02. SITE LOCATION - KHARGHAR
01. RESEARCH
04. DESIGN STRATEGIES AND CONCEPT
ABSTRACT
USER CENTERDNESS AND EBD FUTURE DEVELOPMENT
- Progressive change in user’s perspective. -Study experience and needs of users to understand their psychological, physical and social needs. -HCF, will not only be based on technical, legal and functional aspects but also support the well being of its users. -Healing environment leads to improve in rate of healing, staff performance, reduces stress and medical errors. -Social, economic and environmental aspects of HCF -Public participation and its need. Keywords : Healthcare; well being; psychological interventions; Healing environment; sustainability; social sustainability; patient-centric design; user-friendly; Healthcare providers; environmental characteristics; public participation
Healthcare provider’s core
General Access
- Designed for the sense of their privacy. - Quick movement - Easy accessibility to spaces
- On two sides connecting to different levels such that it doesnt intersect with the access of healthcare providers.
MUMBAI PUNE HIGHWAY
REGISTRATION DESK AND WAITING AREA
GREEN ROOF SYSTEM
Need of containment
- To connect all inpatient rooms facing inwards with the nature. - All inpatient rooms facing outwards are connected to the natural surrounding through landscaping in the site context. - Connects healthproviders area with the natural surrounding while acting as
- Centrally located. - Landscape used to create a sense of privacy and to create a natural connect while waiting. - Connects people easily to the spaces around.
CONTAINMENT OF INFECTION
-Emergency ward, ICU’s and OT’s
CONNECTING ELEMENT Less spread of infection. -General wards, single occupancy rooms, twinsharings rooms. -OPD
a physical barrier between them and the inpatient rooms.
-Ceiling with perforated slab covered with glass to allow natural ventilation into the central area’s. - Bridge acting as a connection between the process
INDOOR CORRIDORS AND CONNECTION WITH CENTRAL SPACES - Creates a vertical connection. - Connection with nature and natural light. - Keeps the movement and space lively and keeps the mind distracted.
of post operative
and ICU rooms to general wards and inpatient rooms. - Perforated circles on green roof covered with glass to let in the natural light in the interior spaces. Green roof area accessible through Doctor’s lounge and bridge for leisure and refreshment with restricted access only.
STRATEGIC LOCATION - Future expansion -Connectivity with the zones - Residential - more opd’s - Connected to Mumbai Pune highway.
RESEARCH QUESTIONS 1. What design factors boost positive and healing experiences in a healthcaree facility? 2. How do social, environmental, and economic aspects of sustainability help/affect users and helpers? 3. How can we develop a resilient healthcare facility for situations like emergence of infectious disease like Covid-19? SCOPE The focus is to design a hospital with technical details like smooth circulation and access between different functional departments and to create a design that copes with social issues like the stressful work environment of the staff, the anxiety of the patient, keeping track of the user groups and its smooth operation and circulation in-between spaces which will also depend on the frequency of its use. METHODOLOGY
Patient
Unstructured Family Members
Healthcare Providers
Structured
Literature Family Members
Healthcare Providers
LEED/ Sustainability in present
User Perspective Methods Understanding physical characteristics
PROGRESS OVER THE YEARS
CIRCULATION PLANS
TOILET, HEALTH ASSESMENT EMERGENCY / CASUALTY GENERAL ACCESS
HEALTHCARE PROVIDER’S CORE
03. SITE ANALYSIS
DESIGN PHASE STRATEGIES
CAFETERIA
GENERAL WARD
SERVICE FLOOR
OUTPATIENT DEPARTMENT
SIXTH FLOOR +23250 LVL FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
CENTRAL WAITING AND REGISTRATION AREA BILLING AND PHARMACY
OPERATION THEATER FLOOR ZONNING
Wind direction North-West to South East
Orientation, noise and sunpath
GENERAL WARD
GROUND FLOOR
GROUND FLOOR +600 LVL
CONNECTION IN BETWEEN OPERATION THEATER
SERVICE FLOOR
Access and flow management
Containment of disease
TWINSHARING
CAFETERIA/ENQUIRY DESK
OUTPATIENT DEPARTMENT User centeredness and EBD
OPERATION THEATER
SERVICE FLOOR
GROUND FLOOR ZONNING
CONCLUSION Strategic Location Resources
05. ZONNING
ULTRASOUND / RADIOLOGY
Saifee Hospital Case study (Services, To understand pre Planning) existing facilities and their planning and efficiency. Kohinoor Hatkesh Hospital Hospital (Sustainabil(Compact ity) planning)
Patient
Interview and Survey
Kharghar is a developing city and serves as a connection to all the cities in the outskirts, linking them and reducing the travel distance and time for them to reach an advanced treatment hospital.
