Table 6-9: Peck Road Countermeasure Concept Costs

Table 6-9: Peck Road Countermeasure Concept Costs

COUNTERMEASURE DESCRIPTION

Advertisement

Concrete or Pavement Construction (low cost options use pavement markings)

Corner Radius Reduction or Truck Apron Concrete curbs and sidewalk

UNIT COST UM QUANTITY LENGTH WIDTH COST

$15,000 EA 2 $30,000

Pavement Markings

Bicycle Priority Lanes Bicycle lane centered in lane, filled with thermoplastic $100 LF 1 800 $80,000

Signs or Signal Infrastructure

Add NoRTOR sign / display Sign attached to existing signal structure

Electronic Feedback Signs

Speed reader board on post (solar) Reflective border on signal heads 8 signal heads Street Lighting Fixture and power lines as needed $500 EA 4

$8,000 EA 1 $2,400 INT 2 $8,000 EA 2

INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet $2,000 $8,000 $4,800 $16,000 Total $140,800

Existing roadway conditions along Peck Road and Lower Azusa Road Crosswalks at Peck Road and Ranchito Street