El Monte Vision Zero Action Plan

Page 95

Implementation

06

Table 6-4: Bryant Road Countermeasure Concept Costs COUNTERMEASURE

DESCRIPTION

UNIT COST

UM

QUANTITY LENGTH

WIDTH

COST

Concrete or Pavement Construction (low cost options use pavement markings) Speed Cushions

Asphalt paving

$7,000

EA

4

$28,000

Bulb Out / Curb Extensions

Concrete curbs and landscaping

$37,000

EA

6

$222,000

Bulb Out / Turn Wedge

Pavement markings with 'buttons' and rubber turn wedges

$2,500

EA

8

$20,000

Bicycle lane stripes both sides of road

$10

LF

1

$8,000

EA

2

Pavement Markings Advisory Bicycle Lanes

1,500

$15,000

Signs or Signal Infrastructure Electronic Feedback Signs

Speed reader board on post (solar)

INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet

Existing roadway conditions on Bryant Road

$16,000 Total

$301,000

Existing high-visibility crosswalks near Legore Elementary School

83


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.