK RCC SLAB 600MM THK BEAM

F1 S1

13

C1 W1

32

C14

A

6735

SCALE -

SCALE1:20

DETAIL A

SCALE 1:10

PROJECT -

WORKING DRAWING W4BUILDING OF RESIDENTIAL

DRAWING NO. -

15

115MM THK FINS

DATE -

01-04-2017

A'

1)

KASHYAP NIMESH SHAH

SEAT NO. START TILE

B'

115MM THK FINS

DRAWN BY -

TOILET DETAILS

C9 300x750

DETAIL A

TOWEL ROD

FLUSH TANK

FLUSH TANK

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission.

SOIL PIPE

SIGN $ STAMP.

D2

D3 PASSAGE

C23

C24

300x600

300x600

W4

C21 D2

C16

C14,C15,SW3,C17,C18,C34,C35 7660

6610

7510

H'

C19,C20,C21,C22

J'

C23,C24

K'

C25,C26,C27,C28

13060

L'

C29,C30,C31,C32

14735

9300

450x300 1 : 100

BALCONY -200 MM SUNK

D2

10130

BEDROOM 2 4100 x 3600

F1 S1

S1 F1

W1

W1 C1

S2 F2

BEDROOM 3 3600 x 4300

K

D3

1 : 100

C25

C26

F2 S2 C1 W2 TOILET -200 MM SUNK

W4

450x300

F1 S1

S1 F1

C1 W1

W1 C1

C27

1 : 100

C28

S2 F2

450x300

W4

-200 MM SUNK

W1

F2 S2 BALCONY - W1 -200 MM SUNK

300x450

END FACELINE

D3

600x300 TOILET W2 C1

W1 C29

200MM THK SUNK

W1 -

BEDROOM 3 3600 x 4300

600x300

L

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

SW1,SW2

F'

450x300

1 : 100

600x300

C1 W1

- W1

with 115 mm long bend pipe & wall flange)

E'

S2 F2 W2 C1

D3

4180

G' C18

TOILET -200 MM SUNK

F2 S2

SINGLE LEVER BASIN

SECTION AA'

S2 F2

W2 C1 TOILET -200 MM SUNK

W4

D3

D2

SQUARE BASIN

200MM THK SUNK

C20 600x300

WATER CLOSET (hindware art - crystal)

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

C17 750x300

RCC CHAJJA ABOVE

B'

C22 C19 450x300

W1

ADITYA COLLEGE OF ARCHITECTURE. Harridas Nagar Rd, Saibaba Nagar, MIRROR Borivali, Mumbai, Maharashtra, WALL FIXTURE Pincode 400067. (with provision ofIndia. over head shower

D2

W3

SW3

300x600

RCC CHAJJA ABOVE

W2

W1 C1

DUCT

3205

BEDROOM 1 4100 x 3400

S1 F1

C16

750x300

W4

C10,C11,C12,C13

RCC CHAJJA ABOVE

600x300

1 : 100

BALCONY -200 MM SUNK

N

SOIL PIPE

WATER CLOSET (hindware art - crystal)

C15

C1 W2 TOILET -200 MM SUNK

C7,C8,C9,C33

C13 S1 F1 W1 C1

DINNING 2700 X 3350

W1 C1

1 : 100

BEDROOM 2 4100 x 3600 TITLE C4 450x300

B

S1 F1

D4

W6

C' D'

150

225

S2 F2

C12

SW2

MIDLANDING

C1,C6

BALCONY -200 MM SUNK

W1

600x300

29

LIFT SHAFT

C2,C3,C4,C5

B'

W1 -

KITCHEN 2730 X 4300

28

A'

450x300

LIVING ROOM 6188 X 3800

1 : 100

C1 W2

C6

W1

FOYER 2915 X 2888

30

F2 S2

PASSAGE

F2 S2 1 : 100

C5 600x300

1 : 100

SW1 W3

D3

TOILET -200 MM SUNK

W4

450x300

00

BALCONY -200 MM SUNK

W1 C1

27

31

D2

H

SECTION BB'

150MM THK LINTEL UP

DINNING 2700 X 3350

G

150MM THK RCC SLAB 600MM THK BEAM

ALUMINIUM FINS L-BRACKET

W4

BEDROOM 1 4100 x 3400

W2

C1 W1

J

150MM THK LINTEL

600x300

F WATER CLOSET (hindware art - crystal)

C22

NAHNI TRAP

NOTES -

23

21

F1 S1

PLAN

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission. The drawings shall not be scaled. Written dimensions are to be followed. Dimensions given are in mm unless and until specified & are from START unfinished surface. TILE All Internal Plaster is 12mm and external plaster is20mm. Any ambiguity shall be immediately brought to the notice of the architect before commencement of work. All external walls are 230mm and internal walls are 150mm thick unless specified.

