1 minute read
Table 6-4: Bryant Road Countermeasure Concept Costs Table 6-5: Garvey Boulevard Countermeasure Concept
Table 6-4: Bryant Road Countermeasure Concept Costs
COUNTERMEASURE DESCRIPTION UNIT COST UM QUANTITY LENGTH WIDTH COST
Advertisement
Concrete or Pavement Construction (low cost options use pavement markings)
Speed Cushions Asphalt paving $7,000 EA 4
Bulb Out / Curb Extensions Concrete curbs and landscaping $37,000 EA 6
Bulb Out / Turn Wedge
Pavement Markings
Advisory Bicycle Lanes Bicycle lane stripes both sides of road $10 LF 1 1,500 $15,000
Signs or Signal Infrastructure
Electronic Feedback Signs Pavement markings with 'buttons' and rubber turn wedges $2,500 EA 8
Speed reader board on post (solar) $8,000 EA 2 INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet $28,000 $222,000 $20,000
$16,000 Total $301,000
Existing roadway conditions on Bryant Road Existing high-visibility crosswalks near Legore Elementary School