THE PORTFOLIO
The Story The Wellness is a leading SPA specialist in the MEA region responsible for the development of fascinating and innovative SPA projects. The company was founded in 2007 in Dubai and has been involved in various high end projects throughout the region. The following factors were and still are responsible for The Wellness success in the planning and realization of SPA projects: Creativity, innovation, expertise and courage.
REFERENCES
U.A.E • Abu Dhabi Country Club, Abu Dhabi • ADIA Health & Wellness Club, Abu Dhabi • Al Bustan Complex, Abu Dhabi • Armaam Al Reem Island, Abu Dhabi • Fairmont Bab Al Bahr, Abu Dhabi • Four Seasons Abu Dhabi, Abu Dhabi • Mövenpick Hotels & Resorts, Yas Island, Abu Dhabi • Anantara Resort & Spa, Palm Jumeirah Dubai. • Cayan Tower, Dubai Marina • Damac 4, Dubai • Damac Maison, Dubai • Damac Burjside Boulevard, Dubai • Dubai Pearl – The Pearl of Life, Dubai • Lapita Hotel, Dubai Parks, Dubai • Hyatt, Palm Jumeirah • Mirdiff Mall, Dubai • My Triton, Platinum Yachts, Dubai • Oceana, Palm Jumeirah • Private Spa Palace, Dubai • Private Villa, Palm Jumeirah • The Cube, Dubai • The St. Regis Al Habtoor Polo Resort & Club, Dubai • Tiara/Essque United Towers, Dubai • Viceroy, Palm Jumeirah • Viceroy, JVC Dubai • W Hotel, Palm Jumeirah, Dubai
04
• • • • •
Waldorf Astoria, Palm Jumeirah Westin Hotel, Habtoor City, Dubai Khatt Hot Springs, Ras Al Khaimah Sheraton, Sharjah Al Mleiha Bed & Breakfast, Sharjah
QATAR • Al Jasra Boutique Hotel, Doha • Al Messila Hotel Resort, Doha • Solis Hotel Doha • The Gate of Life, Doha • West Bay Palace, Doha • Le Mirage, Qatar KSA • Kempinski, Jeddah • Kempinski, Riyadh • Luthan Hotel & Spa, Riyadh • Multiple Private Spas for the Saudi Royal Family • Rocco Forte, Jeddah • Sheraton Dammam, Dammam OMAN • Crowne Plaza, Muscat • Mövenpick Hotels & Resorts, Salalah KUWAIT • Al Corniche Club, Kuwait • Mövenpick Hotels & Resorts, Al Bidaa
LEBANON • Lifestyle & Fitness, Al Mada Towers, Beirut • Mövenpick Hotels & Resorts, Beirut EGYPT • Crowne Plaza, Sharm El Sheikh • Emaar Marassi, North Coast • Le Meridien Gizeh, Gizeh • Luxor Hilton, Luxor • Mövenpick Hotels & Resorts, Elephantine Island, Aswan • Ritz Carlton, Cairo • St. Regis, Cairo JORDAN • Hilton Jordan Gate, Amman • Mövenpick Hotels & Resorts, Dead Sea LIBYA • Seven Star Hotel, Tripoli BAHRAIN • The Domain Hotel Manama TURKMENISTAN • Private Palace, Asghabat TURKEY • Belpark Palace Hotel/Belek, Turkey
05
REFERENCES AUSTRIA • Mohr Life Resort/Lermoos, Austria • Hotel Jagdhof/Neustift im Stubaital, Austria • Wellness Residenz Schalber/Serfaus, Austria • Hotel Tirolerhof/Zell am See, Austria AZERBAIJAN • Gazeli House/ Baku BAHAMAS • Atlantis Resort/Paradise Island, Bahamas
FINLAND • Starwood Kämp Hotel/Helsinki, Finland GERMANY • Tropical Islands/Belin, Germany • Hotel Sackman/Baiersbronn, Germany • Spa-Aladin/Geretsried, Germany • Holmes Place Berlin/Berlin, Germany • Bayerwaldhof/Bad KÖtzting, Germany ITALY • Hotel Brun/Mailand, Italy
BARBADOS • Sandy Lane Resort/St. James, Barbados
IRELAND • Radissun Blu Farnham Estate Hotel/ Cavan, Ireland
CHINA • Four Seasons/ Guangzhou, China • Kempinski Hotel Yinchuan/China
JAMAICA • Gran Bahia Principe Jamaica/Runaway Bay, Jamaica
DOMINICAN REPUBLIC • Hotel Gran Bahia Principe Cayacoa/ Samaná, Dominican Republic • Hotel Gran Bahia Principe Cayo Levantado/Samaná, Dominican Republic • Hotel Gran Bahia Principe El Portillo/ Samaná, Dominican Republic
PORTUGAL • Sheraton Oporto/Porto, Portugal • Solverde/Porto, Portugal • Aquapura Duero/Samodães, Portugal • Suites Alba (Luis Figo)/Carvoeiro, Portugal • Furnas Spa Hotel/Furnas, Azores
FRANCE • Marriott Village d’lle-de-France/ Romainvilliers, France SPAIN • Denia Marriott La Sella Golf Resort & Spa/Denia, Spain • Hotel Fencia Prestige Suites & Spa/Ibiza, Spain • Gran Hotel Ibiza/Ibiza, Spain • Grupotel Parc Natural & Spa/Mallorca, Spain • Hotel Nixe Palace/Mallorca, Spain • Marriott Son Antem Golf Resort & Spa/ Mallorca, Spain • Grupotel Valparaiso Palace/Mallorca, Spain • El Bulli Hazienda Benazuza/Sevilla, Spain • Hotel Botanico Tenerife/Tenerife, Spain • Read’s Hotel & Spa/Mallorca, Spain
WHO WE WORK WITH
SWITZERLAND • Panorama/Feusisberg, Switzerland • Holmes Place Zurich/Zurich, Switzerland
MANY MORE....
