Healthcare facility through the lens of the users

Page 1

02. SITE LOCATION - KHARGHAR

01. RESEARCH

04. DESIGN STRATEGIES AND CONCEPT

ABSTRACT

USER CENTERDNESS AND EBD FUTURE DEVELOPMENT

- Progressive change in user’s perspective. -Study experience and needs of users to understand their psychological, physical and social needs. -HCF, will not only be based on technical, legal and functional aspects but also support the well being of its users. -Healing environment leads to improve in rate of healing, staff performance, reduces stress and medical errors. -Social, economic and environmental aspects of HCF -Public participation and its need. Keywords : Healthcare; well being; psychological interventions; Healing environment; sustainability; social sustainability; patient-centric design; user-friendly; Healthcare providers; environmental characteristics; public participation

Healthcare provider’s core

General Access

- Designed for the sense of their privacy. - Quick movement - Easy accessibility to spaces

- On two sides connecting to different levels such that it doesnt intersect with the access of healthcare providers.

MUMBAI PUNE HIGHWAY

REGISTRATION DESK AND WAITING AREA

GREEN ROOF SYSTEM

Need of containment

- To connect all inpatient rooms facing inwards with the nature. - All inpatient rooms facing outwards are connected to the natural surrounding through landscaping in the site context. - Connects healthproviders area with the natural surrounding while acting as

- Centrally located. - Landscape used to create a sense of privacy and to create a natural connect while waiting. - Connects people easily to the spaces around.

CONTAINMENT OF INFECTION

-Emergency ward, ICU’s and OT’s

CONNECTING ELEMENT Less spread of infection. -General wards, single occupancy rooms, twinsharings rooms. -OPD

a physical barrier between them and the inpatient rooms.

-Ceiling with perforated slab covered with glass to allow natural ventilation into the central area’s. - Bridge acting as a connection between the process

INDOOR CORRIDORS AND CONNECTION WITH CENTRAL SPACES - Creates a vertical connection. - Connection with nature and natural light. - Keeps the movement and space lively and keeps the mind distracted.

of post operative

and ICU rooms to general wards and inpatient rooms. - Perforated circles on green roof covered with glass to let in the natural light in the interior spaces. Green roof area accessible through Doctor’s lounge and bridge for leisure and refreshment with restricted access only.

STRATEGIC LOCATION - Future expansion -Connectivity with the zones - Residential - more opd’s - Connected to Mumbai Pune highway.

RESEARCH QUESTIONS 1. What design factors boost positive and healing experiences in a healthcaree facility? 2. How do social, environmental, and economic aspects of sustainability help/affect users and helpers? 3. How can we develop a resilient healthcare facility for situations like emergence of infectious disease like Covid-19? SCOPE The focus is to design a hospital with technical details like smooth circulation and access between different functional departments and to create a design that copes with social issues like the stressful work environment of the staff, the anxiety of the patient, keeping track of the user groups and its smooth operation and circulation in-between spaces which will also depend on the frequency of its use. METHODOLOGY

Patient

Unstructured Family Members

Healthcare Providers

Structured

Literature Family Members

Healthcare Providers

LEED/ Sustainability in present

User Perspective Methods Understanding physical characteristics

PROGRESS OVER THE YEARS

CIRCULATION PLANS

TOILET, HEALTH ASSESMENT EMERGENCY / CASUALTY GENERAL ACCESS

HEALTHCARE PROVIDER’S CORE

03. SITE ANALYSIS

DESIGN PHASE STRATEGIES

CAFETERIA

GENERAL WARD

SERVICE FLOOR

OUTPATIENT DEPARTMENT

SIXTH FLOOR +23250 LVL FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

CENTRAL WAITING AND REGISTRATION AREA BILLING AND PHARMACY

OPERATION THEATER FLOOR ZONNING

Wind direction North-West to South East

Orientation, noise and sunpath

GENERAL WARD

GROUND FLOOR

GROUND FLOOR +600 LVL

CONNECTION IN BETWEEN OPERATION THEATER

SERVICE FLOOR

Access and flow management

Containment of disease

TWINSHARING

CAFETERIA/ENQUIRY DESK

OUTPATIENT DEPARTMENT User centeredness and EBD

OPERATION THEATER

SERVICE FLOOR

GROUND FLOOR ZONNING

CONCLUSION Strategic Location Resources

05. ZONNING

ULTRASOUND / RADIOLOGY

Saifee Hospital Case study (Services, To understand pre Planning) existing facilities and their planning and efficiency. Kohinoor Hatkesh Hospital Hospital (Sustainabil(Compact ity) planning)

Patient

Interview and Survey

Kharghar is a developing city and serves as a connection to all the cities in the outskirts, linking them and reducing the travel distance and time for them to reach an advanced treatment hospital.

