Our economic activities turn natural resources (space, matter and energy) into services for society (territorial organisation, materials, heat and mobility. They are being called into question today: What difference does it make to think of the world no longer as a world without limits but as one with finite dimensions? This is particularly the case of the construction sector, for which we know the major impacts in terms of resource needs and waste production.

marks. Our intention is not to turn them into an emblem of modernity or ecology, but to capitalise on them for a qualified response: the right quantity – the right material and energy flow – for the right form. Our goal is not any given materiality any more than energy, nor even architectural form, but to secure the conditions which the degrowth economist Nicholas Georgescu-Roegen called “the joy of life” in 1973.

The infrastructure and facilities that we build must be of better quality to reduce the material and energy flows that circulate between them. Sustainable construction defines the additional investments needed so as to be able to function better with less (energy, maintenance, etc.). The very conditions of investment must therefore be reconsidered: the aim today must be to consume ever less, better and differently – even if it means investing more, better and differently. The road map for energy efficiency is becoming increasingly clear: everything points to the need for energy criteria that are as efficient as those of the passive standard.

A world of finite dimensions “disillusions” the economic productive mechanisms ideally designed for growth. But it has the opposite effect on humans; as soon as they detach themselves from the call of sleepwalking consumption. A world of finite dimensions is “re-illusioned”: It gives back value to things, it gives meaning, utility and functionality, whereas the consumerist utopia produces waste, inefficiency and confusion. Whereas consumption turns the citizen into a universal sucker, the world of finite dimensions relocates him, and turns him into a competent, responsible stakeholder.

Sustainable construction is aimed at building not only more efficiently, from the structural or energy point of view, for instance, but also more resiliently, i.e. capable of maintaining an appropriate level of functioning in spite of uncertainties, be they a cold spell, a heat wave, or the breakdown of a technical body. Certain technological gems that are flaunted as being highly efficient are concurrently very vulnerable – and thus not very resilient – to the slightest power failure or malfunction of a simple electronic chip. Efficiency and resilience are consequently paradoxical constraints. The designer’s work must accordingly pertain to the crossing of these two rationales, on the territorial and construction scale. A2M has searched in all directions in the course of its project. Our choices are always made in an informed and critical manner for specific reasons to do with resistance, economy, and transport, particularly through the use of sustainable construction bench-

The question of the fair sharing of resources is the question of the 21st century. The architect is delegated by society to produce the most resilient and most efficient space infrastructure and facilities possible, by building a schematic framework which gives inhabitants the choice of being free and mutually assisting enabling them to live their lives – in short, to inhabit this world of finite dimensions. This is particularly the case in all A2M’s projects. The usual responses of the “sustainably correct” city – compactness, collective mobility, functional diversity and intensity, etc. – work. The city is more dense as a result; it also consumes more energy, space and matter. But that is also what gives it its quality. To preserve its identity and avoid ideological or opportunistic “densification,” it must be even more efficient. This is the principle investigated by A2M and its partners when they design their projects, which are based on a global approach and manage to remain economically very affordable.


architectural dimensions of a finite world


www.A2M.be an architectural firm, commited to client service and the pursuit of excellence in architecture. We do only but passive house buildings.

We do architecture PassiveHouse buildings only design/economic/environmental feasibility studies real Net Zero Energy Buildings PEB, PHPP, dynamic simulations prepress and communication media believe in building physics (and teach it) work like hell

We don’t overcharge outsource building physics restrain our diverse activities understand chaos theory

We will make you smile work for right cause value your projects increase your ambitions build a better world

We won’t sell our souls overcharge miss deadlines let you down

We’re not "bio" extremist close minded only architects aliens neither wise in the ways of kung fu

We are Sebastian Grégory Julie Aline Gladys Marieke Angélique Siegfried Johanna Paolo Geoffrey Sandrine Dimitri Manu Alice Jean-Sébastien


2 175

397 032m² 41 153m² passive house = 4 273 616 ft² 62 573 completed or in construction

zero energy 442 967 ft²

19

71 799 m²

5BREEAM

passive house dwellings 246 completed or in construction

Exemplary Buildings awards

Exemplary Buildings awards 772 838 ft²

52 876 m² / 569 152 ft² completed or under construction Rate: 2 Very Good, 3 Excellent

14office 20schools 9kindergardens 7hotels buildings

A2M projects

benchmark buildings in Brussels before since 150 2007 2003 200

100

Ice challenge

T&T

BYHHR

HAREN 02

LINS

COTE-A-COTE

LOCQ

LES GRANDS MOU-

JETTE

CARROSSE

€CO-Office building

L’ILE AUX OISEAUX

MERLOT

MAISON DU PORT

BAGECI

LOUISE 120

FBZ FSE (marly)