MEXICO • Hacienda Vista Real Villas & Spa/Riviera Maya, Mexico • Silver Sand/Cancún, Mexico
06
07
SCHEMATIC
HOW WE DO IT CONCEPT VISION • Strategic conceptual planning • Vision to define SPA philosophy • Space Program accordingly to the above CONCEPT • Research & collection of Mood Images for possible design direction • Concept Design Layout, scale 1:100 • Circulation Diagram FINANCIAL FORECAST Report with Assumptions, Considerations and Recommendations: • Cost Estimation on Investment • Competition Analysis • SWOT Analysis • P&L 5 years • Cash Flows • ROI
08
3D VISUALIZATIONS INTERIOR & ARCHITECTURAL DESIGN • General layout • Section(s)/elevation(s) MEP ASSISTANCE • Reflecting ceiling plan • Ceiling heights • Water supply layout (Only cold/hot water location, pipe size) • Drainage layout (Only location, size) • Ventilation layout (Only location of supply and return, room temperature range, airflow, rate and speed) • Power (Only location of power supply) • Sound (Only location speakers and source of sound system, location sound control plate) • Lighting (Only position and type of light, defining control zones) • Telephone and data (Only location)
DETAILED MATERIAL SAMPLE BOARDS SPECIFICATIONS & SCHEDULES • Architectural & Interior Design • Spa Equipment Planning INTERIOR & ARCHITECTURAL DESIGN • General layout • Screed layout • Floors & walls finishes layout(s) • Furnishing positioning layout (fixed and loose furniture) • Joinery works incl. ironmongery and glazier works • Section(s)/elevation(s) and details • Doors and windows
EQUIPMENT PLANNING SCHEMATIC ARCHITECTURAL & TECHNICAL EQUIPMENT PLANNING • Overview plan • MEP interfaces (For sanitary, heating, ventilation and electric will be clearly marked in the plans in order to provide the basis for all connection work related to the MEP) • Consumption list (relevant energy supply & consumption data for the technical specialist spa units in view of sanitary, heating, ventilation and electrical requirements DETAILED ARCHITECTURAL & TECHNICAL EQUIPMENT PLANNING • Architectural & Technical Detail Planning: Architectural Detail Drawings (Plans, Elevations, Floor Details); Technical Detail Drawings (Plans, Sections); Plant room/ technical room details; MEP Drawings of SPA Equipment; Documentation (Energy consumption list, technical data sheets)
POOL & WATER FEATURES
WET AREA CLEANSING • Hammam • Rasouls • Moroccan Bath • Scrub Rooms HEAT & ICE EXPERIENCES • Saunas • Infrared Cabins • Steam rooms • Ice Fountains • Cold/Snow Rooms WATER FEATURES • Vitality Pools • Plunge Pools • Flotation Pools • Kneipp Therapies • Experience Showers • River Walks INHALATION ROOMS • Mineral (Salt) • Local Herbs Or Plants MEDITATION & RELAXATION • Sensory Loungers • Sleeping Pods • Meditation • Heated Loungers
Design • Architectural detail drawings • Pool Plan and sections • Technical detail drawings • Plant room/Technical room Details • MEP drawings • Documentation • Technical data sheets • Sections and pipe drawings • Filtration and water treatment • Green products Pool Structure Therapy pools and water features exclusive functions
09
CONCEPT P
h
a
s
e
VISION • Strategic conceptual planning • Vision to define SPA philosophy • Space Program accordingly to the above CONCEPT • Research & collection of Mood Images for possible design direction • Concept Design Layout, scale 1:100 • Circulation Diagram
Zoning
10
Layout
11
Conceptual Sketches
Conceptual Sketches
12
13
SCHEMATIC P
h
a
s
Al Mleiha Desert Boutique Sharjah - UAE
e
3D VISUALIZATIONS INTERIOR & ARCHITECTURAL DESIGN • General layout • Section(s)/elevation(s) MEP ASSISTANCE • Reflecting ceiling plan • Ceiling heights • Water supply layout (Only cold/hot water location, pipe size) • Drainage layout (Only location, size) • Ventilation layout (Only location of supply and return, room temperature range, airflow, rate and speed) • Power (Only location of power supply) • Sound (Only location speakers and source of sound system, location sound control plate) • Lighting (Only position and type of light, defining control zones) • Telephone and data (Only location)
14
15
Le Mirage City Walk Doha - Qatar
3D RENDERS
16
District One Meydan Dubai - UAE
3D RENDERS
St. Regis AL Habtoor Polo Ranch Dubai - UAE
17
3D RENDERS
Palm Jumeirah Private Villa Dubai - UAE
St.Regis Hotel Cairo - Egypt
Gazelli House Baku - Azerbaijan
18
Gazelli House Baku - Azerbaijan
3D RENDERS
19
Le Mirage City Walk Doha - Qatar
3D RENDERS
Emirates Hills - Private Villa Dubai - UAE District One Meydan Dubai - UAE
Al Mleiha Desert Boutique Sharjah - UAE
20
3D RENDERS
21
International Business Tower, Office 1406 & 1407 PO Box 191175 l Dubai l UAE tel. no. +971-4-362-9625 l fax no. +971-4-362-9223
General Notes: 01. THE CONTRACTOR IS TO CHECK ALL DIMENSIONS ON SITE 02. THIS DRAWING MUST NOT BE SCALED. 03. THIS DRAWING IS NOT FOR CONSTRUCTION. 04. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED. 05. FOR ANY ERRORS ON DIMENSIONS WHICH REQUIRE CORRECTIONS, THE DESIGNER SHALL BE NOTIFIED. 06. REFER TO SPA EQUIPMENT TECHNICAL PLANS AND DETAILS FOR SPA EQUIPMENT M.E.P. REQUIREMENTS.
