ARCHITECTURE
P O R T F O L I O Doan Kim Khai
1
CONTENTS PERSONAL INFORMATION 3
PERSONAL INFORMATION
EXPERIENCE - PROJECTS 4 6 8 9 10 11 12 14 15 16 18 20 22 24 27 28 32 36 40 42 46
2
Dragon Hill City Diamond City Hera Apartment Imperial Palace Sky9 - Block 3 Citadines and Luxury Residence Park IX Office Building Bach Mai 2 Hospital Bluescope - LEED EBOM v4 Flora Fuji - EDGE Certification Sai Gon South Residence S11 Residence DE LI CACY Textile Factory Housing Project Satra Mall Lotus Hotel SaiGon MuiNe Resort Renovation South Sai Gon Pier Quang Trung University Renovation The cultural center of District 5 The administrative center of Ho Chi Minh City
MY FAVOURITE SAYING IS: Architecture is not about form. It is about many other things: the light and the use, and the structure, and the shadow, the smell and so on. I think form is the easiest to control, it can be done at the end. (Peter Zumthor - 2009 Pritzker Award)
EDUCATION AND TRAINING Graduated Architecture University of HoChiMinh city
SOFTWARE SKILLS Revit Architecture AutoCad Sketchup Vray Arlantis Photoshop Indesign Word, Excel, PowerPoint Microsoft Project NavisWorks
3
DRAGON HILL CITY NEW URBAN AREA MY ROLE : DESIGN MANAGEMENT + Concept Design Management + Technical Design Management + Making 1/500 Detailed Planning for submision
LOCATION: Bai Chay Ward, Ha Long city, Quang Ninh Province, Vietnam SITE AREA: 10,5 Ha PROJECT YEAR: 2018 The New urban area is planned for an apartment building and a townhouse area toghether with a culuture house. The townhouse already handover to custormer in 2019, mean while, appartment building is planned to completion in 2022
LANDSCAPE & ARCHITECRUE PLANING MAP 1/500
SHOP-HOUSE RENDERING
4
TOWNHOUSE RENDERING
APARTMENT BUILDING RENDERING
COMPLETION PHOTO
5
DIAMOND CITY NEW URBAN AREA MY ROLE : DESIGN MANAGEMENT + Urban Design + Proposal Planning Pararmetters + Detached House Design + Land-used Balance
LOCATION: Long Xuyen city, An Giang Province, Vietnam SITE AREA : 65 ha Project Year: 2018 Diamond city is a new urban area near by Hau river, which has fresh air. Investor aims to build a mordern urban with have all facilities for occupant ( parks, schools, markets,..)
DESIGN 3D VISULAZATION
PHASE 1 COMPLETION PHOTOS
6
LANDSCAPE & ARCHITECTURE PLANNING MAP 1/500
PHASE 2
PHASE 1
7
HERA APARTMENT BUILDING MY ROLE : DESIGN MANAGEMENT + Concept Design + 1/500 Detailed Plan for submisison + Preliminary Design + Fire Fighting Design
LOCATION: Hong Bang District, Hai Phong city, Vietnam SITE AREA : 16.300 m2 PROJECT YEAR: 2020 Hera Apartment is developed on an old structure Block 2, and establish 3 new blocks. So that the design of Block 2 need to update follow new regulation.
LAND-USED PLANING MAP 1/500
APARTMENT BUILDING RENDERING
8
IMPERIAL PLACE APARTMENT BUILDING MY ROLE : DESIGN MANAGEMENT + Fire Fighting Design + Design Revision Management during Construction + Fire Fighting Inspection + Final Inspection with Authorities
LOCATION: Binh Tân District , HoChiMinh city, Vietnam SITE AREA : 18.130 m2 PROJECT YEAR: 2018 This project is social housing which the most quality in HCMc.
COMPLETION PHOTO
APARTMENT BUILDING RENDERING
9
SKY 9 - BLOCK 3 APPARTMENT BUILDING MY ROLE : DESIGN MANAGEMENT + Fire Fighting Adjustment Design + Design Revision Management during Construction + Fire Fighting Inspection + Final Inspection with Authorities
10
LOCATION: District 9, HoChiMinh city, Vietnam SITE AREA: 18.333 m2 PROJECT YEAR: 2018 Sky9 - Block 3 is the Final Phase of the Sky9 Project. The Design of Block 3 have to adjust to meet with Fire Fighting Requirements.
