UNIT C “Narative- Architecture could tell a story’’
INTERGRATED ARCHITECTURAL DESIGN PROJECT LUM KAR MAN
UCSI UNIVERSITY
Unit C CRISIS OF HULU LANGAT
Introduction Malaysia has recently beem hit by widespread ����� which was observed in various stage throughout the country between Saturday, December 17th, and Sunday 19th. Heavy rains began to fall on Friday, but the intensity of the rain increased ������� on Saturday. More than 34,000 people have been displaced as a result of severe ��� in at least six states, including Selangor, forcing the morbilisation of Malaysia’s militiary ������������������������������� Unit C focuses on current relief trends and their design implications for the communities who are vulnerable and also in need of humanitarian supports. How can we ���� ly advocate the policies taht help the disaster victim? How can humanitarian design and building contribute to the saving of lives, the protection of sustainable developement, and the promotion of peacebuilding in a larger framework of community and ressilience, while also honouring fundamental human rights for safety and shelther.
Group members Lum Kar Man 1001955427 Valerie Tan Qin Rou 1001850343 Darren Tan Jun Lee 1001849862 Chean Yee Wee 1001335545 Caelester Ho Kai Tao 1001850732 Lee Koh Ren 1001746483 Al Taib Ali 1001438284 Tan Jia Ming 1001850399 Yong Woon Kang 1001956960
PROJECT 1A COLLECT DATA, ANALYSIS ‘‘ Talk about the building type and typologies and how it is rekated to the lifestyle of people in Hulu Langat.’’
1. Single storey 2. Convex shaped 3. Timber 4.Anjung
1. Single storey 2. Convex shaped 3. Timber, Brick 4. Extended Kitchen
1. Double storey 2. L- shaped 3. Timber, Brick 4. Front Porch
1. Single storey 2. L- shaped 3. Timber, Brick 4. Extended Kitchen
1. Singel storey 2. L- shaped 3. Timber, Brick 4. Extended anjung
1. Single storey 2. Rec- shaped 3. Timber, Brick, Zinc 4. Front porch
1. Single storey 2. Convex shaped 3. Brick 4. Front Porch 1.Single Storey 2.Cross shaped 3. Brick 4.Big compound with
1. Single storey 2. L- shaped 3. Brick 4. Big Front Porch
1. Single storey 2. Convex shaped 3. Brick 4. Front Porch
1. Single storey 2. Convex shaped 3. Brick 4. Front Porch
1. Single storey 2. Convex shaped 3. Brick 4. Front Porch
1. Double Storey 2. Convex shaped 3. Brick 4. Extended Parking
Kitchen Interior
Before Flood
Storage Space
After Flood
Before Flood
After Flood
Before Flood
After Flood
Kitchen Interior
Interior Perspective
Extended Toilet
A compilation of the few most prominent building typology in Hulu Langat which is the topic our group
houses (upper left), kampung houses (upper right), industrial workshop (beside kampung house), school (below workshop), mosque and even the mixed use building. This poster also integrated human activities that are illustrated in the poster.
PROJECT 2A VISUAL, NARRATIVE, STORYLINE ‘‘ Talk about how climate change afftects humans being and give speculative soluiton.’’
PARASITE "Ectoparasites survive by feeding on other organisms known as hosts. They are highly adaptable and can survive in a variety of environments." Humans seek refuge in their homes, but they are increasingly confronted with issues that threaten to destroy their homes. For an example flood disasters are expected to occur in Hulu Langat every year during the monsoon season and their houses were washed away by the flood.
Parasite micro home allows people to migrate with their homes and belongings when one feels threathened or dangered. The design incorporates preventative measures, flexibility, and sustainability, which benefits both the owner and the environment.
Light energy collected by solar panel
The house meets all of the requirements to be called a home. Despite its small size, it could accommodate a small family with a few activities going on at the same time.
Direct wind and spin the wind turbine
Parasite micro homes could switch between modes and attach to any surface. Legs are attached to the house to allow it to stand on the ground and adjust to terrain height differences. The bottom of the house is designed to float in water. Furthermore, steel ropes are part of the structural element which act as an anchor allowing the house to be hung among trees. When a parasite micro house attaches to different environments, it can prevent deforestation for new housing development, because it embraces and places itself among nature.
Rainwater collection into rainwater harvesting tank
The curve solar panel is cladded on the aluminium. The design obeys the Bernoulli’s principle, given an aerodynamic shape, which directs the wind movement to the wind turbine at the front and back of the structure. The wind turbine would transform into a water turbine when flood hapens. The house's exterior is covered with solar panels to generate electricity, and the wind turbine, when used to generate power, will convert into a water turbine.
While the house is designed off grid, it has sufficient power generating elements such as the solar panels, wind turbine and hydropower to supply the electrical needs of the user.
EXPLODED DRAWING 1 1
2 3 5
2
4
1. 30mm 100 Watt 12 Volt Flexible Monocrystalline Solar Panel
5
2. 15 mm aluminum composite panel with application of white spray paint finishes 3. Epdm rubber waterproof membrane
5
4. Polystyrene rigid insulation
6 3
UP
UP
4
Space: 1. Bedroom 2. Working Space 3. Living Room 4. Kitchen 5. Washroom 6. Laundry
SITE PLAN The site is located at a undeveloped green area which located next to the river. Flood occured frequently which the water level can reach to around 3 metre height. The reason we chose this site because it has good view and wide area which is suitable for wind turbine to generate electricty.
5. Carbon fiber framing with application of white spray paint finishes
1
2
FLOOR PLAN
Wind turbine
INTERIOR PERSPECTIVE 2
31
1
8 7
4
ERFRCCTHC
GRCGRCC
VSDBDF MGDRGH, KL, GJ,
SECTION A
SECTION B
5
6
9
10
Space: 1. Turbine 2. Bedroom 3. Wardrobe Space: 4. Storage 1. Turbine 5. Living table 2. Bedroom 6. Tatami storage 3. Wardrobe 7. Water tank 4. Storage 8. Washroom 5. Living table 6. Tatami storage 9. Laundry 10. Converter room 7. Water tank
PROJECT 2B VISUAL, NARRATIVE, STORYLINE ‘‘ Talk about how climate change afftects humans being and give speculative soluiton.’’
‘‘In a context of climate change and rapid urbanization, the design community should consider to reengage and embrace urban water challenge as a design oppurtunity.’’ - Muller(2018)
This poster reflects that climate change is somthething that will happen 50-100yeras later. If the poeple keeps blocking the flood water and building high scafolding structure, they will change their lifestyle completely and turn to be walking on slits due to contamination in the water. Why not we use the natural way to filter the flood water instead of chlorine in order to bribg back their normal lifestyle like swimming, bathing, recreational and bathing.The value is right in front their doorstep they need to step out andappreciate it.
