Concept idea
The project focuses on environmental strategy through meta-graphic exercises. It proposes a boundary within the boundary in response to the 'hyphen' project, with individual programs as units. The project generates spatial volumes through the human scale, developing a series of units based on the graphics from the previous chapter. The educational program is an extension of Universidad Católica Santa María la Antigua, offering studio-based education for art and architecture disciplines. It emphasizes collaboration between disciplines and a division of formal and informal education.
Fig 6. The spatial extensions & a shading top view of the volume
Fig 7. A division of formal & informal education
Landing Exhibition Lecture Architectural Urban Graphic Interior Landscape Reading Workshop Fig 8. External strips including a scale of topography & pavilions
Framed
30*45mm
Horizontal
Metal
10mm
The hall and its supporting programmes fit on the existing concrete framework
Framed glazing panels bounded by extruded circular wall
Horizontal shading boards fixed by aluminium beams
Structural timber boards fixed by metal beams and spacers
of the church
glazing panels
aluminium U-beams
aluminium U-beams
strips above and under the shading boards
metal shading sheets
50*75mm metal structural T-beam
Metal spacer between the timber boards
20mm timber boards
The hall
Fig 9. The technical refurbishment proposal of Iglesia Nuestra Señora de la Esperanza. The shading strategy leads to the breathable sunroof.
Fig 10. The technical details of shading boards pattern
Multiple-layered
5mm rigid extruded polystrene
Membrane underlayment
10mm thermal insulation
100mm reinforced concrete blocks
Membrane underlayment
5mm plaster cladding
Metal panels flow the water Membrane underlayment
100mm reinforced concrete slab Soil tamping
5mm multiple material floor finish fixed on counter battens
5mm air gap above the insulation
20mm thermal insulation layer
Membrane underlayment
100mm reinforced concrete slab
Soil tamping
Foundation footing
floor Outdoor walkway Water channel Reinforced concrete foundation
Reinforced concrete foundation
Water channel
Fig 11. Technical isomatric of the floors, foundation & water channel Fig 12. Detail drawing of floor
& foundation
Shading
Multiple-layered rooftop
Metal sheet skirting
Membrane underlayment
Metal coping on fibre boards
1mm Metal cladding
5mm Timber boards
8mm Mineral fibre boards
Spacer above the beam
60*120mm steel I-beam
Breathable timber grilled facade
Structural framework
10mm corten steel plates fixed on horizontal counter battens
5mm air gap above the insulation
10mm thermal insulation layer
Membrane underlayment
20mm reinforced concrete
6mm diameter horizontal steel rebar Corrugated metal plate
Metal spacer
5mm timber boards laminated
Aluminium column frame
3mm timber grilles
45*60mm aluminium U-beam
Metal shading plates connected to the beam
Fig 13. Technical isomatric of the breathable facade & structural framework
Fig 14. Detail drawing of facade & rooftop
Lobby Pubic corridor Reception Staff room The hall External office Staff toilet Air conditioner room Lounge Student toilet Lecture hall Studio computer lab Studio office Studio pantry Architectural design studio Urban design studio Graphic design studio Interior design studio Landscape design studio Opening reading room Quiet reading room Pantry Material shop Material storage Opening workshop Enclosure workshop Office Exhibition MEP BOH Gallery Teaching room Crit room General print room Large format print room Computer lab Storage Library service desk Self-service area Book stacks Reading area Wood workshop Laser cut room Director office Deputy director office Conference room Staff common room Archive room Steel workshop Welding room 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Studio archive Upper reading space Upper workshop 51 52 53 Ground level 1: 500
Upper level 1: 500 Masterplan 1: 1000
Fig 15. Masterplan Fig 17. Plan of ground level
Fig 16. Plan of upper level
Building volume
The proposed building comprises ten horizontal units, with an emphasis on stimulating movement along the central axis. Educational facilities and studios are located on either side, with interstitial lounge areas intended to encourage informal interaction among students and faculty members.
Shading strategy
In accordance with the tropical climate of Panama, the design features an extended rooftop that provides shade to the ground level. Textured strips are positioned along the edge to allow for adequate penetration of natural light into the building interior.
Heat transfer
Water is utilized as a cooling medium in this project, with channels connecting the interior and exterior spaces serving to absorb heat during the day and dissipate it at night.
Topography
The building is situated at an elevated position on the site, allowing water from the front pool to flow organically towards the river.