C11 F1 S1 C1 W1

E

FLUSH TANK

C' 1 : 100

19'

21 22

300x750

300x750

UP

DOWN

18

1 : 100

C10

START TILE

WALL FIXTURE (with provision of over head shower with115 mm long bend pipe & wall flange)

NAPKIN HOLDER

A'

TOILET DUCT

W2 C1

C21

20

C9

C8

19

600MM THK BEAM

START TILE

G' C18 450x300

600x300

19

S1 F1

C7 20

D

C4 D1

F1 S1 C1 W1

300x750

600x300

START TILE

S2 F2

18

17

450x300

FOYER 2915 X 2888

F1 S1 C1 W1

C 150MM THK RCC SLAB

W5

450x300

D1

- W1

Ar. Ashwin Parmar

W.C

C

16

1 : 100

C3

C2

W1

BALCONY -200 MM SUNK

F2 S2

TILE DROP

SQUARE BASIN

15

14

S2 F2

C1

SECTION CC'

TOWEL ROD HEALTH FAUCET

TOILET -200 MM SUNK

13

12

W1 -

23

D3

11

RCC CHAJJA ABOVE

200MM THK SUNK

6 / 2016

G'

7)

10

- W1

450x300

150MM THK RCC SLAB

19

5) 6)

9

F2 S2 BALCONY -200 MM SUNK

B

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

200MM THK SUNK

0,0 A

WATER CLOSET (hindware art - crystal)

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

2) 3) 4)

8

7

1 : 100

START FACELINE

SINGLE LEVER BASIN

SOIL PIPE

WATER CLOSET (hindware art - crystal)

1)

6

5

4

MIRROR

FLUSH TANK

SOIL PIPE

A

3

2

150MM THK LINTEL ALUMINIUM FINS L-BRACKET

W4

SECTION AA'

END FACELINE

150MM THK RCC SLAB 600MM THK BEAM

150MM THK LINTEL

A

7

150MM THK RCC SLAB 600MM THK BEAM

START FACELINE

Working Drawing

C30

C31

300x450

300x450

S2 F2 W1 -

C32

BALCONY -200 MM SUNK

300x450

1 : 100

14960

1 : 100

SECTION CC'

3 8'

9'

C30

10'

11'

12'

13'

15'

14'

16'

18' 19'

17'

20'

A TITLE STAINLESS STEEL TOILET DETAILS GLASS RAILING

SEAT NO. -

6735

SCALE -

SCALE1:20

PROJECT -

SIGN $ STAMP.

DRAWING NO. -

15

DATE -

01-04-2017

A'

WORKING DRAWING OF RESIDENTIAL BUILDING

N

KASHYAP NIMESH SHAH

DRAWN BY -

B'

T

50MM THK WATER PROOFING

120 119

107 106 105

RCC CHAJJA

104

50MM THK WATER PROOFING 150 MM THK RCC SLAB D1

WALL

NO.

LUSTER PAINT

C1

10mm CERAMIC TILE (200 X 300)DADO

U

900

1200

CEILING

SLIDING WINDOW

D3

750

FLUSH DOOR

W4

1200

600

TOILET VENTS

D4

750

W5

1000

3600

SLIDING WINDOW

ALUMINIUM DOOR FRAME

W6

1000

2000

SLIDING WINDOW

06

DATE -

01-04-2017

W1

W1

W3

W1

25MM THK MOTAR 100MM THK BBC 50MM THK WATER PROOFING 150 MM THK RCC SLAB

W6

D3

D

W3

W3

W1

PASSAGE

W4

W4

PASSAGE

D3

W4

W4

PASSAGE

D3

W4

W4

PASSAGE

D3

W4

+12.45 M

U

W6

+9.45 M

D

THIRD FLOOR D

TITLE -

W4

W3

W3

W1

W6

+6.45 M SECOND FLOOR

RCC CHAJJA

50 MM DIA STAINLESS STEEL PIPE RAILING

18

RCC CHAJJA

W3

W1

W6

+3.45 M FIRST FLOOR

30 MM DIA STAINLESS STEEL PIPE BALUSTER

6

600MMD1 THK PLINTH BEAM

150MM THK PCC 600MM THK PLINTH BEAM

3

150MM THK PLINTH PROTECTION SLOPE FOR PARKING

75 MM GRANITE SKIRTING

150MM THK PCC

5 MM THK STAINLESS STEEL BASE PLATE THREADED INTO BAULSTER AND SCREWED INTO RCC SLAB 18 MM THK GRANITE TREAD

N

150MM THK PLINTH PROTECTION

150 MM THK WAIST SLAB OF RCC STAIRCASE

DETAIL @ B

3'

SCALE1:10 1)

C'

A'

2) 3) 4)

3'

