El Monte Vision Zero Action Plan

Page 105

Implementation

06

Table 6-9: Peck Road Countermeasure Concept Costs COUNTERMEASURE

DESCRIPTION

UNIT COST

UM

QUANTITY LENGTH

WIDTH

COST

$15,000

EA

2

Bicycle lane centered in lane, filled with thermoplastic

$100

LF

1

Add NoRTOR sign / display

Sign attached to existing signal structure

$500

EA

4

$2,000

Electronic Feedback Signs

Speed reader board on post (solar)

$8,000

EA

1

$8,000

Reflective border on signal heads

8 signal heads

$2,400

INT

2

$4,800

Street Lighting

Fixture and power lines as needed

$8,000

EA

2

$16,000

Concrete or Pavement Construction (low cost options use pavement markings) Corner Radius Reduction or Truck Apron

Concrete curbs and sidewalk

$30,000

Pavement Markings Bicycle Priority Lanes

800

$80,000

Signs or Signal Infrastructure

INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet

Existing roadway conditions along Peck Road and Lower Azusa Road

Total

$140,800

Crosswalks at Peck Road and Ranchito Street

93


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.