Professional Practice Report

Page 1

ACM005 HEALTH & SAFETY CLIENT REPORT Kimberley Scally 0803619

1


Government Food Safety - SIQ1 Contents

1 INTRODUCTION

2

1.1 Project Information

2

2 HEALTH AND SAFETY

3

2.1 The Site

3

2.1.2 Land Acquisition 2.1.3 Site Security 2.1.4 Site Access 2.2 Existing Context

3.2 Contract Choice

9

4 APPENDICES

14

4.3 Lecture References

14

3 3 3 4


2 1 INTRODUCTION

1.1 Project Information -

industry. the design process.

-

Government Food Safety SIQ

Fig. 1

Comparison of China and the UK


3 HEALTH & SAFETY 2

2.1 The Site

-

-

2.1.2 Land Acquisition

-

2.1.3 Site Security

2.1.4 Site Access

-


4 2 HEALTH AND SAFETY

2.2 Existing Context

-


HEALTH AND SAFETY 2

2

1

the ground. -

2

3

rice.

4 -

5

9

6

7

8 tion.

Fig. 9

Construction Axonometric


2 HEALTH AND SAFETY

2.4.1 Fire Safety -

2.4.2 Services -


HEALTH AND SAFETY 2

-

Fig. 12

Interior Heights


-

3.1.2 Advantages -


9

3.2 Contract Choice

-

-

-


QUANTITY SURVEYOR -

3.3.1 Design & Construction Team

SURVEYOR -

ARCHITECT

LANDSCAPE ARCHITECT

CONTRACTOR

Client

Planning co-ordinator

Health and Safety Plan

Principal Contractor

STRUCTURAL ENGINEER Co-operate

Co-operate

Designers

CIVIL ENGINEER

Contractors

any Project End

Health and Safety File

Display Notice


11


12

FINAL COST = £ 24,411,445 (rounded up to nearest £5)

it has the correct resources for the project to go ahead.

= £9,562,050

= £ 8,420,598

= £ 2,142,202


13

= £ 1,464,687 -

TOTAL PLANNING FEE = £ 105,241

TOTAL ARCHITECTS FEE = £ 1,754,687 -

-

= £ 22,347 TOTAL BUILDING WARRENT FEE = £ 64,287.5

= £ 82,894


14 4 APPENDICES

Metric Handbook - Planning and Design Data

Planning Application Fees

-

Neufert - Architect’s Data. Building Warrant Fees

Construction Companion. Getting Paid - An Architect’s Guide to Fee Recovery Claims.

Oxford.

Plan of Work Stages

Building Construction Handbook Construction Technology

Contract

Demolition Methods

Which Contract : Choosing The Appropriate Building

EC Harris. Indicative Building Costs.

Construction Planning, Programming and Control Building Cost Planning for the Design Team

NEC. What is the NEC. -

Prospects. Structural Engineer Job Description

Standard Building Contract with Quantities (SBC/Q 2011). Thomson

RICS. Quantity Surveying.

Occupational Health and Safety in Construction Project Management. The Scottish Building Standards Procedural Handbook

HSE. Falls From Vehicals.

Architect’s Legal Handbook

HSE. Residual Risks

Interdisciplinary Design in Practice. CDM Regulations 2007 Procedures Manual

HSE. Are You a Designer?

-

4.3 Lecture References Health and Safety in Construction Design

Duty of Care and Collateral Warranties Designer Duties, NEC, Plan of Work, Which contract 5 pillars of planning

-