Q
N
Key Plan:
+ + 15.0 0
+
N
+1 5. 0 0
Mecca
+ +1 5. 0 0
+ + 15.0 0
+
+
+1 5. 0 0
+1 5. 0 0 + +1 5. 0 0
+ +1 5. 0 0
+ +1 5. 0 0
+
+ +1 5. 0 0
+ +1 5. 0 0
+1 5. 5 0
+ +1 5. 0 0
+ +1 5. 0 0
WL 1 4 . 6 0 BL + 13 . 7 0
+ +1 5. 8 0
+ +1 5. 0 0 + +1 5. 0 0
+ +1 5. 0 0
+ +1 5. 0 0
+ +1 5. 0 0
+
+
TO P O F R O C K W O RK + 1 8 . 0 0
+1 5. 0 0 +
+ WL + 14 . 6 0
+1 4. 7 0 + +1 5. 0 0
+
+
+1 5. 0 0
+
+1 5. 9 5
BL + 13 . 7 0 +
+ +1 5. 5 0
+1 5. 0 0
+
+1 5. 5 0
+
+1 5. 0 0 +
+
+
+1 5. 0 0
+1 5. 0 0
+1 5. 0 0
+1 5. 0 0
+
+
TO P O F R O C K W O RK + 2 0 . 0 0
+1 5. 0 0
+
+ +1 5. 0 0
+ TO W + 15 . 4 5 + +1 5. 0 0
+
+ +1 4. 7 0
+
+ TO W + 15 . 4 5
+ TO W + 15 . 4 5
+ TO W + 15 . 4 5
+ +1 5. 0 0
+1 5. 9 5
+ +1 5. 0 0
+ WL + 14 . 7 0
+
+ +
WL + 14 . 6 0 BL + 13 . 7 0
+ +1 5. 0 0
+ +1 5. 0 0
+ +1 5. 0 0 +
+
+ TO W + 15 . 4 5
+
+1 4. 7 0
+1 5. 0 0
+1 5. 9 5
+ WL 1 4 . 8 5 BL + 13 . 6 5
BL + 14 . 7 0
+ +1 5. 9 5
+
+
WL + 14 . 6 0 BL + 13 . 7 0
+
+1 5. 5 0
+1 5. 0 0
+1 5. 0 0
+
+ +1 5. 2 0
+1 5. 8 0
+ +1 4. 1 0
+
+
+
+ +1 4. 1 0
+1 5. 1 0
+ + +1 5. 5 0
+1 5. 8 0
+ +1 5. 2 0
+
+ TO W + 15 . 4 5
+ +1 5. 0 0
+ +1 5. 5 0
+1 5. 2 0
+1 4. 8 5 + TO W + 15 . 0 0
+ +1 5. 0 0
BL + 13 . 6 5 +
+
+ +1 4. 5 5
+ BL + 14 . 7 0
+
+ +1 5. 0 0 + +1 5. 9 5
WL 1 4 . 8 5 BL + 13 . 6 5
+ BL + 13 . 6 5
+1 5. 0 0
+ +1 5. 0 0 +
WL 1 3 . 9 0 BL + 13 . 4 0 +
BL + 14 . 7 0
+ TO W + 15 . 4 5
+ BL + 14 . 7 0
+ WL + 14 . 6 0
+
+1 5. 0 0
+1 5. 0 0
+1 5. 0 0
+ +1 5. 0 0
+ BL + 14 . 7 0 + +1 4. 8 5
+1 5. 5 0 + TO W + 15 . 4 5
+ +1 5. 0 5
+ +1 5. 0 0
BL + 13 . 7 0
+
+1 4. 7 0 +
+1 5. 0 0 + TO W + 15 . 4 5
+ +1 5. 9 5
+ +1 5. 0 0
+ +1 5. 0 0
+ +1 5. 0 0
+ TO W + 15 . 4 5
+
WL 1 4 . 8 5 BL + 13 . 6 5
+ + 15 .5 0
+
+ +1 5. 0 0
+
BL + 14 . 3 0
BL + 13 . 8 0
TO W + 15 . 0 0
+1 5. 0 0
+1 5. 0 0
WL + 14 . 6 0 BL + 13 . 7 0 + +1 5. 0 0
+1 5. 0 0
+ BL + 14 . 7 0
+ TO W + 15 . 4 5
+ +1 5. 0 0
+ +1 5. 0 5
+ +1 5. 2 0
+ TO W + 15 . 4 5 +
+ 15.2
+
0
+ 51
+ .5 0
+1 4. 9 0
+ + 15
.2 0
+ +1 5. 2 0
+ +1 5. 2 0 + +1 5. 2 0
4m minimum widt h Fire Engine accessway
+ +1 5. 2 0 + +1 5. 2 0
Buried LPG t ank
+ +1 5. 2 0
WL 1 4 . 2 5 BL + 13 . 7 5
+ + + 15 .2
+1 4. 4 5 0
+ +1 5. 2 0 + +1 5. 2 0
Clear zone
DN
2
1
3
6
5
2100
695
1200
300 300 985
635
300
150 EQ
600
600
600
EQ
EQ EQ
2300
400 400
400
2300
CH+ 2800
400 400 400
560
400 EQ
400
200
1130
200
310
600
200
620
EQ
EQ
CH+ 2800
CH+ 2400 330
1200
2300
EQ
CH+ 2600
400 150
CH+ 2800
EQ
CH+ 2600
CH+ 2800
200
250 195
CH+ 2600
EQ
350
CH+ 2800
2600
570
CH+ 2600
3053
EQ
200 420
1180
1000
