Lachish Blvd: Connection to Northern Development
Scale: 1:500
0
10m
Office Lab / Space
Residential
Office Lab / Space
Residential
Office Lab / Space
Residential
Office/Lab Space
Ground Floor Retail
Parking or Storage
Solar Energy Education and Product Distribution Center
Sidewalk
3.5m
Bike Lane
Parking
1.5m
2.5m
SouthBound Travel
SouthBound Travel
North Bound Travel
3m
North Bound Travel
Parking
2.5m
3m
Bike Lane
Sidewalk
1.5m
3.5m
Office/Lab Space
R & D Park Development Details
Solar
STREET SECTION: Lachish Boulevard, Looking North
Food Production
Kiryat Gat, Route 35 Team
Among Industry
Dual Programmed Parking Lot
Walking Paths
16m
6m
Agriculture & Research Demonstration Lots
Focus Specific R&D in the North:
- Quality of Life for Workers - Tourism, Business Amenities & Accomodations - Public Transit Service - Freight Service, Supply Chain
High-Tech Agri - Genetics
Computer / / Software
Hi-Tech / / Creative
Eco / / Agri - Tourism
Nature / / Tourism
Solar / / Research
Solar / / Ed & / / Distribution
Agri / / Genetics Research
Within Industry - Shared Equipment - Knowledge Spillover - Labor Pool - PR, Education, Marketing - Distribution - Innovation
Northern Park Entrance / Plaza Phase 2 R&D Development 2-4 Story Buildings Approx. 400,000 sq ft (~12,000 sq meters footprint) (~37,000 sq meters)
Phase 2 - Public-Private Land Leasable Research Land Privately Maintained Public Park
Phase 1 R&D Development
2-4 Story Buildings Approx. 300,000 sq ft (~10,000 meters sq foot print) (~27,000 sq meters) Potential Uses: High-Tech Solar Research Agriculture Research Agri-Genetics Creative Start Ups
Pastoral / Natural Parkland
Dual Programmed Parking Lots Evening Basketball Courts Festivals Educational Demonstrations Markets, Local Produce Hard-surface Soccer Fields Landscaped Pedestrian Plazas Historic Information Center On-Demand Transit Hub Playground
Industry Clustering | R&D Development | Rebecca Disbrow & Chris Rhie
Industrial / / Tourism
pening for the New Kir yat Gat Res ear ch Park Grand O
CONTINUING NORTH: wildlife preserve
ACTIVE & PRODUCTIVE LANDSCAPES
depress natural landscape
minimal entry
alternative energy
soften
ROADS
Image Gateways
100.00
5.00
4.67
Minimize Route 35
10.67
4.67
Increased Porosity
5.00
30.00
Section 1:500
View at West Gateway
Rte 35 Depression & Bridge
Condensed On/Offramp
Landbridge for Continuous Park
Landbridge
Lachish On/Offramp Gateway
2017
Single Onramp
Bridge Typology
2025 Eco/Agro Resort Congestion Calming Ext Road
Phasing Plan
2050