CITY TOWER - BLOCK 2 APPARTMENT BUILDING MY ROLE: DESIGN MANAGEMENT + Trafic Connection Design + Participant to Pinkbook works
LOCATION: Thuan Giao Ward, Binh Duong city, Vietnam SITE AREA : 11.227 m2 PROJECT YEAR: 2018 Block 2 is also Phase 2 of City Tower Project which lauched 209 apartments and 204 serviced apartments. These serviced apartments are managed under Citadines Brand
11
PARK IX OFFICE BUILDING MY ROLE: DESIGN ARCHITECT + Concept Design + Basic Design and Fire Fighting Design + Prepare Presentation for weekly meeting with clients
12
LOCATION: Tan Binh District, HoChiMinh city, Vietnam SITE AREA : 1.075 m2 PROJECT YEAR: 2017 Park IX is an office building for rent with 2 basements and 16 upper floors with total GFA= 9.100 m2 . Investor aims this bulding to a Class A office with an mordern facade and maximize the rentable floor area
13
BACH MAI 2 HOSPITAL MY ROLE: DETAILED ARCHITECT + Selecting materials for interior design + Revise construction Drawings using Revit + Selecting Tree for Landscape design
14
BLUESCOPE - LEED EBOM V4 MY DUTIES: SUSTAINABLE ARCHITECT + Assessing the project + Making feasibility study for LEED EBOM + Preparing presentation + Writing LEED guildeline for the project
Location: Ba Ria - Vung Tau, Vietnam Site area : 10.000 m2
15
FLORA FUJI - EDGE CERTIFICATION MY DUTIES: SUSTAINABLE ARCHITECT + Selecting and making contact with suppliers that meet EDGE requirements + Calculating preliminary Incremental cost + Preparing presentation + Writing EDGE guildeline for the project
Location: Phu Huu, Distric 9, HoChiMinh city, Vietnam Site area : 12.260 m2 Project Year: 2016 Flora Fuji is a project of Nam Long Group with 789 units. They concerned about impacts of the project on enviroment and also reduced the operation cost. So they followed EDGE - an innovation of Internation Finance Copperation
MAIN STREET VIEW
16
+ Reduced Window to Wall Ratio + Reflective Paint/Tiles for Roof - High SRI + Reflective Paint for External Walls - High SRI + External Shading Devices + Insulation of Roof + Insulation of External Walls + Higher Performance Glass + Energy-Saving Light Bulbs - Internal Spaces + Energy-Saving Light Bulbs - Common Areas and External Spaces + Lighting Controls for Common Areas and Outdoors + Solar Photovoltaics
+ Low-Flow Showerheads + Low-Flow Faucets for Kitchen Sinks + Low-Flow Faucets for Washbasins + Dual Flush for Water Closets - 6 lt./first flush and 3 lt./second flush
+ Floor Slabs: In-Situ Reinforced Concrete Slab + Roof Construction: In-Situ Reinforced Concrete Slab + External Walls: AAC Blocks + Internal Walls: AAC Blocks and common brick wall +Flooring: Cearamic tile and Laminated wooden +Window Frames: Aluminium + Roof Insulation: XPS
17
SAI GON SOUTH RESIDENCE MY DUTIES: DESIGN ARCHITECT + Designing concept from begining + Preparing 1/500 planning detail and basic design documents follow regulations + Preparing presentation + Calculating project index
Location: Phu My Hung Urban Area, Distric 7, HoChiMinh city, Vietnam Site area : 32.900 m2 Project Year: 2015 SSR is designed follow Phu My Hung ‘s requirement to make saleable area as high as possible. It faces to the river and also the main street to make more valuable for shops and apartments
MAIN STREET VIEW
18
BIRD VIEW
XEM CHI TIEÁT LAN CAN
TÖÔØ NG CHAÉ N, XEM BAÛN VEÕ SAÂ N VÖÔØN
XEM CHI TIEÁT ÑOÙNG TRAÀN VEÄ SINH
XEM CHI TIEÁT ÑOÙNG TRAÀN
VEÄ SINH
CÖÛA HAØNG
XEM CHI TIEÁT LAN CAN
HAØN
INOX
CH
MAIN STREET VIEW
TYPICAL WALL CHI TIEÁ T TÖÔØNGSECTION (5)
19
S11 RESIDENCE MY DUTIES: CONCEPT ARCHITECT + Designing concept ( exterior, garden,...) + Preparing presentation ( calculate area,...) + Design development + Working as a team player
Location: Phu My Hung Urban Area, Distric 7, HoChiMinh city, Vietnam Site area : 28.920 m2 Project Year: 2015 This project base on Phu My Hung standard with felicities (club house, swimming pool, work out area, play gound,..) for 3600 people
MAIN STREET VIEW
PLAY GROUND VIEW
20
SWIMMING POOL VIEW
SWIMMING POOL VIEW
21
DE LICACY TECTILE FACTORY MY DUTIES: CONCEPT ARCHITECT + Designing concept of office and typical factory ( exterior and layout) + Preparing presentation + Working as a team player
Location: Binh Duong province, Vietnam Site area : Project Year: 2015
BIRD VIEW
FACTORY VIEW
22
FACTORY VIEW
OFFICE VIEW
23
MY PARENT ‘S HOUSE MY DUTIES: + Designing concept + Project management + Working with suppliers and construction teams
24
Location: Binh Thuan province, Vietnam Site area : 300 m2 Project Year: 2015
The house is designed with low costs and optimized bioclimates I divided the house into two parts by a fish pond. The front part includes living room, kitchen, dinner room, and laundry. the other is bedrooms in order to get quiet. I made open spaces toward the East - South in order to get light breezes into the house. 3D MODEL
25
SKETCH
26
SATRA MALL MY DUTIES: CONCEPT ARCHITECT + Designing interior concept and making layout + Preparing presentation + Working as a team player
Location: HoChiMinh city, Vietnam Site area : 11.300 m2 Project Year: 2015
27
LOTUS HOTEL MY DUTIES: CONCEPT ARCHITECT + Designing Concept + Building 3d + Writing Reports
28
Nha Trang Lotus Hotel is designed 3 stars standard hotel which includes 221 rooms, restaurant, pool, conference center, ...