Programmatic extensions
The proposed design fosters the concept of extended education, enabling interdisciplinary collaboration and informal teaching practices. External pavilions provide additional space for corresponding internal units, exhibition studios, and larger work areas.
Materiality
The design incorporates an archive of the city, with multiple materials serving as representations of their corresponding narratives.
The
Teaching
pool
The lounge The studio External walkway
Sections Fig 18. Sectional perspective at the lounge area
Fig 19. Cross section of the building, pavilions & topography
Sections
Fig 20. Sliding sections for each strip
The project entailes a comprehensive understanding of scaling and materials, as well as an exhibition presentation. The proposal has been reevaluated within the proposed site, incorporating the existing church through a combination and refurbishment, it has seen the incorporation of technical designs that prioritize environmental concerns in Panama City. The programmatic understanding of the project has been developed, with a focus on its educational function and the target client, Santa María La Antigua Catholic University. The research is centered on the art discipline, which has resulted in a studio-based educational extension that takes into consideration the topographic conditions of the site. The proposed educational mode encourages both informal and formal teaching activities.
The design of the project follows a hyphen approach that creates a conscious division in flat architecture and generates its programmes based on its studio-educational features. The exterior design builds on the idea of utilizing spatiality from the previous exercise, thereby acquiring its fragmentary identities through programmes. The final exhibition of the project is of utmost importance, as it seeks to carefully present the entire design process through physical models and drawings. Its focus has been on situating the project within the material context of the city and presenting it in a human-scale and approachable manner.
The presentation
Fig 21. Photograph of the studio volume & corridor
Fig 23. Photograph of the teaching unit & ceiling
[2] Diving Tube
Duration: 2020/05 - 2020/07
Location: Miyun, Beijing, China
Academic
Individual work
Miyun Reservoir, as the largest and only source of drinking water for Beijing had been enjoying a developed industry under the support of favorable policies during the last century. Nowadays, most suburbs of Beijing are developing their economy under the macro environment of urban expansion. A future for this district is blossoming with an increasing population and gradual economic prosperity.
Diving Tube selected a deserted mine pit located in Miyun, which establishes a deep-dive activity center in the pit by the research of its energy environment and historical background. While providing a complete picture of deep diving and living experiences, this project aims to understand the humanity, history and culture of Miyun.
Fig 24. A perspective from the bottom side
Site context N The Great Wall Industrial Heritage Mi Yun Reservior Industrial Mi Yun Reservior 0 km 0 km 60 km 90 km 120km 150km 180km 19 77 Open Pit Mining With Natural Mineral Resources Transition To Light Industry Automoblies Parts Expand Other Industrial Types Based On Mining Transition To Upscale Industry Develope Agriculture Biology Pharmacy Main Granaries Of Beijing Biology Laboratory 19 85 19 80 19 90 20 15 20 10 20 07 20 03 19 92 Major Roads Residential Area Minor Roads Business Zone River System Industrial Zone Site Vegetation Hotel Distribution Fig 25. Site context study Fig 26. Historic context Fig 27. Site mapping & the reservoir
Physical context
The site is located in the Yan Shan mountain range which is situated in the north of Beijing. Sha Chang reservior is closed to the site, moreover, the surrounding traffic is convenient, which is included by the land and the air.
Several
is
Topography
Mi Yun granary, which is closed to the highway, has a high level of agriculture.
The area closed to the highway is more developed. There are several landscape gardens in the area.
Sha Chang reservior is located in the east of the site, which is smaller than Mi Yun reservior. However, this reservior is more stable in water supply.
The site was a famous mining industry zone in the last centary. It is an industry ruins park now.
The south of the site is a modernization residence community.
N Catchment Countour
small villages which
enconomic backwardness is built in the half way up to the mountain.