SOUTH ELEVATION CORRIDOR VIEW
Flexibility and future proofing
FIRST FLOOR Decor
Atmosphere Initial points of contact
Furniture
HEALTHCARE PROVIDER’S CORE
Sound Lighting
Entrances
-Inclusive - ADA accessible
Waiting experience
Reception
-Easy to locate - ADA accessible. -Inclusive
Vegetation around the site. Railway station Bus Stops Metro station
OPD FLOOR ZONNING
THIRD FLOOR ZONNING SINGLE OR DOUBLE OCCUPANCY ROOMS
INTENSIVE CARE UNIT
SIXTH FLOOR +23250 LVL FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL
Privacy Auditory Privacy
-Expansiveness, Extended view
Comfortable and relaxing environment
SECOND FLOOR
THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
Visual Privacy
Primary road Secondary road
GROUND FLOOR +600 LVL
Railway station, Station, Metro and bus stops. HEALTHCARE PROVIDER’S CORE
MATERIAL PALETTE - White wall for a relaxing and calming atmosphere, helps maintain cleaninness and hygiene. - Wooden texture makes one feel comfortable and relaxed. -Colourfull paints around doors to make the environment lively and welcoming.
SECTION A-A’
CENTRAL WAITING AREA VIEW
FOURTH FLOOR ZONNING THIRD FLOOR
06. STUDY OF CASE - Kohinoor Hospital, Mumbai
Residential area Industrial Commercial Future development
The intent of this case study is to understand how green building and using sustainable design with its advantage of helping environment would also help the users and people of the facility indirectly.
Primary and secondary roads.
Healthcare provider Patient Services
Figure 8.3 Source - mgsarchitecture.in
Public amenities and Institution Bus depot Site
8.3 STUDY OF CASE - Hatkesh Multispeciality Hospital
Land use in and around the site.
For inlet of natural light. keeps the central area well lit.
GREEN ROOF VIEW
Image 8.4Source - mgsarchitecture.in Patient room and doctor’s chambers have large windows and light fixtures in specific places, like over the bed or the examination table, all lights are manually operated. Aternate circuit Aternate circuit of light of light Sensible lighting through glazing facade on the exterior facade.
KRISHI PARDESHI 1844 3806 RIZVI COLLEGE OF ARCHITECTURE
Image 8.1, Source - mgsarchitecture.in Atrium and skylights illuminate almost four floors of this six-story building.
Built mass in and around the site.
