Event Show Power Checklist Your Trusted Experts for Environmental & Engineering Solutions Environmental and Engineering Services
Environmental and Engineering Services
Event Manager: Event Name: Event Date: Event Time:
Note: Please place a check next to the house power options that you use for the event and return to engineering department at least 7 days prior to the event. Note: Please verify the event managers will provide all necessary cables and connections to connect to house power.
Show Power Location Stage Stage Stage Stage
Quantity Amperage Voltage
Phase
1 1 1 1
400amps 400amps 200amps 200amps
208volts 208volts 208volts 208volts
Phase Phase Phase Phase
Camlocks Camlocks Camlocks Camlocks
Stage Left Stage Left Stage Left
Sound Sound Sound
1 1 1
400amps 200amps 200amps
208volts 3 Phase 208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks Camlocks
Front of House Front of House
Misc Misc
1 1
200amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
Front of House Front of House
Lazers Lazers
1 1
200amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
Front of House Front of House
Rigging Rigging
1 1
200amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
Front Front Front Front
Lighting Lighting Lighting Lighting
1 1 1 1
200amps 200amps 200amps 200amps
208volts 208volts 208volts 208volts
Phase Phase Phase Phase
Camlocks Camlocks Camlocks Camlocks
Stage Right Stage Right
Misc Misc
1 1
400amps 400amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
Stage Right Stage Right
Misc Misc
1 1
400amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
House House House House
3 3 3 3
Power connection type
Lighting Lighting Lighting Lighting
of of of of
Left Left Left Left
Designation
3 3 3 3
Loading Loading Loading Loading
Dock Dock Dock Dock
Misc Misc Misc Misc
1 1 1 1
200amps 200amps 20amps 20amps
208volts 208volts 120volts 120volts
3 3 1 1
Phase Phase Phase Phase
Camlocks Camlocks Edison Edison
Loading Loading Loading Loading
Dock Dock Dock Dock
Misc Misc Misc Misc
1 1 1 1
200amps 200amps 20amps 20amps
208volts 208volts 120volts 120volts
3 3 1 1
Phase Phase Phase Phase
Camlocks Camlocks Edison Edison
Loading Loading Loading Loading
Dock Dock Dock Dock
Misc Misc Misc Misc
1 1 1 1
200amps 200amps 20amps 20amps
208volts 208volts 120volts 120volts
3 3 1 1
Phase Phase Phase Phase
Camlocks Camlocks Edison Edison
Loading Dock Loading Dock
Misc Misc
1 1
200amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
1
Loading Dock Loading Dock
Misc Misc
1 1
20amps 20amps
120volts 1 Phase 120volts 1 Phase
Edison Edison
Loading Loading Loading Loading
Dock Dock Dock Dock
Misc Misc Misc Misc
1 1 1 1
200amps 200amps 20amps 20amps
208volts 208volts 120volts 120volts
3 3 1 1
Phase Phase Phase Phase
Camlocks Camlocks Edison Edison
Loading Loading Loading Loading
Dock Dock Dock Dock
Misc Misc Misc Misc
1 1 1 1
200amps 200amps 20amps 20amps
208volts 208volts 120volts 120volts
3 3 1 1
Phase Phase Phase Phase
Camlocks Camlocks Edison Edison
Loading Dock
Misc
1
200amps
208volts 3 Phase
Camlocks
Loading Dock Loading Dock
Misc Misc
1 1
200amps 200amps
208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks
Exterior of Building Exterior of Building Exterior of Building
Misc Misc Misc
1 1 1
100amps 100amps 100amps
208volts 3 Phase 208volts 3 Phase 208volts 3 Phase
Camlocks Camlocks Camlocks
Exterior of Building Exterior of Building
Misc Misc
1 1
30amps 50amps
120volts 1 Phase 120volts 1 Phase
Twist locks Twist locks
Exterior of Building Exterior of Building
Misc Misc
1 1
30amps 50amps
120volts 1 Phase 120volts 1 Phase
Twist locks Twist locks
If there are any specialty power request that are not able to be accomdated by show power needs adressed above, please place them in the comments box below
www.eco-alpha.com