Centre of Democracy Occupy Architecture

Name: Peh Ker Neng Id : 0314619 Tutor : Mr Lim Hwa Hong


1.0 Introduction 1.1 Abstract The design proposal challenges are to create an architectural position on purpose to emphasize the broad theme of sustaining humanities and resolution of architecutral design.The theme of sustianing humanities refers to architectural for people, time and place. Sustainable design becomes the crucial issues for architect as it upholds the belief that architecture able to create a better place thus affect the society and humanity. Architecture itself acts as a role in making a community more liveable. The project also aims to explore the topic of Malaysia Identity. Therefore, the design development reflects the theme of project, progressing from urban issues of urban street environment,development of architectural position, proposed strategies in order to solve the issues. The site and proposal programmes were developed to address the needs of user group. Consideration of integration technologies,environmental sustainability and Malaysia identity.

1.2 Introduction In addition to students ability to develop their own position in developing their individual projectwithin the theme of ‘sustaining humanities’—architecture for people, place and time, one keyaspect of the design project is to develop holistic and integrated aspects of technology,environment and cultural context in architectural design. Subsequent to Phase 2: Design Strategyand Sketch Design phase, students are required to develop environmental strategies andtechnological resolutions with the main intent to strengthen their design exploration/ideas, and complement their design

1.3 Aim & Objective 1. Able to adequate the users needs as part of design 2. Produce a sustainable design, consideration and technology used. 3. Identify the Malaysia Identity and apply in the design of building 3. Includes an appropriate architecutural programme and planning within the chosen architecture context.


2.0 Site Investigation and Contextual Studies 2.1 Site Introduction

The site is located at Presint 3 in Putrajaya, Selangor. Putrajaya are now accommodates most of the ministries and the government servants. Planned as a garden and intelligent city, 38% of the area is reserved for green spaces. As indicated in the figure ground diagram, the buildings are quite spread out with large swathes of green and water bodies in between.The site was facing toward the boulevard and located beside the Palace of Justice which is house two courts: The federal court , the highest court of Malaysia and Court of appeal. A monorail reserve cuts through the site into two portions, which it’s now absorbed as part of the site.The current site was treated as a carpark area where the goverment servant and workers from nearby building can park their transport.

2.2 Site History Named after the first Malaysian Prime Minister, Tunku Abdul Rahman Putra Al-Haj, Putrajaya is a planned city and the federal administrative centre of Malaysia. The territory is entirely enclaved within the Sepang District of the state of Selangor. First conceived in the 1990s to replace Kuala Lumpur as the administrative capital, a network of open spaces and wide boulevards were incorporated to the plan. Construction began in August 1995 and it was Malaysia's biggest project with estimated final cost of US 8.1 billion dollars. The entire project was designed and constructed by Malaysian companies with 10% of the materials imported. As a city planned and built virtually overnight of just over 20 years, Putrajaya is replicated based on a northern city model, and arguably not appropriated to the local environmental and cultural conditions. As we are tasked to analyze the site, we also saw Putrajaya in a different take and took the opportunity to appraise the city critically from the view point of an architectural student.First, the 400 hectare Putrajaya Lake, was artificially created by damming two rivers, Sungai Chuau and Sungai Bisa, and forms the centrepiece and identity of the city. With the various bridges spanning across the lake from the main land, one wonders if the creation of the water bodies is a prudent and necessary exercise. The city can be divided into different districts or precincts, marked by the various edges.

Putrajaya view during 2013


2.3 Site Issue

All building are bulky and dense

2.4 Urban Studies

Site are totally expose to sunlight


3.2 Precedent Study German Pavilion Expo 67

Locaction: Montreal,Canada Architect : Frei Otto Area : 8000 Sqm Building type : Exhibition The motto of the world Exposition in Montreal was "Terre des Hommes" inspirated by the meaning of this theme for the intimate relationship and interdependence between mankind and earth, Frei Otto has designed, together with Rolf Gutbrod in their joint competition-winning project, an imaginative sequence of man-made landscapes, mutually overlapping and related to one another, and harmonizing with the natural setting of land and water around it. A curvacelously swinging roofscape was spread widely over a sculptured ground platform and differently raised exhibition terraces. The pavilion has been one of the architectural highlights of the Expo and, no doubt that , it was a real masterpiece of lightweight architecture