5) 6) A

TITLE C4 450x300

B C9

0.0 M GROUND LEVEL

SECTION BB'

5 MM THK POLYSUPLHIDE CAULK 18 MM THK GRANITE RISER 10 MM THK SETTING PLASTER

600MM THK PLINTH BEAM

NOTES -

+0.60M

150MM THK PLINTH PROTECTION SLOPE FOR PARKING

150MM THK PCC

DRAWN BY -

STAIRCASE DETAILS

KASHYAP NIMESH SHAH

N

7)

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission. The drawings shall not be scaled. Written dimensions are to be followed. Dimensions given are in mm unless and until specified & are from unfinished surface. All Internal Plaster is 12mm and external plaster is20mm. Any ambiguity shall be immediately brought to the notice of the architect before commencement of work. All external walls are 230mm and internal walls are 150mm thick unless specified.

ADITYA COLLEGE OF ARCHITECTURE.

7'

16'

8'

NOTES -

TITLE -

A

KASHYAP NIMESH SHAH

W5

SECTION

C4 450x300

B C9 UP

300x750

B'

WORKING DRAWING OF RESIDENTIAL BUILDING

18'

DRAWN BY -

KASHYAP NIMESH SHAH

SEAT NO. -

6735

SCALE -

1:50

DRAWING NO. -

10

DATE -

01-04-2017

PROJECT -

A'

DRAWN BY -

50 MM DIA STAINLESS STEEL TUBE CONNECTOR

20 MM DIA STAINLESS STEEL PIPE TIE

150MM THK PCC

150MM THK PLINTH PROTECTION 2 1 SLOPE FOR PARKING

2)

W4

FORTH FLOOR

DETAIL @ A

D1

8 150MM THK PCC

23'

D3

5 MM THK BALUSTER CAP THREADED INTO BALUSTER

4

F'

PASSAGE

+15.45 M

W3

W1

5 600MM THK PLINTH BEAM

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission. The drawings shall not be scaled.

W4

W1

W1

7

26580

+18.45 M

W3

BALCONY

13

23

ADITYA COLLEGE OF ARCHITECTURE. +23.5 M Harridas Nagar Rd, Saibaba Nagar, Borivali, Mumbai, Maharashtra, India. Pincode 400067.

SIGN $ STAMP.

DRAWING NO. -

W3

12

N

+19.65 M

W1

11 9

18

TERRACE LEVEL

W5 BALCONY

10

16

W6

W1

16

C6

26355

WORKING DRAWING W6 OF RESIDENTIAL BUILDING

SCALE1:10

15

C28,C22,C18

C32

1:50

12MM THK MOSAIC TILES

W5

100

14

C13 6735

SCALE -

W3

101

17

25715

24830

KASHYAP NIMESH SHAH

SEAT NO. -

FIFTH FLOOR

DETAIL B

W6

26280

C12 22325

22400

DRAWN BY -

PROJECT -

20MM THK EXTERNAL PLASTER

102

DETAIL D

C27,C21

C5 20380

C31

C24,C17 19320

18420

C9,C4,C33 16405

SW3

SW2,C35 15390

SW1,C8,C34

14415

W3

12mm ANTISKID CERAMIC TILES

PLASTIC EMULSION PAINT

TYPICAL FLOOR PLAN

W6

103

W6

W4

13440

FLUSH DOOR

T

108

C16,C7,C3

FLUSH DOOR

900

100MM THK BBC

109

10175

TYPE OF DOOR

1200

D2

230MM THK BRICK WALL

25MM THK MOTAR

111

A

8160

C2 6200

WIDTH

D1

SLIDING WINDOW

C

C

110

NO.

FRENCH WINDOW

2000

W1

114 113 112

TYPE OF7 WINDOW

3000

600

150 MM THK RCC SLAB

12MM THK ANTI SKID CERAMIC TILE

118 116

WIDTH

120

12MM THK MOSAIC TILES 100MM THK RCC COPING 25MM THK MOTAR 100MM THK BBC 50MM THK WATER PROOFING 150 MM THK RCC SLAB

100MM THK BBC

DETAIL A

117 115

7260

12mm ANTISKID CERAMIC TILES 300X300 S2

W1 W2.

TITLE -

8

CILL LEVEL

W1 W2

100MM THK RCC PRECAST COPING DRIP MOULD

25MM THK MOTAR

W6

4255

C1

C29

865 F2. NO.

100MM THK RCC COPING

SOIL PIPE

NO.

20 mm THK. VITRIFIED TILES (600 X 600) S1

T

300x750

DOOR AND WINDOW NO.3 SKIRTING 20 mm THK. VITRIFIED TILES

FINISHES FLOORING

F1.

C

C9 UP

NO.