Image 8.2, Source - mgsarchitecture.in Alternate circuiting of light is used so that whenever there is minimal patient tariff one circuit can be turned off. FACADE VIEW
HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS
FLOOR
MUMBAI PUNE HIGHWAY
PARKING
SIXTH FLOOR +23250 LVL
SIXTH FLOOR +23250 LVL
FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL
FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL
THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
GROUND FLOOR +600 LVL
GROUND FLOOR +600 LVL
BASEMENT LEVEL +600 LVL
SECURITY CABIN
SECTION B-B’
NORTH ELEVATION
ENTER/ EXIT OT 2
+600 LVL
POLICE FAMILY ROOM
B
OT 8
Nourishment
Family room
Clean utility
OT 7
Family room Scrub area
OT 3
Family room
OT 4
Family room
OPERATION THEATER
OT 6
OT 5
Changing/locker room
RAMP
B’ X-RAY EMERGENCY WAITING
LOUNGE
Changing/locker room
EMERGENCY WAITING
STORAGE
clean up post operative room
preoperative room
Scrub area
RAMP TO BASEMENT RAMP
scrub area OT 1
soil utility
SERVICES EQUIPMENTS
C RAMP
Sub sterilization
Nourishment
+600 LVL
RAMP
frozen section lab
X-RAY
TECHNICIAN AREA
CASUALTY
MRI
CT
X-RAY
clean utility Lift
Dirty utility Lift
X-RAY
TECHNICIAN AREA RADIOLOGY
+600 LVL GENERAL ACCESS CORE
ULTRASOUND
PATHOLOGY LAB HEALTHCARE PROVIDER’S CORE
RAMP
RAMP
HEALTHCARE PROVIDER’S CORE
BILLING
+600 LVL
REGISTRATION AND WAITING AREA
+600 LVL
SERVICE FLOOR SERVICES EQUIPMENTS
+750 LVL PHARMACY
KIOSKS
GENERAL ACCESS CORE
CANTEEN
A
ENQUIRY AND ENTRANCE TO THE HOSPITAL WITH SIGNAGES AND INFORMSTION BOARD.
RAMP ENTER/ EXIT
+600 LVL
+600 LVL
CAFETERIA
SECOND FLOOR PLAN
BASEMENT FLOOR PLAN
SCALE 1:250
SCALE 1:250
A’ +600 LVL
+1200 LVL
RAMP
Post operative room
Post operative room
Nourishment
SECURITY CABIN
Nourishment Family room
C’
Family room
Scrub area
ENTRANCE
SERVICE FLOOR
Scrub area
CL utility
Changing/locker room
SL utility
Changing/locker room
ICU
PARKING
PROVIDER’S CORE
PROVIDER’S CORE NOURISHMENT
NOURISHMENT
OVERLOOKING CENTRAL WAITING AREA
OUTPATIENT DEPARTMENT
ONCOLOGY STAFF TL
UROLOGY
PAEDRIATIC GYNAECOLOGY
NEPHRO UROLOGY
COMMON TOILET
General wards
General wards
Multipurpose area
Multipurpose area
CARDIOLOGY
FIRST FLOOR PLAN
THIRD FLOOR PLAN
SCALE 1:250 SIXTH FLOOR +23250 LVL
KRISHI PARDESHI PARDESHI KRISHI 1844 1844 3806 3806 RIZVI COLLEGE COLLEGE OF OF RIZVI ARCHITECTURE ARCHITECTURE
GROUND FLOOR PLAN
SCALE 1:250 SIXTH FLOOR +23250 LVL
FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL
FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL
THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL
GROUND FLOOR +600 LVL
GROUND FLOOR +600 LVL BASEMENT LEVEL +600 LVL
SCALE 1:250
EAST ELEVATION
SECTION C-C’ HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS
Pebble cover on ground Growing medium 250mm thk
Drain pipe Water proofing membrane 60mm THK
Pavered concrete pathway
Protection layer 5mm THK Root barrier 5mm THK
Stone water collecting layer 75mm thk Drainage layer 60mm thk Insulation layer 75mm thk
25 mm CLEAR COVER FOR RIB BEAM
WAFFLE SLAB DETAIL
SPIDER FITTING SILICON SEALANT
GENERAL ACCESS
12 mm 4NOS MAIN BARS 25 mm CLEAR COVER FOR RIB BEAM NORTH 230 mm X 900 mm ELEVATION RCC BEAM
25 mm CLEAR COVERALUMINIUM AND FRP PEDESTRIAN GATE FOR RIB BEAM
08 mm STIRRUPS
12 mm 4NOS MAIN BARS
SCALE 1:10
9000
18500
19500
SOIL 25mm THK ALUMINIUM FRAME 500MM THK PCC BED 100MM THK BBC DRAIN PIPE
12mm INTERNAL PLASTER
FRP CLADDING 350MM THK BRICKWALL EXPOSED CONCRETE FINISH
OPENING 125MM NICHE 450X450MM RCC PIER
GRATING
12mm FRP CLADDING PREFABRICATED CONCRETE FLOWER BED
10MM THK MORTAR 16mm STONE CLADDING GRND LEVEL
10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL
GRATING
GRATING
12mm THK INT PLASTER 25MM THK CONDUIT PIPE SOIL 10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL
Single bed
10500
3125
2250
17750
Multipurpose area
SECTION BB'
SECTION CC'
100MM THK BBC
12MM CLEAR TEMPERED GLASS 40MM GAUGE SS POST
25MM CONDUIT DRAIN PIPE
DETAIL C
3250
2250
450X450MM RCC PIERS
12MM SS COVER PLATE
DEFORMED MAIN BARS 12 MM TOP REINFORCEMENT
8MM DIA 150MM C/C BOLT FOR BARREL HINGE BARREL HINGE
10MM DIA @ 150 mm c/c BARS
DETAIL D
BOTTOM BENTUP BARS 10MM DIA.
