Limbe Wildlife Centre: January 2021

Page 17

January 2021

Monthly Report

4. Infrastructures and development| Material & Equipment Funders

□ Chimp Island Enclosure: Replacement of broken pressing tap and sliding door ballbearings (Images 17-22) □ Quarantine Special Care and Rehabilitation Enclosure: Plastering of the additional lines block added on the old wall to add more height (Images 23-24) □ Gorilla Enclosure: Started the project to split and re-enrich the enclosure (Images 25-36) □ Mandrill Enclosure: Changing the position of the electric fence to access the fallow land (Images 37-38)

Image 17. The construction team had Image 18. View of the damaged pressing to break the concrete around the tap. The water was flowing non-stop. damage pressing tap.

- 17 -


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.