POSTER IN-DEPTH
BIO FILTRATION Filter with natural instead of chlorine
LIFESTYLE Walk on slits to prevents contamination
LFESTYLE Move to higher ground to prevent flood
SWIMMING Enjoy the clean water from “river pool”.
BATHING Clean water for the residents in Hulu Langat.
RECREATIONAL Activities like fishing, and kayaking,
Degartion as Morphosis The conceptual model narrates about how the nature could heal itslef and wildlife start to comeback.
PROJECT 2b NARRATIVE, SOLUTION ‘‘ Talk about the speculative solution and the site condition of Hulu Langat.’’
Master Planning
Plan Development
Section Development
Form Development
Proposed Landscape
Progressive Massing
MOCKUP MODEL
PROJECT 3 OASIS OF CALM ‘Architecture that solves the water crisis in Hulu lanagt.’
THE OASIS OF CALM
Community Water Bank & Visitor Centre Hulu Langat is facing serious water shortage issue during flood .My building is a community water bank that aim to supply water for the residents in Hulu Langat so that they do not have to wait for other authority for water supply. The building has its own filtration system using natural way such as wetland and biosand filter. The community can celebrate the clean water here with the public facilities like hot spring, sauna, public pool. The river water is filtered then stored so that it can be lifesaver for the community when flood happens. There is a micro dam in the middle act as a grey water collection and it is designed like a stepwell so that people can go down and swim. It is also supply water for the facilities around it so that my building can a sustainability water supply.
Rear Elevation
Front Elevation
Section A-A scale 1: 250
Section B-B scale 1: 250
SECTION IN DEPTH
SECTION IN DEPTH
Natural Pool People can enjoy nature and swim in the wetland pool.
Hot Spring The constrcuted hot spring give people the experiece of Hulu Langat.
Observatory Tower People can capture the beautiful bird from inside the tower.
Santuary The landscape surrounding the santuary give the sense of living with the nature.
Water Collection Provide clean water when flood happened.
TECHNICAL REPORT
1.0 PLANNING AND BUILDING GUIDELINE 1.1 BUILDING SETBACK REQUIREMENT A 2.86 acres development in between Batu 18, Hulu Langat. The site is a rural area with dense forest. Location: Lot 808 Area: 2.86 acres According to site analysis by Unit C and some info from local authority, the site is allowed / conditional allowed for the development that proposed: Building Typology – (1) Institution (2) Community Centre (programme-specific to project proposal) Since the existing location has been severely damaged by the recent flooding, it is essential to reconstruct and recreate a locus of Batu 18 that can connect and gather the people of the town. It is also direct and appropriate for dealing with the situation and producing solutions to problems. Manual Garis Panduan dan Piawaian Perancangan Negeri Selangor
1.2 UBBL SITE PLANNING REQUIREMENT 1.2.1 UBBL clause 134. Designation of purpose group
Level
Refer to Schedule 5 in UBBL, the proposed design is under: Purpose Group II: Institutional Purpose Group V: Shop
1.2.2 UBBL clause 140. Fire appliances access According to UBBL clause 140, the proposed building volume is 4013.27m3 , hence the minimum proportion of perimeter of building for fire appliances access is one-sixth of total building perimeter. Thus, road or open space not less than 12 metres width and accessible to fire brigade appliances is provided (as shown in site plan)
Ground Floor
Bomba road access width min 6m, proposed road width 12m (for fire access). For turning radius, proposed 12m turning radius (as per min turning radius for truck).
First Floor
Gross Floor Area (m2)
Building Height (m)
Volume (m3)
70.24
4
280.96
79.11
4
316.44
Recycling Storage
19.88
3
59.64
Multipurpose Hall
79.83
7
558.81
Store Room
11.94
4
47.76
Toilets
30.92
4
123.68
Surau
24.35
4
97.40
Foyer
26.68
4
106.72
Meeting Room
20.24
4
80.96
Community Hall
69.33
4
277.32
Management Office
27.88
3
83.64
Lobby
29.43
4
117.72
M&E Room
8.00
3
24.00
Pump Room
8.00
3
24.00
Refuse Chamber
8.00
3
24.00
Utility Room
8.00
3
24.00
Watch Tower
15.44
3
363.19
174.08
46.32 2293.37
Function Room 1
20.77
3
Function Room 2
21.65
3
64.95
Office
78.92
3
236.76
Multipurpose Hall
25.57
3
76.71
Cafeteria
43.82
3
131.46
Restaurant
25.57
3
76.71
Santuary Type A
40.05
3
120.15
16.52
3
Subtotal Second Floor
Purpose Group V: Shop
Wetland Greenhouse
Santuary Type B
Hydrant location: - Not less than 2m from the adjacent building and overhangs - Between 0.61m to 2.4m from fire appliances access - Not more than 91.5m away (for new building, provided if there’s no hydrant in a radius of 45m)
Group II: Institutional Gross Floor Area (m2)
Recycling Workshop
Subtotal
1.2.3 UBBL clause 225. Detecting and extinguishing fire According to UBBL clause 225, every building shall be served by at least one fire hydrant located not more than 91.5 metres from the nearest point of fire brigade access
Space
378.29
Watch Tower
33.28
Flood Gallery
125.32
Subtotal
158.60
Total
900.08
Table: Schedule of Accommodation
62.31
49.56 818.61
4
901.29 901.29
174.08
4013.27
1.3 PASSIVE BOMBA DESIGN 1.3.1 Compartmentation UBBL clause 134, 136, 138, Fifth schedule As the area of building are still under limits of dimension, no compartmentation are needed.