SOUTH ELEVATION CORRIDOR VIEW

Flexibility and future proofing

FIRST FLOOR Decor

Atmosphere Initial points of contact

Furniture

HEALTHCARE PROVIDER’S CORE

Sound Lighting

Entrances

-Inclusive - ADA accessible

Waiting experience

Reception

-Easy to locate - ADA accessible. -Inclusive

Vegetation around the site. Railway station Bus Stops Metro station

OPD FLOOR ZONNING

THIRD FLOOR ZONNING SINGLE OR DOUBLE OCCUPANCY ROOMS

INTENSIVE CARE UNIT

SIXTH FLOOR +23250 LVL FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL

Privacy Auditory Privacy

-Expansiveness, Extended view

Comfortable and relaxing environment

SECOND FLOOR

THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

Visual Privacy

Primary road Secondary road

GROUND FLOOR +600 LVL

Railway station, Station, Metro and bus stops. HEALTHCARE PROVIDER’S CORE

MATERIAL PALETTE - White wall for a relaxing and calming atmosphere, helps maintain cleaninness and hygiene. - Wooden texture makes one feel comfortable and relaxed. -Colourfull paints around doors to make the environment lively and welcoming.

SECTION A-A’

CENTRAL WAITING AREA VIEW

FOURTH FLOOR ZONNING THIRD FLOOR

06. STUDY OF CASE - Kohinoor Hospital, Mumbai

Residential area Industrial Commercial Future development

The intent of this case study is to understand how green building and using sustainable design with its advantage of helping environment would also help the users and people of the facility indirectly.

Primary and secondary roads.

Healthcare provider Patient Services

Figure 8.3 Source - mgsarchitecture.in

Public amenities and Institution Bus depot Site

8.3 STUDY OF CASE - Hatkesh Multispeciality Hospital

Land use in and around the site.

For inlet of natural light. keeps the central area well lit.

GREEN ROOF VIEW

Image 8.4Source - mgsarchitecture.in Patient room and doctor’s chambers have large windows and light fixtures in specific places, like over the bed or the examination table, all lights are manually operated. Aternate circuit Aternate circuit of light of light Sensible lighting through glazing facade on the exterior facade.

KRISHI PARDESHI 1844 3806 RIZVI COLLEGE OF ARCHITECTURE

Image 8.1, Source - mgsarchitecture.in Atrium and skylights illuminate almost four floors of this six-story building.

Built mass in and around the site.

Image 8.2, Source - mgsarchitecture.in Alternate circuiting of light is used so that whenever there is minimal patient tariff one circuit can be turned off. FACADE VIEW

HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS

FLOOR


MUMBAI PUNE HIGHWAY

PARKING

SIXTH FLOOR +23250 LVL

SIXTH FLOOR +23250 LVL

FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL

FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL

THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

GROUND FLOOR +600 LVL

GROUND FLOOR +600 LVL

BASEMENT LEVEL +600 LVL

SECURITY CABIN

SECTION B-B’