CIT BLATON

CPAS FOREST

IPFC de NIVELLES

MOL04

FOREST02

PENICHE

OISEAUX

BELLE VUE Hotel

BELLEVUE

CRECHE ILE AUX

PAL V

LES HAUTS DE

tispice

Anvers-Simons-Fron-

MT200

Haren 03

Linne-Plantes

Tivoli

Ixelles Emploi

BXL01

Barthelemy

BONTE

pearl

berlaymont

old

0

vivaqua

kWh/m².a

50

passive house standard


be.kinshasa

Program Belgian & Netherland embassy Client Foreign affairs minstry of Belgium Collaboration Contractor Willemen groep, Dematco, Jean-Louis Paquet architect (local architecte), Stubeco, CES, Crea-Tec Surface 5 769 m² / 32 097 ft² Performance Passivehouse - BREEAM excellent Situation Kinshasa (DRC) Year 2014-17 Status under construction



be.rabat

Program Belgian embassy Client Foreign affairs ministry of Belgium Collaboration Contractor Willemen groep Cosimco, Still architect (local architecte), Crea-Tec Surface 1 700 m² / 18 298 ft² Performance Passivehouse Net Zero Energy Building Situation Rabat (Morocco) Year 2017-18 Status building permit



paradis express

Program ECO neighborhood: 171 housing, stores, office building Client Befimmo Collaboration Jaspers-Eyers, BAGreisch, TPF, Lemaire, Heinz Winter Surface 40 000 m² / 430 556 ft² Performance Passivehouse - Breeam Situation Liège (BE) Year 2014 - 2018 Status Building permit



zero box

Program micro modular concept for housing, Hotel room, shop, stores, classroom... passivehsoue, ZERO-energy and completely self-sufficient Client FAAST thinktank Collaboration Michel Penneman, Crea-Tec Surface 18 to 27 m² / 193 - 290 ft² Performance Passivehouse – Breeam - zero CO2 Situation Belgium / USA / Singapor Year 2015-17 Status under construction



bara

Program Hotel 150 rooms Client NELSON midi Collaboration Crea-Tec, Stedec, contractor Democo Surface 6 033 m² / 64 938 ft² Performance Passivehouse ZERO energy Situation Brussels (BE) Year 2015-17 Status tender call



bellevue hotel meininger

Program Hotel 170 rooms / 600 beds Client Nelson Canal Collaboration Arcadis, Stubeco, Crea-Tec, contractor Democo Surface 8 714 m² / 93 796 ft² Performance very low energy Exemplary Building award in 2009 Situation Molenbeek-Saint-Jean, Brussels (BE) Year 2010 Status completed 2013



kanaal bellevue

Program 14 apartments Client Hamilton Canal Collaboration Stubeco, contractor Democo Surface 2 117 m² / 22 787 ft² Performance Passivehouse Exemplary Building award in 2011 Situation Molenbeek-Saint-Jean, Brussels (BE) Year 2010 Status completed 2013



mima

Program Street Art Museum Client NELSON midi Collaboration Crea-Tec, Stedec, contractor Democo Surface 1 269 m² / 13 659 ft² Performance Situation Brussels (BE) Year 2015-16 Status completed 2016



the genesis

Program office building Client Parc de l’Alliance (AXA Belgium, AG Real Estate Development) Collaboration Arcadis, Stubeco, JNC, AIB, SECO, D2S int’l, contractor Franki Surface 6 058 m² HS , 9 124 m² / 98 209 ft² Performance Passivehouse, BREEAM excellent Situation Braine-L’Alleud (BE) Year 2010 Status completed 2015



Ekla

Program housing & kindergarden Client CityDev Collaboration Democo Surface 5 200 m² / 55 972 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status building permit



gryson

Program construction of 277 student rooms, 80 appt and retail Client CityDev Collaboration BAEB, ADE, TPF, Democo, Willemen, InAdvance Surface 23 200 m² / 249 722 ft² Performance Passivehouse Situation Brussels (BE) Year 2015Status competition



sport hall

Program sporthall Client Brussels Municipality Collaboration Createc, P Stoffel Surface 2 600 m² / 27 986 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status competition



ixelles emploi

Program office building for job seekers, Actiris outlet Client Commune d’Ixelles Collaboration Createc, Stubeco, Securisan, Contractor Democo Surface 2 451 m² / 26 382 ft² Performance Passivehouse, Exemplary Building award in 2013 Situation Ixelles (BE) Year 2011 Status completed 2015



peterbos

Program Social housing renovation Client Beliris Collaboration Createc, Tractebel Surface 8 000 m² / 86 111 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status competition



