Table 6-4: Bryant Road Countermeasure Concept Costs COUNTERMEASURE
DESCRIPTION
UNIT COST
UM
QUANTITY LENGTH
WIDTH
COST
Concrete or Pavement Construction (low cost options use pavement markings) Speed Cushions
Asphalt paving
$7,000
EA
4
$28,000
Bulb Out / Curb Extensions
Concrete curbs and landscaping
$37,000
EA
6
$222,000
Bulb Out / Turn Wedge
Pavement markings with 'buttons' and rubber turn wedges
$2,500
EA
8
$20,000
Bicycle lane stripes both sides of road
$10
LF
1
$8,000
EA
2
Pavement Markings Advisory Bicycle Lanes
1,500
$15,000
Signs or Signal Infrastructure Electronic Feedback Signs
Speed reader board on post (solar)
INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet
Existing roadway conditions on Bryant Road
$16,000 Total
$301,000