DEFORMED MAIN BARS 12 MM BOTTOM REINFORCEMENT
+2400 LVL +2250 LVL +2150LVL
SS OUTDOOR LAMP WITH LED 150MM PCC COPING WALL LIGHT 350MM THK BRICK WALL
CAPITAL BARS 10MM DIAMETER
DEFORMED DISTRIBUTION BARS 12 MM BOTTOM REINFORCEMENT
FRP CLADDING FINISH 15OMM WIDE NICHE 450X450 RCC PIER
COLUMN 450X450
DETAIL C SECTION AA'
PCC BED
PLANTERS
+0.650 LVL +0.3 FOOTPATH LVL +0.0 GRND LVL
STONE CLADDING
COLUMN BARS 12MM DIAMETER
150MM FOOTPATH
Pebble cover on ground
EAST ELEVATION C
B
A
Growing medium 250mm thk
Drain pipe
Multipurpose area
Filter fleece / Root repelent 75mm Thk
Water proofing membrane 60mm THK
COMPOUND WALL DETAILING
SS OUTDOOR LAMP WITH LED CI GRATING 400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH PREFABRICATED CONCRETE FLOWERBED
B
A B'
A' 15659,45
Protection layer 5mm THK Root barrier 5mm THK
2250
10500
3125
17750
3250
3125
2250
10500
B
A
Pavered concrete pathway
C'
3125
3250
17750
3125
4625
10500
3125
5625
C
PLAN @2600MM
Stone water collecting layer 75mm thk Drainage layer 60mm thk WALL LIGHT
Insulation layer 75mm thk CI GRATING 400X200 MM RCC GUTTER
EMERGENCY WARD
FOURTH FLOOR PLAN SCALE 1:250
A'
B'
A
B
450X450 MM RCC PIER 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH PCC BED 25MM THK ALUMINIUM FRAME FRP CLADDING
C'
PLAN @1500MM C
WALL LIGHT CI GRATING 400X200 MM RCC GUTTER 12 MM FRP CLADDING 450X450 RCC PIER 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH 10MM THK MORTAR 16MM THK STONE CLADDING
GREEN ROOF DETAIL A'
B'
C'
PLAN @500MM
25 mm CLEAR COVER FOR RIB BEAM
SS OUTDOOR LAMP TOP BARS 10MM DIA. WITH LED 150MM PCC COPING
+2400 LVL
12 mm 4NOS MAIN+2250 BARS LVL +2150LVL
ROUTEL
QUADRAUPLE SHARING
FAMILY POD
900
WALL LIGHT 15OMM WIDE NICHE EDGE BEAM REINFORCEMENT
COLUMN CAPITAL
450x450 RCC PIER
SECTION B-B'
+0.650 LVL
GLASS
SLAB REINFORCEMENT
600
400
08 mm STIRRUPS 230 mm X 900 mm BEAM 12MM 6NOS MAIN BARS 450 MM THK COLUMN 15 mm CLEAR COVER FOR SLAB
350MM THK BRICK WALL FRP CLADDING
D
+0.3 FOOTPATH LVL +0.0 GRND LVL
SPIDER FITTING
PREFABRICATED CONCRETE FLOWER BED
12 mm 4NOS MAIN BARS 25 mm CLEAR COVER FOR RIB BEAM 230 mm X 900 mm RCC BEAM
NORTH ELEVATION
ALUMINIUM AND FRP mm CLEAR COVER VEHICULAR25 GATE
RIB BEAM ALUMINIUM FOR AND FRP PEDESTRIAN GATE
12 mm 4NOS MAIN BARS
08 mm STIRRUPS
SILICON SEALANT
12 mm 4NOS MAIN BARS
15 mm CLEAR COVER FOR SLAB
4500
OPEN WAITING
K03G K03G
K03G