MT200

Program renovation 92 housing Passivehouses Client MT200 bvba Collaboration ELD, NicoTerijn, BuroGroen Surface 12 524 m² / 134 807 ft² Performance Passivehouse, Exemplary Building award in 2012 Situation Brussels (BE) Year 2012-17 Status under construction



VDBD

Program 17 apartments Client IMMOBILIERE COMTE DE FLANDRE Collaboration Nelson Canal, Crea-Tec, G. Paelinck, Contractor Democo Surface 1 488 m² / 16 016 ft² Performance Passivehouse, ZERO-energy, Exemplary Building award in 2013 Situation Brussels (BE) Year 2013-15 Status completed 2015



rockaway

Program Hotel Client Collaboration MMA (FNA + A2M) Surface 5 500 m² / 59 201 ft² Performance Passivehouse Situation NYC (USA) Year 2016 Status Idea



newark

Program Hotel 220 rooms, stores, student housing Client R.B. Collaboration MMA + M. Penneman Surface 15 699 m² / 168 982 ft² Performance passivehouse Situation Newark (USA) Year 2015 Status feasibility study



ardea

Program 78 appartments Client Etterbeek Collaboration Willemen, Infrabo, Istema Surface 7 230 m² / 77 823 ft² Performance Passivehouse Situation Brussels (BE) Year 2014-2017 Status under construction



anverssimons

Program 51 housing, school for 490 ch., Chidlcare Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Crea-Tec, contractor Democo Surface 10 779 m² HS, 13 369 m² / 143 902 ft² Performance Passivehouse Exemplary Building award in 2011, Passreg beacon project Situation Brussels (BE) Year 2011 Status completed 2015



linnéplantes

Program 50 social appartments, childcare, renovation of a landmark building from the 60’s Client Service public fédéral Mobilité et Transports Collaboration Stubeco, Stockman, H Meunier, dB Mute Surface 6 506 m² / 70 030 ft² Performance Passivehouse et ZERO energy Situation Saint-Josse (BE) Year 2012-2017 Status under construction



lisbon meininger hotel

Program Hotel 120 rooms / 350 beds Client Nelson Canal Portugal Collaboration Enter architects, Termifrio, ETU, Renew, Acusticprojecto, Stubeco, PPE, Crea-Tec, contractor Democo lisbon Surface 6 200 m² / 62 000 ft² Performance Passivehouse Situation Lisbon (PO) Year 2016-18 Status Tender call



city center

Program housing, shops, childcare Client Drogenbos Municipality Collaboration Democo, Arcadis Surface 6 800 m² / 73 194 ft² Performance Passivehouse Situation Drogenbos (BE) Year 2016 Status competition



haren02

Program 30 housing in neighborhood Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Stockman, contractor Democo Surface 3 377 m² / 36 349 ft² Performance Passivehouse - Exemplary Building award in 2011, incl. 5 ZERO-energy housing, PassReg beacon project Situation Brussels (BE) Year 2010 Status completed 2013



haren III

Program 44 housing and community center in eco-neighborhood Client Régie Foncière de la Ville de Brussels (BE) Collaboration Technum Surface 5 170 m²/ 55 649 ft² Performance Passivehouse Situation Brussels (BE) Year 2015 Status competition



praha

Program office & Housing Client Karling Group Surface 15 262 m² / 164 278 ft² Performance Passivehouse Situation Praha (Cz) Year 2016 Status competition



Holcim Lafarge

Program office building, HQ Holcim Lafarge Client Thomas & Piron Collaboration Architecture et Climat, CSTC, Matriciel, Sixco, contractor Thomas & Piron Surface 4 107 m² / 44 207 ft² Performance Passivehouse BREEAM very good Situation Nivelles (BE) Year 2010 Status completed 2013



les grands moulins

Program Apartments, office building and museum Client SCI de la Haute-Saône Collaboration HDM, Energelio Surface 7 920 m² / 85 250 ft² Performance Passivehouse Situation Péronne (FR) Year 2010 Status building permit



tivoli

Program 374 apartments, 2 childcares, stores Client CITYDEV Collaboration AA, JDS, Stubeco, Istema, contractor Democo Surface 44 321 m² / 477 067 ft² Performance Passivehouse - ZERO energy Situation Brussels (BE) Year 2012 Status competition



FBZ

Program office building, HQ Belgian Electicians Federation Client FBZ Collaboration Cenergie, NEY, contractor M&M Sitty Surface 2 145 m² / 23 088 ft² Performance Passivehouse Exemplary Building award in 2008 Situation Brussels (BE) Year 2008 Status completed 2011