11m
Calculation of exit width Purpose Group II: Institutional Largest gross floor area = 378.29m2
Occupancy load square meter per person = 4.5 net
Capacity exit for door = 100 people per unit
Fifth schedule: Designation of purpose groups
1.3.2 Exits and Evacuation UBBL clause 166. Measurement of travel distance to exits UBBL clause 168. Staircase UBBL clause 172. Emergency exit signs UBBL clause 177. Computing number of staircase and staircase width UBBL clause 181. Width of means of egress Seventh schedule
Measurement of travel distance Dead end limit for: Purpose Group II: Institutional– 9m Purpose Group V: Shop – 15m Unsprinklered: Purpose Group II: Institutional– 30m Purpose Group V: Shop – 30m (Source: UBBL Seventh schedule)
Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x 550mm = (378.29/4.5/100) x 550mm = 460mm 50% of width for main exit is required, min 700mm width of exit, proposed Main exit: 2700mm width Secondary exit: 1800mm width
Purpose Group V: Shop Largest gross floor area = 174.08m2
Occupancy load square meter per person = 3 net
Capacity exit for door = 100 people per unit
Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x 550mm = (174.08/3/100) x 550mm = 319.14mm 50% of width for main exit is required, min 700mm width of exit, proposed Main exit: 2700mm width Secondary exit: 1800mm width
10.4m
7.4m
7.4m 8.4m
Calculation of exit width Purpose Group II: Institutional Largest gross floor area = 522.95m2 Occupancy load square meter per person = 4.5 net Capacity exit for staircase = 60 people per unit Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x 550mm = (522.95/4.5/60) x 550mm = 1065mm 1 number of staircase proposed, the width of staircase will be as follow, total width 1065mm width of one staircase. Staircase 1 = 1100mm width Purpose Group V: Shop Largest gross floor area = 542.20m2 Occupancy load square meter per person = 3 net Capacity exit for staircase = 60 people per unit Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x 550mm = (542.20/3/60) x 550mm = 1660mm 2 number of staircase proposed, the width of staircase will be as follow, total width 1660/2=830mm width of one staircase. Staircase 1 = 900mm width Staircase 2 = 900mm width
Foundation Detail Sub-Structure Concrete pad foundation -Foundation: Shallow foundation -pad foundation -Pad foundations are a form of spread foundation formed by rectangular, square, or sometimes circular concrete ‘pads’ that support localised single-point loads such as structural columns, groups of columns or framed structures. This load is then spread by the pad to the bearing layer of soil or rock below. Pad foundations can also be used to support ground beams. Strip foundation Strip footings are the best option for light loads, it is used as a mass concrete footing. The size and positions of strip footings are usually proportional to the width of the wall structure.
AR724 WORKING DRAWING BACHELOR(HONS) IN ARCHITECTURE FACULTY OF ENGINEERING, TECHNOLOGY & BUILT ENVIRONMENT SCHOOL OF ARCHITECTURE AND BUILT ENVIRONMENT JAN-MAY 2022 ASSIGNMENT PROJECT 2 PREPARED BY: LUM KAR MAN ID: 1001955427 CHECKED BY: AR HISHAM SAIHARI
KM ARCHITECTS
DRAWING SCHEDULE RECORD
1000
CONSTRUCTION DRAWING
PROJECT :
DRAWING LIST NO :
SHEET NO :
1
PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: -
WATER BANK COMMUNITY SPACE ACCOMMODATION UNITS WETLAND BATH HOUSE
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. DATE OF ISSUE NO :
DRAWING NO :
DRAWING DESCRIPTION :
DATE
08
MONTH 04 YEAR
KEY DRAWINGS
PLANS
1
KM/2022/01/CD/1001
KEY PLAN , LOCATION PLAN, SITE PLAN
A1
2
KM/2022/01/CD/1101
GROUND FLOOR PLAN
A1
3
KM/2022/01/CD/1102
FIRST FLOOR PLAN
4
KM/2022/01/CD/1103
SECOND FLOOR PLAN
5
KM/2022/01/CD/1111
ACCOMMODATION PLAN
6
KM/2022/01/CD/1112
TYPICAL UNIT FLOOR PLAN (TYPE A)
7
KM/2022/01/CD/1121
STAIRCASE FLOOR PLAN
A3
8
KM/2022/01/CD/1200
FRONT ELEVATION
A1
9
KM/2022/01/CD/1201
REAR ELEVATION
10
KM/2022/01/CD/1202
RIGHT ELEVATION
A1
11
KM/2022/01/CD/1203
LEFT ELEVATION
A1
12
KM/2022/01/CD/1300
SECTION A - A
13
KM/2022/01/CD/1301
SECTION B - B
14
KM/2022/01/CD/1113
UNIT TYPE A SECTION A - A
15
KM/2022/01/CD/1122
STAIRCASE SECTION A - A
A3
16
KM/2022/01/CD/1123
STAIRCASE SECTION B - B
A3
17
KM/2022/01/CD/1124
RAILING DETAIL SECTION
18
KM/2022/01/CD/1400
WALL TO ROOF DETAIL SECTION
A3
19
KM/2022/01/CD/1500
WALL TO SLAB TO CEILING DETAIL SECTION
A3
20
KM/2022/01/CD/1600
OVERALL TYPICAL DETAIL SECTIONAL AXONOMETRIC
A3
21
KM/2022/01/CD/1700
FACADE ASSEMBLY DETAIL EXPLODED AXONOMETRIC
A3
22
KM/2022/01/CD/1800
5 MISCELLANEOUS DETAILS
A3
SIZE
A3
FOR TRANSMISSION PURPOSE
COMPANY ATTENTION : RECEIVED BY : SIGNATURE : DATE :
22
NUMBER OF SETS ISSUED I
FOR INFORMATION
LDSB
P
PRELIMINARY
SNA
R
AS REQUESTED
NDY
T
FOR TENDER
ODS
C
FOR CONSTRUCTION
JK
A
FOR APPROVAL
ALMA
S
FOR SOFTCOPY
OTHER
The Oasis of Calm
Hulu Langat is facing serious water shortage issue during flood .My building is a community water bank that aim to supply water for the residents in Hulu Langat so that they do not have to wait for other authority for water supply. The building has its own filtration system using natural way such as wetland and biosand filter. The community can celebrate the clean water here with the public facilities like hot spring, sauna, public pool. The river water is filtered then stored so that it can be lifesaver for the community when flood happens. There is a micro dam in the middle act as a grey water collection and it is designed like a stepwell so that people can go down and swim. It is also supply water for the facilities around it so that my building can a sustainability water supply. This project not only help to filter the river water constantly but also provide a community space for people to enjoy the activities of Hulu Langat here. The material used is mainly eco-friendly so that it give a nature and humble feeling for the community.
NOTE:
ACCOMODATION FACILITIES ACCOMODATION UNIT TYPE A
4
8
109.2
ACCOMODATION UNIT TYPE B
4
10
116.4
PUBLIC SPACE RECYCLING WORKSHOP
1
8
100
MULTIPURPOSE HALL
1
15
200
THATCH WORKSHOP
2
8
100
CAFETERIA
1
15
180
OUTDOOR DINING
-
15
180
WETLAND GREENHOUSE
1
20
400
BIOSAND FILTRATION ROOM
1
4
340
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
PROJECT TITLE PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
ANCILLARY FACILITIES
N
CLIENT:
SERVICES
N
KEY PLAN
KEY PLAN
N.T.S
N.T.S
A
B52
1
8
8
180
MEN'S SAUNA
1
4
90
WOMEN'S SAUNA
1
4
90
00
UTILITIES
75
JALA N LANG HULU AT
B
PUBLIC BATHROOM
52 58
C
2
D
46
8121 7
0
90.809m
40
BATTERY ROOM
1
2
40
M&E ROOM
1
2
40
35
F
Plaster & Paint Metal Strip
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
2250m²
3
11
E
Skim Coat & Paint
2
96.264m
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
ARCHITECT
1
PUMP ROOM
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
LUM'S ARCHITECTS No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
G
20
0101 7
0
B52
JAL A LAN N HUL U GAT
19 18
A -
B52
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
4
5
CONSULTANTS
17
80.000
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
A -
6
16
SUNKEN CARPARK
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
64.51
7m
7
989m
108.
