4.Infrastructures and development| Material & Equipment Funders
Activities □ Western lowland gorilla: Completion of the maintenance of the Gorilla Group 2 night dens (Images 16-27) □ Quarantine: Installed rope in Tikar and Ntui den for the enrichment and replaced old palm roof on the main building (Images 28-30) □ Raffia palm-mat roof: Maintenance of all roofs made with raffia palm-mat before the rainy season (Image 31) □ Duiker enclosure: Started the refurbishing of the duiker enclosure (Images 32-35) □ General: Damages induced by the heavy night storm of the 31st of May (Images 3639) □ LWC Rivers: Cleaning of both streams inside the centre to reduce flooding on our island (Image 40)
Image 16. View of some damaged pipe Image 17. View of damaged drinking caused by corrosion. point.