U

C4 450x300

B

NOTES -

2) 3) 4)

D

A

600MM THK BEAM

1)

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission. The drawings shall not be scaled. Written dimensions are to be followed. Dimensions given are in mm unless and until specified & are from unfinished surface. 5) All Internal Plaster is 12mm and external plaster is20mm. 6) Any ambiguity shall be immediately brought to the notice of the architect before commencement of work. 7) All external walls are 230mm and internal walls are ADITYA COLLEGE OF ARCHITECTURE. 150mm thick unless specified. Harridas Nagar Rd, Saibaba Nagar, Borivali, Mumbai, Maharashtra, India. Pincode 400067.

W1

T

OVER HEAD TANK

1750

00

SECTION BB'

C

C10

200MM THK SUNK

SECTION DD'

WATER SUPPLY PIPE

NOTES -

WATER CLOSET (hindware art - crystal)

12MM THK MOSAIC TILES

1)

21' 22' 23'

C

F

All drawings are property of Kashyap Nimesh Shah and can not be used without his/her permission. The drawings shall not be scaled. Written dimensions are to be followed. Dimensions given are in mm unless and until specified & are from unfinished surface. All Internal Plaster is 12mm and external plaster is20mm. Any ambiguity shall be immediately brought to the notice of the architect before commencement of work. All external walls are 230mm and internal walls are 150mm thick unless specified.

W4

7'

C23,C15

6'

U

CONCRETE FINS 23'

B'

D'

7)

5'

4'

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

200MM THK SUNK

450x300

W4

FLUSH TANK

12MM THK CERAMIC TILES (maxima series - white, glossy finish) 20MM THK MOTAR

SHOWER HEAD

PLAN

WALL FIXTURE (with provision of over head shower with115 mm long bend pipe & wall flange)

150 MM THK RCC SLAB H'

600x300

5) 6)

SQUARE BASIN

50MM THK WATER PROOFING

D3

C22

NAHNI TRAP

C21

2) 3) 4)

100MM THK BBC SINGLE LEVER BASIN

TOILET 50MM THK WATER PROOFING DUCT

H'

START TILE

25MM THK MOTAR

NAPKIN HOLDER

C' 150 MM THK RCC SLAB

1 : 100

1)

3'

4180

W4

S2 F2 W2 C1

C

100MM THK RCC COPING

START TILE

300

START TILE

TOILET -200 MM SUNK

SQUARE BASIN

19'

2'

600MM THK BEAM

C25,C19,C14

B

D

NOTES -

TILE DROP

D3

600MM THK BEAM 12MM THK MOSAIC TILES

THK MOSAIC TILES

100MM THK RCC COPING G' 25MM THK MOTAR C18 A' 450x300 100MM THK BBC

W.C

G'

A

1'

23 TOWEL ROD 12MM HEALTH FAUCET

225

19

150MM THK RCC SLAB

C11

150MM THK RCC SLAB

C26,C20

A'

23

23'

N

SIGN $ STAMP.

ADITYA COLLEGE OF ARCHITECTURE. Harridas Nagar Rd, Saibaba Nagar, Borivali, Mumbai, Maharashtra, India. Pincode 400067.


Individual Projects

1800 600

Car Ramp

1180

Transformer

Location: About:

Ajman, UAE.

Status: Year: Done by:

Approved under Ajman’s Architect.

Showroom 3

120

Pump Room

Watch Man

250

250

120

220 200

200

5000

Car Ramp

Showroom 1

120

252

252

Showroom 4

120

2017 Kashyap Shah Munir Halai

Bedroom 2

Garbage C. 220

Changes were made by us in planning provided by the architect according to the client wish for 2 projects: 1st G+1 Villa and 2nd G+3 Commercial and Resdiential Building.

Bedroom 3

Kitchen

Passage

Bedroom 1

Living Room

250

First Floor

1800

2400

Basment

SHOWROOM PLANS

Ground Floor

VILLA PLANS

Showroom 2

Bedroom 2

550

Bedroom 3

Passage

Bedroom 1

Ground Floor

Kitchen

Living Room

8


9

Community Centre Location:

Haja patel ni pol, Ahmedabad, Gujarat, India.

Brief:

Pol is are rapidly changing becoming very urbanised, congested with traffic, fast paced and very hectic. The essence of social life is reducing everyday. The vision is to offer a space to the pol community which can help people come together, space which can be used for health care, display their talents, help women run small business; showcasing ‘An Architecture for the People, based on their Socio - culture Fabric.’

Semester: Mentor:

4 / 2015 Ar. Smit Goghari

Documentation of Pol in Gujarat.

City Fabric - Laser Cut on MDF

Scale structural model of a house in pole


Final Design Model.

Hand Rendered - Water and Pencil Colours, Rotoring Pen


“Design is not just what it looks like and feels like. Design is how it works.� - Steve Jobs


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.