Portfolio

Page 1

The sportman capsule I designed is a combination of retreat and training space for my client. The con cept of my building is taken from my precedent study which is falling water. It is a hierachiral building that is designed for my client where a centre core is the highest part of the building with exposed bridge and maintenance area for my client bucycle activities.

Casting Model2

§ Drawing____________________________________Orthographic3Project 43 § Drawing____________________________________Orthographic3Project 41

Right Elevation Elevation

Casting Model 3

Left

ARCHITECTURE

Casting Model4 5

PORTFOLIO

Casting Model

Casting Model 56 ARCHITECTURE PORTFOLIO

Live Auditorium6 HUMAN ACTIVITY ED ZONING ▪ SPACECO03PROJECTHUMAN ACTIVITY EXPLODED ZONING ▪ SPACECO03PROJECT Exploded Drawing

▪ SPACECO03PROJECT ROTATE FRONT ROTATE BACK DRAWING ▪ SPACECO03PROJECT

Live Auditorium 7 ROTATE FRONT ROTATE BACK

DRAWING

Bricktopia8 ELEVA 8 ARCHITECTURE PORTFOLIO

Bricktopia 910 ARCHITECTURE PORTFOLIO

Bricktopia10 11ARCHITECTURE PORTFOLIO

The hole is opened up at the middle where the tree is placed in the middle provide shaidng for the public in the middle. A concrete seating is placed in the middle

Bricktopia 1111ARCHITECTURE PORTFOLIO

The facade cast a beautiful shadow while provide shading for the visitors inside. The brick provide cool ing sensation for the people indside.

The model is constrcuted using wireframe first then a layer of clay is cladded on it. The brick pattern is sculpted onto it afterward.

The hole is opened up at the middle where the tree is placed in the middle provide shaidng for the public in the middle. A concrete seating is placed in the middle where people can rest and have chit chat here.

10mm(dia) Stainless stee rod connec ed wi h metal plate Detail o ENGR approval 3mm(T)Grou oined wi h e a pla e Deat l to ENGR app oval 15mm(dia) x 750mm(H) Anchor rod fastened 20mm(dia) phillips screws.Detailto ENGR approva 120mm(L) x 100mm(w) x 10mm(H) Base p ate coated w th z nc Detai o ENGR app oval 1000mm(dia) x 150mm(H) Reinforced concrete cast insitu. Detail to ENGR approval. 2000mm(dia) x 150mm(H) Reinforced precast concrete. Detail to ENGR approval. 20mm(dia) Tensile steel bar with herringbone shape joined by welding.Detail to ENGR (Removedapproval. after EXPLODEDconstruction)DRAWING AR 423 BuildingConstruction & Technology 4 Assignment 1 TEAxonometricxplodedViewite: Name: Lum Kar Man ID 1001955427 Date 26 February 2021 Prepared for: Mr Ahmad Fahmi Zainazlan 2000mm(dia) x 150mm(H) Reinforced concrete base cast insitu. Detail to ENGR approval. 1. 280mm(L) x 140mm(W) x15mm(H) Handmade thin tilejoint with natural fast setting cement.Detail to Arch approval 2. 10mm(T) natural fasting cement with water resistance properties.Detail to ENGR detail. 5. 280mm x 140m x 43mm Solid clay brick joined with natural fasting cement and wahsed thin sand mortar (1:1).Detail to ENGR approval. 3. 280mm(L) x 140mm(W) x15mm(H)Hollow clay brick joined with dry Portland cement mortar,M-7.5. Detail to ENGR approval. 6. 40mm(T) Dry Portland cement mortar,M-7.5 with water resistance sealant. Detail to ENGR approval. 7. 5000mm(L) x 2500mm(W) x 250mm(H)Reinforced concrete slab foundation.Detail to ENGR approval 8. 5000mm(L) x 15mm(dia) Slab reinforcement made of steel in both direction. Detail to ENGR approval. 4. 40mm(T) Natural cement and washed thin sand mortar(1:1).Deatil to ENGR approval. 3 2 1 2 1 3 BRICK ARRANGEMENT Catalian vault brick arranegement in horizontal, vertical, and 45 degree to increase frictional force. AR 423 BuildingConstruction & Technology 4 Assignment 1 TEAxonometricxplodedViewite: Name: Lum Kar Man ID 1001955427 Date: 26 February 2021 Prepared or: Mr Ahmad Fahmi Zainazlan

Bricktopia12 12 ARCHITECTURE PORTFOLIO

This project is to design a museum that inspired by my craft which is pottery. We have to choose precedent study for our museum program and skin façade. The project is very interesting as we have to explore the characteristic of our craft and translate it into our museum form. The museum I designed has many greenery space and the form looks like it is moulded from the ground so that it look organic and interesting.

Bricktopia

Precdent Study

The concept is taken from the Adelaide Contemporary Time gallery which it is proposed to create a seamless merging between city and the garden with a diversity of pragmatic yet exciting spaces for art in between unique cultural destination physically and emotionally woven into the place and community. The building will showcase the treasures of South Australia’s State Collection and is intended to give a powerful boost to Adelaide’s creative ecnomy.

Bricktopia 1313ARCHITECTURE PORTFOLIO

CIRCULATION

landscapespacesactivitiesThe

Exploded

The buidling has thtee levles where the diagram first show the circu lation of how people can navigate through ground floor to first floor.

Exploded The the lation through

CIRCULATION

Exploded Drawing

CIRCULATION ARCHITECTURE

HUMAN ACTIVITIES

The buidling the diagram lation of through ground The

PORTFOLIO

Bricktopia14

HUMAN ACTIVITIES

HUMAN ACTIVITIES

The diagram aso show the human activities where it also shows the spaces in the buildings and the landscape of the building.

landscapespacesactivitiesdiagramin

14

14 ARCHITECTURE PORTFOLIO

Exploded Drawing

Bricktopia 15

The diagram aso show the human activities where it also shows the spaces in the buildings and the landscape of the building.

The buidling has thtee levles where the diagram first show the circu lation of how people can navigate through ground floor to first floor.

Bricktopia16 15ARCHITECTURE PORTFOLIO

FORM DEVELOPMENT

Bricktopia 1717ARCHITECTURE PORTFOLIO

Bricktopia18 18 ARCHITECTURE PORTFOLIO SECTION A-A

In the section it shows that the ramp connect the ground floor and first floor where the roof is also acted as a extended staircase which allow people to sit there and go up to the roof top where it is a continuos roof that cover the whole building.

BRIKCTOPIA

Bricktopia 1919ARCHITECTURE PORTFOLIO SECTION B-B

RIGHT

FRONTELEVATIONELEVATION

Bricktopia20

EXTERIOR PERSPCTIVE WORKSHOP

POTTERY

Bricktopia 21 20 ARCHITECTURE PORTFOLIO

Interweaving22 22 ARCHITECTURE PORTFOLIO

Interweaving 2323ARCHITECTURE PORTFOLIO

Treat waste as an opportunity not threat, bring the lifestyle of recycling into Meru with a recycling community center where all the residentials could gather and tackle the problem waste issue. The focus is to educate the people in Meru to tackle the issue of waste and poverty through baster trade.

BARTER TRADE SYSTEM

Interweaving24

24 ARCHITECTURE PORTFOLIO

BARTER TRADE SYSTEM

Treat waste as an opportunity not threat, bring the lifestyle of recycling into Meru with a recycling community center where all the residentials could gather and tackle the problem waste issue. The focus is to educate the people in Meru to tackle the issue of waste and poverty through baster trade.

People can exchange their needs by exchanging with waste.

Threat waste as opportunities not threat

WASTE

NECESSITIES

PUBLIC TRANSPORTATION Exchange public transport ticket with recy clable waste

Interweaving 2525ARCHITECTURE PORTFOLIO

Interweaving26 28 ARCHITECTURE PORTFOLIO

Interweaving 2727ARCHITECTURE PORTFOLIO

INTERWEAVING

28 32

A community recycling centre (CRC) that unites the community of meru and bring them togeth er in order to have the awareness of recycling and solve the disintegration between community that has been existed long time ago in Meru. It give the different feeling and a new typology for the community of Meru to gather.

2.1.LEGENDSSTORAGECOMMUNITY CENTRE 3. FOYER 4. COLLECTION CENTRE 5. COMMUNITY GARDEN 6. PUBLIC TOILET 7. BICYCLE PARKING 8. BICYLE LANE 9. FLEA BAZZAAR 10. 12.11,13.KITCHENTOILETSFOODCOURT

INTERWEAVING

The exterior perspective and section show that the conveyer belt is used to transfer the waste from the sorting centre to a more community friendly sorting centre. The building is seperated into different spaces such as bazaar market, recycling centre, gallery, workshop, and cafeteria. The section show that the staircase is also act like a playground for children to play traditional games that make from recylce itmes.

Form Development

HIERARCHY levelling divide space

COLUMN structural support HIERARCHY connect floors

GREENERY a sense of calm

HIERARCHY connect floors

MAIN LINKAGE showcase building concept

HIERARCHY connecting, zoning

Interweaving32

MAIN LINKAGE showcase building concept

HIERARCHY levelling divide space

COLUMN structural support

GREENERY a sense of calm

HIERARCHY connecting, zoning

Interweaving 33 West SouthNorthElevationElevationElevation

OutdoorMarketGalleryMarket

Food

Interweaving34 37

Outdoor Market bank or night market

This page is intentionally left empty

Interweaving 35

The Oasis of Calm36

Hulu Langat is facing serious water shortage issue during flood .My building is a community have to wait for other authority for water supply. The building has its own filtration system clean water here with the public facilities like hot spring, sauna, public pool. The river water There is a micro dam in the middle act as a grey water collection and it is designed like a stepwell so that my building can a sustainability

THE OASIS Community Water Bank

OASIS OF CALM

Bank & Visitor Centre

community water bank that aim to supply water for the residents in Hulu Langat so that they do not system using natural way such as wetland and biosand filter. The community can celebrate the water is filtered then stored so that it can be lifesaver for the community when flood happens. stepwell so that people can go down and swim. It is also supply water for the facilities around it sustainability water supply.