DRAWING STAGE
8
CARPARK
CARPARK
3°09'17.9"N 101°50'38.2"E
9
10
Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
KEY PLAN, SITE PLAN, SCHEDULE OF ACCOMODATION
SETB
ACK LIN
BOUN
DARY
LINE
E
11 12
N
SITE PLAN
EB
SCALE 1:500 0
10
13
JAL DU AN KA SU N T MPUN UA GS
20
30
40
50
ER
AN
G
15 15
14
DRAWING TITLE SCALE
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2020/017/WATER
DRAWING NO
KM 2020/01/CD/ 1001
LEGENDS Floor Finishes
1300
B52
01
A
RE
1 JALA N LANG HULU AT
NOTE:
TV
Timber Vinyl Wall Finishes
75
00
B
Rammed Earth
20
RE
Rammed Earth
RF
Raw Finish
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.
00
0
°
2
10
C
80
E
WC
Wood Ceiling
PC
Plaster Ceiling
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
UP
00
RF RF
TV
FL: +6800
CLIENT:
00
20
00
G
B52
3
WETLAND GREENHOUSE
60
F
All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
PROJECT TITLE
° 12
00
20
90.809m
00
D
Ceiling Finishes 96.264m
51.3m²
20
FFL : +7000
WETLAND GREENHOUSE
RF
TV
FL: +7100
16°
UP
AA
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
IDG
BR E
0
+650
TV
FL:
GE
KA
LIN
BB CC
4
8000 6000 6°
3800
18
PUMP
ROOM
800 FL: +6
FL: +6800
DN
5
4.02m²
FISHING
DECK
TV
FL: +6800
dn: 300
9°
300 DP
STORAGE
67.82m²
FL: +7100
RECYCLING WORKSHOP TV
D1
TV
11.67m²
RE WF
FL: +7100
TV
TV
RF RF
FL: +7100
RF RF
FL: +7100
REFUSE CHAMBER
01
1300
80.000
RE WF
FL: +7100
UP
DN
UP
8°
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
D1
300 DP
17
dp: 900
B52
RF RF
FL: +7100
63.7m²
WORKSHOP
10°
01
1300
TV
D1
THATCH WORKSHOP
6.56m²
ARCHITECT
20.51m²
STORAGE
81.6m²
D1
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
5°
JAL A LAN N HUL U GAT
19
16
6
WOM EN SPRI HOT NG
FL: +6 000
CHAN
GI ROOMNG
MEN HO SPRI T NG
FL: +6 800
LUM'S ARCHITECTS
FL: +6 000
WAT ER TANK
FFL
m
00
64.517
FL: +6 800
TV
DP
CAFETERIA TV
: +68
100
41.03m²
SUNKEN CARPARK
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
11°
PUBL IC SPRI HOT NG
FL: +6 000
RF RF
7
FL: +7100 46.16m²
BIOSAND FILTRATION TV
RF RF
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
FL: +7100
CONSULTANTS
11°
D3
m
.989
108 FF U P
68
00
RF
:+
00
+71 FL:
L
FF
0
.0
71
:+
100
D2
UP
² ION .8m AT 26 OD M IT RF CO UN RF
UP
100 DP
AC
TV
100 DP
D2
FL:
00
+71
D3
D2
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
°
RF RF
100 FL: +7
12
TV
DP
D2
N
TIO MODA ACCO UNIT
100
²
21.6m
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
8
DP
TV
L
A
TV
D3
UP
² N .6m TIO 21 ODA OM NIT RF CC U
CARPARK
CARPARK
² 26.8m TION DA MO UNIT RF RF
TV
3°09'17.9"N 101°50'38.2"E
ACCO
9
00 FL: +71
7°
D3
ACK LI
DARY
LINE
NE
11
BOUN
7°
SETB
10
DRAWING STAGE Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
00
1/5/2022
REVISION
7°
7°
N
EB
SCALE 1:250 0
10
ER
AN
G
15
13
14 01
GROUND FLOOR PLAN
7°
7°
1300
JAL DU AN KA SU N T MPUN UA GS
12
DRAWING TITLE TOILET DETAIL SCALE
20
30
40
50
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1101
LEGENDS Floor Finishes
01
1300
A
B52
RE
1
Rammed Earth
TV 75 00
JALA N LANG HULU AT
B
Timber Vinyl Wall Finishes
RE
D
20 00
96.264m
WC
Wood Ceiling
PC
Plaster Ceiling
All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
80 00
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
3
60 00
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.