DOC TL
DOC TL
K03G
K03G
K03G K03G
K03G
Scrub area
K03G
Scrub area
DOC TL
Scrub area
LOUNGE
clean utility Storage
Changing/locker rooms
Changing/locker rooms
LOUNGE LOUNGE
SPIDER FITTING DETAIL
STORAGE
K03G
K03G
DOC TL
Nourishment
Soiled utility Storage
Changing/locker rooms
230 mm THICK BRICK WALL
LOUNGE
SCALE 1:10
C
LOUNGE
clean utility clean utility scrub lift
clean utility clean utility Soiled utility Dirty lift lift scrub scrub
FIN SUPPORTED GLAZING
3250
8000
3250
18500
3250
3125
10500
D' SS OUTDOOR LAMP WITH LED K03G K03G K03G
K03G
K03G
K03G
K03G
K03G
K03G
350MM THK BRICKWALL EXPOSED CONCRETE FINISH
100MM THK BBC
PREFABRICATED CONCRETE FLOWER BED
6000
clean utility lift
Dirty lift
clean utility lift
GRATING
10MM THK MORTAR 16mm STONE CLADDING GRND LEVEL
10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL
GRATING
GRATING
12mm THK INT PLASTER 25MM THK CONDUIT PIPE SOIL 10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL
9000
2250
19500
PLAN @2600
2250
12MM 4NOS MAIN BARS ENTRANCE GATE DETAIL 10MM STIRRUPS M20 GRADE CONCRETE (1:1.5:3) 100MM WIDE RIB BEAM
17750
DEFORMED MAIN BARS 12 MM TOP REINFORCEMENT 3125
SS OUTDOOR LAMP SCALE 1:10 WITH LED CI GRATING 400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL PREFABRICATED CONCRETE FLOWERBED
8MM DIA 150MM C/C
3250
10MM DIA @ 150 mm c/c BARS
DEFORMED DISTRIBUTION BARS 12 MM TOP REINFORCEMENT 2250
BOTTOM BENTUP BARS 10MM DIA.
DEFORMED MAIN BARS 12 MM BOTTOM REINFORCEMENT
CAPITAL BARS 10MM DIAMETER
DEFORMED DISTRIBUTION BARS 12 MM BOTTOM REINFORCEMENT
COLUMN 450X450
DETAIL C
6000
6000
6000
K03G
350MM THK BRICK WALL 12mm FRP CLADDING
K03G
K03G
K03G
K03G
K03G
K03G
SOIL 25mm THK ALUMINIUM FRAME 500MM THK PCC BED 100MM THK BBC DRAIN PIPE
12mm INTERNAL PLASTER
450X450MM RCC PIER
K03G
K03G
K03G
K03G
GENERAL WARD
K03G
K03G
K03G
K03G
K03G
100MM PCC COPING
OPENING 125MM NICHE
K03G K03G
K03G K03G
K03G
K03G
K03G
K03G
K03G
K03G
K03G
K03G
2250
FRP CLADDING
K03G
K03G
K03G
Nurse S
K03G
K03G
K03G
Nurse S
K03G
K03G
K03G
K03G
K03G
K03G
SS OUTDOOR LAMP WITH LED
100MM PCC COPING 25mm THK PLASTERBOARD WALL LIGHT
K03G K03G
K03G
DETAIL B
DETAIL A
clean utility Storage
K03G
K03G
STORAGE
K03G
K03G K03G
K03G
K03G
K03G
K03G
STORAGE
DOC TL
K03G
STORAGE
Nourishment
K03G
STORAGE WAITING TL
D
WAITING TL
Nourishment
WAITING TL WAITING TL K03G
OPEN WAITING
WAITING TL
K03G
4500
OPEN WAITING