The Oak View 37

The Oasis of Calm38

The Oasis of Calm38

This poster reflects that climate change is somthething that will happen 50-100yeras later. If the poeple keeps blocking the flood water and building high scafolding structure, they will change their lifestyle completely and turn to be walking on slits due to contamination in the water.

Why not we use the natural way to filter the flood water instead of chlorine in order to bribg back their normal life style like swimming, bathing, recreational and bathing.The value is right in front their doorstep they need to step out andappreciate it.

‘‘In a context of climate change and rapid urbanization, the design community should consider to reengage and embrace urban water challenge as a design oppurtunity.’’ Muller(2018)

The Oasis of Calm 39

Master Planning

The Oasis of Calm 41

The Oasis of Calm42

The Oasis of Calm 43

Sectionscale1:

Section A-A 1: 250 SectionScale1:250

Rear Elevation

Sectionscale1:

Front Elevation Section B-B 1: 250 SectionScale1:250

Natural Pool

People can enjoy nature and swim in the wetland pool.

Observatory Tower

The Oasis of Calm48

People can capture the beautiful bird from inside the tower.

Santuary

Hot Spring

The constrcuted hot spring give people the experiece of Hulu Langat.

The Oasis of Calm 49

The landscape surrounding the santuary give the sense of living with the nature.

Mockup Models

The Oasis of Calm50 MOCKUP MODEL

The Oasis of Calm 51

Competition52

BeeBreeder Competition

Competition 53

Q’Cell is an innovative shelter design acting as a temporary living and medical space, which is to be built at places for those in need in a short period of time. The creative modular form allows interaction between victims, which could boost positivity and maintain good mental health despite the hardship they are going through.

Paswee Competition

Competition54

Technical Report 55

JAN-MAY 2022

AR724

WORKING DRAWING

BACHELOR(HONS) IN ARCHITECTURE

FACULTY OF ENGINEERING, TECHNOLOGY & BUILT ENVIRONMENT SCHOOL OF ARCHITECTURE AND BUILT ENVIRONMENT

PREPARED BY: LUM KAR MAN

CHECKED BY: AR HISHAM SAIHARI

ASSIGNMENT PROJECT 2

ID: 1001955427

Building Construction and Technology Site Strategy

Fifth schedule: Designation of purpose groups

Calculation of exit width

UBBL clause 181. Width of means of engress

UBBL clause 177. Computing number of staircase and staircase width

1.3.2 Exits and Evacuation

1.3.1 Compartmentation

UBBL clause 172. Emergency exit signs

UBBL clause 166. Measurement of travel distance to exits

PurposeUnsprinklered:Group : Institutional 30m

Secondary exit: 1800mm width

Locate the building in the middle of the site. Have a distance with the main road and put a parking there as a noise buffer. Have a series of trees blocking the noise from warehouse and factory. Have a long distance with the back of the factories and put a small park there to buffer the air pollution of the factories

Purpose Group V: Shop 30m

Occupancy load square meter per person = 3 net Capacity exit for door = 100 people per unit Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x =550mm(996.70/3/100) x 550mm = 50%1827.28mmofwidthfor main exit is required, min 700mm width of exit, proposed Main exit: 2700mm width

Superstructure

Purpose Group V: Shop Largest gross floor area = 996.70m2

Dead end limit for:

Measurement of travel distance

Interweaving56

UBBL clause 134, 136, 138, Fifth schedule

Proposed using concrete pad foundation because it is economic and easy to construct. It can be design to accommodate light site. The addition of reinforcement allows for relatively wide but shallow pad foundations. In order to make the reinforcing cage easier to construct and place, the pads tend to be designed as a square plan area. The reinforced concrete base is designed to span in one direction, with the main bars longitudinal in the bottom.

Occupancy load square meter per person = 4.5 net Capacity exit for door = 100 people per unit

Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x =550mm(547.90/4.5/100) x 550mm = 50%669.65mmofwidth for main exit is required, min 700mm width of exit, proposed Main exit: 2700mm width

As the area of building are still under limits of dimension, no compartmentation are needed.

2. Timber slanted roof

Roofing

b. Pad foundation

Purpose Group V: Shop 15m

Brick wall structure ad column as Round exposed column to support the roof structure

1.3 PASSIVE BOMBA DESIGN

Secondary exit: 1800mm width

UBBL clause 168. Staircase

Group II: Instituitional 3m

TECHNICAL REPORT

Purpose Group II: Institutional Largest gross floor area = 1391.95m2

a. Strip foundation

1. Metal panel roofing

Seventh schedule

(Source: UBBL Seventh schedule)

Proposed reinforced concrete rigid frame structure system because it has long service life with low maintenance cost. mainly post and beam construction represent the sense of industrial

Steel structure

Building Construction System

Strip footings are the best option for light loads, it is used as a mass concrete footing. The size and positions of strip footings are usually proportional to the width of the wall structure.

Interweaving 57

1 = 900mm width

Largest gross floor area = 996.70m2

Occupancy load square meter per person = 3 net

Staircase 2 = 900mm width

Second Floor First GroundFloorFloor 9m 11m 21m 13m 19m 14m 23m

Largest gross floor area = 547.905m2

Purpose Group II: Institutional

Ground floor exit width

Foundation: Shallow foundation pad foundation

Strip

Purpose Group V: Shop

= [floor area/occupancy load/capacity exit (door)] x =550mm(996.70/3/60) x 550mm = 1827.28mm

Pad foundations are a form of spread foundation formed by rectangular, square, or sometimes circular concrete ‘pads’ that support localised single point loads such as structural columns, groups of columns or framed structures. This load is then spread by the pad to the bearing layer of soil or rock below. Pad foundations can also be used to support ground beams.

Foundation Detail Foundation Pad Foundation

Capacity exit for staircase = 60 people per unit

1 = 1100mm width

1 number of staircase proposed, the width of staircase will be as follow, total width 1065mm width of one Staircasestaircase.

Strip foundation

Calculation of exit width

2 number of staircase proposed, the width of staircase will be as follow, total width 1660/2=830mm width of one Staircasestaircase.

Occupancy load square meter per person = 4.5 net Capacity exit for staircase = 60 people per unit

Ground floor exit width = [floor area/occupancy load/capacity exit (door)] x =550mm(547.90/4.5/60) x 550mm = 1116.09mm

Sub ConcreteStructurepadfoundation

Frame Stainless steel roof frame welded with connector to Engr detail.

aluminum frame

x 5000mm(H) Timber frame welded with connector to Engr detail

PVC detail

A joint framed structure that sustained the inclined, vertical or horizontal loads.

Façade Treatment

Curtain

recycled wood pallet detail to Engr detail

800mm(H)

A truss consist of angles, channels, plates and eye bars

railing Building structure 600mm(T) concrete column to Engr detail

60mm(T)

Truss structural

Panel PVC roof panel detail to Engr detail.

frameworks used to support roofs or other heavy structures.

wall Low E glass to minimize absorption of heat 400mm(L)x 300mm(W) T beam to Engr detail

Roof

Floor Timber flooring to fit the context. Facade 800mm(h) Wood pallet façade to Engr detail

Construction Detail

Material and Finishes

100mm(T)

1000mm(H)Timber

to Engr detail. 100mm(T) x 5000mm(H) Timber frame welded with connector to Engr detail

roof panel

Trusses Detail

To create a more harmonious and humble ambient of space. I proposed timber and brick as most of the wall. The material also represent the main focus of my building which is recycled. Facade Engineering

Interweaving58 Roof Insulated & recycled wooden roof Eco friendly and present a humble feeling to the building Wall Brick provideRecycledwallmaterialsbetterinsulation

Recycled wood pallet as double skin facade which fixed by steel cleat on a steel column which could provide shading for the building

recycled wood pallet detail to Engr detail 400mm(L)x 300mm(W) T beam to Engr detail

800mm(H)

railing

1000mm(H)Timber

wooden

The proposed building is a community recycling centre (CRC) that unites the community of Meru and bring them together in order to have the awareness of recycling and solve the disintegration between community that has been existed long time ago in Meru. It give the different feeling and a new typology for the community of Meru to gather.

Façade treatment

Skylight

The design objective is to increase the awareness of community to recycling and interact together. The spaces are designed to have a humble feeling so that it is local friendly and Remain the identity of Meru. The buildings aim to connect the rural and the residential where it interweave recycling with community with architecture as an device.

Interweaving 59

Allow better ventilation

The void in the centre of the building allow light to penetrate in

Design Strategies

Façade

The façade is the recycled wood pallet which allow air to flow in

Compartmentalised

DESIGN CONCEPT

Roof Design

I proposed wood pallet façade that made from the recycled materials and it is operable and the roof is angled supported with column. The passive design create a eco Friendly building with less electrical consumption.

The levelling of the building for better air ventilation

Operable façade

Interweaving

DESIGN OBJECTIVE

Site plan

Open air trusses air flowing Through truss to reduce the heat gain

Angled

roof allow light penetrate Open trusses air flowing through truss to reduce the heat gain