NORTH ELEVATION

ENTER/ EXIT OT 2

+600 LVL

POLICE FAMILY ROOM

B

OT 8

Nourishment

Family room

Clean utility

OT 7

Family room Scrub area

OT 3

Family room

OT 4

Family room

OPERATION THEATER

OT 6

OT 5

Changing/locker room

RAMP

B’ X-RAY EMERGENCY WAITING

LOUNGE

Changing/locker room

EMERGENCY WAITING

STORAGE

clean up post operative room

preoperative room

Scrub area

RAMP TO BASEMENT RAMP

scrub area OT 1

soil utility

SERVICES EQUIPMENTS

C RAMP

Sub sterilization

Nourishment

+600 LVL

RAMP

frozen section lab

X-RAY

TECHNICIAN AREA

CASUALTY

MRI

CT

X-RAY

clean utility Lift

Dirty utility Lift

X-RAY

TECHNICIAN AREA RADIOLOGY

+600 LVL GENERAL ACCESS CORE

ULTRASOUND

PATHOLOGY LAB HEALTHCARE PROVIDER’S CORE

RAMP

RAMP

HEALTHCARE PROVIDER’S CORE

BILLING

+600 LVL

REGISTRATION AND WAITING AREA

+600 LVL

SERVICE FLOOR SERVICES EQUIPMENTS

+750 LVL PHARMACY

KIOSKS

GENERAL ACCESS CORE

CANTEEN

A

ENQUIRY AND ENTRANCE TO THE HOSPITAL WITH SIGNAGES AND INFORMSTION BOARD.

RAMP ENTER/ EXIT

+600 LVL

+600 LVL

CAFETERIA

SECOND FLOOR PLAN

BASEMENT FLOOR PLAN

SCALE 1:250

SCALE 1:250

A’ +600 LVL

+1200 LVL

RAMP

Post operative room

Post operative room

Nourishment

SECURITY CABIN

Nourishment Family room

C’

Family room

Scrub area

ENTRANCE

SERVICE FLOOR

Scrub area

CL utility

Changing/locker room

SL utility

Changing/locker room

ICU

PARKING

PROVIDER’S CORE

PROVIDER’S CORE NOURISHMENT

NOURISHMENT

OVERLOOKING CENTRAL WAITING AREA

OUTPATIENT DEPARTMENT

ONCOLOGY STAFF TL

UROLOGY

PAEDRIATIC GYNAECOLOGY

NEPHRO UROLOGY

COMMON TOILET

General wards

General wards

Multipurpose area

Multipurpose area

CARDIOLOGY

FIRST FLOOR PLAN

THIRD FLOOR PLAN

SCALE 1:250 SIXTH FLOOR +23250 LVL

KRISHI PARDESHI PARDESHI KRISHI 1844 1844 3806 3806 RIZVI COLLEGE COLLEGE OF OF RIZVI ARCHITECTURE ARCHITECTURE

GROUND FLOOR PLAN

SCALE 1:250 SIXTH FLOOR +23250 LVL

FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL

FIFTH FLOOR +19200 LVL FOURTH FLOOR +15150 LVL

THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

THIRD FLOOR +11100 LVL SECOND FLOOR +8700 LVL FIRST FLOOR +4650 LVL

GROUND FLOOR +600 LVL

GROUND FLOOR +600 LVL BASEMENT LEVEL +600 LVL

SCALE 1:250

EAST ELEVATION

SECTION C-C’ HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS


Pebble cover on ground Growing medium 250mm thk

Drain pipe Water proofing membrane 60mm THK

Pavered concrete pathway

Protection layer 5mm THK Root barrier 5mm THK

Stone water collecting layer 75mm thk Drainage layer 60mm thk Insulation layer 75mm thk

25 mm CLEAR COVER FOR RIB BEAM

WAFFLE SLAB DETAIL

SPIDER FITTING SILICON SEALANT

GENERAL ACCESS

12 mm 4NOS MAIN BARS 25 mm CLEAR COVER FOR RIB BEAM NORTH 230 mm X 900 mm ELEVATION RCC BEAM

25 mm CLEAR COVERALUMINIUM AND FRP PEDESTRIAN GATE FOR RIB BEAM

08 mm STIRRUPS

12 mm 4NOS MAIN BARS

SCALE 1:10

9000

18500

19500

SOIL 25mm THK ALUMINIUM FRAME 500MM THK PCC BED 100MM THK BBC DRAIN PIPE

12mm INTERNAL PLASTER

FRP CLADDING 350MM THK BRICKWALL EXPOSED CONCRETE FINISH

OPENING 125MM NICHE 450X450MM RCC PIER

GRATING

12mm FRP CLADDING PREFABRICATED CONCRETE FLOWER BED

10MM THK MORTAR 16mm STONE CLADDING GRND LEVEL

10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL

GRATING

GRATING

12mm THK INT PLASTER 25MM THK CONDUIT PIPE SOIL 10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL

Single bed

10500

3125

2250

17750

Multipurpose area

SECTION BB'

SECTION CC'

100MM THK BBC

12MM CLEAR TEMPERED GLASS 40MM GAUGE SS POST

25MM CONDUIT DRAIN PIPE

DETAIL C

3250

2250

450X450MM RCC PIERS

12MM SS COVER PLATE

DEFORMED MAIN BARS 12 MM TOP REINFORCEMENT

8MM DIA 150MM C/C BOLT FOR BARREL HINGE BARREL HINGE

10MM DIA @ 150 mm c/c BARS

DETAIL D

BOTTOM BENTUP BARS 10MM DIA.

DEFORMED MAIN BARS 12 MM BOTTOM REINFORCEMENT

+2400 LVL +2250 LVL +2150LVL

SS OUTDOOR LAMP WITH LED 150MM PCC COPING WALL LIGHT 350MM THK BRICK WALL

CAPITAL BARS 10MM DIAMETER

DEFORMED DISTRIBUTION BARS 12 MM BOTTOM REINFORCEMENT

FRP CLADDING FINISH 15OMM WIDE NICHE 450X450 RCC PIER

COLUMN 450X450

DETAIL C SECTION AA'

PCC BED

PLANTERS

+0.650 LVL +0.3 FOOTPATH LVL +0.0 GRND LVL

STONE CLADDING

COLUMN BARS 12MM DIAMETER

150MM FOOTPATH

Pebble cover on ground

EAST ELEVATION C

B

A

Growing medium 250mm thk

Drain pipe

Multipurpose area

Filter fleece / Root repelent 75mm Thk

Water proofing membrane 60mm THK

COMPOUND WALL DETAILING

SS OUTDOOR LAMP WITH LED CI GRATING 400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH PREFABRICATED CONCRETE FLOWERBED

B

A B'

A' 15659,45

Protection layer 5mm THK Root barrier 5mm THK

2250

10500

3125

17750

3250

3125

2250

10500

B

A

Pavered concrete pathway

C'

3125

3250

17750

3125

4625

10500

3125

5625

C

PLAN @2600MM

Stone water collecting layer 75mm thk Drainage layer 60mm thk WALL LIGHT

Insulation layer 75mm thk CI GRATING 400X200 MM RCC GUTTER

EMERGENCY WARD

FOURTH FLOOR PLAN SCALE 1:250

A'

B'

A

B

450X450 MM RCC PIER 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH PCC BED 25MM THK ALUMINIUM FRAME FRP CLADDING

C'

PLAN @1500MM C

WALL LIGHT CI GRATING 400X200 MM RCC GUTTER 12 MM FRP CLADDING 450X450 RCC PIER 25MM THK INT PLASTER 350MM THK BRICK WALL EXPOSED CONCRETE FINISH 10MM THK MORTAR 16MM THK STONE CLADDING

GREEN ROOF DETAIL A'

B'

C'

PLAN @500MM

25 mm CLEAR COVER FOR RIB BEAM

SS OUTDOOR LAMP TOP BARS 10MM DIA. WITH LED 150MM PCC COPING

+2400 LVL

12 mm 4NOS MAIN+2250 BARS LVL +2150LVL

ROUTEL

QUADRAUPLE SHARING

FAMILY POD

900

WALL LIGHT 15OMM WIDE NICHE EDGE BEAM REINFORCEMENT

COLUMN CAPITAL

450x450 RCC PIER

SECTION B-B'