PROJECT TITLE
20 00
G
CLIENT:
20 00
B52
2
Raw Finish Ceiling Finishes
90.809m
E F
Rammed Earth
RF
10 00 0
C
NOTE:
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
JAL A LAN N HUL U GAT
19
4
18
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
5
Skim Coat & Paint
ARCHITECT Plaster & Paint
01
1300
B52
01
17
1300
Metal Strip
80.000
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
6
16
LUM'S ARCHITECTS
SUNKEN CARPARK
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
64.517
m
7
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CONSULTANTS
m
.989
108
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
8
CARPARK
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
CARPARK
3°09'17.9"N 101°50'38.2"E
9
10 SETB
ACK LI
BOUN
DARY
LINE
NE
11
DRAWING STAGE Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
MANHOLEDETAIL
12
N
SCALE 1:250
10
ER
AN
G
15 15
14 01
EB
1300
ROOF PLAN 0
13
JAL DU AN KA SU N T MPUN UA GS
DRAWING TITLE TOILET DETAIL SCALE
20
30
40
50
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1103
NOTE:
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
1
2
3
4
5
7
6
8
10
8
2700
9300
6300
14100
9200
38200
1560
10010
CLIENT:
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
10000
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
B
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
5400
C
2400
ARCHITECT 1200
A
4500
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
11
9 6800
BOUNDARY LINE
3.0m BUILDING SETBACK LINE
6.0m BUILDING SETBACK LINE
BOUNDARY LINE
PROJECT TITLE
G
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
1400
E 2700
F
LUM'S ARCHITECTS
2000
D
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CONSULTANTS Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
DRAWING STAGE
1 0
Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
00
1/5/2022
REVISION
NORTH ELEVATION SCALE 1:200 5
10
20
30
40
DRAWING TITLE TOILET DETAIL SCALE
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1200
NOTE:
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
1
2
4
7
6
5
8
9
10
D
BOUNDARY LINE
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
1003 6601
11284
10135
7861
4206
8699
8621
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
3106
1844
ARCHITECT
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
2870
C
B
CLIENT:
3375
A
12257
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
11
3 12116
12
3.0m BUILDING SETBACK LINE
BOUNDARY LINE
3.0m BUILDING SETBACK LINE
PROJECT TITLE
LUM'S ARCHITECTS
E
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CONSULTANTS Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
DRAWING STAGE
1 0
Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
00
1/5/2022
REVISION
WEST ELEVATION
SCALE 1:200 5
10
20
30
40
DRAWING TITLE TOILET DETAIL SCALE
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1203
NOTE:
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
PROJECT TITLE PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
CLIENT:
1
2
3
4
6
7
9
8
10
11
12
13
14
15
16
17
18
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
19
20
21
5
4000
22
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
1303 9667
2460
1388 4255
9071
9104
9026
9058
3000
3000
3000
3000
3000
3000
3000
3000
3000
8100
ARCHITECT
2000
A
8032
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
3800
B
D F
G
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
1155 3000
E
LUM'S ARCHITECTS
2800
C
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CONSULTANTS Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
DRAWING STAGE
1 0
Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
SECTIONA-A
SECTION A-A SCALE 1:200 5
10
20
30
40
DRAWING TITLE SCALE
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2020/017/WATER
DRAWING NO
KM 2020/01/CD/ 1300
NOTE:
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
PROJECT TITLE PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
1
2
4
5
6
7
8
9
10
11 12
CLIENT:
3 ____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
A
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
B
ARCHITECT
C D
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
E
LUM'S ARCHITECTS No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CONSULTANTS Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
DRAWING STAGE Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
00
1/5/2022
REVISION
B-B 2 SECTION SCALE 1:200 0
5
10
20
30
40
DRAWING TITLE TOILET DETAIL SCALE
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1301
10mm(Thk) Wood Floor and Subfloor Detail to Engr Approval 100mm(Thk) Wood Ledger Beam Connect with Bolt Detail to Engr Approval 400mm (Thk) Stabilized Rammed Earth Detail to Engr Approval 75mm (Thk) Eps Rigid Insulation Detail to Engr Approval 40mm (Thk)Bio Degradable Rammed Earth Brick Detail to Arch Approval 10mm (Thk) Mortar as Skeleton Wall Detail to Arch Approval Steel Knife Edge Connector Detail to Engr Approval
100mm(Thk) Wood Ledger Beam Detail to Engr Approval
1
WALL TO SLAB TO CEILING DETAILS
SCALE 1:10
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
WALL TO SLAB TO CEILING DETAILS
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1500
Submission Tender Construction Loaded Dwg
E
D C N
A
B
1 2
3 4 5
1
ACCOMODATION UNIT DETAIL - KEY PLAN
SCALE 1:50
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
ACCOMODATION UNIT DETAIL - KEY PLAN & UNIT PLAN
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/1111
Submission Tender Construction Loaded Dwg
A
N
B 3934
B
A 3200
1
DOUBLE BED
STAFF'S BEDROOM TOILET
4300
WORKING TA
BLE
3
5500
SHARING LIVING UNIT
4 2
WARDROBE
1800
WARDROBE
5
2 1
BALCONY
3
TYPE A- STAFF'S UNIT
SCALE 1:50
TYPE B- COUPLE SHARING UNIT
SCALE 1:50
ACCOMODATION UNIT DETAIL - UNIT PLAN
SCALE 1:50
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
ACCOMODATION UNIT DETAIL - KEY PLAN & UNIT PLAN
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/1111
Submission Tender Construction Loaded Dwg
17
80
°
5°
100mm(W) x 50mm(THK) H.W railing at 900mm height attached to baluster 25mm(THK) Ceramic tiles flooring finish on cement screed. Detail to ARCH
800mm(W) RC staircase with 200mm(H) risers and 400mm(L) tread. Detail to ENGR
UP
1
STAIRCASE PLAN
SCALE 1:50
100 65
27
7.8728
18
100mm(W) x 50mm(THK) H.W railing at 900mm height attached to baluster
4
4
25mm(THK) Ceramic tiles flooring finish on cement screed. Detail to ARCH
14
57
800mm(W) RC staircase with 200mm(H) risers and 400mm(L) tread. Detail to ENGR
2
3
STAIRCASE AXONOMETRIC
STAIRCASE SECTION
SCALE 1:50
SCALE 1:50
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
STAIRCASE DETAIL
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/1122
Information Submission Tender Construction Loaded Dwg
2
LEGEND FOR DETAIL 1.2 4
5
6 7
8
9
1
11
2
10MM THK. PAVER, WITH SHIM, DETAIL TO ENGR AND ARCH APPROVAL
3
600MM (H) ENGINEERED SOIL, FINISHED WITH GRASS, DETAIL TO ENGR AND ARCH APPROVAL
4