Polyester

New German Parliament

Assembly of Wales

Architect : Norman Foster

Architect : Rogers Stirk Harbour + Partners

Location : Berlin,Germany Project Year : 1999

Location : Wales,UK Project Year : 2006

In fact, it is that contentious dome–or cupola–that most fully captures Foster’s ideals for the project. The cupola is the most publicly accessible portion of the building; it provides a visual connection to the work in the parliamentary chamber below, An inverted cone of mirrored panels in the center of the dome reflects daylight down into the debating chamber, and also supports ventilation in the building, exhausting hot air through the top of the cupola.

section Though less conspicuous than the cupola, Foster’s other interventions in the building were no less significant. The design was able to consolidate the functional spaces of the parliament back into a single building, including, most notably for the MPs, the “faction rooms” where party caucuses gather to discuss policy.entrance, under the classical pediment inscribed, “To the German People.”

Debating Area

The New Assembly reflects the democratic process, reinforcing the importance of the electorate by placing the public above the elected assembly members, with the debating chamber as both the physical and metaphorical centre of the design. It has since been awarded the BREEAM 'excellent' rating for its environmental strategy, which includes boreholes, grey water recycling and extensive use of natural light and ventilation.

Public Area

The National Assembly for Wales is a prestigious landmark that was awarded for its environmental strategy.


3.3 Design Intention When political theorist discuss public space, they generally refer the print and digital media as the representative for democracy, this is contrast to the olden civilization where public spaces such as the forum and debating chamber played a significant role in determine the idea of democracy, the shift from physical to virtual has taken place for a number of reasons. This is due to scale and complexity of our society, as our civilization evolves and grew larger, it is impossible for everyone to gather and argue in a physical forum, furthermore with the invention of print media and the beginning of digital age, physical forum has taken a backseat and sadly it remained architecturally stagnant in term of design. The centre accommodate a sequence of varied, liberal spaces interconnecting larger institutional and domestic spaces. Suspended above the settlement is a protective tensile membrane which respond to varying environmental conditions as well as social ones.The centre was constructed around various practical, environmental, political, and symbolic constituents, mainly model the site into an democracy hub that sustains the act of protest through institutional and domestic facilities.

3.4 Project Brief SPACE REQUIREMENT

Palace of Justice

ana

NORTH

Pers

iaran

Perd

Menara Prisma

Jala

n Ke

Jabatan Alam Sekitar

Plot GFA: 25,789.60 sqm Plot Area: 5,140 sqm

mer

deka

an

1st Floor: Basement Floor: 1. Underground Subway 1. Research Centre 2.Workshops 3. Public Kitchen Ground FLoor: 4. Volunteer Training 1.Drop-off Area 5. Services 2.Foyer 3.Registration 2nd Floor: 4.Selling Stall 1. Accommondation 5.Public freedom 2. Check-in Lobby Platform 6.Justice Exhibition 3rd Floor: 7.Cafeteria 1.Bersih Office 8.Citizen Living 9.Selling Stall 10.Services

Plot Ratio: 5.02

In this project, the proposed programme is to increase the public awareness and participation in the movement of democracy.The proposed site is located beside the Palace of justice.The centre for democracy was a constructed space for exploring and expressing democracy ideologies via legitimate and progressive means, and developing strategies to counteract modes of suppression by law enforcement and government.Conceived with direct help from ‘BERSIH’ organisation, the project developed from the growing numbers of people and organisations who fight for the right to protest against undemocratic ideals.

Aerial View of Building


3.5 Site Response

3.6 Design Strategy

Push & Pull Climatic Response

The tensile structure to explain the relationsip between the people & Politics

Transparency In Bersih, transparency is Important element to explain the condition

Seamless Circulation To create public community space, seamless circulation will enhance the experiece.