Reservior The site Main access Fig 28. Programmatic context Fig 29. Rainwater catchment
Concept idea
Facade study
Undeveloped period (absent - 1969)
Physical context Brief
Deep
Soil-rock sripping Site Context
and Function Opencast mining Transport Steel rolling Coal carbonization Sintering production Blast furnace iron-making Pneumatic steel-making
Steel Facade Roof Inside Site
Massing
diving clubs Vegetation distribution Vegetation parallel Vegetation parallel Vegetation parallel Type proportion Reservior Beijing Accommodation Tourism Landscape garden Agritainment resort Ruins park B&B Ski resort Motel Mining park Youth hostel Miyun District Site scope Highway Location Location Tourism Accommodation North-south boundary Transport Reservior Reservior Reservior Reservior Reservior Perched water Phreatic water Artesian water Rainwater path Hydrology Mountain ridge Mountain Saddle Saddle Hillside Mountain peak Basin Basin Basin Plain Reception Reception Diving course Deep diving Swimming Restaurant Sanua Cloakroom Shower Garbage room Outdoor pool Outdoor bath Bedroom Bath pool Lounge Bungee Kitchen Lobby Living room Outdoor path Cafe Water bar Sun-bathe Geology Groundwater path Basin present Excavation Basin supplement Ladder Basin Top sport Living Outdoor Activities Superficial water path Basin River path Type proportion Type proportion Vegetation Vegetation Vegetation Industy Industy Industy Building types Building types Building types Vegetation distribution Vegetation distribution Industrial period (1970 - 2004) Transitional period (2005 - present)
Welding the pilars
Installing bolts of ring bean
Flatting by concrete
Hotel modules
Installing bolts of frame bean
Installing reinforcement
Installing steel wall
Installing bolts of hinge joint
Installing ring steel parts of hinge joint
Installing reinforcement
Installing concrete slab
Installing taps
Installing steel frame
Structural study
protection Lower level Foundation
Ground level Upper level Roof level Painting
protection Lower level Ground level Upper level Roof level Lower level Ground level Upper level Roof level Lower level Ground level Upper level Roof level
Painting rust
Foundation Foundation Foundation
fire
Section perspective & technical details
water baffle 30% 30% 30mm cement mortar 30mm cement mortar 30mm floor finish 30mm floor
Installation of
system 1000mm
30mm
30mm
Reinforced
30mm roof protection layer 20mm membrane
150mm concrete slab 20mm membrane waterproof 20mm membrane waterproof 20mm membrane
30mm thermal insulation 30mm thermal insulation 30mm thermal insulation 30mm cement mortar 30mm cement mortar 30mm cement mortar 100mm concrete slab 100mm concrete slab 100mm concrete slab Installing glass in the groove with nails Floor Groove Glass 50mm Thick Glass 20mm membrane layer 30mm thermal insulation 30mm cement mortar 100mm concrete slab Installing water baffle with nails on the roof while the other side put up with L-shape iron sheet
10mm
finish
glass curtain wall
growing layer 900mm intergrated glazing
membrane waterproof
membrane waterproof
concrete foundation
waterproof
waterproof
Layout 20.800 14.600 7.400 4.400 ±0.000 -6.000 -18.000 -21.600 -28.200 -34.600 -41.200 -44.800 -47.800 -60.000 -100.000 ±0.000 7.400 4.400 6.200 -100.000 19 18 17 21 3 4 20 Ground level Elevation First level N Second level -60.000 -100.000 4.800 ±0.000 14.600 14.600 13 13 11 11 10 10 12 9 9 8 8 7 7 6 5 3 4 1 2 16 23 34 1 Reception 2 Cafe 3 Staff Lift 4 Service Lift 5 Women's Washroom 6 Men's Washroom 7 Washbasin 8 Clock Room 9 Shower Room 10 Wet Sauna Room 11 Dry Sauna Room 12 Washroom 13 Bathing Pool 14 Water Bar 15 Mixed Bathing Pool 16 Operation Room 17 Diving Classroom 18 Deep Pool 19 Shallow Pool 20 Primary Diving Pipe 21 Senior Diving Pipe 22 Lobby 23 Introduction 24 Restaurant 25 Lounge 26 Staff Clock Room 27 Dishwashing Room 28 Staff Washroom 29 Garbage Room 30 Fred Storage 31 Refrigerator Storage 32 Kitchen 33 Lobby Washroom 34 Bungee Jumping 22 33 27 Down Down Down 29 26 30 4 3 28 31 32 33 25 24 12 14 14 15 Up Up Up Up Up Down Down Down Down Up Up Up Up 1: 200
[3] Evolution
Duration: 2019/10 - 2020/01
Location: Dongcheng, Beijing, China
Academic
Individual work
The studio aims to give the increasing worldwide concern over environmental issues of smog and global warming in Beijing. The project situates in the central area of the city, a green area next to the Ming Wall garden in Dongcheng. This project intends to discuss opening human perception to nature, a possibility of revering nature’s power. According to net zero regulations, architects should recognize the essence of nature and incorporate such understanding into architecture to express the thoughts on environmental protection.