300MM THK. GRAVEL LAYER, LAID ABOVE MOISTURE RETENTION LAYER, DETAIL TO ENGR APPROVAL
5
10MM FILTER FABRIC, LAID UNDER ENGINEERED SOIL, DETAIL TO ENGR APPROVAL
6
10MM THK. MOISTURE RETENTION LAYER, DETAIL TO ENGR APPROVAL
7
10MM AERATION LAYER, DETAIL TO ENGR APPROVAL
8
10MM THK DRAINAGE LATER, TO ALLOW DRAINAGE PIPE TO FIT, DETAIL TO ENGR APPROVAL
9
400MM INSULATION LAYER, FILLED WITH EXTRUDED POLYSTYRENE (XPS), DETAIL TO ENGR APPROVAL
300mm
10
5MM THK. SHEET METAL PARAPET CAP SLOPED TO DRAIN ROOD SIDE, SHIM AS REQUIRED , DETAIL TO ENGR APPROVAL
90mm(Thk) Rammed Earth Degradable Facade Detail to Manuf Approval
30
600mm
3
1
850
1
Mortar with steel wire Detail to Engr Approval
Gravel
10
10MM THK PROTECTION COURSE, DETAIL TO ENGR APPROVAL
11
5MM THERMOPLASTIC WATERPROOFING MEMBRANE, DETAIL TO ENGR APPROVAL
100mm(Thk) Exterior Plywood Grade 10mm(Thk) Waterproof Membrane 10mm (Dia) Painted Steel Angle Detail to Manuf Approval 10mm (Dia) Painted Steel Tube Detail to Manuf Approval
ROOF GARDEN DETAIL
SCALE 1:20
Stone Base TOP OF WALL
TOP PLATE
60mm x 60mm Top Plate Detail to Engr Approval
2
FACADE SECTIONAL DETAIL
SCALE 1:20
10mm(Thk) Mortar with steel wire Detail to Engr Approval
Reinforce Concrete Bond Beam Detail to Engr Approval
TOP OF BEAM
90mm(Thk) Rammed Earth Degradable Facade Detail to Manuf Approval
40mm(Thk) Reinforced Rammed Earth Wall With 10mm( Thk) Rigid Insulation Detail to Engr Approval
100mm(Thk) Exterior Plywood Grade. Detail to Manuf Approval
Water Tank
FINISHED FLOOR
Stone Base BTTM OF FOOTING
2
2
WALL, SLAB TO ROOF DETAIL
SCALE 1:40
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
PROJECT TITLE
WALL, SLAB TO ROOF DETAIL
DRAWN BY
LUM KAR MAN
PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS:
Submission Tender Construction Loaded Dwg
FACADE ASSEMBLY DETAIL EXPLODED AXONOMETRIC
SCALE 1:40
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1400
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
FACADE ASSEMBLY DETAIL EXPLODED AXONOMETRIC
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1700
Submission Tender Construction Loaded Dwg
750
MM
1100mm(H) Wooden Railing fixed to wooden batten. Detail to Engr Approval 200mm(Thk) x 200mm(L) Wooden Frame connected with stainless steel bolt . Detail to Engr Approval. 60mm(L)x 40mm(Thk) Wood Purlins bolted into vertical frame. Detail to Engr Approval 10mm(Thk)Fireproof membrane fixed to thatch. Detail to Engr Approval
75mm(Thk) Timber Structure Detail to Engr Approval
10mm(Thk) Column cap Detail to Engr Approval
10MM Bolt Connected with Steel Cap Detail to Engr Approval 10mm(Thk) Steel Cap Detail to Engr Approval
500MM
200mm(Thk) Concrete Column Detail to Engr Approval
200MM
400mm(Thk) Thatch fixed to frame with thatching hook. Detail to Engr Approval 400mm(L)x 180mm(H) Sunken stone auditorium steps. Detail to Engr Approval 10mm(Thk) Wooden flooring board painted with waterproof acrylic. Detail to Engr Approval. 300mm(Thk) Footing Foundation bolted with wooden frame. Detail to Engr Approval. 600mm(Dia) Wooden Column as support to the bridge. Detail to Engr Approval.
1
SECTIONAL AXONOMETRIC
SCALE 1:50
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
SECTIONAL AXONOMETRIC
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/1600
Information Submission Tender Construction Loaded Dwg
600mm(Thk) Upper Thatch Roof Detail to Manuf Approval Ø 6mm Laths Detail to Engr Approval 60mm x 40mm Wood Batten Detail to Engr Approval Water Collection canal Opening for birds Nesting Space- Dense Timber Structure
5mm(Thk) Sheet Metal Parapet Cap Drain Roof Side Detail to Engr Approval.
600mm(Thk) Lower Thatch Roof Structure Detail to Manuf Approval 75mm(H)x 30mm (Thk) Rafter Detail to Engr Detail Approval 40mm x 30mm Wood Batten Detail to Engr Approval
10mm(Thk) Paver Detail to Engr Approval.
60mm x 40mm Top Plate Detail to Engr Approval
600mm(H) Engineered Soil, Finished with Grass Detail to Engr Approval.
600MM
5mm(Thk) Gravel Layer, Lad Above Moisture Retention Layer Detail to Engr Approval. 10mm(Thk) Filter Fabric laid under Engineered Soil Detail to Engr Approval.
300MM
600mm(Thk) Upper Thatch Roof Detail to Manuf Approval
10mm(Thk) Moisture Retention Layer Detail to Engr Approval. 10mm(Thk) Aeration Layer Detail to Engr Approval. 10mm(Thk) Protection Course Detail to Engr Approval.
Ø 6mm Laths Detail to Engr Approval 60mm x 40mm Wood Batten Detail to Engr Approval
5mm(Thk) Sheet Metal Parapet Cap Drain Roof Side Detail to Engr Approval.
Water Collection canal
100mm(Dia) Water Pipe Connect to Water Tank Detail to Engr Approval.
100MM
Opening for birds Nesting Space- Dense Timber Structure
600mm(Thk) Lower Thatch Roof Structure Detail to Manuf Approval 75mm(H)x 30mm (Thk) Rafter Detail to Engr Detail Approval
1
1
MISCELLANEOUS DETAIL 1: Opening for Birds
SCALE 1:40
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
PROJECT TITLE
MISCELLANEOUS DETAIL 1: OPENING FOR BIRDS
DRAWN BY
LUM KAR MAN
PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS:
Submission Tender Construction Loaded Dwg
MISCELLANEOUS DETAIL 2: Roof Garden Details
SCALE 1:20
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1810
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
MISCELLANEOUS DETAIL 2: ROOF GARDEN DETAILS
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1820
Submission Tender Construction Loaded Dwg
750
MM
330MM
20MM 750MM
75mm(Thk) Timber Structure Detail to Engr Approval
10mm(Thk) Vertical Batten Marking Every Rafters Detail to Engr Approval Thatching hook fixed the thatch
10mm(Thk) Column cap Detail to Engr Approval
75mm(Thk) Rafter with Fixing Battens Detail to Engr Approval
10MM
10mm(Thk) Fire- retarding insulation board Detail to Engr Approval
Bolt Connected with Steel Cap Detail to Engr Approval
40mm x 40mm (Thk) Blocking pinned to rafter feet Detail to Manuf Approval
70MM
10mm(Thk) Steel Cap Detail to Engr Approval
60MM
500MM
60mm x 40mm(Thk) Top Plate Detail to Engr Approval
200mm(Thk) Concrete Column Detail to Engr Approval
Existing Wall
200MM
1
1
MISCELLANEOUS DETAIL 3: Concrete and Timber Connection
SCALE 1:20
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information Submission Tender Construction Loaded Dwg
REMARKS
MISCELLANEOUS DETAIL 4: Thatching Techniques
SCALE 1:20
DRAWING TITLE
SCALE
AS SHOWN
PROJECT TITLE
MISCELLANEOUS DETAIL 3: CONCRETE AND TIMBER CONNECTION
DRAWN BY
LUM KAR MAN
PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS:
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1830
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
MISCELLANEOUS DETAIL 4: THATCHING TECHNIQUES
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/ 1840
Submission Tender Construction Loaded Dwg
PVC Inlet Pipe Dirty Water Inlet Biofilm Layer Fine Layer 100mm (dia) Local species bamboo lintel, treated with boric acid
Fine Sand Pea Gravel Sand Gravel Layer
200mm(Thk) Thatch connected with J Bolts and Bamboo Pulins Detail to Engr Approval.
