ACM005 HEALTH & SAFETY CLIENT REPORT Kimberley Scally 0803619
1
Government Food Safety - SIQ1 Contents
1 INTRODUCTION
2
1.1 Project Information
2
2 HEALTH AND SAFETY
3
2.1 The Site
3
2.1.2 Land Acquisition 2.1.3 Site Security 2.1.4 Site Access 2.2 Existing Context
3.2 Contract Choice
9
4 APPENDICES
14
4.3 Lecture References
14
3 3 3 4
2 1 INTRODUCTION
1.1 Project Information -
industry. the design process.
-
Government Food Safety SIQ
Fig. 1
Comparison of China and the UK
3 HEALTH & SAFETY 2
2.1 The Site
-
-
2.1.2 Land Acquisition
-
2.1.3 Site Security
2.1.4 Site Access
-
4 2 HEALTH AND SAFETY
2.2 Existing Context
-
HEALTH AND SAFETY 2
2
1
the ground. -
2
3
rice.
4 -
5
9
6
7
8 tion.
Fig. 9
Construction Axonometric
2 HEALTH AND SAFETY
2.4.1 Fire Safety -
2.4.2 Services -
HEALTH AND SAFETY 2
-
Fig. 12
Interior Heights
-
3.1.2 Advantages -
9
3.2 Contract Choice
-
-
-
QUANTITY SURVEYOR -
3.3.1 Design & Construction Team
SURVEYOR -
ARCHITECT
LANDSCAPE ARCHITECT
CONTRACTOR
Client
Planning co-ordinator
Health and Safety Plan
Principal Contractor
STRUCTURAL ENGINEER Co-operate
Co-operate
Designers
CIVIL ENGINEER
Contractors
any Project End
Health and Safety File
Display Notice
11
12
FINAL COST = £ 24,411,445 (rounded up to nearest £5)
it has the correct resources for the project to go ahead.
= £9,562,050
= £ 8,420,598
= £ 2,142,202
13
= £ 1,464,687 -
TOTAL PLANNING FEE = £ 105,241
TOTAL ARCHITECTS FEE = £ 1,754,687 -
-
= £ 22,347 TOTAL BUILDING WARRENT FEE = £ 64,287.5
= £ 82,894
14 4 APPENDICES
Metric Handbook - Planning and Design Data
Planning Application Fees
-
Neufert - Architect’s Data. Building Warrant Fees
Construction Companion. Getting Paid - An Architect’s Guide to Fee Recovery Claims.
Oxford.
Plan of Work Stages
Building Construction Handbook Construction Technology
Contract
Demolition Methods
Which Contract : Choosing The Appropriate Building
EC Harris. Indicative Building Costs.
Construction Planning, Programming and Control Building Cost Planning for the Design Team
NEC. What is the NEC. -
Prospects. Structural Engineer Job Description
Standard Building Contract with Quantities (SBC/Q 2011). Thomson
RICS. Quantity Surveying.
Occupational Health and Safety in Construction Project Management. The Scottish Building Standards Procedural Handbook
HSE. Falls From Vehicals.
Architect’s Legal Handbook
HSE. Residual Risks
Interdisciplinary Design in Practice. CDM Regulations 2007 Procedures Manual
HSE. Are You a Designer?
-
4.3 Lecture References Health and Safety in Construction Design
Duty of Care and Collateral Warranties Designer Duties, NEC, Plan of Work, Which contract 5 pillars of planning
-