core-payment-plan-price-list

Page 1

PAYMENT PLAN Down Payment Plan(12% Assured Return) Booking Amount

10% of TSP

Within 45 Days of Booking

90% of TSP

At Possession

Registration Charges + Stamp Duty

Flexi Payment Plan(11% Assured Return) Booking Amount

10% of BSP

Within 45 Days of Booking

40% of BSP + 50% of PLC

Structure Of Mall

25% of BSP + 50% of PLC

Structure Of Galleria Tower

25% of BSP + 50% of Other Charges

At the Time of Possession

50% of other Charges + Registration Charges + Stamp Duty

Construction Link Payment Plan Booking Amount

10% of BSP

Within 45 Days of Booking

10% of BSP

On the start of Excavation

10% of BSP

On the start of PCC

10% of BSP + 50% of PLC

Casting of Basement Slab

10% of BSP + 50% of PLC

Casting of Upper Ground Floor

10% of BSP

Casting of Second Floor

10% of BSP + 50% of Other Charges

Casting of Fourth Floor Slab

10% of BSP + 50% of Other Charges

On Commencement of Finishing

10% of BSP

At Possession

10% of BSP + Registration Charges + Stamp Duty


Price Revising Since 10th July 2016

PRICE LIST Mall Down/Flexi Plan

Const. Linked Plan

Lower Ground Floor (Hypermarket)

15,500 per sqft.

15,000 per sqft.

Upper Ground Floor (Retail)

17,500 per sqft.

17,000 per sqft.

First Floor (Retail)

16,500 per sqft.

16,000 per sqft.

Second Floor (Retail)

15,500 per sqft.

15,000 per sqft.

Kiosk

19,500 per sqft.

19,000 per sqft.

ATM

45,00,000 per unit

45,00,000 per unit

Tower Down/Flexi Plan

Const. Linked Plan

Lower Ground Floor (Hypermarket)

15,500 per sqft.

15,000 per sqft.

Upper Ground Floor (Galleria Retail)

14,500 per sqft.

14,000 per sqft.

First Floor (Galleria Retail)

13,500 per sqft.

13,000 per sqft.

Second Floor (Food Court)

18,500 per sqft.

18,000 per sqft.

Fourth - Ninth Floor (Office Spaces)

9,500 per sqft.

9,000 per sqft.

Tenth Floor (Restaurant)

21,500 per sqft.

21,000 per sqft.

Preferential Location Charges Corner

10% of BSP

Road Facing

Ext: 5% & Int: 2.5% of BSP

Park Facing

5% of BSP

Atrium Facing

2.5% of BSP

Mall Facing

5% of BSP

Other Charges EDC/IDC

Rs. 250 PSF

EEC/FFC

Rs. 150 PSF

Car Parking (Covered)

Rs. 3,00,000

IFMS

Rs. 100 PSF

Power Backup

Rs. 20,000 Per KVA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.