3.7 Form Studies

Visual Connection

Activities Connection

1.Connectivity

2.Open Plan

4.Center Core

5.Structural

3.Lifted

6.Remodernise Tent


3.7 Spatial programming The ground level of the centre house a cafe, Public Conference Area where people can access freely without authorisation and constraints. The first level,Research Centre and Workshops area where users can access with request and some authorisation approved. Then, the second level is the floor where the accommondation located. Last, the 3rd floor was the Bersih Office located.These spaces require quiet and privacy.

Roof Level

3rd Level Private

2nd Level

Semi Private

1st Level

Semi Private

Ground Level

Public

Lowerground Level

Public


4.0 Environmental and Technological strategies 4.1 Wind Analysis

4.3 Rainwater Harvesting System

Putrajaya

Rain

Anual Wind Rose Diagram

Daily Wind Rose Diagram

The rainwater flows on the sloped tensile roof then collected according to the center core of the building. The collected rainwater will be utilised for the accommondation,washrooms and green pocket area.

4.2 Ventilation

Stack Ventilation Fresh air from outside can help to force the warm air exit from the outlet

The rainwater will stores in the water storage tank which has been place on the underground.By incorporating this system as part building system thus able to save costs and also save water usage.

CONSTRUCTION DRAWINGS

GENERAL NOTES: 1. This drawing is copyright and is the property of Chuah Wei Hong. No


5.0 Exploration of Design 5.1 Building Structural Section

CONSTRUCTION DRAWINGS

Recycle Bin

18

FULL WALL SECTION DETAIL

Multipurpose park

Drop-off Area

KEY PLAN 1 : 500

17

9

16

8

15

7

14

6

13

5

12

4

Foyer

A Foyer Democracy Monument

Registration

UP Merchandise Shop

Public Living

UP

15

11

13

3000

8000

9

8000

7

8000

50500

5

3

1

Lift Lobby

3

GENERAL NOTES: 1. This drawing is copyright and is the property of Chuah Wei Hong. No part or whole drawings shall be copied / reproduced without permission. 2. All dimensions and levels are to be verified on site by licensed surveyor. 3. Contractors must check all dimension on sites. Only figure dimensions are to be worked on. 4. All discrepancies must be reported immediately to the architect before proceeding. 5. Any alterations in levels and dimensions without prior consultation with the architect or engineer shall be responsibility of the contractor. 6. All works are to be constructed to specifications, any variation shall be reported immediately to the architect or engineer. 7. The architect must be informed before work commences.

FFL +0

Cafeteria

FFL -300

Exhibition Area

7500

8000

8000

750MM STEEL MAST TO ENG. DETAIL

Press Conference

UP

Selling Stalls

kL ac Se tb

Washroom

UP

A

ine

Waiting Area

PROJECT NAME

Bo

un

da

ry

Lin

e

PROPOSED DESIGN OF CENTRE FOR DEMOCRACY IN PRESINST 3,PUTRAJAYA.

SUSPENDED PRESTRESSED TEXTILE MEMBRANE

200MM SHEET METAL CAP

Roof Level 30000

1100M HIGH M.S RAILING TO ENG.DETAIL

80MM ALUMINIUM FRAME WITH 12MM THK BENT TEMPERED GLASS

450MMx 450MM THK. R.C COLUMN TO ENG.DETAIL

300MM HOLLOW STEEL TUBULAR COLUMN

600MMx 300MM R.C BEAM TO ENG.DETAIL

R.C MONOLITHIC STAIRCASE TO ENG.DETAIL

CLIENT ( LOT 7-27, JALAN BENDAHARA, 12345 MELAKA, MALAYSIA )

DATO' TAN NRIC 880604-14-5422

Signature:

ARCHITECT Level 5.14 Block E, No. 1 Jalan Taylor's, 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia. Tel: +603-331 5550

Fax: +603-3311 5551

Email : info@tomatopotato.net

LEMBAGA ARKITEK MALAYSIA

4th Floor 14000

Signature:

Ar. PEH KER NENG Professional Architect

Workshop

M. Arch (UCLA, USA) APAM

Public Living

300MM R.C RETAINING WALL TO ENG. DETAIL

Accommondation

Library

LAM Reg. No. A/P 27

3rd Floor

600MMx 300MM R.C BEAM TO ENG.DETAIL

10800

NRIC 941102-01-5663 "Saya memperakui bahawa detail-detail dalam pelan adalah menurut kehendakan-kehendakan Undang undang Bangunan Segaram (Wilayah Persekutuan Kuala Lumpur) 1954 dan says setuju terima tanggungjawab degan sewajarnya."