CPAS forest

Program office building, social welfare centerlisted bullding renovation (1932) Client CPAS de Forest Collaboration JZH, Matriciel, contractor Dherte Surface 1 017 m² / 10 946 ft² Performance very low energy Exemplary Building award in 2008 Situation Forest (BE) Year 2008 Status completed 2011



jette

Program 2 social housing - full zero energy Client Foyer Jettois Collaboration Ecorce, contractor Falco Surface 286 m² / 3 078 ft² Performance Passivehouse Exemplary Building award in 2009 ZERO energy Situation Jette (BE) Year 2006 Status completed 2011



louise 120

Program office building, renovation Client Gilt investment Collaboration Moreno-Lux, CES, Widnell , contractor Democo Surface 2 948 m² / 31 732 ft² Performance Passivehouse and BREEAM very good Situation Brussels (BE) Year 2010 Status completed 2012



M2E

Program office building for job seekers, childcare Actiris outlet Client Forest Municipality Collaboration JZH, TPF, contractor M&M Sitty Surface 1 731 m² / 18 632 ft² Performance Passivehouse Exemplary Building award in 2009 Situation Forest (BE) Year 2008 Status completed 2012



locq

Program 15 apparrtments, childcare, renovation Client Ville de Brussels (BE) Collaboration JZH, Contractor In-Advance Surface 3 828 m² / 41 204 ft² Performance Passivehouse, Exemplary Building award in 2008 Situation Brussels (BE) Year 2006 Status completed 2013



Cit-Blaton

Program office building, HQ CIT-Blaton, renovation Client CIT-Blaton Collaboration Arcadis, Ney, Contractor CIT-Blaton Surface 4 247 m² / 42 470 ft² Performance Passivehouse (the 1st in Brussels Region) Situation Schaerbeeck (BE) Year 2004 Status completed 2008



ICEChallenge

Program installation Client PMP Collaboration contractor Batisam Surface 16 m² / 172 ft² Performance Passivehouse Situation Brussels (BE) Year 2007, 2009 Status completed 2007, 2009



masui

Nemo33

BXL01

Program school , sport facilities and community center Client Commune de Brussels (BE)-Ville Collaboration Sodeg Groupe Artelia Surface 4 345 m² / 43 450 ft² Performance Passivehouse Situation Brussels (BE) Year 2011 Status competition, 2nd price

Program cdiving center , the deepest swimming pool in the world (Guinness World Record) Client Spirifer Collaboration Solyremy, Papegnies, Contractor iBens and Denys Surface 2 630 m² / 26 300 ft² Performance Situation Uccle (BE) Year 2000 Status completed 2003

Program 28 appartments, landmark from 1850 renovation Client Ville de Brussels (BE) Collaboration Cenergie, Stockman, Evico, contractor M&M Sitty Surface 4 247 m² / 42 470 ft² Performance low energy Situation Brussels (BE) Year 2002 Status completed 2009


Hotel on water

IPFC

passivehouse highrise

Program floating Hotel, ZERO energy and self-sufficient Client Biloral Collaboration Arcadis, Createc, Stubeco, Securisan, Surface 2 600 m² / 26 000 ft² Performance Passivehouse et ZERO energy, Exemplary Building award in 2009 Situation Brussels (BE) Year 2008 Status idea

Program european commission passiveProgram school IPFC hosue highrise Client Province du Braban Wallon Client TWT-Rogiers PMP-PHP, IBGE Collaboration Cenergie, NEY, Solyremy, contractor Collaboration Arcadis, Stubeco, Widnell, Surface 2 580 m² / 25 800 ft² DTZ, Democo Performance Passivehouse Surface 220 500 m² / 2 205 000 ft² Situation Nivelles (BE) Performance Passivehouse Year 2003 Situation Brussels (BE) Status completed 2008 Year 2011 Status study

hop

Program school, sport facilities and 76 housing Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Sofia eng, JNC, contractors Pelikaan Surface 16 657 m² / 166 570 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition


mariemont

verdun potager

delta

Program 13 appartments, school Client Commune de molenbeek Collaboration Surface 5 622 m² / 56 220 ft² Performance Passivehouse Situation Molenbeek-Saint-Jean (BE) Year 2011 Status competition

Program 78 apparments Client Fond du logement de la Région Bruxelloise Collaboration Thomas et Piron Surface 8 749 m² / 87 490 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition 2nd price

Program appartments Client Fond du logement Région Bruxelloise Collaboration Createc, Stubeco, Securisan, contractor Democo Surface 7 862 m² / 78 620 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition 2nd price


