ALL FAITHS COMMUNITY SCHOOL U-Value of finished roof 0.10 w/m2K Steel Structure with TEK roof finished with Kalzip Zinc Cladding

PROJECT BRIEF Client:

King and Johnston

Architect: Hazel McCormack Young LLP Sector:

Education

Type:

New Build

Location: Kent

A new build school built using traditional Masonry and steel construction to be finished with a TEK panel mono pitch roof to four main areas of the school. This job presented a particular challenge as the architect had initially designed the product using a SIP’s panel which is not available in the UK, so K-Panels and the client had to work with the client to ensure the pre-designed Kalzip Zinc roof could still be fitted and the specified U-Values achieved.

K-Panels Ltd, Brailwood Road, Bilsthorpe, Newark, Notts NG22 8UA T: 0845 2260 214 E: info@k-panels.co.uk W: www.k-panels.co.uk


ALL FAITHS COMMUNITY SCHOOL

KEY STATISTICS • TEK roof incorporated with Masonry and Steel structure • Low U-Value requirements • Live school site with particular attention to H&S • Overcoming incorrect specification issues • Completed ahead of schedule

PROJECT SOLUTION Due to the impact the design and specification changes had on the build programme K-Panels were asked to complete the installation of approximately 600 square meters of roofing panel within a 3 week time frame, with design and delivery period being only 3 weeks from order placement.

PROJECT EVALUATION From the offset the K-Panels were aware some earlier problems meant the client was facing an extremely tight lead time with over running costs, it was extremely important our phase of the build did not add to the escalating programme and expense. Our ability to react quickly providing tightly timed sequenced deliveries and an efficient installation programme afforded our client some valuable acceleration in build programme to recoup lost time.

The time and cost constraints on this site left no room for any miscalculation with regards to fitting the TEK panels to the steel structure, and the precise design evaluation carried out by K-Panels enabled the site installation to be reduced to just 2 weeks with a team of 4 installers fixing over 300 square meters of panel in the first week alone. Due to the tight site restrictions of a live school site K-Panels were given strict timed delivery slots of only 30 minute windows. K-Panels planned a sequenced delivery and lifting schedule meaning each of the 4 key areas were delivered in one day with the panels immediately offloaded to the specific area they were required.

K-Panels Ltd, Brailwood Road, Bilsthorpe, Newark, Notts NG22 8UA T: 0845 2260 214 E: info@k-panels.co.uk W: www.k-panels.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.