Interweaving60 Dimension od space S1 Length (L) =18.6 Length(L) =9m Width( W)= 11m Width(W)= 4.7m Total floor area Area = (18.6m x 11m ) 9m x 4.7m) = 162.38m Types of lighting fixture Perfk E27 PAR30 LED Spotlight, cool white No. of lamps in each luminaires (n) 4 Lumen 2200lm Height of luminaire 3000mm Height of working plane 750mm Height difference (hm) 3000mm 750mm = 2250mm Room index k = L W ( 2 25 18 +11) 66 2.43 Assumption of reflectance value Ceiling Wall Floor = 70 50 20 Utilization Factor (UF) When k = 2.43 UF = 0.65 Maintenance Factor (MF) 0.8 (normal condition with AC) Standard illuminance, E 300 No. of luminaires required (N) N = E A 2200 4 0 65 0 8 10.6 nos = 11 At least 43 of recessed lightings are required to achieve the standard requirement of illuminance recommended by MS1525 Spacing between luminaires Assume max. spacing between the luminaires to height ratio for the lighting = 1.5 Smax = 1.5 x Hm = 1.5 x 2.25m Smax ≤ 3.375m Dimension of space Total Length(L) = 18m S1 Length=9m Width(W)= 11m Width= 5m Total floor area Area =(18m x 11m)+ (9m x 5m) ==153m1636.11ft According to UBBL 41, 3 th schedule of UBBL, office requires 0.14m3 According to UBBL 41, 3th schedule of UBBL, office requires 0.14m3 od air per minute per occupant ( ) which is equal to 4.94 CFM per BTU/occupant.Hrrequired in the space 1636ft2 x 25 = 40900 BTU/ 40900BTU/Hr Hr / 12000= 2.91nos =3 CFM to Tons 1 tons of cooling = 400CFM 1 tons of cooling = 12000 BTU /Hr Since 3 of 12000 BTU/Hr AC is used, total of 38000 BTU/Hr is provided, 36000 BTU/Hr = 3 tons of cooling 3 tons of cooling = 1200 CFM There approximately max. 30 occupants inside this room,30 x4.94CFM =148,2 CFM Therefore, the space is sufficient and approved for the 3 of AC system to cool the space and appropriate for mechanical ventilation in the case which the openings are closed. In conclusion, 3 nos of wall mounted 1.5 Hp of Air conditioning unit is used for the cooling purpose in the space mentioned, Multi split system is applied which outdoor condensing unit to installed to supply the 3 indoor evaporating unit. This ensure lesser duct work in the space and provide individual control of temperature settings Air conditioning unit: Source: https://www.senheng.com.my/panasonie 1 5.hp standard non inverter 32.air conditioner es pn/2wkh 1.himl?did 5D_Ikg19g8zmx61x7.Y40UKNIDUA/KkaAm2WEALw_weB&utm_id=C/OKCQjwagmEBhDiARIANVSH30cNf61C/OKC@iwsamEBhDiARISANV8H30cNf61/AkithFebsivKNI AkitaF@beivXNI 50_1kgr94A2madIX7AYAUUKNINDUAIKkaAm2WEALw_weB&gclid CiOKCQ/wsqmE@hDiARISANV8H30cNI6| AkilkFebsiYKNA 50 Ikg/@gAz<607*74uC/KNIDUAIKkoAm?WEALwweB Brand: Panasonic Horsepower = 1.5 HP Cooling capacity = 12000BTU/Hr Comfort Technology: R32 Refrigerant, BIG FLAP Higher Cooling Capacity Reduce Energy Costs ECO Friendly The space is a office and has skylight. The lighting fixtures can be installed evenly among the space. There are 11 nos fixtures and they align equally so that the light distributed equally. The AC are mounted on 3 side of the wall. The ductwork runs through the ceiling void space. This overall multi split AC system provides overall thermal cooling and provide thermal comfort to the users while complying the rules of the UBBL.Glass Glass Transluscent 6 Glass Fine fabricsmooth 80 LIGHTINGDAYLIGHTSTUDYSTUDY ARTIFICIAL LIGHTING LAYOUT PLAN TEMPERATURE STUDY AC SYSTEM LAYOUT PLAN VENTILATION STUDY Minimum illumination Maximum illumination Direct sunlight cool Highmoderatetemperaturetemperaturetemperature SPACE 01 : Office FLOOR AXONOMETRICPLAN VIEW MATERIAL & SPECIFICATIONS There are 4 AC are mounted on the two side of each wall. The ductwork runs through the ceiling void space. This overall multi split AC system provides overall thermal cooling and provide thermal comfort to the users while complying the rules of the UBBL. Dimension of space S1 Length (L)= 24.1m Width( W)= 7.7m Total floor area Area = (24.1m x 7.7m) = 185.57m2 Types of lighting fixture Perfk E27 PAR30 LED Spotlight, cool white No. of lamps in each luminaires (n) 4 Lumen 2200lm Height of luminaire 3000mm Height of working plane 750mm Height difference (hm) 3000mm 750mm = 2250mm Room index k = Hm L+W) = 25 = 185 57 2.59 Assumption of reflectance value Ceiling Wall : Floor = 70 50 : 20 Utilization Factor (UF) When k = 2.59 UF = 0.67 Maintenance Factor (MF) 0.8 (normal condition with AC) Standard illuminance, E 300 No. of luminaires required (N) N = E A = 185 57 =11.8nos12nos At least 32 nos of recessed lightings are required to achieve the standard requirement of illuminance recommended by MS1525 Spacing between luminaires Assume max. spacing between the luminaires to height ratio for the lighting = 1.5 Smax = 1.5 x Hm = 1.5 x 2.25m Smax ≤ 3.375m Dimension of space S1 Length(L) = 18.63m S2 Length=5.6m Width(W)= 7.7m Width= 4.1m Total floor area Area =(18.6m x7.7m)+ (5.6mx4.1m) =166.18m2 According to UBBL 41, 3th schedule of UBBL, office requires 0.14m3 od air per minute per occupant(cmm which is equal to 4.94 CFM per BTU/occupant.Hrrequired in the space 1399ft2 25 = 34975BTU/ Hr 34975BTU/ Hr / 12000= 2.91nos =4 nos CFM to Tons 1 tons of cooling = 400CFM 1 tons of cooling = 12000 BTU /Hr Since 4 nos of 12000 BTU/Hr AC is used, total of 48000 BTU/Hr is provided, 48000 BTU/Hr = 4 tons of cooling 4 tons of cooling = 1200 CFM There approximately max. 30 occupants inside this room, 30 x4.94CFM = 148.2 CFM Therefore, the space is sufficient and approved for the 4 of AC system to cool the space and appropriate for mechanical ventilation in the case which the openings are closed. In conclusion, 4 of wall mounted 1.5 Hp of Air conditioning unit is used for the cooling purpose in the space mentioned, Multi split system is applied which 2 outdoor condensing unit to installed to supply the 4 indoor evaporating unit. This ensure lesser duct work in the space and provide individual control of temperature settings Air conditioning unit: Source: https://www.senheng.com.my/panasonie 1 5.hp standard non inverter 32.air conditioner es pn/2wkh 1.himl?did CiOKCQ/wsqmE@hDiARISANV8H30cNI6|AkitaF@beivXNI5D_Ikg19g8zmx61x7.Y40UKNIDUA/KkaAm2WEALw_weB&utm_id=C/OKCQjwagmEBhDiARIANVSH30cNf61C/OKC@iwsamEBhDiARISANV8H30cNf61/AkithFebsivKNI50_1kgr94A2madIX7AYAUUKNINDUAIKkaAm2WEALw_weB&gclidAkilkFebsiYKNA50Ikg/@gAz<607*74uC/KNIDUAIKkoAm?WEALwweB Brand: Panasonic Horsepower = 1.5 HP Cooling capacity = 12000BTU/Hr Comfort Technology: R32 Refrigerant, BIG FLAP Higher Cooling Capacity Reduce Energy Costs ECO Friendly Material and specifications GlassGlass Transluscent 6 Minimum illumination SPACE 02: LIBRARY Maximum illumination DirectHighmoderatecoolsunlighttemperaturetemperaturetemperature LIGHTING VENTILATIONSTUDYSTUDYDAYLIGHTSTUDY ARTIFICIAL LIGHTING LAYOUT PLAN TEMPERATURE STUDY AC SYSTEM LAYOUT PLAN FLOOR AXONOMETRICPLAN VIEW MATERIAL & SPECIFICATIONS DAYLIGHT STUDY The space is workshop and have white furniture to make contrast. The lightning fixtures can be installed among the space. There are 12 nos fixtured and they equally with spacing of 3.475

Ground

SchematicPlanlayout Manhole detail SEWERAGE SYSTEM

Interweaving 61 Level Space Average amount of usage GF Water Closet (WC) 9 x 40 gallons = 360G Urinal (U) 4 x 30 gallons = 120G Basin (B) 6x 20 gallons = 120G Tap (T) 6 x 5 gallons = 30G Total 630G Level Space Average amount of usage FF Water Closet (WC) 3x 40 gallons = 120G Urinal (U) 1 x 30 gallons = 30G Basin (B) 4 x 20 gallons = 80G Tap (T) 5 x 5 gallons = 25G Total 255G Fittings Consumption per day Water Closet (WC) 180 litres 40 gallons Urinal (U) 130 litres 30 gallons Basin (B) 90 litres 20 gallons Tap (T) 20 litres 5 gallons Total capacity of water tank required GF + FF = 630G + 255G = 885 gallons Ground Floor Plan

First Floor Plan

WATER SUPPLY & DISTRIBUTION SYSTEM DIAGRAM COLD WATER SUUPLYSYSTEM First

Second Floor Plan Floor PlanFloor

Technical Report62 Skim Coat & Paint Plaster & Paint Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar KM2020/017/WATERMan2020/01/CD/ KEY PLAN N.T.S KEY PLAN N.T.S ACCOMODATION FACILITIES ACCOMODATION UNIT TYPE A ACCOMODATION UNIT TYPE B PUBLIC SPACE RECYCLING PUMPPUBLICMULTIPURPOSEWORKSHOPHALLTHATCHWORKSHOPCAFETERIAOUTDOORDININGANCILLARYFACILITIESWETLANDGREENHOUSEBIOSANDFILTRATIONROOMSERVICESBATHROOMMEN'SSAUNAWOMEN'SSAUNAUTILITIESROOMBATTERYROOMM&EROOM 11111111114428 15151510888204844222 2250m²109.2116.41002001001801804003401809090404040 KEY PLAN, SITE PLAN, SCHEDULE OF ACCOMODATION 1001 JALANHULULANGAT JALANHULULANGAT 0 102050 3040 SITE PLAN SCALE 1:500 N SETBACKLINEBOUNDARY 3°09'17.9"N 90.809m 64.517m 108.989m DUSUNJALANKAMPUNGTUASEBERANG 7500 5852 46821170 3511 20001170 A 2 1 15 13 12 11 10 8 456 3 FG E D BB 15 181719 N N D2 D3 D3 D1 dp:900 FFL +7000 +6800FFL FFL +71.00 LINKAGEBRIDGEFL:+6500 FISHINGDECK+6800 D1 FL: +7100 D1 FL:WOMENSPRING+6000 MENSPRING+6000 FL:PUBLICHOTSPRING+6000 TV ACCOMODATIONRFUNITFL:+710021.6m² ACCOMODATION+710021.6m² ACCOMODATIONRFUNITFL:+710026.8m² 4.02m² DP ACCOMODATIONRFUNIT+710026.8m² UP B CD E FG 3 456 8 9 10 11 12 13 14 15 FL:WATERTANK+6800 ROOM FL:FL:CHANGING+6800ROOM+6800 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ 1 JALANHULULANGAT JALANHULULANGAT 0 102050 3040 GROUND FLOOR PLAN SCALE 1:250 N BOUNDARYSETBACKLINELINE 101°50'38.2"E3°09'17.9"N 90.809m 64.517m 108.989m Ceiling Finishes Wood CeilingWC Wall FloorFinishesFinishes Rammed EarthRERERammed Earth LEGENDS DUSUNJALANKAMPUNGTUASEBERANG Raw FinishRF Plaster CeilingPCTVTimber Vinyl FFL +6800 7 2 A 20° 12° 16° 11°5°10° 11° 12° 7° 7° 7° 7° 7°75007°10000 2000 8000 6000 20002000 18171619 AA BB CC 6° 8°9° 3800 6000 8000 UP 011300 130001 01 011300 1300 1101