The project discusses dynamic conditions in scales of nature, an organic approach that architectural technology negotiating with the landscape. It creates the variation through holographic projection technique, then gives an account of nature’s charm. The project proposes a museum programme, fitting into the triangle area.
Site context Office area Train station
Traditional alleys Railway Ruins park Old wall Public buildings Trunk roads Governmental agency Site content Site context University Museum Art center ExibitionArt school Gallery Center park Philosophy Project Art Sculpture Painting Nature Art Private Simi-private Public History Photography Philosophy Perforamnce art
In close proximity to Beijing Railway Station, the theme of the exhibition serves as a crucial factor. Following an analysis of the typology of various public buildings in Beijing, it was observed that there exists no exhibition that permits unrestricted ingress and egress, with visitors often being confined to the exhibition space without the ability to engage in other activities.
The site is situated at the intersection of two urban arterial roads, with a subarterial road facing southwest on the north side, and a historic Ming City Wall remnant on the south side. The site's overall shape forms a right-angled triangle towards the southwest. In light of the site's road relationships and the types of surrounding buildings, the new building should conform to the two roads and extend the architecture red line area inward.
The north side of the site faces the Beijing Hutong, while the northeast side is in proximity to the Beijing Railway Station. Moreover, the east side of the site is close to the Ming Dynasty City Wall Ruins Park. To consider the privacy needs of the hutongs and parks, and the impact of the city's arterial road, the new building should be appropriately elevated. Furthermore, given the uniqueness of the site at the intersection of the city's arterial roads and the view of the train station on the northeast side, the height of the new building should not be excessively high.
An isometric view of the site indicates a declining trend in the height of buildings in the northeast direction, starting from the furthest office building, Beijing Railway Station, Hutong, and Ming City Wall Ruins Park. To guide the site effectively, the new building needs to be deformed after an overall elevation treatment. The original height should serve as the highest point, while the road intersection should be the lowest point, thereby lowering from east to west.
Preliminary investigation analysis of the site shows that it is located in a densely crowded area. Therefore, in the spirit of the green concept of coexistence between humans and the environment, the building roofs should be fully utilized. As such, the roof of the new building can provide a space for people to walk according to their height, and trees can be incorporated into the design to realize the concept of symbiosis between people and the environment.
When selecting building materials for new construction projects, it is important to consider the surrounding site. The railway station located on the east side of the site serves as a vital transportation hub in the city, and its multi-pillar space is visible in the vertical view. As a result, steel with a "sense of line" can be utilized for the pillars of new buildings to reflect the site language.
The choice of roof building materials should also be influenced by the surrounding sites. The Ming City Wall Ruins Park is the most prominent building in the area, constructed of bricks which were pioneers of ancient Chinese construction materials during the Ming Dynasty. Therefore, bricks are a suitable material for the building roof, as they pay homage to the historic context of the site.
Steel facade
Landscape The purposed site
Brick facade Crowding
Site contents
Concept idea
Roof Upper level
Ground level
Basement
Case study - Pathway pattern
The British Museum is renowned for its streamlined design, characterized by a singular, uninterrupted pathway that extends from the entrance to the exit, with rest areas strategically positioned between exhibition halls. This design approach has proven to be highly effective and will therefore be employed in the construction of the new building.
The Mitsubishi Corporation Galleries The Mitsubishi Corporation Galleries
Great court restaurant
Anthropology library
Reading room
The Waddesdon Bequest
Brass Plaques from Benin
The Lewis Chessmen
Parthenon sculptures
Pizzeria
Brass Plaques from Benin Ford Centre for young vistors
The Clore Centre for education
The exhibition gives people nearby free space in the central part of Beijing. It makes the visitor cozy with no wall but pillars. Therefore, I make walls by the front-projected holographic display, which are projected from the pillars. Moreover, the project walls can be changed according to the location of the entrance, which is set on the hypotenuse of the triangle boundary. We could get the path according to the calculation result of the shortest walks of grids and lines between entrance and pillars. Then the path we get could extrude to dozens of project walls. The final step is to make the pillars and the roofs.