EQ
EQ
EQ
CH+ 2400
910
CH+ 2400
EQ
300
EQ
300 300
800
585 320 300
260
400
3650 480 200 680
200 300
EQ
EQ
615
200
600
1200
675
200
200 EQ
200
EQ
690
1091
CH+ 2400
1130
710
600 600
CH+ 2600
915
670
330
545
CH+ 2800 2300
CH+ 2800
300
1200
300
470
230
CH+ 2600 400
625
625
320 250
630
3100
1200
200
675 200
350
630
570
280
2785
600
600
G
395
1300
400
500
150
CH+ 2600
800
EQ
EQ
800
200 360
CH+ 2800
CH+ 2600
EQ
370
1100
EQ
EQ EQ
CH+ 2600
238 350 150
680
290 300 345 1200 355 600 200 445
645
200
2100
500
325
670
EQ
300
CH+ 2800
EQ
EQ
EQ EQ 200 800
EQ 690 1130
CH+ 2400
200
LAPITA HOTEL BY MARRIOTT AUTOGRAPH DUBAI PARKS
680
CH+ 2600
CH+ 2800
CH+ 2400 1000
2680
795
330 200
150
200 490 775
1045
1680 500 200 100
450
EQ
200 445
EQ
EQ
2300
1200
CH+ 2800
CH+ 2600
FIRST FLOOR LEVEL - OVERVIEW PLAN
300 200
150
850
OTTOMAN
1
EQ 200
EQ
600
350
200 200
Project Title:
250 240
01-16 12 m²
1000
200
EQ
200 200
200
EQ
TREATMENT ROOM
815
01-15b 1 m²
01-15 12 m²
EQ
EQ
815
OTTOMAN
TREATMENT ROOM
420
01-10 28 m²
350
SUITE
EQ
700
EQ
1200
01-10a 1 m²
01-09 12 m²
650
EQ
200
SHOWER TREATMENT ROOM
EQ
2600
560
01-09b 1 m²
1355
CH+ 2800
CH+ 2600 CH+ 2800
BOH
420
SHOWER
Meraas Development LLC and RTKL-UK Ltd
SHOWER
CH+ 2400
2300
CH+ 2600
200
Client:
2300
TREATMENT ROOM
CH+ 2400
F
OTTOMAN
EQ
500
CH+ 2800
600
CH+ 2600
200
350
01-14 13 m²
200
CH+ 2600
EQ
200 360
CORRIDOR
01-07 13 m²
500 500
EQ
500
CH+ 2800
450
EQ
CH+ 2600
150
755
EQ
SHAFT
CORRIDOR
01-08 12 m²
EQ
1090
EQ
350
CH+ 2800
750
EQ
EQ
FHC
200
EQ
OTTOMAN
1090
CH+ 2600 150
01-18 1 m²
01-11 1 m²
700
EQ
JANITOR ROOM
SHELVES
JANITOR ROOM
EQ
01-12 14 m²
01-19 3 m²
370
5215
EQ
680
PANTRY SHELVES
150
CH+ 2600
TOILET
CH+ 2600
CH+ 2600
CH+ 2800
500
200
CH+ 2400
EQ
01-13 3 m²
CH+ 2800
CH+ 2800
550
665
01-17 4 m²
TOILET
F
370
HANDICAP W.C
01-02 4 m²
FHC
775 350
CH+ 2800
200
CH+ 2800
HANDICAP W.C
650
1260
EQ
150
TOWEL STATION
TOWEL STATION
EQ
CH+ 2600
200
500
500
EQ
500
400
STAIRS STAIRS
SHAFT
650
EQ
CH+ 2600 1390
950
01-20 19 m²
FOYER
1170
1500 EQ
700
400 500
380
665
400 400 200
D
LOBBY
FOYER
E
1260
CH+ 2800
EQ
01-06 27 m²
2300
200
200 EQ EQ 200
EQ EQ
905
200 400
Date
3650
Decorative item
Description
650
400
HAMMAM
No.
SHAFT
700
2100
400
Decorative item
2600
730
600
1780
CH+ 2800 CH+ 2600
2100
400
1900
CH+ 2800
400
LIFT 6 m²
01-06b 2 m²
CH+ 2800
400
SHOWER
2200
01-06a 2 m²
CH+ 2600
2300
Important: © All rights reserved. No part of this drawing may be reproduced or transmitted in any forms and by and means without permission of the THE WELLNESS.
