HORNE 5
THE NEXT GREAT UNDERGROUND MINE IN CANADA HORNE 5: TOP QUARTILE PROJECT1 LOW ALL-IN SUSTAINING CASH COST - US$399/oz gold AISC (net of by-products) - Operating cost per tonne of C$41.00/tonne
HORNE 5 PROJECT FEASIBILITY STUDY COMPLETE
CAPEX - US$802M
IRR POST-TAX NPV (5%) - 15.3%, US$602 million NPV
ANNUAL AVERAGE PRODUCTION - 219,000 oz Au - 1,752 koz Ag - 67 million lbs Zn - 16 million lbs Cu
- Focus now shifts towards immediate permitting, development and financing - Results confirm the Horne 5 project supports an economically viable, robust, low-grade, high bulk tonnage underground gold mine - Targeted start of construction in 2019, first gold expected in late 2021 - Further optimization planned which builds on robust Feasibility Study
Proven & Probable Mineral Reserve 6.0 million oz AuEq (80.9 mt at 2.37 g/t AuEq)
INITIAL MINE LIFE - Over 15 years
Substantial potential to expand existing resource at depth
1. See Oct. 16, 2017 press release
CAPITAL STRUCTURE
as at 04/30/2020
Market Cap Basic Shares Outstanding Stock Options Warrants Fully Diluted Shares Outstanding Cash & Cash Equivalents
C$64.5M 226.0M 11.1M 6.4M 243.7M ~C$4.7M
ECONOMIC BENEFITS ESTIMATED AT $6.6 BILLION BASED ON $1,300 PER oz Au & LIFE OF MINE ROYALTIES & TAXES
SHAREHOLDERS Osisko Gold Royalties Sprott Government of Québec Falco Insider
18.3% 7.2% 5.1% 1.7%
DESTOR-PORCUPINE FAULT
O O R II O AR N TTA ON
Bryan A. Coates Chair of the Board Luc Lessard President & CEO, Director
Q C EC BE EB UE QU
BOARD OF DIRECTORS
67,000 H E C TA R E S O F L A N D
Duparquet
HHOO LL LLOO W WAAYY M M II NNEE
HORNE HORNE COMPLEX COMPLEX
Mario Caron Lead Independent Director Paola Farnesi Independent Director Angelina Mehta Independent Director Chantal Sorel Independent Director
SENIOR MANAGEMENT Luc Lessard President & CEO Guy Belleau Mine General Manager Ronald Bougie VP, Engineering & Construction Hélène Cartier VP, Environment and Sustainability
0
Évain
UUPP PP EE RR BB EE AAVV EE RR
5
Km
10
20
LL AA RR O O NN DD EE
-
FFAA LLCC OO RR EESSOOUU RRCC EESS PPRR OOPPEERRTTII EESS
CADILLAC FAULT
Virginiatown
W W EE SS TT W W OO OO DD
Rouyn-Noranda
00
55 K Km m
Larder Lake
(! !(
AA CC TT II VV EE GG OO LL DD PP RROO DD UUCC EE RR SS FF OO RR M M EE RR GG OO LL DD PP RR OO DD UU CC EE RR SS FF OO RR M M EE RR BB AA SS EE M M EE TTAA LL PP RR OO DD UU CC EE RR SS
INFRASTRUCTURES Located adjacent to the town of Rouyn-Noranda, roads, railways and electrical power. Extensive local mining expertise.
HIGHLY EXPERIENCED MANAGEMENT TEAM WITH PROVEN TRACK RECORD
Anthony Glavac VP, Corporate Controller Christian Laroche VP, Processing André Le Bel VP, Legal Affairs and Corporate Secretary François Vézina VP, Mining
HORNE 5 EXPECTS TO BE A SIGNIFICANT EMPLOYER IN THE ROUYN-NORANDA REGION, CREATING 525 LONG-TERM JOBS
COMMUNITY RELATIONS Falco is committed to sustainable development and the goal of zero harm to people, the environment and our communities.
HEAD OFFICE
This commitment means that we strive to act consistently in all of our activities in relation to health & safety, the environment, community relations and social development.
Tel: +1.514.905.3162 info@falcores.com
Wherever we operate, we will ensure we do so in a socially responsible manner and meet or exceed all applicable requirements.
1100, av. des Canadiens-de-Montréal Suite 300, Montréal, Québec H3B 2S2
PROJECT OFFICE 161, Avenue Murdoch Rouyn-Noranda, Québec J9X 1E3 GBELLEAU@FALCORES.COM
QUALIFIED PERSONS Claude Bernier, Exploration Manager, (P.Geo. Eng.) is the qualified person for this release as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects and has reviewed and verified the technical information contained herein. Mr. Bernier is an employee of Falco and is non-independent.
INDEPENDANT QUALIFIED PERSONS Carl Pelletier (P.Geo. Géo., B.Sc.) the qualified persons as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects for the mineral resource estimate Data in this document as it relates to the technical information related to the 2016 Horne 5 Project Resource Estimate and they have reviewed and verified the technical information contained herein. Mr. Pelletier is a consulting geologist with InnovExplo Inc. and fulfills the requirements to be "qualified person" for the purposes of NI 43-101. A Feasibility Study was prepared for Falco under the direction of BBA Inc., by leading independent industry consultants, all of whom are qualified persons (“QP”) under National Instrument 43-101. For more details on independant QPs who have prepared or supervised the preparation of the technical information relating to the Feasibility Study, please refer to the press release issued on October 16, 2017.