Open Space & Connectivity Presentation

Page 1

OPEN SPACE & CONNECTIVITY Creating vibrant parks and paths to connect people and places


PROGRAM ELEMENTS ●

Reinforce Regional Connections

Establish Recreation Corridor

Foster Universal Communities

Offer Transportation Choices

Provide Intellectual Stimulation

Implement Lean Zone


HISTORY A RICH HISTORY OF AGRICULTURE AND RAILROADS

CENTERAL BENCH 1938

THE DEPOT


ANALYSIS

Vacant Lots

Existing Parks


THE BIG IDEA


THE BIG IDEA


THE BIG IDEA


MASTER PLAN ORCHARD

Intersection

Tank Over Look

CURTIS

EMERALD

Bench Park Trail

Gateway Park

FRANKLIN

Gateway Entry



MASTER PLAN ORCHARD

Intersection

Tank Over Look

CURTIS

EMERALD

Bench Park Trail

Gateway Park

FRANKLIN

Gateway Entry


TANKS! South Bench Park

Rock Climbing Ice Climbing

Tree Tower

Look Out Point

Exposed

Open

Art

Big Slide

Movie Night

Zipline



PHASING

PHASE THREE

PHASE TWO

PHASE ONE

NORTH AND SOUTH BENCH PARKS

Park Amenities • • • •

Pond Overlook Playground Bike Stop

• Boise Green Bike • Restroom • Community Center • Tank Art

Park Amenities • • • •

Soccer Fields Playground Skate Park Dog Park


TRANSPORTATION

Existing All routes go to down town Boise Hub Difficult to get from one end to the other of the bench Long wait between bus arrivals Transit system doesn’t run late enough

Proposed • • • •

Vital for residents without car Easier travel from one end to the other Direct routes to health and commercial centers Serves areas with no existing routes

CURTIS

Transit Center ORCHARD

• • • •

• • • •

Proposed Diesel Light Rail connecting from Caldwell to Boise Easier travel from one end to the other Both Train and Bus Center Central Location


TRANSPORTATION


SEE THE FUTURE OF THE BENCH FROM “THE LOOKOUT”



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.