MATERIALS AND FINISHES E-PORTFOLIO

Page 1


300MM(W)* 2000MM (H) fixed floor-to-ceiling windows

2000MM (H ) Smooth Cement plastered Finish plasterboard with white colour paint

1364.0533

549.6344

90 MM(H)Powder coating chamfered and grooved skirting aluminium baseboard with a strip of rubber

13.5356 225MM(L)* 300MM(W)* 152MM(THK) pre-cast exposed-concrete ceiling

321.4229

300MM(W)* 2000MM (H) fixed floor-to-ceiling windows

127.0000

101.6000

10.0000 12.5000 9.9000

500.0000 1391.8395

94.8143 100.0001

90.0000

9.9218

157.4000

5.0000

600MM (L)*600MM(W) *15 MM(THK) Mortar powder finish BLACK COLOUR Cementitious Terrazzo

PLAN

PLAN

SECTION

DETAIL


Description

Specification finishes…

Ceiling Soffit slab Wall

Size (in mm)

Colour

Supplier

pre-cast 225(L) exposed-concret 300*(W) e ceiling 152*(THK )

no

Mesmenang Sdn Bhd

Smooth Cement 2000*(H) plastered Finish plasterboard with white colour paint

white

Over Sea Plaster Supply & Construction Sdn. Bhd.

fixed floor-to-ceiling windows

300(W) 2000*(H)

no

Tropicale Window & Door Sdn. Bhd.

chamfered and Powder coating grooved skirting aluminium baseboard

90 (H)

No colour

FOSHAN JECA LIMITED

EUVAL BWS 80.20 CARAN

600(L) 600 *(W) 15*(THK)

black

EUVAL terrazzo

Mortar powder finish Cementitious Terrazzo















Stone cladding retaining wall


Concrete pre cast wall


Tiles (floor and wall)


Timber furniture


metal


Assignment 1(a)

Assignment 1(a)

Tiles (floor and wall)

Stone

Steel

Concrete

Timber



PL

PLAN OF INTERIOR CONSTRUCTION DETAILING SCALE: 1:34

ELA

SIDE ELEVATION OF INTERIOR CONSTRUCTION DETAILING

SCALE: 1:34

NOTE : REVISION No. Date

PROJECT TITLE : MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE : PLAN AND SIDE ELEVATION OF INTERIOR CONSTRUCTION DETAILING

LEGEND : SCALE

: 1:34

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


CS

CROSS-SECTION OF INTERIOR CONSTRUCTION DETAILING SCALE: 1:34

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE : CROSS-SECTION OF INTERIOR CONSTRUCTION DETAILING

LEGEND : SCALE

: 1:34

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

INTERIOR CONSTRUCTION BLOW-UP SECTION DETAIL 1 CEILING-WALL JOINERY (N.T.S)

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE : BLOW UP SECTION DETAIL 1 OF INTERIOR CONSTRUCTION DETAILING

LEGEND : SCALE

: NOT TO SCALE

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

INTERIOR CONSTRUCTION BLOW-UP SECTION DETAIL 2 FLOOR-WALL JOINERY (N.T.S)

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE : BLOW UP SECTION DETAIL 2 OF INTERIOR CONSTRUCTION DETAILING

LEGEND : SCALE

: NOT TO SCALE

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


A

A

PL

ELA

PLAN OF FURNITURE (CHAIR) SCALE: 1:17

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE :

PLAN AND FRONT ELEVATION OF FURNITURE (CHAIR)

FRONT ELEVATION OF FURNITURE (CHAIR) SCALE: 1:17

LEGEND : SCALE

: 1:17

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


CS

ELA

CROSS SECTION A-A OF FURNITURE (CHAIR) SCALE: 1:17

SIDE ELEVATION OF FURNITURE (CHAIR) SCALE: 1:17

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE :

CROSS-SECTION AND SIDE ELEVATION OF FURNITURE (CHAIR)

LEGEND : SCALE

: 1:17

DESIGNER : LIM KAI TING DATE

CLIENT: XXX

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

POV

BLOW UP SECTION DETAIL OF JOINT 1 BACK SIT RAIL TO BACK LEGS - DOWEL JOINT

NOTE :

PROJECT TITLE :

DRAWING TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2

BLOW UP SECTION DETAIL AND PERSPECTIVE ON JOINT 1 OF FURNITURE

Revision

PERSPECTIVE OF JOINT 1 BACK SIT RAIL TO BACK LEGS

LEGEND : SCALE

DATE

CLIENT: XXX

: NOT TO SCALE

DESIGNER : LIM KAI TING

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

BLOW UP SECTION DETAIL OF JOINT 2 SEAT APRON TO BACK LEGS - INTERLOCKING JOINT POV

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2

DRAWING TITLE :

CLIENT: XXX

LEGEND : SCALE

BLOW UP SECTION DETAIL AND PERSPECTIVE ON JOINT 2 OF FURNITURE

Revision

PERSPECTIVE OF JOINT 2 SEAT APRON TO BACK LEGS

: NOT TO SCALE

DESIGNER : LIM KAI TING DATE

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

BLOW UP SECTION DETAIL OF JOINT 3 NAILS TO SEAT APRON

NOTE :

PROJECT TITLE :

DRAWING TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2

BLOW UP SECTION DETAIL ON JOINT 3 OF FURNITURE

Revision

LEGEND : SCALE

DATE

CLIENT: XXX

: NOT TO SCALE

DESIGNER : LIM KAI TING

REV :

: 17 JUNE 2022

DRAWING NO :


DTL

POV

BLOW UP SECTION DETAIL OF JOINT 4 SIDE STRETCHER TO FRONT LEGS - TWIN MORTISE AND TENON

NOTE :

PROJECT TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2 Revision

DRAWING TITLE :

BLOW UP SECTION DETAIL AND PERSPECTIVE ON JOINT 4 OF FURNITURE

PERSPECTIVE OF JOINT 4 SIDE STRETCHER TO FRONT LEGS

LEGEND : SCALE

DATE

CLIENT: XXX

: NOT TO SCALE

DESIGNER : LIM KAI TING

REV :

: 17 JUNE 2022

DRAWING NO :


POV DTL

BLOW UP SECTION DETAIL OF JOINT 5

PERSPECTIVE OF JOINT 5 CROSS STRETCHER TO SIDE STRETCHER

CROSS STRETCHER TO SIDE STRETCHER - TWIN MORTISE AND TENON

NOTE :

PROJECT TITLE :

DRAWING TITLE :

REVISION No. Date

MATERIALS AND FINISHES ASSIGNMENT 2

BLOW UP SECTION DETAIL AND PERSPECTIVE ON JOINT 5 OF FURNITURE

Revision

LEGEND : SCALE

DATE

CLIENT: XXX

: NOT TO SCALE

DESIGNER : LIM KAI TING

REV :

: 17 JUNE 2022

DRAWING NO :



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.