Technical Report 63 Skim Coat & Paint Plaster & Paint Metal Strip 15 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ JALANHULULANGAT JALANHULULANGAT 0 102050 3040 ROOF PLAN SCALE 1:250 N 96.264m BOUNDARYSETBACKLINELINE 101°50'38.2"E3°09'17.9"N 90.809m 64.517m 108.989m Ceiling Finishes Wood CeilingWC Wall Finishes Rammed EarthRERERammed Earth LEGENDS DUSUNJALANKAMPUNGTUASEBERANG Raw FinishRF Plaster CeilingPC 80.000 TVTimber Vinyl B CD E FG 3 456 8 9 10 11 12 13 14 15 1 7 2 A 7500 10000 2000 8000 6000 20002000 18171619 011300 130001 01 011300 1300 MANHOLEDETAIL1103 action is Puteri Jaya, 43500, PuterineedConstructionJaya,LoadedDwgconstruction.ofextraonthis Architects. It other projects. legal action. authority. Legalwww.simsimsim.comsimsimsim@gmail.comEHSANEVENTandKAMPUNGFORGading,56000A/R69 D2 D2 D3 D3 D3 D3 D1 dp:900 +6800FFL LINKAGEBRIDGE DECK D1D1 WOMENHOTSPRING MENHOTSPRING PUBLICHOTSPRING ACCOMODATIONRFUNIT21.6m² ACCOMODATIONRFUNIT21.6m²ACCOMODATION26.8m² 4.02m² TV ACCOMODATIONRFUNIT26.8m² UP B CD E FG 3 456 8 9 10 11 12 13 14 15 WATER CHANGING Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ 1 B52 JALANHULULANGAT JALANHULULANGAT 0 102050 3040 COLD WATER SUPPLY SCALE 1:250 N 96.264m BOUNDARYSETBACKLINELINE 101°50'38.2"E3°09'17.9"N 90.809m 64.517m 108.989m Stop Cock or Valve LEGENDS DUSUNJALANKAMPUNGTUASEBERANG D2 +6800:FFL 7 2 A 20° 12° 16° 11°5°10° 11° 12° 7° 7° 7° 7° 7°75007°10000 2000 8000 6000 20002000 18171619 AA BB CC 6° 8°9° 3800 6000 8000 150mm(GradientPipe 50mm(Gradient (Gradient 150mm(Gradient (Gradient1:200) 150mm(Gradient1:200) 011300 130001 130001 011300 Pump Room 32mm(dia) HOPE PN12.5 water recirculation main pipesupply25mm(dia) Loackable valve Air Selangor approved water 25mm(dia) UPVC pipe(classE) Booster pump in pump room to engr's detail 15mm(dia) UPVC Pipe (class E) 25mm(dia) main water supply pipe to water tank with stopcock at 1960mm height 25mm(dia) HDPE PN12.5 Incoming 15mm(dia)PipeHDPE PN16 Distributor Pipe COLDWATERSUPPLY1105

Technical Report64 1 2 3 45 6 7 89 10 A B DCE 12116 12257 1003 6601 11284 10135 7861 4206 8699 12 11 8621 1844 287031063375 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ WEST ELEVATION SCALE 1:2001 0105203040 LINEBOUNDARY LINEBOUNDARYLINESETBACKBUILDING3.0mLINESETBACKBUILDING3.0m 1203 1 234 56 7 8 8 9 10 11 A B DC E F G 6800 4500 2700 9300 6300 14100 9200 38200 1560 10010 10000 1200 14002000540024002700 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ NORTH ELEVATION SCALE 1:2001 0105203040 LINEBOUNDARY LINESETBACKBUILDING3.0m LINEBOUNDARYLINESETBACKBUILDING6.0m 1200

Technical Report 65 By Law, action is BandarBHD Puteri Jaya, 43500, phillipcns@gmail.com89594280BHDBandarPuteri Jaya, ekajmne@gmail.com89590824 ConstructionLoadedDwg contractor prior to construction. is any need of extra illustrations o of LUM's Architects. It for any other projects. be liable to legal action. requirement by the authority. Legal guideline and WORKSHOP AND EVENT 808, B52, KAMPUNG DARUL EHSAN FOR Menara Gading, 56000 www.simsimsim.comLumpur8959777789597778simsimsim@gmail.com ARCHITECTS KarNumber:ArchitectManA/R 69 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL CHECKEDSCALE BY NOTE:DRAWINGDIRECTEDNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations o drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ SECTION B-B SCALE 1:2002 0105203040 DCABE 1 2 3 4 5 6 7 8 9 10 1211 1301 Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar KM2020/017/WATERMan2020/01/CD/ 1 2 34 5 67 8 9 10 111213 14 1516 17 18 1920 21 22 A CB D E F G 9667 8032 2460 138813034255 9071 9104 9026 9058 3000 3000 3000 3000 3000 3000 3000 3000 3000 8100 4000 280038002000 1155 3000 SECTION A-A SCALE 1:2001 0105203040 SECTIONA-A 1300

10mm (Thk) Mortar as Skeleton Wall Detail to Arch Approval

WALL TO SLAB TO CEILING DETAILS SCALE 1:101 WALL TO SLAB TO CEILING DETAILS 1500

100mm(Thk) Wood Ledger Beam Detail to Engr Approval

10mm(Thk) Wood Floor and Subfloor Detail to Engr Approval

40mm (Thk)Bio Degradable Rammed Earth Brick Detail to Arch Approval

75mm (Thk) Eps Rigid Insulation Detail to Engr Approval

400mm (Thk) Stabilized Rammed Earth Detail to Engr Approval

Steel Knife Edge Connector Detail to Engr Approval

DRAWING TITLE

Technical Report66 PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg

DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNOREVISONDATE AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS

100mm(Thk) Wood Ledger Beam Connect with Bolt Detail to Engr Approval

Technical Report 67 3934 5500 1800 A B 21 3200 4300 STAFF'S BEDROOMWORKINGTABLE WARDROBE SHARINGUNITLIVING TOILET DOUBLEWARDROBEBED BALCONY A B 43 5 PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS KMArchitects ACCOMODATION UNIT DETAIL - UNIT PLAN SCALE 1:501 ACCOMODATION UNIT DETAIL - KEY PLAN & UNIT PLAN 1111 TYPE A- STAFF'S UNIT SCALE 1:502 TYPE B- COUPLE SHARING UNIT SCALE 1:503 N PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/11112022/017/WATERSHOWNREMARKS KMArchitects E D C B A 1 23 4 5 ACCOMODATION UNIT DETAIL - KEY PLAN SCALE 1:501 ACCOMODATION UNIT DETAIL - KEY PLAN & UNIT PLAN N

DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS

75mm(H)x 30mm (Thk) Rafter Detail to Engr Detail Approval

600mm(Thk) Upper Thatch Roof Detail to Manuf Approval

DRAWING TITLE

60mm x 40mm Wood Batten Detail to Engr Approval

600mm(Thk) Upper Thatch Roof Detail to Manuf Approval

InformationPreliminarySubmissionTenderConstructionLoadedDwg

PROJECT TITLE

Technical Report68

60mm x 40mm Wood Batten Detail to Engr Approval

Water Collection canal

Nesting Space- Dense Timber Structure

75mm(H)x 30mm (Thk) Rafter Detail to Engr Detail Approval

MISCELLANEOUS DETAIL 1: Opening for Birds SCALE 1:401

MISCELLANEOUS DETAIL FOR BIRDS

1810 KM Architects No 7, Jalan Kuala Lumpur Tel: (03) Fax: Email:(03)kmkmkm@gmail.comWeb:www.kmkmkm.com300MM600MM

60mm x 40mm Top Plate Detail to Engr Approval

Ø 6mm Laths Detail to Engr Approval

PROPOSED A 2STOREY B52, KAMPUNG STAGE

JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING

600mm(Thk) Lower Thatch Roof Structure Detail to Manuf Approval Opening for birds

40mm x 30mm Wood Batten Detail to Engr Approval

Nesting Space- Dense Timber Structure

Ø 6mm Laths Detail to Engr Approval

MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808,

600mm(Thk) Lower Thatch Roof Structure Detail to Manuf Approval Opening for birds

1: OPENING

Water Collection canal

60mm x 40mm(Thk) Top Plate Detail to Engr Approval

10mm(Thk) Vertical Batten Marking Every Rafters Detail to Engr Approval

10mm(Thk) Fire- retarding insulation board Detail to Engr Approval

40mm x 40mm (Thk) Blocking pinned to rafter feet Detail to Manuf Approval

PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWN 330MMREMARKS 20MM750MM MISCELLANEOUS60MM70MM DETAIL 4: Thatching Techniques SCALE 1:201 MISCELLANEOUS DETAIL 4: THATCHING TECHNIQUES 1840

75mm(Thk) Rafter with Fixing Battens Detail to Engr Approval

Existing ThatchingWallhook

Technical Report 69 1830

fixed the thatch

Technical Report70 PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE PreliminarySubmissionTenderLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS KMArchitects Dirty Water Inlet Biofilm Layer Fine Layer Fine Sand Pea Gravel Sand Gravel Layer PVC Outlet Pipe 100mm (dia) Local species bamboo lintel, treated with boric acid200mm(Thk) Thatch connected with J Bolts and Bamboo Pulins Detail to Engr Approval. 1000mm (H) x 200mm(dia) Bio Sand Filter for Water Purification Detail to Engr Approval PVC Inlet Pipe MISCELLANEOUS DETAIL 5: Water Filter Pavillion SCALE 1:401 MISCELLANEOUS DETAIL 5: Water Filter Pavillion 1850 Bamboo principal rafter BambooJ-BoltThatch Purlin 200mm (Thk) Wooden Flooring bolted with bio sand filter. Detail to Engr Approval MISCELLANEOUS DETAIL 5: Water Filter SCALE 1:202 MISCELLANEOUS DETAIL 5: Bamboo Connection SCALE 1:202 PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN.No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/16002022/017/WATERSHOWNREMARKS KMArchitects

60mm(L)x 40mm(Thk) Wood Purlins bolted into vertical frame. Detail to Engr

75mm(Thk) Timber Structure Detail to Engr Approval 10mm(Thk) Column cap Detail to Engr Approval Bolt Connected with Steel Cap Detail to Engr Approval 10mm(Thk) Steel Cap Detail to Engr Approval 200mm(Thk) Concrete Column Detail to Engr Approval 750MM 200MM 500MM SECTIONAL10MM AXONOMETRIC SCALE 1:501 SECTIONAL AXONOMETRIC

1100mm(H)Approval

Approval400mm(Thk)

Thatch fixed to frame with thatching hook. Detail to Engr Approval

Wooden Railing fixed to wooden batten. Detail to Engr

Wooden flooring board painted with waterproof acrylic. Detail to Engr Approval.