200mm (Thk) Wooden Flooring bolted with bio sand filter. Detail to Engr Approval
PVC Outlet Pipe
2
MISCELLANEOUS DETAIL 5: Water Filter
SCALE 1:20
1000mm (H) x 200mm(dia) Bio Sand Filter for Water Purification Detail to Engr Approval
Bamboo principal rafter Thatch J-Bolt Bamboo Purlin
1
2
MISCELLANEOUS DETAIL 5: Water Filter Pavillion
SCALE 1:40
KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com
PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.
DRAWING STAGE Preliminary Information
REMARKS
DRAWING TITLE
SCALE
AS SHOWN
MISCELLANEOUS DETAIL 5: Water Filter Pavillion
DRAWN BY
LUM KAR MAN
CHECKED BY
AR. JAKE LUM
REVISON
DIRECTED
2022/017/WATER
DATE
DRAWING NO
KM/2022/01/CD/1850
Submission Tender Construction Loaded Dwg
MISCELLANEOUS DETAIL 5: Bamboo Connection
SCALE 1:20
NOTE:
LEGENDS 1300
B52
65mm(dia) HDPE PN16 VCP PIPE
01
A
JALA N LANG HULU AT
1 75 00
B
GT
Gully Trap to Arch detail
MH1 20
Proposed Manhole to Authorities Detail
10 00 0
°
C
80 00
90.809m
PROJECT TITLE
12
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
°
E
All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
96.264m
20 00
D
2
UP
CLIENT:
20 00
FFL : +7000
RF RF
TV
20 00
G
B52
3
WETLAND GREENHOUSE
60 00
F
51.3m²
WETLAND GREENHOUSE TV
RF
16°
UP
AA
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
KA LIN GE
BB
TV
E IDG BR
CC 4
8000 6000 6°
3800
18
PUMP
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
5°
JAL A LAN N HUL U GAT
19
ROOM
DN
5
4.02m²
FISHING
DECK
TV
dn: 300
ARCHITECT
20.51m²
9°
STORAGE
17
6.56m²
STORAGE
67.82m²
dp: 900
B52
RECYCLING WORKSHOP TV
RF RF
63.7m²
TV
RF RF
MH1
RF RF
TV
01
WORKSHOP
THATCH WORKSHOP
10°
01
1300
TV
D1
81.6m²
D1
1300
11.67m²
RE WF
REFUSE CHAMBER
D1
TV
80.000
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
D1
RE WF
DN
UP
8°
6
WOM EN SPRI HOT NG
CHAN
GI ROOMNG
15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
16
MEN HO SPRI T NG
LUM'S ARCHITECTS
150mm(dia) VCP discharge to MH2
FFL
WAT ER TANK
TV 15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
00
: +68
41.03m²
SUNKEN CARPARK
m
CAFETERIA
RF RF
64.517
TV
46.16m²
7
150mm(dia) VCP discharge to MH3
BIOSAND FILTRATION TV
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
11°
MH2
PUBL IC SPRI HOT NG
RF RF
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
MH3
CONSULTANTS
11°
D3
m
.989
108 FF U P
15 (G 0mm ra dien dia. t 1: VC 20 P 0) Pipe
00
MH4
D2 ² ION .8m AT 26 OD M IT RF CO UN RF
150mm(dia) VCP discharge to MH5
D3
D2
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
e
P Pip . VC ) m dia 1:200 150m ient (Grad
TV
°
UP
AC
D2
12
UP
RF RF
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
8
150mm(dia) VCP discharge to MH4
D2
N
TIO MODA ACCO UNIT TV
68
²
21.6m
RF
TV
U
TV
UP
AC
:+
D3
L
² N .6m TIO 21 ODA M IT RF CO N
CARPARK
MH5
CARPARK
²
26.8m TION MODA ACCO UNIT RF RF
150mm(dia) VCP discharge to MH6
TV
9
MH6
10
ER
AN
G
15
LINE
EB
SCALE 1:250 0
7°
7°
MH8
Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
MANHOLEDETAIL
12
13
14 01
Manhole Detail
7°
e
Pip P VC 0) dia. 20 m t 1: 0m en 15 radi (G
1300
JAL DU AN KA SU N T MPUN UA GS
NE
N
DRAWING STAGE
7°
MH7
150mm(dia) VCP discharge to main pipe
ACK LI
11
DARY
7°
SETB
10
BOUN
150mm dia. VCP Pipe (Gradient 1:200)
7°
D3
3°09'17.9"N 101°50'38.2"E
e
P Pip . VC ) m diat 1:200 150m ien (Grad
DRAWING TITLE TOILET DETAIL SCALE
20
30
40
50
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1105
NOTE:
LEGENDS 1300
B52
01
A
Stop Cock or Valve
JALA N LANG HULU AT
1 75 00
B
25mm(dia) HDPE PN12.5 Incoming Pipe 15mm(dia) HDPE PN16 Distributor Pipe
20
10 00 0
°
C
80 00
90.809m
PROJECT TITLE
12
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
°
E
All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
96.264m
20 00
D
2
UP
CLIENT:
20 00
FFL : +7000
RF RF
TV
20 00
G
B52
3
WETLAND GREENHOUSE
60 00
F
51.3m²
WETLAND GREENHOUSE TV
RF
16°
UP
AA
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
KA LIN GE
BB
TV
E IDG BR
CC 4
8000 6000 6°
3800
18
PUMP
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
5°
JAL A LAN N HUL U GAT
19
ROOM
DN
5
4.02m²
FISHING
DECK
TV
dn: 300
ARCHITECT
20.51m²
9°
STORAGE
17
6.56m²
STORAGE
67.82m²
dp: 900
B52
RECYCLING WORKSHOP TV
TV
RF RF
63.7m²
01
WORKSHOP
THATCH WORKSHOP
TV
RF RF
10°
01
1300
TV
D1
81.6m²
D1
RF RF
1300
11.67m²
RE WF
REFUSE CHAMBER
D1
TV
80.000
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
D1
RE WF
DN
UP
8°
6
WOM EN SPRI HOT NG
CHAN
GI ROOMNG
15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
16
MEN HO SPRI T NG
LUM'S ARCHITECTS
FFL
WAT ER TANK
TV 15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
00
: +68
41.03m²
SUNKEN CARPARK
m
CAFETERIA
RF RF
64.517
TV
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
11°
PUBL IC SPRI HOT NG
7
46.16m²
BIOSAND FILTRATION TV
RF RF
FF
8 D2 ² ION .8m AT 26 OD M IT RF CO UN RF
D3
D2
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
e
