ABPL20033_2014_SM2: Construction Analysis Assignment 4: Flipbook Section Assignment Lian Chen Ng 617177
PLANS 1 EXCAVATIONS & FOOTINGS 2 BASEMENT SLAB & PLUMBING LAYOUT 3 PRIMARY FRAMING (STEEL) 4 INTERMEDIATE FLOOR STRUCTURE (TIMBER) 5 WALL BRACING PART I (GRD FLR) 6 ROOF STRUCTURE & COVER 7 WALL BRACING PART II (1ST FLR) 8 WINDOW SYSTEMS & ROUGH INS 9 WALL INSULATIONS 10 SERVICES & CEILING STRUCTURE 11 SURFACES COVERING & CARPENTRY 12 FINISHES TRADES (ACCESSORIES & TOUCH UP)
P1 GROUND EXCAVATION
P2 BORED PIER REINFORCEMENT
- SITE CLEARING - REMOVING EARTH TO BUILD FOUNDATION
- STEEL REBAR WITH STEEL FABRIC ON TOP
150mm STEPDOWN/ SETDOWN RL 48.61
P3 DOWNPIPE ANGLE THROUGH SLAB
P4 SUBROUGH PLUMBING THROUGH SLAB
1B7 FB4
1B6
1B13 FB3
C1
STEEL CHANEEL FOR BALUSTRADE
FB2 C1
P5 PRIMARY FRAME FOR GROUND FLOOR - COLUMN | FLOOR BEAM| LVL BEAM - TEMPORARY STEEL STUD FOR ADDITIONAL SUUPORT
FB2
P6 SHS C1 WELDED ON BASE PLATE - SEALED AT ‘MISS’ AREA - TO PREVENT CORROSION DUE TO TRAPPED MOSITURE
1B7
1B6
P7 BEAMS CONNECTION -FLOOR BEAM CONNECTION TO LOWER ROOF BEAMS
FJ1
P8 FLOOR JOIST INSTALLED ON FLOOR BEAM - GROUND FLOOR TIMBER STUD WORK COMMENCED AT THE SAME TIME
P9 TEMPORARY STAIRCASE - TEMPORARY STAIRCASE AND PLYWOOD PLATFORM INSTALLED FOR FIRST FLOOR FRAMING PREPARATION
P10 SCAFFOLDING -SCAFFOLDING INSTALLED AT PERIMETER FOR ROOF FRAMING PREPARATION
WT01B
P11 TIMBER STUD WORK GROUND FLR - TIMBER STUD FRAME FOR WT01B
S1 P1 RB2B
DOWNPIPE HOLE IN THE SUMP
MR 1 DEGREE FALL
1: 1
00
FAL L
PARAPAT WALL FRAME
P12 ROOF BOX GUTTER & SUMP
P13 ROOF FRAME
WH1
P14 WINDOW FRAME AT FIRST FLOOR - DOWNPIPE ROUGH IN FROM ROOF SUMP
P15 FAN COIL UNIT & DUCTWORK
P16 TIMBER ON FOLDED STEEL STAIRCASE P17 SARKING & FLASHING -TEMPORARY STAIRCASE REMOVED - PREVENT WATER TRAPPED INSIDE WALL
SECTION 1 EXCAVATIONS & FOOTINGS 2 BASEMENT SLAB & PLUMBING LAYOUT 3 PRIMARY FRAMING (STEEL) 4 INTERMEDIATE FLOOR STRUCTURE (TIMBER) 5 WALL BRACING PART I (GRD FLR) 6 ROOF STRUCTURE & COVER 7 WALL BRACING PART II (1ST FLR) 8 WINDOW SYSTEMS & ROUGH INS 9 SERVICES & CEILING STRUCTURE 10 WALL INSULATIONS 11 SURFACES COVERING & CARPENTRY 12 FINISHES TRADES (ACCESSORIES & TOUCH UP)