SHOWER LIFT 4 m²
900
Beverage Counter
500
2300
CH+ 2600
350
300
660
600
660
EQ
650
Beverage Counter
01-01 19 m²
1440
1200
300
LOBBY
SHAFT
850
01-21 13 m²
CH+ 2800
EQ
315 350
CH+ 2600
CH+ 2600
665
01-25 14 m²
EQ
350
CH+ 2800
800
700
500
C
TREATMENT ROOM
TREATMENT ROOM
CH+ 2600
350
1500
2300
1500
1200
1440
665
EQ
250
250
200
200
CH+ 2800
2100
200
CH+ 2800
CH+ 2400
315
350
310
C
D
370
150
01-05 19 m²
EQ
530
01-04 11 m²
01-23 12 m²
01-24 19 m²
EQ
01-22b 2 m²
TREATMENT ROOM
RESTING
RESTING
488
TREATMENT ROOM
450
1500
CH+ 2800
830
SHOWER
01-03b 2 m²
600
350
SHOWER
500
3D VISUALIZATIONS INTERIOR & ARCHITECTURAL DESIGN • General layout • Section(s)/elevation(s) MEP ASSISTANCE • Reflecting ceiling plan • Ceiling heights • Water supply layout (Only cold/hot water location, pipe size) • Drainage layout (Only location, size) • Ventilation layout (Only location of supply and return, room temperature range, airflow, rate and speed) • Power (Only location of power supply) • Sound (Only location speakers and source of sound system, location sound control plate) • Lighting (Only position and type of light, defining control zones) • Telephone and data (Only location)
1180
CH+ 2800
1225
CH+ 2600
650
2300
300 268
700
800
450
265
520
CH+ 2800
718
900
240
703 1430
1170
CH+ 2800
610
OTTOMAN
01-22 18 m²
600
01-04b 2 m²
635
TREATMENT ROOM
01-23b 2 m²
OTTOMAN
OTTOMAN
SHOWER
01-03 17 m²
150
B SHOWER TREATMENT ROOM
OTTOMAN
825
e
CH+ 2600
200
s
6
5
CH+ 2400
B
930
a
GENERAL LAYOUT
VOID
1200
h
4
Legend:
EQ
P
3
EQ
SCHEMATIC
1
7
4
Stage:
1 : 50
1
DrawingTitle:
Level 01 - Overview PLan Development:
Phase:
FIRST FLOOR LEVEL - REFLECTED CEILING PLAN 1 : 50
MEP ASSISTANCE
Project Number:
Stage:
4008
DE
ML
P1
Area/Land:
Venue:
Discipline:
Doc Type:
Doc No:
4
500
I
PLN
02001
The Wellness Drawing No.
ARC-01-01 Authority Drawing No.
Consecutive No.
06/17/15
23
Paper Size : A0
Drawn By:
The Wellness
Checked By:
The Wellness
12 PM
22
Date:
DETAILED D E S I G N MATERIAL SAMPLE BOARDS SPECIFICATIONS & SCHEDULES • Architectural & Interior Design • Spa Equipment Planning INTERIOR & ARCHITECTURAL DESIGN • General layout • Screed layout • Floors & walls finishes layout(s) • Furnishing positioning layout (fixed and loose furniture) • Joinery works incl. ironmongery and glazier works • Section(s)/elevation(s) and details • Doors and windows
DETAILS
24
SAMPLE BOARDS
25
without explicit written permission of THE WELLNESS. Description
No.
05
ELEVATION SCALE
00
Kk
1:20M
Kk
FOR APPROVALT03
Kk
Date 6
LVO
10.08.2017
6 6
6
T03 LVO
T04 LVO
Kk
EQUIPMENT
T08 H04LVO LVO
E07 LVO
T07 LVO
T03 LVO
H01 LVO
T04 LVO
E04 LVO
MO 07 WALL FINISH (BY ID FIT-OUT CONTRACTOR)
MO 07 CEILING FINISH (BY ID FIT-OUT CONTRACTOR)
8mm THK.TEMPERED CLEAR GLASS DOOR ALUMINUM DOOR FRAME
ST 07A WALL FINISH (BY ID FIT-OUT CONTRACTOR)
MT 02 METAL TRIM
MT 02 METAL TRIM
Ø30mm STAINLESS STEEL DOOR HANDLE
MO 07 PEDESTAL FINISH (BY ID FIT-OUT CONTRACTOR)
ST 04 SCRUB TABLE (BY ID FIT-OUT CONTRACTOR) HAND SHOWER w/ MIXER
06
ELEVATION SCALE
H04 LVO
T08 LVO
E04 LVO
H03 IFB
H03 IFB
T11 LVO
H03 IFB
H03 IFB
H03 IFB
T14 LVO
T12 LVO
LVO LVO T14 T14
Client: T10 LVO
H04 LVO
LVO LVO T10 T10
E04 LVO
H03 IFB
Gulf trading & Contracting Co.
H03 IFB
H03 IFB
H03 IFB
IFB IFB H03 H03
Kk Kk
SCALE
1:20M
SCALESCALE
1:20M 1:20M
Le Mirage KkCity Walk
ARCHITECTURAL DRAWINGS
T03 LVO
Drawing No:
T04 LVO
Kk
T03 T03 LVO LVO
SCALE
1:20M
H02
1:20M 1:20M
H03
MALE SCRUB ROOM 1:20M
SCALE
H03 IFB
T04 LVO
6
Status: DETAIL MALE T03 SCRUB ROOM LVO PERMANENT ACCESS
heating/sanitary (BY MAIN CO
Site Location Site Location Plan: Plan:
H02
Steam room
Ø100 200m³/h - total By MEP Contractor calculations
make all connections of stand pipe HVAC interceptor, including connections at H04 fitterSupply, H02fit and
01
MALE SCRUB ROOM
E01
1:20M
SCALE
E02
E03
H03 IFB
E04 E05
DESIGN PHASE
HATCH 700MM X700MM
17200
Project number :
Supply insulated cold water pipe, sto
HVAC fitter
E01
© All rights reserved. No part of this drawing may be
/ output without explicit written permission dimension of THE WELLNESS.
waste pipe 1l/sec per floor drain
Supply, fit and makeClient: all connections to dimmer transformer incl. Connections to led strip lights Controlled by area lighting (BMS).
E06
Gulf trading Supply, fit andClient: makeClient: all connections to dimmer transformer incl. Connections to spotlights. Controlled by area lighting or BMS.