200mm(Thk) x 200mm(L) Wooden Frame connected with stainless steel bolt . Detail to Engr 10mm(Thk)FireproofApproval.membranefixedtothatch.DetailtoEngrApproval600mm(Dia)WoodenColumnassupporttothebridge.DetailtoEngrApproval.300mm(Thk)FootingFoundationboltedwithwoodenframe.DetailtoEngrApproval.

400mm(L)x 180mm(H) Sunken stone auditorium steps. Detail to Engr 10mm(Thk)Approval

GF + FF = 1090G + 365G = 1455 gallons

Basin (B) 90 litres / 20 gallons

MANHOLE DETAIL

ClosetWater (WC) 5 x 40 gallons=200G

Level Space Average amount of usage

SANITARY SCHEMATIC

lLeve Space amountAverage of usage

Technical Report 71

WATER SUPPLY DISTRIBUTION SYSTEM

DIAGRAM

FF

SEWERAGE SYSTEM

Fittings perConsumptionday

GROUND FLOOR PLAN

GF Water Closet (WC) 12 x 40 gallons680G= Urinal (U) 4 x 30 gallons120G=

Water Closet (WC) 180 litres / 40 gallons

Tap (T) 20 litres / 5 gallons

Basin (B) 10 x 20 gallons200G= Tap (T) 18 x 5 gallons90G= Total 1090G

Basin (B) 4 x 20 gallons=80G

Tap (T) 5 x 5 gallons25G=

COLD WATER SUPPLY SYSTEM

WATER TANK STORAGE CALCULATION

Urinal (U) 2 x 30 gallons=60G

&

Urinal (U) 130 litres / 30 gallons

LAYOUT GROUND FLOOR PLAN

Total 365G Total capacity of water tank required

Technical Report72 FFL:+71.00 FL:+6500 FL: +6000 FL: +6000 +6000 +7100 FL: +7100 +7100 DP100 300300 FL:+7100 +6800 FL:FL: +6800 D2 D2 D3 D3 D3 D1D1dp:900 FFL +7000 +6800FFLTV LINKAGEBRIDGE FISHING WOMENHOTSPRING SPRINGHOT PUBLICSPRING ACCOMODATIONRFUNIT21.6m² ACCOMODATIONUNIT21.6m²ACCOMODATION26.8m² TV ACCOMODATIONRFUNIT26.8m² WATER PUMPROOMCHANGINGROOM Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'S ARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah KM2020/017/WATERMan2020/01/CD/ JALANHULULANGAT JALANHULULANGAT 0 102050 30 40 GROUND FLOOR PLAN SCALE 1:250 N 96.264m BOUNDARYSETBACKLINELINE 101°50'38.2"E3°09'17.9"N 90.809m 64.517m 108.989m Ceiling Finishes Wood CeilingWC Wall FloorFinishesFinishes Rammed EarthRERE Rammed Earth LEGENDS DUSUNJALANKAMPUNGTUASEBERANG Raw FinishRF Plaster CeilingPC 80.000 D2 Timber Vinyl +6800:FFLTV 20° 12° 16° 11°5°10° 11° 12° 7° 7° 7° 7° 7°75007°10000 2000 8000 6000 20002000 6° 8°9° 3800 6000 8000 UP GROUND FLOOR1101PLAN AA CC BB AA 18191716 A 2 7 1 15 14 13 12 11 10 9 8 456 3 FG E CD BB D2 D2 D3 D3 D3 D1 dp:900 +6800FFL LINKAGEBRIDGE WOMENSPRING SPRING PUBLICSPRING ACCOMODATIONRFUNIT21.6m² ACCOMODATIONUNIT1.6m²ACCOMODA26.8m² TV ACCOMODATIONRFUNIT26.8m² UP B CD E FG 3 456 8 9 10 11 12 13 14 15 WATERTANK CHANGINGROOM Declaration:Alldrawings comply to the Uniform Building By Law, action is ready to be taken if it is not complied.LimChu Lin NO IC: CONSULTANTSExecutive690609-06-6969ManagerArch(M)SDNBHDPhillipC&SSDNBHDNo8,JlnPuteri,Bandar Puteri Jaya, 43500, Phone:Puchong(03) 89594280 Email: NoVaselinephillipcns@gmail.comM&ESDNBHD9,JlnPuteri,BandarPuteri Jaya, 43500, Puchong Phone: (03) 89590824 Email: ekajmne@gmail.com NO 1/5/2022DATE REVISION PROJECT TITLE 00DRAWING STAGE InformationPreliminary SubmissionTender ConstructionLoadedDwg DRAWING TITLE TOILET DETAIL DRAWNSCALE NOTE:DRAWINGDIRECTEDCHECKEDBYBYNOARCHITECTDisclaimer:Alldrawingsmust be checked by contractor prior to construction. Contractor shall contact architects if there is any need of extra information.Allcontents including any designs, details and illustrations on this drawing and presentation are strictly copyrights of LUM's Architects. It shall not be reproduced or modified by others or for any other projects. Any unauthorized use, in part or in whole shall be liable to legal action. Declaration:Alldrawings comply to guideline and requirement by the authority. Legal actions shall be taken if any failure to comply the guideline andrequirements.PROPOSED A 2STOREY MIXED WORKSHOP AND EVENT CENTRE CONTAIN 3 MAIN BLOCKS AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN FOR Arch(M) SDN BHD No 6, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: simsimsim@gmail.com Web: www.simsimsim.com LUM'SARCHITECTS Ar.Lum Kar Man Professional Architect LAM Registration Number: A/R 69 CLIENT: AS AllyoisSHOWNLeeKah Man Lum Kar Man 2021/ Water KM 2020/02/CD/ 1 JALANHULULANGAT JALANHULULANGAT 0 102050 3040 Manhole Detail SCALE 1:250 N 96.264m BOUNDARYSETBACKLINELINE 101°50'38.2"E3°09'17.9"N 90.809m 64.517m 108.989m LEGENDS DUSUNJALANKAMPUNGTUASEBERANG 80.000 D2 +6800:FFLTV 7 2 A 20° 12° 16° 11°5°10° 11° 12° 7° 7° 7° 7° 7°75007°10000 2000 8000 6000 20002000 18171619 AA BB CC 6° 8°9° 3800 6000 8000 (Gradient1:20 MH3 MH8 50mm Pipe (Gra 150mm(GradientVCPPipe (Gradi adient 150mm(GradientVCP1:200) 011300 130001 01 011300 MH1GT 65mm(dia) HDPE PN16 VCP GullyPIPETrap to Arch detail Proposed Manhole to Authorities Detail 150mm(dia) VCP discharge to main pipe 150mm(dia) VCP discharge to MH2 150mm(dia) VCP discharge to MH3 150mm(dia) VCP discharge 150mm(dia) VCP discharge 150mm(dia) VCP discharge to MH6 MANHOLEDETAIL 1300 1105

TOP OF WALL TOP PLATE TOP OF FINISHEDBEAMFLOORBTTMOFFOOTING Reinforce Concrete Bond Beam Detail to Engr 40mm(Thk)Approval Reinforced Rammed Earth Wall With 10mm( Thk) Rigid Insulation Detail to Engr Approval Water Tank 60mm x 60mm Top Plate Detail to Engr ApprovalWALL,600mm300mm SLAB TO ROOF DETAIL SCALE 1:402 WALL, SLAB TO ROOF DETAIL 1400 ROOF GARDEN DETAIL SCALE 1:201 KM Architects No 7, Jalan Kuala Lumpur Tel: (03) Fax: Email:(03)kmkmkm@gmail.comWeb:www.kmkmkm.com90mm(Thk)Facade

300MM THK. GRAVEL LAYER, LAID ABOVE MOISTURE RETENTION LAYER, DETAIL TO ENGR APPROVAL

400MM INSULATION LAYER, FILLED WITH EXTRUDED POLYSTYRENE (XPS), DETAIL TO ENGR APPROVAL9 10MM THK PROTECTION COURSE, DETAIL TO ENGR APPROVAL10

10MM THK. MOISTURE RETENTION LAYER, DETAIL TO ENGR 10MMAPPROVALAERATION LAYER, DETAIL TO ENGR APPROVAL7653214

COMMUNITY

10MM THK. PAVER, WITH SHIM, DETAIL TO ENGR AND ARCH 600MMAPPROVAL(H)ENGINEERED SOIL, FINISHED WITH GRASS, DETAIL TO ENGR AND ARCH APPROVAL

5MM THERMOPLASTIC WATERPROOFING MEMBRANE, DETAIL TO ENGR APPROVAL11

JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS 1 2 3 4 5 6 7 8 9 10 11 LEGEND