P17 PILING PIERS INTO THE GROUND
BP1
SLAB REINFORCEMENT WATERPROOF MEMBRANE SANDBED
EB1
BP1
P18 PRIMARY FRAME FOR GROUND FLOOR - COLUMN | FLOOR BEAM| LVL BEAM - TEMPORARY STEEL STUD FOR ADDITIONAL SUUPORT
FB2
1B6
C1
1B7
P19 FLOOR JOIST INSTALLED ON FLOOR BEAM
FJ1 FB2
1B13
P20 TIBER STUD WORK AT GRG FLR
1B13
WT01F TIMBER STUD
DJ
TEMPORARY STAIRCASE BEHIND
WT01B TIMBER STUD
P21 ROOF STRUCTURE
INS_03
SARKING
PURLIN @ 600 CTRS MR
P1
PC FLASHING S WH1
S1
C1
C1
TEMPORARY STAIRCASE
EO1
EO2 BG1 RB2B
SL BEHIND
WT01F
WT01B
P22 WINDOW FRAME INSTALLED & ROUGH DOWNPIPE COMING THROUGH ROOF STURCTURE
D7
ELECTICAL WIRING ROUGH IN L2 W. 11
D8
P22 FAN COIL UNIT CONNECTED WITH DUCTWORK SUSPENDED ON CEILING TIMBER SUSPENDED CEILING SYSTEM INS_02 TIMBER CEILING BATTENS ACOUSTIC PANEL CEILING LINING
D9 FC3
L2 W. 11
D10
D9
D10
P23 INSULATION BATT ON STUDWALL & CEILING
WT01F
L2 W. 11
WT01B
WT01F WT01B
P24 SARKING & FLASHING - PREVENT WATER TRAPPED INSIDE TIMBER CLADDING
ACCESS PANEL
WTO1B L2.03 GALLERY L2.06 DINING
STAIRS BALUSTRADE
D12
D11 F22
F18
L1.02 LAUNDRY
WT01B
L1 D.03 WT02A L1.08 CARPORT F16
D11
D12
P25 LIGHTING FIXTURES & SKIRTING TOUCH UP
ACCESS PANEL
L2.03 GALLERY GLASS BALUSTRADE
L2.06 DINING
WT 02D
L1.02 LAUNDRY
WT01B
L1 D.03 WT02A L1.08 CARPORT
12 CONSTRCUTION STAGES IN AXONOMETRIC VIEWS T PA
UM
CO
A LF
P1
B
T
GH
LI SKY
GR DE
E STE
OL
EH
P NPI
W
DO
T1 FA OO
IC BR
LR TA ME
OP
T VER
S E IN
LL 0 FA
0 1:1
LL FA EE 6B ROOF COVER
1 EXCAVATION & FOOTINGS
L ICA
T VER E
AG SEW
T
VEN
E
ST WA OR
FLO
E PIP
WN
DO
H UG
O
THR
B
SLA
7 WALL BRACING PART II (1ST FLR)
2 PLUMBING LAYOUT & BASEMENT SLAB
H IN
UG
O GR
IN
WIR
3 PRIMARY FRAMING (GRD FLR)
8 WINDOW SYSTEM & ROUGH IN
C
HVA
R OO FL IST JO 4 INTERMEDIATE FLOOR STRUCTURE
ER IMB
9 SERVICES & CEILING STRUCTURE
D
STU
5T
4 90X
ER
EST
Y POL
5 WALL BRACING PART I (GRD FLR)
TS BAT
.0
R2
10 WALL INSULATION
N
TIO
E AR QU
EC WS
LLO
HO
S
EAM
NB
IN
RL
PU
LE
NG
A AL EQU
IO ECT
S
ER IMB
T
6A ROOF STRUCTURE
UE
T
G ON
VE ADE OO R ST LU A SB
R DG
AN
GL
AS
11 SURFACE COVERING & CARPENTRY + 12 FINISHING TRADES