Slide Set 4 KOSTT

Page 1

- K O S O V A N T R A N S M I S S I O N S Y S T E M & M A R K E T O P E R A T O R - O P E R A T O R I I S I S T E M I T, T R A N S M I S I O N I T & T R E G U T T Ë K O S O V Ë S -

Kosovo- International investors’ conference New Kosovo Power Plant

KOSTT JSC Functioning Developments Perspective Fadil Ismajli Chief Executive Officer

Prishtina 20 January 2010


Legal & Regulatory Framework in Kosova

Primary Legislation in Energy Sector in Kosovo (June 04) - Law on Energy - Law on Electricity - Law on Energy Regulator Nomination

July 04 Establishment of Energy Regulatory Office

Dec 04 Establishment of Ministry of Energy & Mining

July 06 Establishment of ITSMO

Licensing Economic regulation of the

Designing sectors’

Operation of the electricity

energy sector

developments strategies and

system and electricity

policies

market 2


KOSTT and its functions •

KOSTT JSC is responsible for: – Bulk transmission of electricity on HV network and other ancillary services (… secondary regulation, etc.) – Maintenance & development of TS – Operation of Kosovo electricity system – Balancing (demand = supply) – Operation of electricity market – Congestion management (allocation of interconnections)

3


License obligation -development of rules, codes, etc.•

Market Rules – OP for implementation of rules

Grid Code & Metering Code

Electrical Standards Code & Technical Equipment Code

Distribution Code (in cooperation with DSO)

Technical performance indicators

Commercial Agreements

Long-term Power Balance (& PB on annual basis)

Business Plan of KOSTT (2007-2012)

Connection Charging Methodology

Transmission Network Development Plan

Other documents under preparation/under approval 4


Access to the Transmission Network •

KOSTT will offer its transmission capacities for all users EC Directive → Law on Electricity → TSO License – Cost reflective and regulated tariffs & charges • Transmission Use of System Charges (EROs Tariff Methodology)  Generation component in the Tariff methodology for Transmission Use of Charge (ToUS) equal to zero (G=0) • Physical connection to the transmission network (KOSTTs Charging Methodology):  Deep connection approach • Cross border related mechanisms (CB principles & rules)

– Parties’ access is granted following the fulfillment of technical & financial criteria – Transparency in Third Party Access (TPA) ensured by the Grid Code and other technical codes 5


Transmission network development •

Investment plan – approved by ERO (regulator)

Significant projects, which will accommodate system users’ needs

Results → Increase of transmission capacity (53%) → Improve the security of the network → Increase interconnection capacities for regional market → Enabling higher level of cross-border flows over KOSTT’s system → To meet future generation capacities and supply in Kosovo → Improve the quality of supply & system operations capabilities 6


Perspective for investments •

Well developed legal framework (all in compliance with EU legal framework)

Strong and autonomous agencies (Regulators, Antitrust, etc.)

Very well developed electricity transmission infrastructure - regulated and easy access to the network

 No requirements for generation developer to invest in interconnections  Establishment of the appropriate SCADA system  Establishment of the tools for monitoring and settling all power transactions in the market (software platform reflecting the market) •

Well operational Transmission, System and Market obligations with motivated and skilled staff 7


Historic Electricity Consumption & Peak Load 5000 4500

GWh

4000 3500 3000

stan Co n

In d ust

t ly

ry

Ho

W

d hol e s u

ar e eas ) r c h In erage g i H av % 7 (

2500 2000 1500 1000 500

Year

0 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

Similar reflections on the peak load (MW)

1000 900

MW

892

800

693

700

In 10 years = double

400

537 504

621

624

603 500

604

525

970

808

755

733

780

690

600 500

692

914

653 656

617

550

300 200 100

Year

0

8


Energy sector developments •

Continuous need for power import of neighboring countries like Macedonia, Albania, Montenegro, etc.

Privatization of distribution and supply of electricity

Emerging regional market – wider market, more possibilities – Development of regional bodies for facilitation of electricity market and trades – Development of electricity trading mechanism Regional and European integration

9


Kosovo- International investors’ conference Kosova e Re Power Plant 20 - 21 January 2010

Thank You

www.kostt.com KOSTT - Transmission, System and Market Operator j.s.c. Iljaz Kodra nn 10000 Prishtina, Kosova 10