PROPOSED A 2STOREY MIXED WATER KAMPUNG FOR DETAIL 1.2

BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52,

5MM THK. SHEET METAL PARAPET CAP SLOPED TO DRAIN ROOD SIDE, SHIM AS REQUIRED , DETAIL TO ENGR APPROVAL

Technical Report 73 PROJECT TITLE

10MM FILTER FABRIC, LAID UNDER ENGINEERED SOIL, DETAIL TO ENGR APPROVAL

10MM THK DRAINAGE LATER, TO ALLOW DRAINAGE PIPE TO FIT, DETAIL TO ENGR APPROVAL8

Technical Report74 PROJECT TITLE PROPOSED A 2STOREY MIXED COMMUNITY WATER BANKS CONTAIN 5 MAIN BLOCKS: AT LOT 808, B52, KAMPUNG JAWA, 43100, HULU LANGAT, SELANGOR DARUL EHSAN. KM Architects No 7, Jalan Menara Gading, 56000 Kuala Lumpur Tel: (03) 89597777 Fax: (03) 89597778 Email: kmkmkm@gmail.com Web: www.kmkmkm.com DRAWING STAGE InformationPreliminarySubmissionTenderConstructionLoadedDwg DRAWING TITLE DRAWNSCALE DRAWINGDIRECTEDCHECKEDBYBYNODATEREVISON AR. JAKE LUM LUM KAR MAN AS KM/2022/01/CD/2022/017/WATERSHOWNREMARKS

Earth Degradable Facade Detail to Manuf Approval Gravel

10mm (Dia) Painted Steel

10mm(Thk)Approval

90mm(Thk) Rammed

100mm(Thk) Exterior Plywood Grade. Detail to Manuf Approval

Angle Detail to Manuf Approval

100mm(Thk) Exterior Plywood Waterproof Membrane

Mortar with steel wire Detail to Engr Approval

Tube Detail to Manuf Approval Stone Base 850 30

Mortar

90mm(Thk) Rammed Earth FacadeDegradableDetail to Manuf

Stone Base FACADE ASSEMBLY DETAIL EXPLODED AXONOMETRIC SCALE 1:402 FACADE ASSEMBLY DETAIL EXPLODED AXONOMETRIC 1700 FACADE SECTIONAL DETAIL SCALE 1:202

with steel wire Detail to Engr Approval

Grade 10mm(Thk)

10mm (Dia) Painted Steel

Technical Report 75

Technical Report76 GEBAH 307515240DCFIJ EL-403EEB SEC-405B A SEC-405A C SEC-405C 2875 5 6 7 8 9 104321 EL-403FF EL-403GGEL-403DD9002875135049901350900 6075 4300 2350 2250 2050 3600 4025 14002580 1325 1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 202PL-FIRST FLOOR PLAN 2230 N FIRST FLOOR PLAN (TBC) SCALE 1:1002 fall fall COMPONENTSBRKCS150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING LIGHTWEIGHTON ROOF TRUSS RF-2 M.S. GLASSGLASSGRILLESTEELELEMENTTIMBERDOORSLIDINGDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIALAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT LEGENDS : WALL FINISHES PP PLASTERED & PAINTED BRICKWALL HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGREINFORCEDBOARDFIBROUSFINISHESPLASTERCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIP PCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD SC SKIM COAT ON CONCRETE ASPHALT SHINGLE ROOFING ROOFLIGHTWEIGHTONTRUSSCONCRETEMASONRYUNITWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR WATERCONCRETEFACEDVN SELECTED TIMBER VENEER PANEL FF FAIR CONCRETEFACEDSOFIT ELEVATIONFAIRBRICKWALLFACEDCONCRETEFINISHONELEVATION&SECTIONCMUWALLON&SECTION RUBBLE STONE WALL HATCH LEGEND VN SELECTED TIMBER VENEER PANEL CMU MASONRYCONCRETEUNIT STAIRCASE 2 1F TO SD, WHITE OAK STAIR TREAD ON RC HEIGHT:RISER:TREAD:STRUCTURE260MM169MM2700MMSTEPS:16RCTF RC COLUMN WITH RDWP EMBEDDED TO ENGR'S DTL RC FF STEEL GRILLE FOLDING SCREEN WITH 200MM LEDGE TO DTL CANTILEVEREDST METAL DECK CAR PORCH ROOF WITH STEEL TRUSS TO ENGR'S DTL STL FAIR FACE CONCRETE WALL WITH PLASTER AND PAINT FINISH INTERNALLY AND CEMENT AID (OR EQUIV.) SEALANT EXTERNALLY TO ENGR'S DTL RC PAVILION ROOF WITH ENGR'SSOFITFAIR-FACEDFINISHTODTL PERIMETER RC COPING WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SC FF DOTTED INTERNALLYINDICATESLINERCGUTTERPROFILEABOVEFAIRFACECONCRETEWALLWITHPLASTERANDPAINTFINISHANDCEMENTAID(OREQUIV.)SEALANTEXTERNALLYTOENGR'SDTLRCFF2400MM HT WALL WITH 600MM GAP ABOVE (REF. SEC) BRK PP 900MM HT LOWWALLBRK PP SC2 SC2 SC2SC4 AW7 SC3SC2SC2STAIRFFL:8.3m²TF 2 BATHFFL:HT-29.3m²3.751 YARDFFL:HT-37.3m²3.75 CS CS RF-2 RF-2 RF-1FALL 1300 3150 450 500 1275 4990450 1875 1800525 525 75024001580 450450 240013001395 805450805 42512751275 17002505 60045017002500900600300 75 4685 75 4675 785785 2022 MASTER LAYOUTBATHROOMBEDROOM,WALLTBC STAIRCASE RAILING WALL (BLUE) DETAIL TBC GEBAH 307515240DCFIJ EL-403EEB SEC-405B A SEC-405A C SEC-405C 2875 5 6 7 8 9 104321 EL-403FF EL-403GGEL-403DD9002875135049901350900 6075 4300 2350 2250 2050 3600 4025 14002580 1325 201PL-GROUND FLOOR PLAN1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 2230 N GROUND FLOOR PLAN SCALE 1:1001 BOOKSHELFSTORAGECAB,SHOE fall 50dp 50dp 50dp 150dp 50dp 50dp fall 50dp 25dp 100dp 100dp 100dp 450dp 100dp 850dp D1AW1 D2AW2SGD1 AD8 AD11AD12AD9 SD5 AD1 AD3AD2AD2 AD4 AW3 D7D6 AW4AW5 SC1 SD2 D2 COMPONENTSBRKCS150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING LIGHTWEIGHTON ROOF TRUSS RF-2 M.S. GLASSGLASSGRILLESTEELELEMENTTIMBERDOORSLIDINGDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIALAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT LEGENDS : WALL FINISHES PP PLASTERED & PAINTED BRICKWALL HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGREINFORCEDBOARDFIBROUSFINISHESPLASTERCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIP PCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD SC SKIM COAT ON CONCRETE ASPHALT SHINGLE ROOFING ROOFLIGHTWEIGHTONTRUSSCONCRETEMASONRYUNITWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR WATERCONCRETEFACEDVN SELECTED TIMBER VENEER PANEL FF FAIR CONCRETEFACEDSOFIT ELEVATIONFAIRBRICKWALLFACEDCONCRETEFINISHONELEVATION&SECTIONCMUWALLON&SECTION RUBBLE STONE WALL HATCH LEGEND VN SELECTED TIMBER VENEER PANEL CMU MASONRYCONCRETEUNIT 1630 600 3800 225 2350275 2250 2050 225 4502850 3000500 600 1200 1075675 6752400700 255100049902551000 180010752458502950245 12003715 4300 1400 85013801035500 485 1130 1830 400 975 2230 1725 14751100 650 1700 2175 1975 1100 2850 450 10752000 700 13nosTREAD=3380 6501250 1500 1550 2100125022504725 6252500170014251875 450 300300600 2400 2750960 900 1550 1350 13590 225 110 3000 4100525900800 800 1200 2850 900 750600 1500 600 500 975 785 1800 7nos TREAD = 1820 1485 1250 LIVINGFFL:49.0m²TR0.00 CS DININGFFL:19.4m²TR0.00KITCHENFFL:25.4m²TR0.00STOREFFL:18.2m²HT-30.00 DECKFFL:103.4m²WP-0.05UTILITYFFL:HT-36.5m²0.00 STUDYFFL:25.2m²TR0.00ROOMGUESTFFL:15.0m²TR0.00ROOM GENKANFFL:12.0m²TR-0.15 DECKFFL:103.4m²WP-0.05 STAIR12.3m²TFFFL:- 1 CARFFL:50.4m²WP-0.25PORCH FOYERFFL:7.0m²WP-0.20 GARDENSL:108.5m²S-0.15 1 POOLFFL:42.2m²HT-1-1.35 LIVINGFFL:26.5m²WP-0.05 GARDENSL:37.9m²S-0.15 2BATHFFL:HT-3-0.052 FFL:HT-26.2m²-0.05P.R. CS CS S OUTDOOR RL: -0.65 STAIRCASE 1 1F TO 2F, WHITE OAK STAIR TREAD ON RC HEIGHT:RISER:TREAD:STRUCTURE260MM173MM3800MMSTEPS:22RCTF RC COLUMN WITH RDWP EMBEDDED TO ENGR'S DTL RC FF 600W RC BENCH AT 400H 1200HTPOLISHEDWITHCONCRETEFINISHTODTLRCOVERGROUNDPOOLEQUIPMENTROOM(TBC) 2000MM FROM ROAD LEVEL HIGH NEW BOUNDARY WALL BRK PP RAMP FOYER1TO DECK, WASH PEBBLE FINISH ON RC STRUCTUREWIDTH:2100MM LENGTH : 1800MM HEIGHT : 150MM GRADIENT : 1 12 RC WP DOTTED INDICATESLINEPAVILIONROOFABOVE DOTTED INDICATESLINE1F SLAB PROFILE ABOVE 1200HT PERIMETERRUBBLE200THKSTONEWALLTOENGR'SDTL DOTTED LINE INDICATES CAR PORCH ROOF ABOVE DOTTED INDICATESLINECARPORCHROOFPROFILEABOVE BENCH SHOWER OPT 1 SHOWER OPT 2 1015 22 STAIRCASE RAILING AND STORE WALL (BLUE) DETAIL TBC REVISED STAIRCASE DESIGN

