D R I V I N G R A N G E T E E E X PA N S I O N J U N E 3 - E N D O F AU G U S T *

PURPOSE:

The lower south tee will be excavated and space will be added to the top tee, which will nearly double the size of the south tee to comfortably accommodate our membership needs.

The removal of the lower tee will also allow more distance between the south and north tees to accomodate the use of golf clubs’ modern technology and the north tee usage.

S CO P E :

Six weeks of excavation, irrigation install; six weeks of growth.

The small putting green (currently located behind the cart path of the driving range tee) will be removed to allow us to expand the tee to these specifications. The existing chipping green and bunker complex will be redesigned to complement the range expansion.

The overall south tee will nearly double from 35,000 sq. ft. to 68,000 sq. ft. The distance to the front edge of the north tee will also be expanded from 260 yds. to 280 yds., with 320 yds. from the back of new south tee.

*Timeline is approximate and is subject to change. SUMMER 2019

3


Capital Enhancements: Golf

C H I P P I N G G R E E N R E N OVAT I O N J U N E 3 - E N D O F AU G U S T *

PURPOSE:

The Clubhouse chipping green (adjacent to the #1 tee) will be reconfigured to accurately replicate the structure of our current greens, allowing players to practice various shot scenarios found on the golf course.

S CO P E :

Six weeks of excavation, irrigation install; six weeks of growth.

The chipping green, which currently sits at 7,000 sq. ft., will expand to 11,000 sq. ft.

The green will be contoured to mimic #1 and #16 greens. The recontouring will enable players to see the shot roll out, as they currently are unable to, due to the severe undulations within the green.

*Timeline is approximate and is subject to change.

4

SUMMER 2019


Creates longer bump and run Chipping area

Elevated green to allow flop shot with butterfly feet

Proposed Green (11,000 s.f.)

Great off green putting area

Area for pitch shots from variable slopes



Capital Enhancements: Golf

H O L E # 1 0 R E N OVAT I O N S

TEE BOX, RESTROOMS & PUMP STATION

J U N E 3 - E N D O F AU G U S T *

PURPOSE:

Under the direction of the course architect, Tom Fazio, the men’s tees will be slightly lengthened and relocated to the right towards the cart path. The fairway bunker complex will be recreated to return the hole to its original intended design.

The restrooms will be outfitted with air conditioning.

As the first phase of the course irrigation renovation, the aging pump station will be replaced to ensure the heart of course irrigation will be reliable for years to come.

S CO P E :

Six to eight weeks.

Restroom building will have roof replaced, will be outfitted with air conditioning, along with the addition of office space incorporated into building.

*Timeline is approximate and is subject to change. SUMMER 2019

7


QUESTIONS OR COMMENTS C O N TA C T U S GREGOR JAMIESON, DIRECTOR OF GOLF GJAMIESON@LAKENONA.COM 407.209.1252 BRANDON RICHEY, GOLF COURSE SUPERINTENDENT BRICHEY@LAKENONA.COM 407.209.1281


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.