Monthly Report
November 2021
4. Infrastructures and development| Material & Equipment Funders
Activities □ Western Lowland Gorillas: Completed the splitting of the group 1 enclosure: finished the design and fully re-enriched the two sub-units 1a and 1b (Images 13-26)
Image 13. Installing of the corridor safety Image 14. Final view from the corridor cage of between the 2 new the Western safety cage. lowland gorilla sub-enclosures.
Image 15. Scrubbing of the metal pillar with Image 16. Installation of electric fence wire brush. lines.
- 18 -