Slide Set 7 PwC Mark Hughes

Page 1

Kosova Lignite Power Investors Conference January 2010




Transaction structure Components A. Construction of a new electric power generation plant, ‘Kosova e Re Power Plant’ (“KRPP”) - Estimated installed initial capacity of 500 MW - Possibility of expanding up to 1000 MW - Limited associated interconnection facilities A. Immediate development of the Sibovc Lignite Field to supply existing plant and KRPP B. Private sector participation in Kosova B

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 2


Transaction structure Components Kosova A

Kosova B

DiSCo

Domestic Market

Sibovc KRPP 1 KRPP2 Option

Regional Market

Key: Transaction components Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 3


Transaction structure Components

LSA

Kosova A

Kosova B Sibovc

LSA

LSA

LSA

PPA

DiSCo

Domestic Market

PPA

KRPP 1

KRPP2 Option

Regional Market

Key: Transaction components Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 4


MineCo & GenCo

MineCo

GoK

Kosova B

KRPP 1

KRPP2 Option

GoK

Sibovc

GenCo GenCo

2 companies but one consortium bid No pre-determined corporate structure, but must work to ensure efficient project delivery and operation

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 5


Main transaction agreements

LSA

MineCo

GenCo

LSA LSA

Kosovo Lignite Power PricewaterhouseCoopers LLP

Kosovo A

Kosovo B1 Kosovo B2 KRPP

Power

PPA1

DiSCo

PPA2 PPA3

January 2010 Slide 6


Transaction structure MineCo: Sibovc lignite field • • • • • • •

Asset / staff / truck & shovel contract transfer Transfer of existing Sibovc SW mining licence Exclusive rights to mining development of Sibovc lignite field GoK contribution: e.g. Bucket Wheel Excavators, Sibovc SW overburden removal spend MineCo will not assume pre-existing environmental / social liabilities Access to Bardh mine for overburden disposal (MineCo responsible for safe operation of spoil heaps and contribution to rehabilitation) Duration of concession (40 years from KRPP COD)

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 7


Transaction structure MineCo: Contractual & pricing arrangements •

• • •

LSAs – non-discriminatory pricing across generation customers, supply to Kosovo A, B, KRPP 1 and other potential generators serving the domestic market Mining tonnage concession a function of licensed generation 5, 10 or 15 year levellized price per tonne; regulated/indexed price afterwards (for remaining 25-35 years) Will schedule meetings with interested parties to receive indicative market feedback prior to Draft RfP

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 8


Transaction structure Kosova e Re Power Plant (KRPP) •

Commitment to construct new plant with estimated installed capacity of 500MW for domestic consumption (KRPP 1)

Long-term PPA with Distribution & Supply company (DiSCo)

On site of Kosovo B power plant

To fulfill all EU-mandated environmental requirements and to achieve efficiencies in excess of 38%

Proposed option to extend by further 500MW (KRPP 2)

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 9


KRPP contractual framework Financing Connection Agreement

Licences

O&M Agreement

KRPP

Water Supply Agreement Ash Disposal Agreement Kosovo Lignite Power PricewaterhouseCoopers LLP

Power purchase agreement

Lignite Supply Agreement

January 2010 Slide 10


Transaction structure KRPP – unit size • • •

Trade-off between supercritical favourable efficiency / emissions and commercial / technical viability in context of domestic and regional market Willing to listen to indicative market feedback prior to Draft RfP Draft RfP will include specific required contracted operating and technical characteristics - Rated capacity (MW) - Minimum heat rate, thermal efficiency in excess of 38% - CO2 and other emissions performance (EU Standards) -

CCS ready

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 11


Transaction structure KRPP – offtake arrangements •

Long term PPA with Licensed Distribution and Supply business - Capacity up to 500MW - Duration – 20 years (circa) Kosovo Government support agreement with World Bank PRG / MIGA support - Support framework to extend beyond DiSCo privatisation

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 12


Transaction structure KRPP – site for construction • •

• •

Existing water supply from Iber-Lepenc canal Existing transmission connections, require expansion Site-sharing synergies with Kosovo B Existing ash-disposal pipeline connection to Mirash mine

New Coal Yard Ash Pile

KRPP

To mine

Kosovo B 1 & 2 Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 13


Transaction structure KRPP – Typical IPP PPA structure

KRPP

Average power price of PPA (€/MWh 2009 prices)

70

60

50

40

Fuel

“Energy charge”

Variable Operations & Maintenance cost Tax

€/MWh

30 Fixed

Operations & Maintenance cost

20

10

“Availability charge”

Capital repayment & return

€/MW

0

Kosovo Lignite Power PricewaterhouseCoopers LLP

Capital repayment & return

Operations & Maintenance cost

Tax

Fuel

January 2010 Slide 14


Transaction structure Kosova B •

Long-term PPA with DiSCo with pre-determined Availability payments and competitively bid energy price (inclusive of LSA price)

Long-term LSA with MineCo

Immediate revenue source to GenCo

Contribution of B assets by GoK in return for equity interest in GenCo

Rehabilitation of plant to extend life to ensure EU-compliance and to provide domestic security of supply

Offtake arrangements through PPA with provision for rehabilitation expenditure; step-up in Availability payments for expenditure approved by ERO

Clearly identified assets, including facilities, PPA and generation licence

Existing skilled workforce

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 15


What does a bid look like: preliminary views

• •

• •

Bid price for KRPP Availability and Energy (including bid price LSA) Bid price for Kosovo B1 and B2 Energy (pre-rehabilitation, including bid price LSA) - pre-determined Availability payment and minimum Energy conversion efficiency Bid price LSA for Kosovo A Pre-determined government stake

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 16


Bid evaluation criteria

For a given project volume / structure, bidders will be evaluated on: NPV of 20 years’ capacity • Lowest total cost of power supplied from KRPP charge + energy charge * demand • Lowest cost of energy supplied from Kosovo B, NPV of [20] years’ energy charge * demand pre-rehabilitation

• Lowest cost of lignite supplied to Kosovo A

Kosovo Lignite Power PricewaterhouseCoopers LLP

NPV of Lignite price * Kosovo A demand until decommissioning

January 2010 Slide 17


How to win this transaction

• •

Pre-qualify! Engineer a successful bid - Efficient Lignite mining plan and efficient operation - Efficient and effective KRPP construction plan for early and compliant commercial operation - Realisation of operational synergies with B1 & B2 - Efficient and effective B1 & B2 operation - Optimum cost of capital - Integrating value synergies from trading with regional markets through successful development of KRPP 2 option

Kosovo Lignite Power PricewaterhouseCoopers LLP

January 2010 Slide 18