+0.650 LVL

GLASS

SLAB REINFORCEMENT

600

400

08 mm STIRRUPS 230 mm X 900 mm BEAM 12MM 6NOS MAIN BARS 450 MM THK COLUMN 15 mm CLEAR COVER FOR SLAB

350MM THK BRICK WALL FRP CLADDING

D

+0.3 FOOTPATH LVL +0.0 GRND LVL

SPIDER FITTING

PREFABRICATED CONCRETE FLOWER BED

12 mm 4NOS MAIN BARS 25 mm CLEAR COVER FOR RIB BEAM 230 mm X 900 mm RCC BEAM

NORTH ELEVATION

ALUMINIUM AND FRP mm CLEAR COVER VEHICULAR25 GATE

RIB BEAM ALUMINIUM FOR AND FRP PEDESTRIAN GATE

12 mm 4NOS MAIN BARS

08 mm STIRRUPS

SILICON SEALANT

12 mm 4NOS MAIN BARS

15 mm CLEAR COVER FOR SLAB

4500

OPEN WAITING

K03G K03G

K03G

DOC TL

DOC TL

K03G

K03G

K03G K03G

K03G

Scrub area

K03G

Scrub area

DOC TL

Scrub area

LOUNGE

clean utility Storage

Changing/locker rooms

Changing/locker rooms

LOUNGE LOUNGE

SPIDER FITTING DETAIL

STORAGE

K03G

K03G

DOC TL

Nourishment

Soiled utility Storage

Changing/locker rooms

230 mm THICK BRICK WALL

LOUNGE

SCALE 1:10

C

LOUNGE

clean utility clean utility scrub lift

clean utility clean utility Soiled utility Dirty lift lift scrub scrub

FIN SUPPORTED GLAZING

3250

8000

3250

18500

3250

3125

10500

D' SS OUTDOOR LAMP WITH LED K03G K03G K03G

K03G

K03G

K03G

K03G

K03G

K03G

350MM THK BRICKWALL EXPOSED CONCRETE FINISH

100MM THK BBC

PREFABRICATED CONCRETE FLOWER BED

6000

clean utility lift

Dirty lift

clean utility lift

GRATING

10MM THK MORTAR 16mm STONE CLADDING GRND LEVEL

10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL

GRATING

GRATING

12mm THK INT PLASTER 25MM THK CONDUIT PIPE SOIL 10mm THK MORTAR 16mm STONE CLADDING GRND LEVEL

9000

2250

19500

PLAN @2600

2250

12MM 4NOS MAIN BARS ENTRANCE GATE DETAIL 10MM STIRRUPS M20 GRADE CONCRETE (1:1.5:3) 100MM WIDE RIB BEAM

17750

DEFORMED MAIN BARS 12 MM TOP REINFORCEMENT 3125

SS OUTDOOR LAMP SCALE 1:10 WITH LED CI GRATING 400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL PREFABRICATED CONCRETE FLOWERBED

8MM DIA 150MM C/C

3250

10MM DIA @ 150 mm c/c BARS

DEFORMED DISTRIBUTION BARS 12 MM TOP REINFORCEMENT 2250

BOTTOM BENTUP BARS 10MM DIA.

DEFORMED MAIN BARS 12 MM BOTTOM REINFORCEMENT

CAPITAL BARS 10MM DIAMETER

DEFORMED DISTRIBUTION BARS 12 MM BOTTOM REINFORCEMENT

COLUMN 450X450

DETAIL C

6000

6000

6000

K03G

350MM THK BRICK WALL 12mm FRP CLADDING

K03G

K03G

K03G

K03G

K03G

K03G

SOIL 25mm THK ALUMINIUM FRAME 500MM THK PCC BED 100MM THK BBC DRAIN PIPE

12mm INTERNAL PLASTER

450X450MM RCC PIER

K03G

K03G

K03G

K03G

GENERAL WARD

K03G

K03G

K03G

K03G

K03G

100MM PCC COPING

OPENING 125MM NICHE

K03G K03G

K03G K03G

K03G

K03G

K03G

K03G

K03G

K03G

K03G

K03G

2250

FRP CLADDING

K03G

K03G

K03G

Nurse S

K03G

K03G

K03G

Nurse S

K03G

K03G

K03G

K03G

K03G

K03G

SS OUTDOOR LAMP WITH LED

100MM PCC COPING 25mm THK PLASTERBOARD WALL LIGHT

K03G K03G

K03G

DETAIL B

DETAIL A

clean utility Storage

K03G

K03G

STORAGE

K03G

K03G K03G

K03G

K03G

K03G

K03G

STORAGE

DOC TL

K03G

STORAGE

Nourishment

K03G

STORAGE WAITING TL

D

WAITING TL

Nourishment

WAITING TL WAITING TL K03G

OPEN WAITING

WAITING TL

K03G

4500

OPEN WAITING

15 mm CLEAR COVER FOR SLAB

12MM 6NOS MAIN BARS

OPEN WAITING

OPEN WAITING

SECTION BB'