E07
Break interruptor for vichy shower control
fitter
fitter
E03 E04 E05
E07
electrical specification (BY MA
Connection of emergency push button and cables to pos.Nr. alarm panel e.g.Comments reception incl. mute switch at the cabin
Site for Location E01 Break interruptor electricalPlan hea provide floor socket connections for a NORTH Supply, fit and make all connections plug for the scrub table transformer incl. Connections to clea E02 Controlled by switch at plant room. Supply, fit and make all connections to dimmer transformer incl. Connections to led strip push lights butt Connection of emergency Controlled by area lighting (BMS). to alarm panel e.g. reception E03 mute at thetocabin Supply, fit andincl. make all switch connections dimmer transformer incl. Connections to spotlights. provide floor socket connections fo Controlled by area lighting or BMS. plug for the scrub table E04 Break interruptor for vichy shower control E05
prim. 230V /N/PE AC sec. 12V AC 20W per light fitting
electrician E07 ATTENTION:
RCD (Residual current device) No. nominal current IΔN≤ 0,03 A to be fitted fo Legends: electrician 00 FOR AP heating/sanitary air conditioning ATTENTION: electrical Water Temperature Range: electrician scope of thermal build delivery 01. contractor Cold Water : 16-18 deg.C done by main 02. Hot Water: 60-65 deg.C done by main con electricianpoint of delivery thermal build
230V AC 100W prim. 230V /N/PE AC sec. 12V DC 15W/m per light fitting
& Contracting Co. AC prim. 230V /N/PE sec. 12V AC 20W per light fitting
GulfGulf trading trading & Contracting & Contracting Co.50,60Hz Co. 6A 230V/1/N
electrician
Project Name:
Legends:
heating/sanitary air conditioning electrical scope of thermal build delivery done by main contractor
Le Mirage Le Mirage City City WalkWalk
T11 LVO
Drawn by :
T03 LVO
LVO LVO T11 T11
T14 LVO
The Wellness
Legends:
T11 LVO
Checked by :
T14 T14 LVO LVO
Scale :
PERMANENT ACCESS HATCH 700MM X700MM
Ø25MMELECTRICAL CONDUIT IN SCREED
H03 IFB
1:20
Paper Size :
A1
IFB IFB H03 H03
IFB IFB H03 H03
H03 IFB
Revision No.:
H03 IFB
00
05
ELEVATION 1:20M
SCALE
SCALESCALE
T11 LVO
H03 IFB
ELEVATION
02
SCALE
1:20M 1:20M
1:20M
H03 IFB
heating/sanitary specifications electrical specifications air conditioning specifications delivered by thermal build at ceiling height at cabin roof height inside the flooring construction place at the construction site place acc. to the deliverer
the
Client:
Gulf tr
1200 mm above finished flooring
Project Name:
10.08.2017 10.08.2017 The Wellness
Date :Date Drawn: by :
Checked Checked by: : by : Scale
17200
17200 17200 10.08.2017
DrawnDrawn by : byby : : Checked
Ø25MMELECTRICAL CONDUIT IN SCREED
05 05ELEVATION ELEVATION
EQP-RL-POS.16-02.01
Project Project number : : Date : number
T11 LVO
1:20M
Drawing No: TECHNICAL TECHNICAL DRAWINGS DRAWINGS
Drawing Drawing No: No: heating/sanitary air conditioning EQP-RL-POS.16-02.01 EQP-RL-POS.16-02.01 electrical Status: DETAIL DESIGN PHASE scope of thermal build delivery done by main contractor Status: Status: DETAIL Project number : main DETAIL DESIGN DESIGN PHASE PHASE done by contractor point of delivery thermal build
The Wellness
L
The Wellness The Wellness 1:20
Paper Size : A1 The Wellness The Wellness
ScaleRevision Scale : : No.:
1:20 1:20 PaperPaper Size :Size : A1
A1 00
Revision Revision No.: No.:
00
00
Drawing Title:
BLOCK
T
Drawing No:
EQ Status:
26
Ø25MMELECTRICAL CONDUIT IN SCREED
H03 IFB
do
point of delivery
Drawing Title: ATTENTION: Water Temperature Range: BLOCK B-MALE SCRUB ROOM 01. Cold Water : 16-18 deg.C Drawing Drawing Title: Title: TECHNICAL DRAWINGS 02. Hot Water: 60-65 deg.C BLOCK BLOCK B-MALE B-MALE SCRUB SCRUB ROOM ROOM
HATCH 700MM X700MM
T04 LVO
H03 IFB
RCD (Residual current device) nominal current IΔN≤ 0,03 A to be fitted for all electrical supplies.
10.08.2017
© All rights reser
Break interruptor for vichy shower reproduced or tra
Water Temperature Range: without explicit w 01. Cold Water : 16-18 deg.C ATTENTION: 02. Hot Water: 60-65 deg.C electrician
ATTENTION:ProjectProject Name:Name: Le Mirage City Walk
DatePERMANENT : ACCESS
Supply, fit and make all connections transformer incl. Connections to led
ATTENTION:Controlled by area lighting (BMS).
RCD device) construction by (Residual current Supply, fit and make all connections nominal current IΔN≤ 0,03 A to beImportant: for all electrical s transformer incl.fitted Connections to spo E06 electrician Controlled by area lighting or BMS.
Connection of emergency push button and cables to alarm panel e.g. reception incl. mute switch at the cabin
provide floor socket connections for a plug for the scrub table
Supply, fit and make all connections to transformer incl. Connections to cleaning lights.
fitter
E06
Dimensions / Pipe sizes 400V/3/N 50,60Hz 25A
Break interruptor for electrical heating Supply, fit and make all connections to transformer incl. Connections to cleaning lights. Controlled by switch at plant room.