BASEMENT FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
29
4th FLOOR PLAN
TYPICAL FLOOR PLAN
16th FLOOR PLAN
30
BEDROOM INTERIOR: it ‘s designed in modern style, but still brings warmth by tone wood Interior space ‘s clear, simple and wide.
31
SAIGON MUINE RESORT RENOVATION MY DUTIES: CONCEPT ARCHITECT + Designing center area + Designing new hotels + Building 3d + Writing reports
Saigon Muine resort renovation to attract tourists by renovating the center area: + Expanding the pool, restaurant + Improving pollution + Increasing the number of rooms
The resort did not meet traveler ‘s needs: lack of restaurant area, polluted streams, ... The idea of the design is to create a resort among the trees ......
32
OPTION 1
OPTION 2
33
OPTION 1: CENTER AREA RENOVATION
OPTION 2: CENTER AREA RENOVATION
34
HOTEL BUILDING DESIGN
35
SOUTH SAI GON PIER MY DUTIES: CONCEPT ARCHITECT + Analyzing site + Designing concepts + Building 3d + Writing reports
South Saigon pier project aims to serve tourism activities of HCM city, includes functional areas: reception hall, an administrative area, sales area, restaurant, ...
option 1
36
option 2
OPTION 1
C - SECTION
L - SECTION
PERSPECTIVE
37
38
OPTION 2
C - SECTION
L - SECTION
PERPESTIVE
39
QUANG TRUNG UNIVERSITY RENOVATION MY DUTIES: CONCEPT ARCHITECT + Analyzing existing conditions + Renovating block A + Building 3d + Writing reports
Block A - Quang Trung University Renovation: + Design internal courtyard, library. + Change the functional areas. + Renovate the façade.
Current Situation
Ground Floor Renovation Plan
Exterior renovation Perspective
40
Anti-noise Detail
Internal courtyard Perspective
Library renovation Perspective
41
THE CULTURAL CENTER OF DISTRICT 5 MY DUTIES: DRAFTER +Analyzing local architecture + Working as a team + Building 3d file
42
The architectural idea competition for the Cultural Center of District 5 aims not only to preserve and promote diversity in French and Chinese cultures, but also to connect urban space and create a common space for people.
43
44
45
THE ADMINISTRATIVE OF HO CHI MINH CITY MY DUTIES: DRAFTER + Analyzing local architecture + Working as a team
46
The architectural concept competition for Ho Chi Minh Civic Center aims to redevelop the city administrative center but still preserve essential architectural heritage which connects the past and the future
DU AN QUY HOACH VA THIET KE KHU TRUNG TAM HANH CHINH TPHCM Thi Tuyen Quoc Te Thang Gieng 2015
THE NEW ADMINISTRATIVE CENTER OF HO CHI MINH CITY International Design Competition • January 2015
Nam Ky Khoi Nghia
01
Ly Tu Trong Ly Tu Trong
Bao Tang TPHCM
Past eur
Bao Tang TPHCM
Dong Khoi
Le Thanh Ton
Dong Khoi
Nguyen Hue
Past eur
Le Thanh Ton
Le Loi
Nguyen Hue
Nha Hat Sai Gon
BANG DO KHU VUC _ ty le 1/2000
SITE PLAN _ scale 1/2000
MAT BANG TONG QUAT_ ty le 1/500
area khu vuc danh cho nguoi di bo luong xe muc vao xe o to muc vao nguoi di bo
new pe pedes destri des trian tri an are areaa vehicl veh icles icl es flow vehicl veh icles icl es acc access ess pedest ped estria est rian ria n acce acce ccess
MASTER PLAN _ scale 1/500
BINH PHONG QUY HOACH WALL SCREEN URBAN BACK-DROP
TANG HAM BASEMENT
SO DO KHAI NIEM CONCEPT DIAGRAM HINH THE NOI THEM MORPHOLOGICAL EXTENSION
DI SAN LICH SU HISTORICAL BUILDING
IS
N BA
N
AI
M
UR
AX
DI SAN LICH SU HISTORICAL BUILDING
H
N HI
UC TR
Y QU
H AC HO
C
TRUNG TAM HOI THAO RECEPTION CENTRE
SO DO KHAI NIEM_TIET LO NET BAN DIEN
CONCEPT DIAGRAM _ REVEAL THE PROFILE
PHOI CANH TU DUONG NGUYEN HUE
PERSPECTIVE FROM NGUYEN PER EN HUÊ BOULEVARD
THANH PHAN DU AN PROJECT ENTITIES
47
48