Technical Report 77 1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 204PL-ROOF PLAN 2230 N ROOF PLAN SCALE 1:1004 GEBAH 307515240DCFIJ EL-403EEB SEC-405B A SEC-405A C SEC-405C 2875 5 6 7 8 9 104321 EL-403FF EL-403GGEL-403DD9002875135049901350900 6075 4300 2350 2250 2050 3600 4025 14002580 1325 150dp FALLRF-1 RF-1FALL RF-1FALL RF-2 RF-2 GLS GLS GLS RF-1FALLAD7 COMPONENTSBRKCS150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING LIGHTWEIGHTON ROOF TRUSS RF-2 M.S. GLASSGLASSGRILLESTEELELEMENTTIMBERDOORSLIDINGDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIALAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT LEGENDS : WALL FINISHES PP PLASTERED & PAINTED BRICKWALL HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGREINFORCEDBOARDFIBROUSFINISHESPLASTERCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIP PCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD SC SKIM COAT ON CONCRETE ASPHALT SHINGLE ROOFING ROOFLIGHTWEIGHTONTRUSSCONCRETEMASONRYUNITWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR WATERCONCRETEFACEDVN SELECTED TIMBER VENEER PANEL FF FAIR CONCRETEFACEDSOFIT ELEVATIONFAIRBRICKWALLFACEDCONCRETEFINISHONELEVATION&SECTIONCMUWALLON&SECTION RUBBLE STONE WALL HATCH LEGEND VN SELECTED TIMBER VENEER PANEL CMU MASONRYCONCRETEUNIT DECKFFL:9.7m²WP6.45 CS COR.FFL:3.8m²WP10.003SERV. CS ROOFFFL:WP10.00DECK750100 13501435450 1275 525750 1800 4200 410 1050355 4800 825 955 139513201450 750705 570 13502425 3070 300 5002700500500 1700 5002810 4420 57057038505705703850 ASPHALT SHINGLE ROOF TO DTLPERIMETERRF-1 RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SC STAIRCASE 3 SD TO RD, WASH PEBBLE FINISH STAIR TREAD ON 1HEIGHT:RISER:RADIUS:STRUCTURERC750MM197MM3550MMSTEPS:18RCWPNO3000L(670G)SSWATERTANK(KINGKONGHR300)TOARCH'SAPPROVAL 300W x RCSKYLIGHT3700LOPENINGTODTLBENCHAT400HTWITHPOLISHEDCONCRETEFINISHTODTLRCGLS805W (TAPERING) x 4270L OPENINGSKYLIGHTTODTLGLS PERIMETER RC GUTTER ROOFENGR'SFAIR-FACEDWITHSOFITFINISHTODTLRCSCASPHALTSHINGLETODTLRF-1 1817 1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 203PL-MEZZANINE FLOOR PLAN GEBAH 307515240DCFIJ EL-403EEB SEC-405B A SEC-405A C SEC-405C 2875 5 6 7 8 9 104321 EL-403FF EL-403GGEL-403DD9002875135049901350900 6075 4300 2350 2250 2050 3600 4025 14002580 1325 3 2230 101 N MEZZANINE FLOOR PLAN SCALE 1:1003 50dp 50dp FALLRF-1 RF-1FALL RF-1FALL RF-2RF-2 GLS AD6 SW2 D2 AD7 COMPONENTSBRKCS150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING LIGHTWEIGHTON ROOF TRUSS RF-2 M.S. GLASSGLASSSLIDINGGRILLESTEELELEMENTTIMBERDOORDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIALAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT LEGENDS : WALL FINISHES PP PLASTERED & PAINTED BRICKWALL HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGREINFORCEDBOARDFIBROUSFINISHESPLASTERCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIP PCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD SC SKIM COAT ON CONCRETE ASPHALT SHINGLE ROOFING ROOFLIGHTWEIGHTONTRUSSCONCRETEMASONRYUNITWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR WATERCONCRETEFACEDVN SELECTED TIMBER VENEER PANEL FF FAIR CONCRETEFACEDSOFIT ELEVATIONFAIRBRICKWALLFACEDCONCRETEFINISHONELEVATION&SECTIONCMUWALLON&SECTION RUBBLE STONE WALL HATCH LEGEND VN SELECTED TIMBER VENEER PANEL CMU MASONRYCONCRETEUNIT MEZZANINEFFL:TF7.30DECKFFL:9.7m²WP6.45 FFL:VN SLOPED- CEIL. STAIRFFL:8.3m²TF 2 CSVOIDWPFFL:7.25MEZ.BAL. SLOPEDCEIL.FFL:VN COR.FFL:3.8m²TF6.502SERV. CS 750 100 13501410450 620 1275 2230 11501300 525750 1800 4200 560 715 820510 940 545 100 1750 2350 400 1850 1975 16252150 4800 715560825 955 1395 895 1395321011451050 750705 645 560 715 715560 13502425 12751275900 900 1500 1500 STAIRCASE 2 1F TO SD, WHITE OAK STAIR TREAD ON RC HEIGHT:RISER:TREAD:STRUCTURE260MM169MM2700MMSTEPS:16RCTF ASPHALT SHINGLE ROOF TO DTLPERIMETERRF-1 RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SC 1 NO 2730L (600G) PE WATER TANK (DELUXE N500RD) TO INDICATESDOTTEDAPPROVALARCH'SLINE1F WALL BELOW STAIRCASE 3 SD TO RD, WASH PEBBLE FINISH STAIR TREAD ON 1HEIGHT:RISER:RADIUS:STRUCTURERC750MM197MM3550MMSTEPS:18RCWPNO3000L(670G)SSWATERTANK(KINGKONGHR300)TOARCH'SAPPROVAL DOTTED INDICATESLINE1F WALL DOTTEDBELOW INDICATESINDICATESLINESKYLIGHTABOVEATROOFDECKDOTTEDLINEROOFPROFILEABOVE 1

Technical Report78 1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 303EL-SIDE ELEVATION SIDE ELEVATION SCALE 1:1007 GROUND FLR FIN LVL GROUND(0.00)LVL (-0.15) ROAD LEVEL (-0.95) SWIMMING POOL FLR FIN LVL (-1.35) FIRST FLR FIN LVL FINROOFFINMEZZANINE(3.80)FLRLVL(7.30)DECKLVL(10.00)TOPOFROOFLVL(10.95)40080015038002700270090010900 800 SERVICE DECK FLR FIN LVL (-6.50) J I H G F E D C B A 6075 900 2875 1350 4990 1350 2875 900 3075 18315 D6 AD3 AW6 AD5 AW6 AW8 AD2 AD2 AW5 AW4 SGD4 AD12 SC2SC2 SC3POOL DECK CS LEGENDS : COMPONENTSBRK150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF TRUSS RF-2 M.S. GLASSGLASSSLIDINGGRILLESTEELELEMENTTIMBERDOORDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL WALL FINISHES PP PLASTERED & PAINTED BRICKWALL CMU MASONRYCONCRETEUNIT HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGBOARDFIBROUSFINISHESPLASTER HATCHREINFORCEDLEGENDCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIPPCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF UNITCONCRETETRUSSMASONRYWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR CONCRETEFACED HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIAL WATERAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT VN SELECTED TIMBER VENEER PANEL FAIRBRICKWALLFACED CONCRETE FINISH ON ELEVATION & CMUSECTIONWALL RUBBLEELEVATIONON&SECTIONSTONEWALL SC SKIM COAT ON CONCRETE FF FAIR CONCRETEFACEDSOFIT VN SELECTED TIMBER VENEER PANEL RF-1FALL RF-2 RF-1 RF-2RF-2 RF-1 FF PP PP PP HT-1 FF 15001050120080030014501200 200 300 300 2100 150 450 300 2003900 4000 1200 600 200 1800 150450 2450 3600CH3006003000 715 560 2400 1500 4840 495495 32° 1500 2400 13001300 750 525 4502425 975 275600 375250 800 525 600 2100200 1375 425375 300 12990600 4004501200 1400 1075 2000 32° 8° 8° 600 400 2000MM FROM ROAD LEVEL HIGH NEW BOUNDARY WALL BRK PP ASPHALT SHINGLE ROOF TO DTLFAIRRF-1FACE CONCRETE WALL WITH PLASTER AND PAINT FINISH INTERNALLY AND CEMENT AID (OR EQUIV.) SEALANT EXTERNALLY TO ENGR'S DTL RC FF PERIMETER RC COPING WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL SC PORCHMETALCANTILEVEREDRF-2DECKCARROOFWITHSTEELTRUSSTOENGR'SDTLPERIMETERRCCOPINGWITHFAIR-FACEDSOFITFINISHTOENGR'SDTLRCCOLUMNWITHRDWPEMBEDDEDTOENGR'SDTLRCFF1200HT200THKRUBBLESTONEPERIMETERWALLTOENGR'SDTL 1 NO 3000L (670G) SS WATER TANK (KING KONG HR300) TO APPROVALARCH'S RF-2 1200HT PERIMETERRUBBLE200THKSTONEWALLTOENGR'SDTL PERIMETER RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SC 1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022REAR ELEVATION 304EL2 REAR ELEVATION SCALE 1:1008 GROUND FLR FIN LVL GROUND(0.00)LVL (-0.15) ROAD LEVEL (-0.95) SWIMMING POOL FLR FIN LVL (-1.35) FIRST FLR FIN LVL FINROOFFINMEZZANINE(3.80)FLRLVL(7.30)DECKLVL(10.00)TOPOFROOFLVL(10.95)40080015038002700270090010900 800 SERVICE DECK FLR FIN LVL (-6.50) 12345678910 258022304300235022502050360040251400 157609025 AD4 AW10 AW3 D7 D5 AD7 AD6 BATH 2 YARD CS LEGENDS : COMPONENTSBRK150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF TRUSS RF-2 M.S. GLASSGLASSSLIDINGGRILLESTEELELEMENTTIMBERDOORDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL WALL FINISHES PP PLASTERED & PAINTED BRICKWALL CMU MASONRYCONCRETEUNIT HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGBOARDFIBROUSFINISHESPLASTER HATCHREINFORCEDLEGENDCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIPPCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF UNITCONCRETETRUSSMASONRYWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR CONCRETEFACED HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIAL WATERAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT VN SELECTED TIMBER VENEER PANEL FAIRBRICKWALLFACED CONCRETE FINISH ON ELEVATION & CMUSECTIONWALL RUBBLEELEVATIONON&SECTIONSTONEWALL SC SKIM COAT ON CONCRETE FF FAIR CONCRETEFACEDSOFIT VN SELECTED TIMBER VENEER PANEL RF-1FALL RF-2RF-2RF-2 FALL RF-1 FF FF FF HT-3PPPP PP FF AW9 260090030015501200 9256530 400400 600500 4500 425500 15015002003002450 600 900 650 28602400915 5607152325 32°1050900 4675 675 900 550 750750125 89513604275955 2900CH9006001800300265025021005509503600CH 600 900 2650CH 195020011501100 150 STAIRCASE 2 1F TO SD, WHITE OAK STAIR TREAD ON RC HEIGHT:RISER:TREAD:STRUCTURE260MM169MM3550MMSTEPS:18RCTF PAVILIONRF-2 ROOF WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL PERIMETER RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SC FAIR FACE CONCRETE WALL WITH PLASTER AND PAINT FINISH INTERNALLY AND CEMENT AID (OR EQUIV.) SEALANT EXTERNALLY TO ENGR'S DTL RC FFPERIMETER RC COPING WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RF-2 PERIMETERSC ASPHALT SHINGLE ROOF TO DTLRCRF-1COLUMN WITH RDWP EMBEDDED TO ENGR'S DTL RC FF 1200HT PERIMETERRUBBLE200THKSTONEWALLTOENGR'SDTL RAILING TBC

