Table 6-9: Peck Road Countermeasure Concept Costs
Table 6-9: Peck Road Countermeasure Concept Costs
COUNTERMEASURE DESCRIPTION
Advertisement
Concrete or Pavement Construction (low cost options use pavement markings)
Corner Radius Reduction or Truck Apron Concrete curbs and sidewalk
UNIT COST UM QUANTITY LENGTH WIDTH COST
$15,000 EA 2 $30,000
Pavement Markings
Bicycle Priority Lanes Bicycle lane centered in lane, filled with thermoplastic $100 LF 1 800 $80,000
Signs or Signal Infrastructure
Add NoRTOR sign / display Sign attached to existing signal structure
Electronic Feedback Signs
Speed reader board on post (solar) Reflective border on signal heads 8 signal heads Street Lighting Fixture and power lines as needed $500 EA 4
$8,000 EA 1 $2,400 INT 2 $8,000 EA 2
INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet $2,000 $8,000 $4,800 $16,000 Total $140,800
Existing roadway conditions along Peck Road and Lower Azusa Road Crosswalks at Peck Road and Ranchito Street