P Pip . VC ) m dia 1:200 150m ient (Grad
TV
D2
°
m
.989
108
UP
AC
32mm(dia) HOPE PN12.5 water recirculation main pipe supply
12
UP
RF RF
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
15 (G 0mm ra dien dia. t 1: VC 20 P 0) Pipe
RF
D2
N
TIO MODA ACCO UNIT TV
00
²
21.6m
68
U
TV
TV
AC
UP
D3
:+
² N .6m TIO 21 ODA M IT RF CO N
L
15mm(dia) UPVC Pipe (class E)
Air Selangor approved water metre to manuf's detail
CONSULTANTS
U P
25mm(dia) Loackable valve
Pump Room 25mm(dia) main water supply pipe to water tank with stopcock at 1960mm height Booster pump in pump room to engr's detail 25mm(dia) UPVC pipe(classE)
11°
D3
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
CARPARK
CARPARK
²
26.8m TION MODA ACCO UNIT RF RF
e
P Pip . VC ) m diat 1:200 150m ien (Grad
TV
3°09'17.9"N 101°50'38.2"E
M
9
ACK LI
LINE
NE
11
DARY
7°
SETB
10
BOUN
150mm dia. VCP Pipe (Gradient 1:200)
7°
D3
DRAWING STAGE Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
COLDWATERSUPPLY
7°
7°
e
N
EB
SCALE 1:250 0
10
ER
AN
G
15
12
13
14 01
COLD WATER SUPPLY
7°
7°
1300
JAL DU AN KA SU N T MPUN UA GS
Pip P VC 0) dia. 20 m t 1: 0m en 15 radi (G
DRAWING TITLE TOILET DETAIL SCALE
20
30
40
50
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1105
NOTE:
LEGENDS Water Supply for Sprinkle
1300
B52
01
A
Upright Sprinkle Head-ul Listed and FM Approved
1 JALA N LANG HULU AT
Horse Reel 75 00
B
CO2 Fire Extinguisher 20
°
10 00 0
H
C
80 00
90.809m
PROJECT TITLE
12
PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD
°
E
UP
CLIENT:
20 00
FFL : +7000
RF RF
TV
20 00
G
B52
3
WETLAND GREENHOUSE
60 00
F
51.3m²
WETLAND GREENHOUSE TV
RF
16°
UP
AA
Disclaimer: All drawings must be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information. All contents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action.
96.264m
20 00
D
2
Fire Hydrant
____________________________ Lim Chu Lin NO IC: 690609-06-6969 Executive Manager Arch (M) SDN BHD
KA LIN GE
BB
TV
E IDG BR
H
CC 4
8000 6000 6°
3800
18
PUMP
Declaration: All drawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline and requirements.
5°
JAL A LAN N HUL U GAT
19
ROOM
DN
5
4.02m²
FISHING
DECK
TV
dn: 300
ARCHITECT
20.51m²
9°
STORAGE
17
6.56m²
STORAGE
67.82m²
dp: 900
B52
RECYCLING WORKSHOP TV
TV
RF RF
63.7m²
01
WORKSHOP
THATCH WORKSHOP
TV
RF RF
10°
01
1300
TV
D1
81.6m²
D1
RF RF
1300
11.67m²
RE WF
REFUSE CHAMBER
D1
TV
80.000
_________________________ Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69
D1
RE WF
DN
UP
8°
6
WOM EN SPRI HOT NG
CHAN
GI ROOMNG
15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
16
MEN HO SPRI T NG
H
LUM'S ARCHITECTS
FFL
WAT ER TANK
TV 15 0m (G radiem dia nt . VC 1:2 P Pi 00 pe )
00
: +68
41.03m²
SUNKEN CARPARK
m
CAFETERIA
RF RF
64.517
TV
No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com
11°
PUBL IC SPRI HOT NG
7
46.16m²
BIOSAND FILTRATION TV
RF RF
CONSULTANTS
11°
D3 U P
FF
m
.989
108
Pump Room
Declaration: All drawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.
15 (G 0mm ra dien dia. t 1: VC 20 P 0) Pipe
00
D2 ² ION .8m AT 26 OD M IT RF CO UN RF
D3
D2
Vaseline M&E SDN BHD No 9, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com
e
P Pip . VC ) m dia 1:200 150m ient (Grad
TV
°
UP
AC
D2
12
UP
RF RF
Phillip C&S SDN BHD No 8, Jln Puteri, Bandar Puteri Jaya, 43500, Puchong Phone: (03) 89594280 Email: phillipcns@gmail.com
8
D2
N
TIO MODA ACCO UNIT TV
68
²
21.6m
RF
TV
U
TV
UP
AC
:+
D3
L
² N .6m TIO 21 ODA M IT RF CO N
CARPARK
CARPARK
²
26.8m TION MODA ACCO UNIT RF RF TV
3°09'17.9"N 101°50'38.2"E
e
P Pip . VC ) m diat 1:200 150m ien (Grad
9
ACK LI
LINE
NE
11
DARY
7°
SETB
10
BOUN
150mm dia. VCP Pipe (Gradient 1:200)
7°
D3
DRAWING STAGE Preliminary
Submission
Construction
Information
Tender
Loaded Dwg
NO
DATE
REVISION
00
1/5/2022
FIRESAFTETYDETAIL
7°
7°
e
N
EB
SCALE 1:250 0
10
ER
AN
G
15
12
13
14 01
FIRE SAFETY DETAIL
7°
7°
1300
JAL DU AN KA SU N T MPUN UA GS
Pip P VC 0) dia. 20 m t 1: 0m en 15 radi (G
DRAWING TITLE TOILET DETAIL SCALE
20
30
40
50
AS SHOWN
DRAWN BY
Allyois Lee Kah Man
CHECKED BY
Lum Kar Man
DIRECTED
2021/ Water
DRAWING NO
KM 2020/02/CD/ 1105
COLD WATER SUPPLY SYSTEM GROUND FLOOR PLAN WATER TANK STORAGE CALCULATION
Level
Space
Average amount of usage
Water Closet (WC)
GF
4 x 30 gallons = 120G
Basin (B)
10 x 20 gallons = 200G 18 x 5 gallons = 90G
Total
WATER SUPPLY & DISTRIBUTION SYSTEM DIAGRAM
12 x 40 gallons = 680G
Urinal (U)
Tap (T)
Leve l
1090G
FF
Space
Average amount of usage
Water Closet (WC)
5 x 40 gallons = 200G
Urinal (U)
2 x 30 gallons = 60G
Basin (B)
4 x 20 gallons = 80G
Tap (T)
5 x 5 gallons = 25G Total
365G
Fittings
Consumption per day
Water Closet (WC)
180 litres / 40 gallons
Urinal (U)
130 litres / 30 gallons
Basin (B)
90 litres / 20 gallons
Tap (T)
20 litres / 5 gallons
Total capacity of water tank required GF + FF = 1090G + 365G = 1455 gallons
SEWERAGE SYSTEM GROUND FLOOR PLAN
SANITARY SCHEMATIC LAYOUT
MANHOLE DETAIL