Set the boundary of the architecture
Construct grids in the boundary
Reduce lines of the grids randomly Link the entrance point and every points in the grids
Calculate the shortest walk between entrance point and grids points through the selected lines
Delete lines passing through the atriums
Delete lines near the entrance and construct an antechamber
Construct pillars according the grids point
Construct underground walls by a height
Construct roofs on the pillars Construct walls on the ground according to the distances between boundary and point and grids points
Step 1
Girds rotated 45 degrees
Step4
Pillars and roofs according to the grids and the distance of paths
Shortest walks between entrance and the points of grids
Walls
entrance or atrium Entrance 01 Parameterization Entrance 08 Entrance 15 Entrance 02 Entrance 09 Entrance 16 Entrance 03 Entrance 10 Entrance 17 Entrance 04 Entrance 11 Entrance 18 Entrance 05 Entrance 12 Entrance 19 Entrance 06 Entrance 13 Entrance 20 Entrance 07 Entrance 14 Entrance 21 Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Selected path Type 01 Type 08 Type 15 Type 02 Type 09 Type 16 Type 03 Type 10 Type 17 Type 04 Type 11 Type 18 Type 05 Type 12 Type 19 Type 06 Type 13 Type 20 Type 07 Type 14 Type 21
without going through
Step
Construct a moving point as entrance on the boundary Step5 Step 3
2
made by front- projected holographic display
Paths
Section 2-1 Section 1-1 Section 2-2 Layout Section 2-1 Section 2-2 Elevation Section 1-1 15.100 ±0.000 -4.100 -4.100 5.900 -4.100 14.600 15.100 ±0.000 ±0.000 ±0.000 Rooftop Framework Holographic display walls Ground level 1: 100
Thefirststepistoexcavatefoundationsinthegroundaccordingtothesitesofbeams.Each columnfoundationismadeofthree-thirdscubes.Secondly,setfourmainsteelrebarsatf -ourcornersofeveryfoundationinordertomakethefoundationsolid.Thirdly,setfourm -inorsteelrebarsbetweenmainrebarsineveryfoundation.Then,setthreeloopsofst eelstirrupshorizontallyandverticallyaroundthemainandminorrebarstomakethe foundationnoteasytodeform.Afterward,fillthefoundationswithconcreteanddig fourholeswith30mmindiameterand100mmin-depthonthesurfaceofeveryf -oundation.Lastly,placetheflangeplateonthesurfaceandconnectittothef -oundationwithfourexpansionboltsandtightenthemwithnuts.
Excavation
70mm diameter steel rebars
20mm diameter steel stirrups
Expansion bolts
15mm flange plate
First,seteighttapsineverydepressionofcorrugated webinordertofixthesteelbarsontheplate.Next, settwosteelrebarswitha3minlengthand30mm indiameterateachdepressionofthecorrugated webandfixthembytaps.Then,putverticalste -elrebarsabovethe transversesteelrebarst -oensurethecorrugatedwebfirm,thenfilli -twithconcrete.
20mm flange plate
10mm glazing panel
50mm floor finish
Steel welding Upper glazing cell
Glazing pedestal Lower glass cell
Beam & connectioncolumn
40mm concrete panel
20mm membrane waterproof
Details of beam
90mm corrugated web
Details of roof
Taps Steel rebars Vertical rebars
Details of glazing groove
Details of joint
Details of webcorrugate Details of waterproof layer
Makethree curvedattheendofthe waterprooflayerinordertostopw -aterpenetrateintothe corrugate -dweb.Thenmaketheglassc -ellatthegap betweenthew -aterprooflayerandsurfac -etile.
Foldedlayerwaterproof
Sectional perspective & technical details
[4] Rebirth of Lop Nur
Duration: 2020/08 - 2020/10
Location: Lop Nur, Xinjiang, China
Academic Group Work
Collaborator: Zixi Li
Lop Nur, located in Xinjiang Province, China, is a desolate and uninhabited region dominated by the Yardang landform and vibrant colors. Once a flourishing oasis with the prosperous civilization of Loulan, it now attracts people seeking to cross the no man's land or explore the mysterious Loulan ruins. However, this journey is perilous, fraught with danger. Amidst this harsh landscape, architectural structures emerge as beacons of hope, providing spiritual support and symbolizing resilience. They offer solace and reflection, connecting explorers to the past and inspiring visions of rebirth. In the desolation of Lop Nor, the interplay between the barrenness and architectural marvels reflects human aspiration and resilience. These structures become sanctuaries, reminding us of the strength of the human spirit and our ability to find beauty and meaning in even the harshest environments.