SECTION CC'

+2400 LVL +2250 LVL +2150LVL

COLUMN BARS 12MM DIAMETER

11250

7500

SECTION AA'

S

08 mm STIRRUPS

500

Twinsharing rooms

12MM 4NOS MAIN BARS 10MM STIRRUPS M20 GRADE CONCRETE (1:1.5:3) 100MM WIDE RIB BEAM

350MM THK BRICK WALL

100MM THK BBC

SCALE 1:10

DEFORMED DISTRIBUTION BARS 12 MM TOP REINFORCEMENT

SS OUTDOOR LAMP WITH LED 100MM PCC COPING

3125

SS GLASS CLAMP (SQUARE SHAPE)

FRP CLADDING 2250

FIN SUPPORTED GLAZING 100MM PCC COPING 25mm THK PLASTERBOARD WALL LIGHT

3250

25MM THK ALUMINIUM FRAME

D'

PLAN @2600

SS OUTDOOR LAMP WITH LED

12MM FRP CLADDING

400X200 MM RCC GUTTER 150 MM PCC COPING 450X450 MM PCC COPING 25MM THK INT PLASTER 350MM THK BRICK WALL PREFABRICATED CONCRETE FLOWERBED

DETAIL B

DETAIL A

25X25 THK ALUMINIUM FRAME 25X25X6MM MS ANGLE CLEAT SCREW FOR FITTING FRP ON ALUMINIUM FRAME FRP PANEL

SS TOP CAP

15 mm CLEAR COVER SS OUTDOOR LAMP WITH LED FOR SLAB CI GRATING

230 mm THICK BRICK WALL

2250

DETAIL B

SECTION DD'

12 mm 4NOS MAIN BARS

C

3250

100MM THK BBC 16mm STONE CLADDING PREFABRICATED CONCRETE FLOWER BED

08 mm STIRRUPS

12MM 6NOS MAIN BARS

8000

DRIP MOLD

FRP CLADDING

ALUMINIUM AND FRP VEHICULAR GATE

D

3250

25MM THK ALUMINIUM FRAME 12MM THK FRP CLADDING

PREFABRICATED CONCRETE FLOWER BED

15 mm CLEAR COVER FOR SLAB

SPIDER FITTING DETAIL

450x450 RCC PIER

500

ROUTEL

450X450 RCC PIER SCREW FOR FITTING

350MM THK BRICK WALL FRP CLADDING

D

300X300X10 MS PLATE BOLT 150MM PCC COPING

100MM PCC COPING

15OMM WIDE NICHE

7500

ENTRANCE

+0.3 FOOTPATH LVL +0.0 GRND LVL

SS OUTDOOR LAMP WITH LED

11250

GLASS

EDGE BEAM REINFORCEMENT COLUMN CAPITAL WALL LIGHT

SECTION B-B' +0.650 LVL

SS OUTDOOR LAMP WITH LED

SS OUTDOOR LAMP WITH LED 150MM PCC COPING

500

Family pods

+2400 LVL +2250 LVL +2150LVL

DETAIL A

SLAB REINFORCEMENT 900

WAITING AREA

Nourishment Family pods

08 mm STIRRUPS 230 mm X 900 mm BEAM 12MM 6NOS MAIN BARS 450 MM THK COLUMN 15 mm CLEAR COVER FOR SLAB

600

OBSERVATION ROOM Nourishment

TOP BARS 10MM DIA.

12 mm 4NOS MAIN BARS

750

CASUALTY AREA

400

EXAMINATIONROOM

Filter fleece / Root repelent 75mm Thk

PRIVATE ROOMS

TWINSHARING BEDS

15659,45

10500

KRISHI PARDESHI 1844 3806 RIZVI COLLEGE OF ARCHITECTURE

750

+0.3 FOOTPATH LVL +0.0 GRND LVL

500

+0.650 LVL

ELECTRICAL LAYOUT

DRAINAGE LAYOUT

FIRE LAYOUT

HVAC LAYOUT

WATER LAYOUT

HEALTHCARE FACILITY THROUGH THE LENS OF ITS USERS

3125


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.