T&T

Namur09

BYHHR

Maison du Port

Program 126 appartments Client Tour & Taxis Collaboration Surface 17 500 m² / 175 000 ft² Performance Passivehouse Situation Brussels (BE) Year 2010 Status idea

Program office building, renovation fromer post office Client IRET Collaboration Contractors BAGECI Surface 6 384 m² / 63 840 ft² Performance Passivehouse Situation Namur (BE) Year 2009-10 Status idea

Program small and medium-sized busines cnter and childcare, landmark renovation Client CPAS de Bruxelles Collaboration Neo construct , Suède 36 Surface 9 280 m² / 92 800 ft² Performance Passivehouse Situation Brussels (BE) Year 2009 Status competition, 2nd price

Program office building, HQ Brussels Client Port de Bruxelles Collaboration PPP Contractor Norpac, Arcadis Surface 7 500 m² / 75 000 ft² Performance Passivehouse Situation Brussels (BE) Year 2008-09 Status competition


villers les sables

Program eco-neighbohood, , 220 housing, childcares, eldery persons housing, stores Client Thoumpsin Collaboration CREAT, Igretec, Giria, Epuvaleau Surface 38 876 m² / 388 760 ft² Performance Passivehouse et ZERO energy Situation Villers-La-Ville (BE) Year 2008-... Status in progress

Haren II phase 2

Program 32 housing in eco-neighborhood Client Régie Foncière de la Ville de Brussels (BE) Collaboration Stedec, Createc, contractor Democo Surface 3 582 m² / 35 820 ft² Performance Passivehouse Situation Brussels (BE) Year 2015-16 Status tender call

MOL 04

Program childcare Client Commune de Molenbeek-Saint-jean Collaboration JZH, CreaTec, Matriciel, contractors Gillion Surface 634 m² / 63 400 ft² Performance Passivehouse, exemplary building award in 2010 Situation Molenbeek-Saint-jean (BE) Year 2006 Status completed 2014

evere destrier

Program social housing Client SLRB Collaboration BLAF architecten Surface 12 500 m² / 125 000 ft² Performance Passivehouse Situation Evere (BE) Year 2016 Status competition


Haren 03

Program 110 housing in eco-neighborhood, childcare, shop Client EuroBeauty (BE) Collaboration Surface 24 526 m² / 245 260 ft² Performance Passivehouse Situation Brussels (BE) Year 2010-2015 Status building permit

White Hotel

Program Hotel 53 rooms, renovation Client Newquay Properties sa Collaboration Michel Penneman Surface 4 222 m² / 42 220 ft² Performance Situation Brussels (BE) Year 2006 Status completed in 2007

l’île aux oiseaux

côte à côte

Program 354 housing, childcare, stores, eco-neighborhood Client Thomas & Piron, Toit et Moi Collaboration Arcadis, SIA, Sixco Surface 33 400 m² / 334 00 ft² Performance Passivehouse, low energy Situation Mons (BE) Year 2005 Status completed 2012

Program apartments for people with cerebral-motor disability (IMC) Client Côte à côte asbl Collaboration Stubeco, Contractor Democo Surface 1 347 m² / 13 470 ft² Performance Passivehouse, Exemplary Building award in 2013 Situation Louvain-La-Neuve (BE) Year 2010 Status completed 2014


survey

program

montant htva housing

Jardins de la Chasse Ambassade BE à Kinshasa Vandenbrande Ixelles Emploi MT200 Linne-Plantes PAL V Anvers-Simons-Frontispice Côte-à-côte Locq Mol04 Haren 02 Haren02 phase 2 Haren 03 Les Hauts de Bellevue Bellevue Hotel Meininger €CO-Office building Forest02 M2E Louise 120 FBZ FSE (marly) CPAS Forest Jette IPFC de Nivelles Evere01 CIT Blaton childcare île aux Oiseaux L’île aux Oiseaux Les grands moulins BAGECI BXL01 Bonte IPAM Nemo33 Ice challenge Péniche Passive Liège Fedimmo Tivoli Gryson Berchem Delta Verdun potager dbfm1-5 hop VLV masui mariemont Schaerbeeck 11 Quai AA loft Merlot maison du port Carrosse T&T BYHHR

office building

enseignement divers

1 200 € htva


scale

liters per coffee / project 0

Jardins de la Chasse Ambassade BE à Kinshasa Vandenbrande Ixelles Emploi MT200 Linne-Plantes PAL V Anvers-Simons-Frontispice Côte-à-côte Locq Mol04 Haren 02 Haren02 phase 2 Haren 03 Les Hauts de Bellevue Bellevue Hotel Meininger €CO-Office building Forest02 M2E Louise 120 FBZ FSE (marly) CPAS Forest Jette IPFC de Nivelles Evere01 CIT Blaton childcare île aux Oiseaux L’île aux Oiseaux Les grands moulins BAGECI BXL01 Bonte IPAM Nemo33 Ice challenge Péniche Passive Liège Fedimmo Tivoli Gryson Berchem Delta Verdun potager dbfm1-5 hop VLV masui mariemont Schaerbeeck 11 Quai AA loft Merlot maison du port Carrosse T&T BYHHR

5000

10 000 15 000 20 000

25 000

30 000 35 000

40 000m²


R&B

Relations and Branding

A2M

R&D

Research and Development

D&B

Design and Build


faster, stronger, further ...