CIVIL AND STRUCTURAL ENGINEER

2nd floor 7500

ALYSSA Engineering Sdn. Bhd.

(923767-K)

No. 21-22, Jalan Perai, 13400 Pulau Pinang, Malaysia. Tel: +604-331 4789

Fax: +604-3311 7845

Email : info@alyssaenginnering.net

Debating Chamber Office

1st floor 4000

MECHANICAL AND ELECTRICAL ENGINEER

CRYSTAL Expert & Co.

(923597-K)

Lot 22, Jalan Butterworth, 13400 Pulau Pinang, Malaysia. Tel: +604-331 3681

Fax: +604-3311 1546

Email : info@crysalexpert.net

Ground floor 0 Rainwater Harvesting

QUANTITY SURVEYOR

NGOH Consultancy Sdn. Bhd.

(923584-K)

No. 22, Jalan Bagan Lallang, 13400 Pulau Pinang, Malaysia. Tel: +604-331 8863

Fax: +604-3311 8863

Email : info@ngohconsultancy.net

300MMx 300MM THK. R.C COLUMN TO ENG.DETAIL

3MM THK STEEL PLATE CEMENT RENDER FINISH 150MM R.C SLAB TO ENG. DETAIL

Section A-A 1 : 100

1000MM THICK R.C COLUMN FOOTING TO ENG. DETAIL

DRAWING TITLE

SECTION A-A

SCALE

AS SHOWN

DATE

30/NOV/ 2016

DESIGNED BY

PEH KER NENG

DRAWN BY

PEH KER NENG

CHECKED BY

MR. KHAIROOL AIZAT

PROJECT NO.

SHEET NO.

01

03

** NOTE: ALL DRAWINGS ARE TO BE PRINTED ON A1 SIZE PAPER


13

Merchandise Shop

Public Living

UP

CONNECTION PLATE

Exhibition Area

PROJECT NAME

Press Conference

PROPOSED DESIGN OF CENTRE FOR DEMOCRACY IN PRESINST 3,PUTRAJAYA.

UP Waiting Area

Lin ck

ANCHOR BOLTS

e

Washroom

UP Selling Stalls

Bo

un da ry

Lin e

A

tba

TIE-BACK CABLE

Cafeteria

FFL -300

50MM THK.OPEN SWAGE SOCKET AND TURNBUCKLE TO MANUF'S DETAIL

Se

750MM STEEL MAST TO ENG. DETAIL

Lift Lobby FFL +0

150MM R.C SLAB TO ENG. DETAIL

CABLE TO MANUF'S DETAIL

KEY PLAN

CONSTRUCTION DRAWINGS 1 : 500

5.2 Structural Detail

CLIENT ( LOT 7-27, JALAN BENDAHARA, 12345 MELAKA, MALAYSIA )

DATO' TAN

Fabric-To-Cable Detail 1 : 10

NRIC 880604-14-5422

GENERAL NOTES: 1. This drawing is copyright and is the property of Chuah Wei Hong. No part or whole drawings shall be copied / reproduced without permission. 2. All dimensions and levels are to be verified on site by licensed surveyor. 3. Contractors must check all dimension on sites. Only figure dimensions ARCHITECT are to be worked on. 4. All discrepancies must be reported immediately to the architect before proceeding. 5. Any alterations in levels and dimensions without prior consultation with the architect or engineer shall be responsibility of the contractor. 6. All works are to be constructed to specifications, any variation shall be reported immediately to the architect or engineer. Ar. PEH KER NENG 7. The architect must be informed before work commences. 200MM THK. SHEET Signature:

Recycle Bin

Level 5.14 Block E,

No. 1 Jalan Taylor's, 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia. Tel: +603-331 5550

200MM THK. SHEET METAL CAP

18 Multipurpose park

Drop-off Area

17

9

16

8

15

7

14

6

13

5

4

3

Foyer

80MM ALUMINIUM FRAME WITH 12MM THK BENT TEMPERED GLASS

Foyer

750 MM STEEL MAST TO ENG.DETAIL

Professional Architect

M. Arch (UCLA, USA) APAM

METAL CAP

Democracy Monument

Registration

CIVIL AND STRUCTURAL ENGINEER

Merchandise Shop

ALYSSA Engineering Sdn. Bhd.

Public Living

CRYSTAL Expert & Co.

FIN PLATE

ack

Lin

e

PROPOSED DESIGN OF CENTRE FOR DEMOCRACY IN PRESINST 3,PUTRAJAYA. e Lin ry da un

10800

150MM R.C SLAB TO ENG. DETAIL

Full Wall Section 2 1 : 50

Fax: +604-3311 1546

(923584-K)

No. 22, Jalan Bagan Lallang, 13400 Pulau Pinang, Malaysia. Tel: +604-331 8863

Fax: +604-3311 8863

Email : info@ngohconsultancy.net

DRAWING TITLE

SECTION A-A

SCALE

Bo

3rd Floor

Tel: +604-331 3681 Email : info@crysalexpert.net

tb

Workshop

Washroom

UP Selling Stalls

Malaysia.

QUANTITY SURVEYOR

Waiting Area

A

(923597-K)

Lot 22, Jalan Butterworth, 13400 Pulau Pinang,

NGOH Consultancy Sdn. Bhd.

PROJECT NAME

UP

600MMx 300MM R.C BEAM TO ENG.DETAIL

Fax: +604-3311 7845

MECHANICAL AND ELECTRICAL ENGINEER Cafeteria

SUSPENDED PRESTRESSED TEXTILE MEMBRANE

Press Conference

SUSPENDED PRESTRESSED TEXTILE MEMBRANE

Malaysia. Email : info@alyssaenginnering.net

Lift Lobby

FFL -300

Fabric to Mast Detail

(923767-K)

No. 21-22, Jalan Perai, 13400 Pulau Pinang, Tel: +604-331 4789

UP

FFL +0

Exhibition Area

14000

CLAMP BAR

LOCKWASHER

Se

4th Floor

Roof Level

LAM Reg. No. A/P 27

NRIC 941102-01-5663 "Saya memperakui bahawa detail-detail dalam pelan adalah menurut kehendakan-kehendakan Undang undang Bangunan Segaram (Wilayah Persekutuan Kuala Lumpur) 1954 dan says setuju terima tanggungjawab degan sewajarnya."

UP

30000

LEMBAGA ARKITEK MALAYSIA

Signature:

A

300MM HOLLOW TUBULAR STEEL COLUMN

Fax: +603-3311 5551

Email : info@tomatopotato.net

12

AS SHOWN

DATE

30/NOV/ 2016

DESIGNED BY

PEH KER NENG

DRAWN BY

PEH KER NENG

CHECKED BY

MR. KHAIROOL AIZAT

PROJECT NO.

KEY PLAN 1 : 500

SHEET NO.

Fabric to Mast Detail 1 : 10

CLIENT

01

03

** NOTE: ALL DRAWINGS ARE TO BE PRINTED ON A1 SIZE PAPER

( LOT 7-27, JALAN BENDAHARA, 12345 MELAKA, MALAYSIA )

S P M

DATO' TAN

R.C MONOLITHIC STAIRCASE TO ENG.DETAIL

NRIC 880604-14-5422

F

13 SUSPENDED PRESTRESSED TEXTILE MEMBRANE TO MANUF'S DETAIL

2nd floor 7500 1100M HIGH M.S RAILING TO ENG.DETAIL

C

Signature:

ARCHITECT

750MM STEEL MAST TO ENG. DETAIL

Level 5.14 Block E,

Selangor Darul Ehsan, Malaysia. Tel: +603-331 5550

BASE PLATE

1st floor

Fax: +603-3311 5551

Email : info@tomatopotato.net

CLAMP BAR Debating Chamber

T

No. 1 Jalan Taylor's, 47500 Subang Jaya,

LEMBAGA ARKITEK MALAYSIA Signature:

CABLE TO MANUF'S

Ar. PEH KER NENG DETAIL Professional Architect M. Arch (UCLA, USA) APAM LAM Reg. No. A/P 27 NRIC 941102-01-5663

4000

300MM HOLLOW TUBULAR STEEL COLUMN TO ENG.DETAIL

GASKET CORD EDGE

"Saya memperakui bahawa detail-detail dalam pelan adalah menurut kehendakan-kehendakan Undang undang Bangunan Segaram (Wilayah Persekutuan Kuala Lumpur) 1954 dan says setuju terima tanggungjawab degan sewajarnya."

CIVIL AND STRUCTURAL ENGINEER

ALYSSA Engineering Sdn. Bhd.

(923767-K)

No. 21-22, Jalan Perai, 13400 Pulau Pinang, Malaysia.

Fax: +604-3311 7845 THK. SHEET 200MM METAL CAP

Tel: +604-331 4789

Email : info@alyssaenginnering.net

MECHANICAL AND ELECTRICAL ENGINEER

CRYSTAL Expert & Co.

Ground floor

750 TO

(923597-K)

Lot 22, Jalan Butterworth, 13400 Pulau Pinang, Malaysia. Tel: +604-331 3681

0

Fax: +604-3311 1546

Email : info@crysalexpert.net

80MM THK. ALUM. FRAME WITH 12MM BENT TEMPERED GLASS

Fabric-To-Cable Detail 300MMx 300MM THK. R.C COLUMN TO ENG.DETAIL

QUANTITY SURVEYOR

Roof Level

NGOH Consultancy Sdn. Bhd. 30000

No. 22, Jalan Bagan Lallang,

LO (923584-K)

13400 Pulau Pinang, Malaysia. Tel: +604-331 8863

Fax: +604-3311 8863

Email : info@ngohconsultancy.net

Fabric to Mast Detail

DRAWING TITLE

SECTION A-A

1000MM THICK R.C COLUMN FOOTING TO ENG. DETAIL

300MM THK R.C RETAILIONG WALL TO ENG.DETAIL

SCALE

SUSPENDED PRESTRESSED TEXTILE MEMBRANE AS SHOWN

DATE

30/NOV/ 2016

DESIGNED BY

PEH KER NENG

DRAWN BY

PEH KER NENG

CHECKED BY

MR. KHAIROOL AIZAT

PROJECT NO.

Full Wall Section 1 1 : 50

FABRIC-TO-RIGID EDGE DETAIL 1 : 10

SHEET NO.

01

Full Wall Section 2

1 : 50 03

** NOTE: ALL DRAWINGS ARE TO BE PRINTED ON A1 SIZE PAPER

SU PR TE ME


4.4 Greeneries Some spaces on each floor dedicated for green pockets thus able to provide cooling on the outside and inside of the building too.

The trees lanted on the surrounding context act as buffer for noise and achieve the green scheneries.Hence, more trees planted on the road sides since traffic congestion occured most of the time especially during the day

4.5 Dormitary


3.0 Project Background & Design Intentions Strategies 3.1 Micro Site Analysis The proposed site is located at the empty carpark beside the Palace of Justice. Its was also facing the main axis in Putrajaya, the Boulevard. It was connect the Presint 1 to Presint 5. Therefore, it was a good idea to place a community building as well as a Democracy building where it help people to achieve the freedom of speech.

3.2 Micro Climate 7.00 AM

Certain area of site were covered during morning.

3.00 PM

12.00 PM

Site were fully exposed to sunlight during at this hour.

6.00 PM

Site Condition

Site were still exposed to sunlight during this hour.

Eventhough during this hour the site still fully exposed to the sunlight ,it is less hotter compared to afternoon.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.