Comments Supply, and make all connections Break for fit electrical heating H04interruptor
E02 construction by Controlled by switch at plant room.
fitter
Verify Calculation
Comments
Supply and fit linear floor drain comp
pipework in(BY the cabin. electricalH03 specification MAIN CONTR
Allwater rights © Allpipe, rights reserved. Noofpart thisofdrawing this drawing may be may max. service of thebe end user Supply insulated©hot stopreserved. cockNo andpart 4bar by 0.8 l /sec reproduced reproduced or at transmitted or transmitted in anyinforms any forms and and any bymeans any means interceptor, including connection handover point, Handover to thermal build without explicit explicit writtenwritten permission permission of THE of WELLNESS. THE WELLNESS. circulation pipeswithout or heating band. Description No. Date 1/2" male max. service of 10.08.2017 the end user 00 pipe, stop FORcock APPROVAL Supply insulated cold water and 4bar ,0.8 l Date /sec Date Description Description No.connections No. at handover interceptor, including point. Handover to thermal build 1/2" male10.08.2017 00 00 FOR APPROVAL FOR APPROVAL 10.08.2017
Supply, fit and make all connections of stand pipe
Supply insulated hot water pipe, stop interceptor, including connection at h
H01 construction by Supply and fitcirculation linear floorpipes drainor complete trap a heatingwith band. H03 fitterpipework in the cabin. HVAC
pos.Nr.
Supply and fit linear floor drain complete with trap and all pipework in the cabin.
Supply insulated cold water pipe, stop cock and pos. Nr. including description interceptor, connections at handover point
dimension / output 50x100 TO Ø100 200m³/h - total
Important:
pos.Nr.
1:20M
SCALE
interceptor, including connection at handover point,
H01 build thermal circulation pipes or heating band. thermal build
electrical specification (BY MAIN CONTRACTOR)
6
EQP-RL-POS.16-01.01
01
H04
T tel. no.
connection and piping of fresh air duct (PVC)
Key Plan: thermal build Supply insulated hot water pipe, stop cock and
330x330mm
NORTH
pos.Nr. description L01 connection and piping of fresh air duct (PVC) fresh air temperature (apx. 25°C+ 30°C) L02 Supply, fit and make all connections from extract duct (all PVC). Extracted essence air to run direct to outside. L03 Supply, fit and make all connections for the extract ducts with adjustable plate valve for the cabin entry.
SCALESCALE
T03 LVO
T07 LVO
H03 IFB
Hand Shower
pushT10 button selector
conditioning others) (by THEto CONTRACTOR (allair PVC). Extracted essence air run direct to
push button selectorSite Location Plan:
description
T09 vichy thermostatic mixer shower water distributor
thermal build THIS DRAWING MUS pos.Nr.fit and make description Supply, all connections for the extra L03 build THIS DRAWING IS N thermal ducts with adjustable plate thefresh cabinairen connection and piping of L01 valve ALLfor DIMENSIONS AR thermal build fresh air temperature (apx. 25°C+O FOR ANY ERRORS DESIGNER SHALL B thermal build L02 Supply, fit and make all connectio thermal build (all PVC). Extracted essence air to thermal build L03 Supply, heating/sanitary (BY MAIN CONTRACTO fit and make all connectio ducts with adjustable plate valve f thermal pos. Nr. build description
BLOCK A
BLOCK ABLOCK A
sensor floor heating
basinT08
thermal Supply, fit and make all connections from extrac L02 build
6
BLOCK B-MALE SCRUB ROOM
T03 LVO
ELEVATION
04
04 04ELEVATION ELEVATION
T07 LVO
Drawing Title:
BLOCK BBLOCK B
Table heating circuit bench heating Sensor T02 Sensor tablewall heating heating circuit T03 floor heating cable T04 sensor wall heating sensor floor heating T05 Table heating circuit vichy shower water distributor Sensor table heating T06 Hand Shower T07 floor heating cable alarm push button
GENERAL NOTES:
230V AC 150W/m2
NORTH NORTH air conditioning (by others)
H01
H03 IFB
01
Kk
L01
230V AC 150W/m2
BLOCK B
sensor Bench heating cable T01wall heating
thermal build fresh air temperature (apx. 25°C+ 30°C)
thermostatic mixer
T11 T11 LVO LVO
pos. Nr.
T07 LVO
03 03ELEVATION ELEVATION
BLOCK CBLOCK C
description Bench heating cable Sensor bench build heating thermal wall heating circuitdescription Pos.Nr.
T11 alarm push button basin construction byT12 air conditioning (by others) mixer thermal build T13 thermostatic pos.Nr. description push button selector thermal build T14
heating/sanitaryImportant: (BYImportant: MAIN CONTRACTOR) reproduced or transmitted in any forms and by any means
H03 IFB
T10 T11 T12 T13 T14
230V AC 150W/m2
basin
H03 H03 IFB IFB
Kk
T03 LVO
ELEVATION
T11
T10 T11 T12 T13 LVO T14
H03 IFB
T03 LVO
IFB IFB H03 H03
Project Name: 03
H01 LVO H02 LVO
T08 T09
BLOCK C
Table heating circuit Sensor table heating floor heating cable sensor floor heating vichy shower water distributor Hand Shower alarm push button
T08 T09
H01 LVO H02 LVO
T07 LVO
T06 T07
dimension / output 230V AC 150W/m2
BLOCK DBLOCK D
sensor wall heating
T05 T06 T07
H01 LVO H02 LVO
H03 IFB
T05
BLOCK E
CONCEALED LED STRIP LIGHT BY OTHERS
H04 LVO
T12 LVO
T03 T04
Hammam
BLOCK D
BLOCK E
CONCEALED LED STRIP LIGHT BY OTHERS
T03 T04
H03 IFB
H04 LVO
Key Plan: Key Plan:
description Bench heating cable Sensor bench heating wall heating circuit
T01 T02
T11 LVO
LVO LVO T09 T09
H02 LVO
Pos.Nr.