R&D

Research and Development

thermal Bridge : Trisco

life cycle Assessment : LCA Eco-Bat

daylight analysis : ecotect

hygrothermal behaviour of multi-layer building component : logiciel wufi 2D

Life Cycle Cost

daylight factor : Daylight Vizualizer 2

4 000 000 € 3 500 000 € 3 000 000 €

end of life cost maintenance cost

2 500 000 €

operation cost construction cost

2 000 000 € 1 500 000 € light facade 1

light faacde 2

light facade 3

light facade 4

massive facade 1

massive facade 2

massive facade 3

massive facade 4

Impact budg• taire sur dur• e de vie LCC (30 ans) Le calcul LCC a • t• test• sur 8 type de composition de fa# ade. La solution retenue est une fa# ade de type «massive»

parametric design rhino & grasshoper



D&B

Design and Build


15

O 14 O

N

N

M 16

L E 1 M

L

D K

1

2 J

C

K

17

3

J G

2 I

5

F 14

15 4 6' 16 E

3

I

17 E

6

D C

G

6' D C

A

18-02-2015

Index

Datum

aanpassen opmerkingen 30-01-2015

Omschrijving

Janssens bvba

4 5

metaalconstructie / montage dak- & wandbekleding

Franki

Datum :

E C

D

F 7'

7

Klant

Isometrie middenstuk

Tekening

Project

Parc D'Alliance Braine L'Alleud

6

Hoekstraat 2 3950 Bocholt tel : 089/48 04 60 fax : 089/47 31 95

09.01.2015

Tekenaar : RD

7' 7

Schaal : Project :

1/33

141037

Model :

141037_Franki-Parc D'Ailliance Braine L'

Tek. :

formaat :

1189x841

plotdatum :

18.02.2015

G [15]

A


R&B

Relations and Branding

For 5 years, A2M published the quaterly magazine be.passive and begin 2015, the book "passive + architecture"

01

SEP OCT NOV 2009

flash 08 focus 12 humour 15 global view 16 face à face 20 parole d’image 24 le missionnaire 27 qu’en dites-vous 28 architecture partagée 35 dossier 46 portrait 50 phpp, vademecum 54 logement 60 non-résidentiel 64 rénovation 67 immobilier 70 Elisabeth's diary 81 ça bouge en ... 82

bureau de dépôt 2099 Antwerpen X P 910294

be.passive

02

DEC JAN FEV 2010

trimestriel du standard passif > www.bepassive.be

Looking forward Etat de la question be.passive 01

1

flash 08 focus 12 humour 14 global view 16 perspective 18 carte blanche 22 le missionnaire 24 parole d’image 26 architecture partagée 29 dossier 39 phpp, vademecum 52 logement 59 rénovation 64 détail 69 tante Monique 76 Elisabeth's diary 78 ça bouge en 80

magazine be.passive

be.passive trimestriel du standard passif > www.bepassive.be

Bruxelles passif en 2015

bureau de dépôt 2099 Antwerpen X P 910294

09 oct nov dec 2011

sur le vif 06 focus 12 global view 14 face à face 18 le missionnaire 20 carte blanche 24 vu et entendu 30 parole d'image 34 thema 36 architecture partagée 37 phpp 60 le mot des plateformes 62 résidentiel 67 rénovation 73 détail 78 Elisabeth's diary 80 angle droit 82 tante Monique 84 nos étudiants 90 chiffres 86 la famille carbonique 94

be.passive trimestriel du standard passif > www.bepassive.be

value for money

bureau de dépôt 2099 Antwerpen X P 910294

be.passive 09

1

15 avr mai jui 2013

flash 08 focus 14 global view 16 face à face 18 le mot des plateformes 22 vu et entendu 23 perspective 24 parole d'image 28 carte blanche 32 architecture partagée 32 passive story 34 what's up 36 non résidentiel 39 thema 50 tips & tricks 56 phpp 60 be.batex 60 nos étudiants 70 logements 73 détails 80 be.global 88 chiffres 90 angle droit 94 bureau de dépôt 2099 Antwerpen X P 910294

be.passive trimestriel du standard passif > www.bepassive.be

10 years


book architecture+passive


We could speak of post-passive or high design building. Through the many projects developed in Belgium, the architectonic projects are re-examined, and the material regains primacy over technique. New design and construction methods are emerging, particularly with the computer-aided parametric design. Intended more particularly for architects, this presentation tends to show passive building no longer from the angle of its constraints but of its new potential.