Loulan, the ancient country existing more than three thousand years ago, had beautiful grassland and lakes. Later, due to the environmental destruction by local residents, the land turned to desert and the country disappeared.
Sun Tomb is one of the most important sites discovered today among the ancient country area. There is a circular open space in the middle, surrounded by several seven wooden stakes. Each stake is more than a foot high. It shows like a number of rays in the shape of the sun, which represents new born.
Thesis: Spiritual Intention
Lop Nur, one of China's largest no man's lands situated in the Gobi Desert, presents numerous challenges such as water scarcity, absence of mobile phone signal, and extreme weather conditions like sandstorms. Despite these difficulties, Lop Nur continues to captivate people due to its enigmatic nature and ancient ruins, accompanied by mysterious legends often associated with disappearance and death. Many individuals are drawn to this place, disregarding the dangers involved. Some opt to drive through, while others choose to walk or cycle across.
The disappearance of the ancient civilization of Loulan in Lop Nur was a result of environmental destruction caused by humans, representing a form of biological selfdestruction. Similarly, those who venture into Lop Nur symbolize a spiritual self-destruction. According to Freud's theory, humans possess two instincts: one driven by love and the other by death. The instinct of destruction and aggression is inherent in everyone, driven by impulses rather than conscious decisions. Motivated by these impulses, individuals aim to achieve a sense of accomplishment by crossing the no man's land, seeking inspiration or a sprouting spirit in a unique environment, or finding emotional sustenance.
The lines in the accompanying picture symbolize the binary simulation of a black hole, representing destruction. The background images of Tolstoy, John Lennon, and the crowd surrounding a bonfire represent the three spiritual pillars of life: literature, music, and emotion, respectively. Together, they allude to the profound impact of these elements on human existence.
Site context
Lop Nur locates in the south-east of Yuli County, Xinjiang Province, China. The climate here is dry and hot with strong erosion. The highest temperature in summer of the place is more than 40 degrees centigrade, while the lowest temperature in winter is below - 20 degrees centigrade.
From March to May, it belongs to windy season and from June to August it regards as gale season.
Affected by the climate, most people choose to go through the land in September and October, so the temporary buildings can be built during the two months.
Topograhpy
The site locates on the South Bank of Lop Nur, with an integral Yardang landform rising from South to West which is unique. The characteristic of the landform is a combination of wind erosion mounds and hollow formed by weathering, intermittent water erosion and wind erosion, parallel to the prevailing wind direction. Therefore, the relatively flat part of the area is selected as the design site.
Lop Nur narratives
GEOGRAPHICAL LOCATION TEMPERATURE CHART WIND CHART The boundary JAN N W SW SE NW 2km 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 100m 2km 2km 2km 2km 2km 2km 2km 2km 2km 2km 2km 2km 2km NE E S MAR OCT APR SEPT JUN JUL NOV <20℃ 0℃ -10℃ 10℃ 20℃ 30℃ FEB NOV MAY. AUG.
Preventing round chairs by deleting multiple inscribed circles.
Cut concentric circles and break it with straight lines.
Cut concentric circles and break it with straight lines.
The display stands is set up by dividing several concentric circles equally.
Each of them consists of annular resin boards inclining from inside to outside, which effectively changes the direction of the wind and prevents direct strong wind blowing.
Ground level Graphic generation Wind & ventilation 1 2 N 3 3 4 2m 4m 6m 5 6 9 8 10 11 1 Loulan Historical
Library 2 Social Space and Rest Space 3 Mini Rest Space 4 Open-Air Concert Hall / Theater 5 Barrier-Free Toilet 6 Storage Room 7 Electrical Equipment Room 8 Equipment Piping Room
Theme
The Plan of Sun Tomb Location Of Bearing Column
Reconstruction of the Plan Find Modulus and Repeat Composition of Upper Plan Break the Monotonous Plan
The bookcases is set up by dividing several concentric circles equally.
N Wind Direction 9 Toilet 10 Restaurants and Bars 11 Food Processing and Storage 12 Commodity Trading Space 12 7
Rotate 180°
Assembling process
Model
After putting the precast iron pieces into the bearing pillar and inserting the end of the pillar into the reserved hole position of the resin board, expansion screws will be used for connection.
Trimming fabric to wrap the accessories on the resin board, and connecting the cloth with the resin board with expansion bolts.
Rendering