T12 LVO
T09 LVO
LVO LVO H01 H01
thermal build
LVO T07 IFB H03
T11 LVO
T01 T02
Key Plan:
T08 LVO
6
H02 H02 LVO LVO
SCHEMATIC ARCHITECTURAL & TECHNICAL EQUIPMENT PLANNING • Overview plan • MEP interfaces (For sanitary, heating, ventilation and electric will be clearly marked in the plans in order to provide the basis for all connection work related to the MEP) • Consumption list (relevant energy supply & consumption data for the technical specialist spa units in view of sanitary, heating, ventilation and electrical requirements DETAILED ARCHITECTURAL & TECHNICAL EQUIPMENT PLANNING • Architectural & Technical Detail Planning: Architectural Detail Drawings (Plans, Elevations, Floor Details); Technical Detail Drawings (Plans, Sections); Plant room/ technical room details; MEP Drawings of SPA Equipment; Documentation (Energy consumption list, technical data sheets)
H04 LVO
E07 E07 LVO LVO
Pos.Nr.
The Binary Tower, Office P314 & P315 PO Box 191175 l Dubai l UAE tel. no. +971-4-362-9625 l fax no. +971-4-362-9223 www.thewellness.ae The Binary TheTower, BinaryOffice Tower,P314 Office & P315 P314 & P315 GENERAL NOTES: PO Box PO 191175 Box l191175 Dubai l lUAE Dubai l UAE tel. no. +971-4-362-9625 tel. no. +971-4-362-9625 l fax no. l+971-4-362-9223 fax no. +971-4-362-9223 THE CONTRACTOR IS TO CHECK ALL DIMENSIONS ON SITE. www.thewellness.ae www.thewellness.ae THIS DRAWING MUST NOT BE SCALED. NOTES: THISNOTES: DRAWING IS NOT FOR CONSTRUCTION. GENERAL GENERAL ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED. FOR ANY ERRORS ON DIMENSIONS REQUIRE THE THE CONTRACTOR THE CONTRACTOR IS TO CHECK IS TO CHECK ALL DIMENSIONS ALLWHICH DIMENSIONS ON SITE. ONCORRECTIONS, SITE. DESIGNER SHALL BE THIS DRAWING THIS DRAWING MUST NOT MUST BENOTIFIED. NOT SCALED. BE SCALED. THIS DRAWING THIS DRAWING IS NOT FOR IS NOT CONSTRUCTION. FOR CONSTRUCTION. ALL DIMENSIONS ALL DIMENSIONS ARE IN MILLIMETERS, ARE IN MILLIMETERS, UNLESSUNLESS OTHERWISE OTHERWISE NOTED.NOTED. FOR ANY FOR ERRORS ANY ERRORS ON DIMENSIONS ON DIMENSIONS WHICH WHICH REQUIRE REQUIRE CORRECTIONS, CORRECTIONS, THE THE DESIGNER DESIGNER SHALL BE SHALL NOTIFIED. BE NOTIFIED.
BLOCK E
P l a n n i n g
thermal build
6
T04 LVO
02
ELEVATION SCALE
H03 IFB
1:20M
27
DET
Project number : Date :
POOL & WATER
F e a t u r e s Design • Architectural detail drawings • Pool Plan and sections • Technical detail drawings • Plant room/Technical room Details • MEP drawings • Documentation • Technical data sheets • Sections and pipe drawings • Filtration and water treatment • Green products Pool Structure • Concrete Pools • Preformed Pools • Stainless steel Pools Therapy pools and water features exclusive functions • Hydro Pools • Whirl Pools • Vitality Pools • Salt Water Pools • Floatation Pools • Kneipp Walks • Water Features
Design
Filtration and water treatment
28
29
1.0
2.0
3.0
4.0
5.0
CLEANSING
HEAT & ICE
WATER FEATURES
INHALATION ROOMS
RELAXATION
WET AREA 1.0 2.0 3.0 4.0 5.0
30
CLEANSING HEAT & ICE EXPERIENCES WATER FEATURES INHALATION MEDITATION & RELAXATION
31
The Clubhouse - ABU DHABI, UAE
CLEANSING
Private Villa - DUBAI, UAE
32
Acquaparco Splash e Spa Tamaro - SWITZERLAND
33
Viceroy JVC - DUBAI, UAE
HEAT & ICE EXPERIENCES
St Regis - CAIRO, EGYPT
Viceroy JVC - DUBAI, UAE
34
Private Palace - ABU DHABI, UAE
The Address JBR - DUBAI, UAE
35
Sackmann Hotel - GERMANY
WATER FEATURES
Acquaparco Splash e Spa Tamaro - SWITZERLAND
The Adress JBR - DUBAI, UAE
36
W Hotel - MUSCAT, OMAN
The Clubhouse - ABU DHABI, UAE
37
INHALATION
Aqua Dome - TYROL, AUSTRIA
Hotel Bayerwaldhof - GERMANY
38
Al Mesillah - QATAR
39
MEDITATION & RELAXATION
Kempinski - RIYADH, KSA Das Aspen GRINDELWALD, SWITZERLAND
Aqua Dome - TYROL, AUSTRIA
40
41
www.thewellness.ae