Construction Logbook: Week 9 Part 1

Page 1

ENVS 10003 CONSTRUCTION LOG BOOK

Week 9: Detailing Strategies 2 Construction Workshop • Stress Testing • Box Beam construction Full Size 1:1 Detailing Drawing Tutorial • Construction Site Visit: 522 Collins St • Concrete pour • Tension rods • Glazed curtain window system eLearnings • Finish Work and Composite Materials • Wall finishes • Engineered composite materials • Flooring • Ceiling

109


ENVS 10003 CONSTRUCTION LOG BOOK Construction Workshop 5th May 2014 Design brief: -Using the materials provided, construct a structure that will span a 1m gap and be as strong and rigid as possible, enough to substantially withstand a point load from directly above. Consider: • The material-what works best in tension and compression-why? • In what way will your structure utilise the material inherited qualities • How will your design maximise the load bearing capacity? Materials provided: • 3mmx100mmx1200mm brace plywood X2 • 30mmx40mmx1200mm structural pine X2

Extra materials provided: • Handsaw • Measuring tape • Various types of nails • Bench hooks • Hammer • Power drill • Timber screws • Square 110


ENVS 10003 CONSTRUCTION LOG BOOK Design:

Plasterboard Nails

30mmx40mmx1200mm Structural Pine

3mmx100mmx1200mm Brace Plywood

Timber Decking Nails

Note: Plasterboard nails were used as they have a wider surface area on the head, thus a greater purchase between the pine and plywood

111


ENVS 10003 CONSTRUCTION LOG BOOK Materials used in construction: • 3mmx100mmx1200mm Brace Plywood X2 • 30mmx40mmx1200mm Structural Pine X2 • Plasterboard Nails • Timber Decking Nails Final Product:

Plasterboard nails

Cracks in timber due to nails at each end

112


ENVS 10003 CONSTRUCTION LOG BOOK Stress Testing: The device that we used was similar to the device shown here, however it was hand driven.

http://www.frontiersin.org/files/Articles/63674/fbioe-01-00013-HTML-r1/image_.jpg Device we used for stress testing:

Digital Pressure readout Deflection ruler Crosshead

Impact point

Specimen

Supports

113


ENVS 10003 CONSTRUCTION LOG BOOK Stress Testing Result: Our structure withstood 380kg of stress before failing in the centre

Structure shattered in the centre where the mass was applied

Shattered where a nailed had weakened the structural integrity

Faired pretty well relative to other designs-small fracture rather than complete collapse

Point of failure Peer designs:

114


ENVS 10003 CONSTRUCTION LOG BOOK Full Size 1:1 Scale Detail Drawing

115


ENVS 10003 CONSTRUCTION LOG BOOK

116


ENVS 10003 CONSTRUCTION LOG BOOK Tutorial CBD Construction Site Visit 522 Collins St Overview: As a group we visited the Construction Site of 522 Collins St, soon to be new, Premium office space. We were given an overview of the various components and construction principled employed in the buildings construction and fabrication. The following show the construction techniques employed on site:

1.

Tension rods: increase the strength and rigidity of concrete once set

Reinforcing for concrete

Corrugated alloy sacrificial formwork for concrete

2.

Temporary formwork for concrete

Onsite power

Tension rods

3. 117


ENVS 10003 CONSTRUCTION LOG BOOK

Temporary crane

Concrete pump

Mechanical system piping

4.

Set concrete

Service corridor

Formwork impression

5.

118


ENVS 10003 CONSTRUCTION LOG BOOK

Concrete pour process: Pumped up form cement trucks on the base level floor, pumped into the steel reinforcing’s, levelled, extruded and settled

Concrete pump

6.

Bundles of steel rods for the tension casing

Tension casing

Arterial reinforcing

7.

119


ENVS 10003 CONSTRUCTION LOG BOOK

8.

Safety barriers

Concrete pump mechanism

Column reinforcing

Figures 1-8: 10th floor external concrete construction

9.

10. •

Internal steel sacrificial concrete formwork

Figures 9-10: 10th and 11th floor internal concrete formwork 120


ENVS 10003 CONSTRUCTION LOG BOOK

Fire system

30mm polyurethane insulation board coated with sisalation paper to increase thermal insulation properties

Temporary formwork

Glazed curtain wall: unit system (pg. 93)

Temporary safety barrier

11.

12.

121


ENVS 10003 CONSTRUCTION LOG BOOK

Hanging support system

Space for glazed curtain wall system installation

Theodolite

13.

Glazed curtain wall units

Installation process: units are hung from a series of cantilevered rails, which are fixed to the above concrete floor. They are then connected with a system of weather proof stripping and galvanised steel brackets. All curtail walls are non loadbearing

14.

122


ENVS 10003 CONSTRUCTION LOG BOOK

15.

Galvanised steel bracket

Concrete bracket

Weatherproof stripping

Temporary safety barrier

16. Figures 11-16: 4th and 5th floor glazed curtain wall installation process 123


ENVS 10003 CONSTRUCTION LOG BOOK

Reinforced steel pylons are a structural as well as an aesthetic feature

Open foyer integrates the structure with the landscape

Mechanical systems-climate control

Temporary cover paper-protect the surface

Base of the temporary crane

Exposed sacrificial formwork

17.

18.

Location of photo

Figures 17-19: Ground floor superstructure 19. 124