At times there are no other solutions to preserve the aesthetic appearance of a building that we want to renovate. This presentation describes in detail the different aspects to be How can the issues taken into account in this of density and type of intervention. From sustainability be vapour migration to broached on the scale of a neighbourhood? We drying potential, interior illustrate the different points insulation is examined thoroughly through very of the BREEAM matrix concrete, more or less with concrete examples through the development radical examples, all the impacts of which (technical, of several projects and energetic, aesthetic, in particular that of the Guillemins eco-district. economic) are examined.

Mobile passive building: towards autonomy

Through years of teaching we've developed a very practical approach, leading the participant to apply the fundamentals in an every-day project's life.

Interior insulation: risks and potential

Among all actual matters, the latest subjects we shall be broaching, which we consider topical, are given below. You might find some of them of interest for your training/lecture cycles.

A BREEAM neighbourhood

A2M provide training courses and master class on passivehouse, sustainable development

What does passive building do to architecture?

training

A transportable and universal project, the zero box adapts to every environment. A home, office or shop all at once, this project, developed in direct connection with industrialists and developers, raises the questions of land use and self-sufficiency (energy, water, etc.).


2-hour training session on growing pains and other new pathologies of high energy performance buildings. This training is particularly appreciated by the experts and insurers. Hygrothermal principles applied to buildings (+Wufi software)": 2-hour session on the theoretical principles of vapour migration in walls, followed by concrete examples from practice – particularly interesting to delve in depth into topics such as renovation and interior insulation.

Energy efficiency of buildings: what’s it about?

Passive building in practice

Passive building and pathologies

2-hour session on financial impact control throughout the project, with a detailed description of economic aspects linked to passive buildings. Operating experience and feedback from several design and build projects in particular have enabled us to identify several decisive factors for containing the costs of the project without being led by the nose by external stakeholders. This training broaches planning, preparation, detail, material, and design elements.

8-hour training session that groups the two cases below and many cases from practice. What participants generally appreciate are concrete cases of projects for massive/ light, new/renovation, residential/commercial construction, air tightness, etc. The training is followed by implementation where the participants have to consider the details with real tools (condetti or models). The specificity of this training lies in applying theoretical principles in practice.

Reality Check

2-hour assessment, about labels, EPD, LCA, EPDB, software, criteria. How can you find your way through the jungle of different labels of materials? How can you take their lifecycle into account? What tools can be used to make objective choices and what pertinent criteria can be applied? This training broaches these questions and shows some cases of practical implementation on projects.

Cost management

Eco-audits of building materials

Passive building abroad? let's go worldwide Exporting Belgian expertise is not always a simple task! The project of the Belgian embassy in Kinshasa shows the adjustments, solutions and innovations needed in a tropical, sunny and radically different climate in terms of construction. The question arises whether passive building is still pertinent and possible to apply under such latitudes. Recent Belgian projects in New York also show the impact of more extreme climates on the design of energy-efficient buildings.

2-hour session of putting passive buildings to the test of the facts, success/ failure factors, etc. A2M has been erecting passive buildings since 2003, and this experience has enabled us to identify recurrent problems but also simple solutions and issues to be monitored in high environmental performance projects.

2-day training course (16 hours) particularly focused on the passive building, which goes over all of the following aspects: •

General,

Gains and losses by transmission, ventilation, infiltration

Exercises

Hygrometry and vapour diffusion

Ventilation systems

Internal gains

Comfort and overheating management

Practical exercises


feasibility studies

Volumetric design & Zoning studies Programatic study


Cost development & environmental appraisal

Sustainable studies: energy study emboded energy natural lighting CO2 balance biodiversity ...


the team

17 team

we master ...

we use ...

people

male

female

coffee

male

other

73% female

27% 47%

paper /

lised /

soft

rum

53%

latino novels

water

samsung ecotect

nexus

iphone

60%

60%

we m

60% 80%

we drink ... we dance to...

tea

champagne 53%

soft

other

20%

beer

water

73%

other

ovels

73% 80%

wufi2d

we use ...

anga

73%

kobra

53%

coffee

80%

samsung

80%

60%tea 60% 47%

rum

nexus

champagne beer

e d/

we are ...

we dance to... we read...

other

phpp

we use ...

o

M²

iphone

ro mics

332

nexus

grap, ste rt cid/ s

53% size of agency

ecotect

we drink... we drink ...

eople

73%

wufi2d

samsung

çai

483

80% years

kobra

other

total age

elecro

acid/ manga p/ trans

20%

33

years

phpp

ai

exus average age iphone

0%

we

we master ... we use ... physics softwares ... we master building

arewe ...are ...