15 mm CLEAR COVER FOR SLAB
12MM 6NOS MAIN BARS
OPEN WAITING
OPEN WAITING
SECTION BB'
SECTION CC'
+2400 LVL +2250 LVL +2150LVL
COLUMN BARS 12MM DIAMETER
11250
7500
SECTION AA'
S
08 mm STIRRUPS
500
Twinsharing rooms
12MM 4NOS MAIN BARS 10MM STIRRUPS M20 GRADE CONCRETE (1:1.5:3) 100MM WIDE RIB BEAM
350MM THK BRICK WALL
100MM THK BBC
SCALE 1:10
DEFORMED DISTRIBUTION BARS 12 MM TOP REINFORCEMENT
SS OUTDOOR LAMP WITH LED 100MM PCC COPING
3125
SS GLASS CLAMP (SQUARE SHAPE)
FRP CLADDING 2250
FIN SUPPORTED GLAZING 100MM PCC COPING 25mm THK PLASTERBOARD WALL LIGHT
3250
25MM THK ALUMINIUM FRAME
D'
PLAN @2600
SS OUTDOOR LAMP WITH LED
12MM FRP CLADDING
400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL PREFABRICATED CONCRETE FLOWERBED
DETAIL B
DETAIL A
25X25 THK ALUMINIUM FRAME 25X25X6MM MS ANGLE CLEAT SCREW FOR FITTING FRP ON ALUMINIUM FRAME FRP PANEL
SS TOP CAP
15 mm CLEAR COVER SS OUTDOOR LAMP WITH LED FOR SLAB CI GRATING
230 mm THICK BRICK WALL
2250
DETAIL B
SECTION DD'
12 mm 4NOS MAIN BARS
C
3250
100MM THK BBC 16mm STONE CLADDING PREFABRICATED CONCRETE FLOWER BED
08 mm STIRRUPS
12MM 6NOS MAIN BARS
8000
DRIP MOLD
FRP CLADDING
ALUMINIUM AND FRP VEHICULAR GATE
D
3250
25MM THK ALUMINIUM FRAME 12MM THK FRP CLADDING
PREFABRICATED CONCRETE FLOWER BED
15 mm CLEAR COVER FOR SLAB
SPIDER FITTING DETAIL
450x450 RCC PIER
500
ROUTEL
450X450 RCC PIER SCREW FOR FITTING
350MM THK BRICK WALL FRP CLADDING
D
300X300X10 MS PLATE BOLT 150MM PCC COPING
100MM PCC COPING
15OMM WIDE NICHE
7500
ENTRANCE
+0.3 FOOTPATH LVL +0.0 GRND LVL
SS OUTDOOR LAMP WITH LED
11250
GLASS
EDGE BEAM REINFORCEMENT COLUMN CAPITAL WALL LIGHT
SECTION B-B' +0.650 LVL
SS OUTDOOR LAMP WITH LED
SS OUTDOOR LAMP WITH LED 150MM PCC COPING
500
Family pods
+2400 LVL +2250 LVL +2150LVL
DETAIL A
SLAB REINFORCEMENT 900
WAITING AREA
Nourishment Family pods
08 mm STIRRUPS 230 mm X 900 mm BEAM 12MM 6NOS MAIN BARS 450 MM THK COLUMN 15 mm CLEAR COVER FOR SLAB
600
OBSERVATION ROOM Nourishment
TOP BARS 10MM DIA.
12 mm 4NOS MAIN BARS
750
CASUALTY AREA
400
EXAMINATIONROOM
Filter fleece / Root repelent 75mm Thk
PRIVATE ROOMS
TWINSHARING BEDS
15659,45
10500
KRISHI PARDESHI 1844 3806 RIZVI COLLEGE OF ARCHITECTURE
750
+0.3 FOOTPATH LVL +0.0 GRND LVL
500
+0.650 LVL
ELECTRICAL LAYOUT
DRAINAGE LAYOUT
FIRE LAYOUT
HVAC LAYOUT
WATER LAYOUT
HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS
3125