Technical Report 79 GROUND FLR FIN LVL GROUND(0.00)LVL (-0.15) ROAD LEVEL (-0.95) SWIMMING POOL FLR FIN LVL (-1.35) FIRST FLR FIN LVL FINROOFFINMEZZANINE(3.80)FLRLVL(7.30)DECKLVL(10.00)TOPOFROOFLVL(10.95)40080015038002700270090010900 800 SERVICE DECK FLR FIN LVL (-6.50) SEC-309SECTION E-E1. This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 1 FALL 3 1015 SECTION E-E SCALE 1:10013 JIHGFEDCBA 6075900287513504990135028759003075 18315 D2 SD5D7 SGD4 AD8 SGD1 AD3AD2 D6 D5 D2D2 AD5 SD3 AW6SC2 AW1 AW4AW5 D2 GUEST ROOM CAR PORCHPLATFORMKITCHENUTILITYBATH2 YARD LAUNDRY COR. BEDROOM 1 COR. 2SERV. DECK COR. 3 ROOF DECK CS LEGENDS : COMPONENTSBRK150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF TRUSS RF-2 M.S. GLASSGLASSSLIDINGGRILLESTEELELEMENTTIMBERDOORDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL WALL FINISHES PP PLASTERED & PAINTED BRICKWALL CMU MASONRYCONCRETEUNIT HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGBOARDFIBROUSFINISHESPLASTER HATCHREINFORCEDLEGENDCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIPPCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF UNITCONCRETETRUSSMASONRYWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR CONCRETEFACED HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIAL WATERAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT VN SELECTED TIMBER VENEER PANEL FAIRBRICKWALLFACED CONCRETE FINISH ON ELEVATION & CMUSECTIONWALL RUBBLEELEVATIONON&SECTIONSTONEWALL SC SKIM COAT ON CONCRETE FF FAIR CONCRETEFACEDSOFIT VN SELECTED TIMBER VENEER PANEL RF-2RF-1RF-2RF-1RF-2 RF-2 RF-1 RF-1 PP PP PP HT-3 PPPPPP PP PP VN FF PP VN 8001500 30014501200 600 300300 2275 800 1350 150 300 2100 715560825450 600 900 4001400 6002900CH 3100CH 1000 1015 12751075 2000 450 2500CH 900 570 1500 2400CH 21003003000CH 2450 3100CH 570 32° 32° 1000575 8° 875750 2700 2900CH2400CH2100CH6002900CH 17001502800 2100 1 NO 2730L (600G) PE WATER TANK (DELUXE N500RD) TO ARCH'S APPROVAL 600mm HT PARAPETPERIMETERWALLBRK RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC EXISTINGSCRUBBLESTONERETAININGWALL RC CAR PORCH ROOF WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL PERIMETERRC RC GUTTER WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC SCSC 1 NO 3000L (670G) SS WATER TANK (KING KONG HR300) TO ARCH'S APPROVALPP 600HT PLATFORMTIMBERWITHBUILT-INCABINETWORKTODTLTF STAIRCASE 3 SD TO RD, WASH PEBBLE FINISH STAIR TREAD ON GALV. HEIGHT:RISER:RADIUS:STRUCTUREM.S750MM197.2MM3550MMSTEPS:18RCWP LETTER BOX, ELECTRICAL METER, WATER METER AND WATER FILTER COMPARTMENT TO DTL BRK PPSTEELRC GRILLE FOLDING SCREEN WITH 200MM LEDGE TO DTL300WST x 300H RC LIGHT TROUGH WITH LED STRIP LIGHTING TO DTL RC FF 2 TBC SEC-308SECTION D-D GROUND FLR FIN LVL GROUND(0.00)LVL (-0.15) ROAD LEVEL (-0.95) SWIMMING POOL FLR FIN LVL (-1.35) FIRST FLR FIN LVL FINROOFFINMEZZANINE(3.80)FLRLVL(7.30)DECKLVL(10.00)TOPOFROOFLVL(10.95)40080015038002700270090010900 800 SERVICE DECK FLR FIN LVL (-6.50)1.This drawing and design is subjected to copyright and may not be reproduced without prior written consent. 2. Contractor to verify all dimensions on site before commencing work. Report all discrepancies to the Designer prior to construction. 3. Figured dimensions take precedence over scaled dimensions. FTA-037PROJECTDRAWNDATESCALE NO. NO.DRAWINGDRAWINGPROJECT DESCRIPTIONDATEREV.NOTES FABIAN ARCHITECTTAN TAI HOUSE 36, JALAN ATHINAHAPAN 3 1/8/22ASSHOWNYXDRAWINGCONSTRUCTIONREVISED1/8/2022 1 SKYLIGHT BEHIND J I H G F E D C B A 6075 900 2875 1350 4990 1350 2875 900 3075 18315 9 15 20 23 1 15 16 84 SECTION D-D SCALE 1:10012 SC2 AW10AW6 D4 AD7 D6 AW4 AW5 AW1SGD3SGD2 SGD1 SD3 GUEST ROOM STORE UTILITY BATH2 CAR PORCH BEDROOM 1 COR. LAUNDRY YARD COR. 2 SERV. DECK COR. 3ROOF DECK COR. CS LEGENDS : COMPONENTSBRK150MMTHKBRICKWALL W/ PLASTER & PAINT FINISH RC REINFORCED CONCRETE WORK CMU CONCRETE MASONRY UNIT W/ PLASTER & PAINT FINISH INTERNALLY RF-1 ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF TRUSS RF-2 M.S. GLASSGLASSSLIDINGGRILLESTEELELEMENTTIMBERDOORDOORALUMINIUMDOORALUMINIUMWINDOW FLOORCEMENTFINISHESSCREED WATERPROOFINGW/ HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE TF TIMBER FLOORINGSTRIP TR TERRAZZO WP WASH PEBBLE S SOIL GR GRAVEL WALL FINISHES PP PLASTERED & PAINTED BRICKWALL CMU MASONRYCONCRETEUNIT HT-1 HOMOGENEOUSSELECTED TILE HT-2 HOMOGENEOUSSELECTED TILE CEILINGBOARDFIBROUSFINISHESPLASTER HATCHREINFORCEDLEGENDCONCRETEWORK WASH FLOORINGDIRECTIONGRASSPEBBLEVEGETATIONOFTIMBERSTRIPPCPPC FIBROUS PLASTER BOARD PAINTMOISUREWITHRESIST. CB EXTERNAL CEMENT BOARD ASPHALT SHINGLE ROOFING ON LIGHTWEIGHT ROOF UNITCONCRETETRUSSMASONRYWALL EXISTING STRUCTURE HT-3 HOMOGENEOUSSELECTED TILE FF FAIR CONCRETEFACED HT-3 HOMOGENEOUSSELECTED TILE RC ROOF WATERPROOFWITH& CEMENT SCREED FALL ELEMENTSPECIAL WATERAWSGDSDADSP TIMBER WINDOWSLIDINGSW M.S. ELEMENTSCREENSC ST STEEL COMPONENT GLS TEMPERED LAMINATED GLASS SKYLIGHT VN SELECTED TIMBER VENEER PANEL FAIRBRICKWALLFACED CONCRETE FINISH ON ELEVATION & CMUSECTIONWALL RUBBLEELEVATIONON&SECTIONSTONEWALL SC SKIM COAT ON CONCRETE FF FAIR CONCRETEFACEDSOFIT VN SELECTED TIMBER VENEER PANEL RF-2RF-1RF-2 RF-2 RF-1 GLS RF-2 TBC PP PP PP PP PP HT-3PP PPPPPPPP PP PP 800150030014501200 300300 4420 800 1350 150300 2400CH 2100 715 560 3900 32° 825 450 525 600 1350 900 400 1400 32° 600 2900CH3100CH 1000 26502340 10752000 4501050 2500CH 12752375 1835 57090015009402400CH2100300 3000CH 7308002400 2450 3100CH 1700 600 1100 2950 2700CH 300300150 1 NO 3000L (670G) SS WATER TANK (KING KONG HR300) TO ARCH'S APPROVAL CANTILEVER SHINGLE CAR PORCH ROOF WITH LIGHTWEIGHT STEEL TRUSS TO ENGR'S DTL PERIMETERSTL RC COPING WITH FAIR-FACED SOFIT FINISH TO ENGR'S DTL RC ENGR'SINDICATESDOTTEDSCLINERCCOLUMNTODTLRCPP RC WORK BENCH AT 850mm HT WITH POLISHED CONCRETE FINISH TO DTL RC 600mm HT PARAPETWALLRC EXISTINGPPRUBBLESTONERETAININGWALL STEEL GRILLE FOLDING SCREEN WITH 200MM LEDGE TO DTL ST

Casting Model80