53% iphone

phpp


malemale

female female female

other other other

100% 100%100% 90% 90% 90% 80% 80% 80% 70% 70% 70% 60% 60% 60% 50% 50% 50% 40% 40% 40% 30% 30% 30% 20% 20% 20% 10% 10%0% 10%

0% 0%

comics comics comics

phpp phppphpp

80% 80% 80% 60% 60% 60% 60% 60% 60%

47% 47% 47%

53% 53% 53%

latino latino latino

53% 53% 53%

20% 20% 20%

arch, grap, arch, grap, art art arch, grap, art

people people people

daily paper daily paper daily paper

specialised specialised specialised

we play .. wewe play play .. ..

80% 80% 80%

dubste p/ dubste acid/ p/ acid/ trans dubste trans p/ acid/ trans elecro elecro elecro

60% 60% 60%

27% 27% 27%

we play ..

73% 73% 73%

iphone iphone iphone

we dri wewe drin d

pop/ pop/ rock rock pop/ rock franรงai s franรงai s franรงai s jazz jazz jazz

73% 73% 73%

nexus nexus nexus

we dance to... we dance on... we we dance dance to...to...

RNB/ RNB/ rap rap RNB/ rap

73% 73% 73%

novels novels novels

73% 73% 73%

manga manga manga

we read... we read... we we read... read...

samsung samsung samsung

we l wew li


about

awards

Liege Paradis express

Mipim award best futura poject

Anvers Simons High architectural design, eco sustainable developments, and Net Zero Energy feasibility studies. With its experience, PH expertise and large range of competences, A2M is the perfect partner to value your projects. A2M team is composed of architects, engineer architects and thermal engineers. All trained specifically in the aspects of sustainable development, passive design, and particularly in natural light analysis as well as dynamic simulation.

Beacon Project PassReg.EU, 2015 Exemplary building award, 2012 finalist Green Building Solutions 2015 finalist Horta's award 2016

Haren02

Beacon Project PassReg.EU, 2015 Exemplary building award, 2011 finalist Green Building Solutions 2015

vandenbranden

Exemplary building award, 2013

These skills gathered under one roof enable us to combine the economic with the exemplary dimensions in each of our projects.

Ixelles Emploi

Although all our projects are passive - and for some Net Zero Energy, Exemplary Buildings, or Breeam - more than 50% are priced at an equivalent or lower cost than standard market prices.

MT200

A2M projects reach high standards with a pragmatical approach. A2M is specialized in feasibility studies for large scale developments. Design approach, economic feasibility, high performance : the perfect combination to make a difference.

A2M offices are in Brussels and in NYC. â–

Exemplary building award, 2013

Exemplary building award, 2012

linnĂŠ-plantes

Exemplary building award, 2012


Côte-à-côte

l'île aus oiseaux

BTP1000

Atlantis

Jette

Evere

BXL01

FBZ

Quai AA

M2E

locq

Mol04

Bellevue

CPAS Forest

Exemplary building award, 2012

Marshall plan 2.0 green award, 2011 finalist World Efficiency Award 2015 finalist Green Building Solutions 2015

Belgian architecture award selected, 2011 Exemplary building award, 2007 Tenant gold bric award, 2006

Brussels Horta award selected, 2011

Exemplary building award, 2009

Exemplary building award, 2009

Exemplary building award, 2009

Public call for tender award, 2013

Exemplary building award, 2009

Brussels Horta award selected, 2008

Exemplary building award, 2008

Exemplary building award, 2008

Exemplary building award, 2007

Exemplary building award, 2007



A2M BE 6 chaussĂŠe de Boondael 1050 Brussels Belgium T +32 2 640 51 81 F +32 2 644 67 37 info@a2m.be A2M NYC 110 East 25th Street New York, NY 10010 USA nyc@a2m.be

we share we build A2M : + Architectural firm specialising in projects with very high environmental value and high design. + All A2M projects are passive, i.e. zero energy. + A2M won 19 Exemplary Buildings awards in Belgium.

+ A2M won Best Futura Project award at Mipim 2016 + A2M published the quarterly periodical be.passive. + A2M published the book Architecture+Passive + Founding member of Faast Thinktank


Design approach, economic feasibility, high performance : the perfect combination to make a difference.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.