Ready to Rise 2020 Annual Report

Page 38

Cohort 1: Implementation Destiny worked with Liberty Hill to establish a customized and responsive capacity building model that met the unique needs of the R2R grantees. Destiny vetted and hired coaches directly, with consultation from Liberty Hill, to ensure good fit with grantees. Destiny Four-Step Process

Discovery/ Design: Review grantee documents to inform capacity building approach; develop the capacity building model, custommade site visit protocol, and capacity assessment tools; collaborate with the evaluation partner (Imoyase) to align and streamline capacity building efforts.

38

Planning

Implementation

Conduct joint grantee site visits to perform diagnostic assessments; establish a rapport with grantees’ leadership and other program staff; deepen understanding of each grantee’s community, culture, context, and program; develop capacity building plans and goals. Coaches vet and begin the matchmaking process between other contentexpert consultants and grantees.

Deliver a relational, culturally responsive, timely, and flexible approach to coaching and technical assistance at both the individual level and group level. Through a continual feedback loop, guide grantees in their assessments of their progress and help them make improvements/ pivots to goals in response to any emerging needs or shifts in priorities.

Evaluation and Reflection: Engage grantees in an end-ofyear formative evaluation process to self-reflect and evaluate their capacity building efforts in the following areas: progress, appropriateness of goals, coach/ consultant matching, growth and tangible products obtained, shifts in organizational culture, suggested improvements for Year 2.

Ready to Rise Annual Report - 2020


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.